11096713 PLEASE QUOTE ON YOUR COMPANY LETTER HEAD ...

1 downloads 116 Views 308KB Size Report
Mar 27, 2018 - BOTTOM COVER THICKNESS: 1.6 MM, PLY QUANTITY: 4,. TOP COVER THICKNESS: 5 MM, MATERIAL: RUBBER COMPOUND, C
SCOPE OF WORK : Scope of work. REQ NO: 11096713 PLEASE QUOTE ON YOUR COMPANY LETTER HEAD PLEASE SUPPLY COMPANY DETAILS REF REQ NO: 11096713 DESCRIPTION: Supply conveyor belt 1300m. BELT, CONVEYOR; TYPE: HEAVY DUTY, WIDTH: 1.35 M, LENGTH: 300 M, THICKNESS: 15 MM, BOTTOM COVER THICKNESS: 1.6 MM, PLY QUANTITY: 4, TOP COVER THICKNESS: 5 MM, MATERIAL: RUBBER COMPOUND, CUT RESISTANCE: 1600 KNM, REINFORCEMENT MATERIAL: M TYPE, CLASS: 1350; HIGH ABRASION AND CUT RESISTANT RUBBER COMPOUND: BRAND : PLYLON EP OR EE, TYPE N+ (STACKER TM); ALL BELTING SUPPLIED TO BE RATED FOR A T ROUGHING ANGLE OF 45DEGREES; ALL BELTING TO BE RATED AS FLAME RESISTANT AND ABRASION RESISTANT BELTING; ALL BELTING TO BE RATED AS COMPLETELY PROTECTED FOR MOISTURE AND MILDEW; SUPPLIERS TO CLEARLY SPECIFY MAXIMUM ROLL LENGTH PER BELT CLASS AND WEIGHT; ALL BELTI NG TO BE SUITABLY PROTECTED FOR TRANSPORTATION AND STORAGE; ALL BELTING TO BE SUITABLY MARKED AT REGULAR INTERVALS WITH ALL RELATIV E BELTING DETAIL Requirement : 2 x 500m rolls and 1 x 300m roll Quantity required : 1500m Delivery period : ______________ Price each : _______________

1) Quotations must be in a sealed envelope with the seal signed by the sender. 2) Please remember to quote the reference number on the Request For Quotation AND on the envelope with description. 3) Envelopes must be deposited into the Quotation Box at the Regional Procurement Office, 111 Mahatma Gandhi Road (Point Road) Durban. - Incomplete Quotations will not be accepted. - All quotations must have the a) Validity period of the Quotation, b) Guarantees / Warranties, d) Delivery date / Lead Time/ Stock Availability. 4) No late quotations will be accepted. 5) Please attach your BBBEE Certificate/Affidavit. 6) Terms and conditions of RFQ will be available on request 7) TPT have the right to split the award of the order/s between more than one Supplier/Service Provider should it at Transnet’s discretion be more advantageous in terms of, amongst others, cost or developmental considerations: This Request will close on: Date: 27th March 2018 Time: 10:00am