The pit depth (maxi & mini values defined chapter 1.2.4.1) is determined with a
building tolerance of + 20 mm. The effective pit depth given to Otis and included ...
Lux MACHINE ABOVE - 2,50 m/s BUILDER’S WORK CATALOGUE 07-04-15
Version: a-e
800 kg – 1600 kg
© Otis Elevator Company 2007, All rights reserved
FAA29100H_BWC
BUILDER'S WORK CATALOGUE Lux
2/38
MAIN
FAA29100H_BWC
Version : a-e
Date: 07-04-15
This catalogue summarizes useful information for installation of the Otis Gen2TM Machine above 2,5m/s 800 kg–1600 kg range in buildings.
The catalogue is divided into three main parts:
Part 1: General information The first part contains general information about the building interfaces that must be complied with in order to obtain a good final product.
Part 2: Builder’s work drawing (single car) The second part contains a definition of the builder’s work drawings for the Gen2 Machine above 2,5m/s 800 kg–1600 kg range with: - The building interfaces and dimensions for a single lift in the hoistway (doors are installed in the hoistway) - The mechanical reactions exerted by the lift on the building for a single lift in the hoistway.
Part 3: Information concerning banks of lifts The third part contains information for installing the Gen2 800 kg–1600 kg range in banks. Bank
Duplex
Triplex
Number of lifts in the bank
2
3
Quadruplex Quintuplex 4
5
Sextuplex
Octoplex
6
8
BUILDER'S WORK CATALOGUE Lux FAA29100H_BWC
1
2
3
3/38
INDEX Version : a-e
Date: 07-04-15
PART 1: GENERAL INFORMATION
4
1.1.
DEFINITIONS
4
1.2.
DIMENSIONS
5
1.3.
REQUIREMENTS FOR THE WELL – GENERAL WELL TOLERANCES
8
1.4.
ELECTRICAL POWER SUPPLY AND TELEPHONE LINE
15
1.5.
HEAT DISSIPATION
17
1.6.
MAIN BUILDING LIMITATIONS
17
PART 2: EFFORTS ON THE HOISTWAY WALLS
18
2.1. LIST OF THE COMPONENTS EXERTING EFFORT ON THE WALL AND ON CEILING
18
2.2.
20
GENERAL VIEW
PART 3: INFORMATION CONCERNING BANKS OF LIFTS
25
3.1.
REQUIREMENTS CONCERNING BANKS OF LIFTS
25
3.2.
RECOMMENDED HOISTWAY DIMENSIONS (ELEVATION)
38
3.3.
HOOKS AND REACTION THE PIT
38
3.4.
LOCATION OF THE HOISTWAY FIXTURES
38
BUILDER'S WORK CATALOGUE Lux
4/38
PART 1: GENERAL INFORMATION
FAA29100H_BWC
Version : a-e
Date: 07-04-15
1 PART 1: GENERAL INFORMATION 1.1.
DEFINITIONS CONCEPT This range of lifts is designed with machine room above the well , one entrance car with center door opening (CLD) , and rear counterweight . BUILDING DIMENSIONS All dimensions used in this catalogue are commercial dimensions. SYMBOLS The symbols used in this catalogue are the following: Identifier CD
Definition Car internal depth (mm)
CH
Car internal height (mm)
CLD
Central landing door (Centre Opening)
CW
Car internal width (mm)
HD
Hoistway depth (mm) (including hoistway doors)
HW
Hoistway width (mm)
K OP OPH R
Overhead height (mm) Door opening width (mm) Door opening height (mm) Rise (m)
RW1
Left Return Wall (mm)
RW2
Right Return Wall (mm)
S
Pit depth (mm)
V
Rated Speed (m/s)
TLD TYFAC WTW
Telescopic Landing Door (Side Opening) Type of Façade Wall to wall (mm)
TYPE OF DOORS AND DOOR HAND Only one car entrance car with center opening doors is proposed Note: The door-opening axis is located in the car axis. LANDING DOOR FACADES, DOOR FRAMES AND DOORS INSTALLATION SF: door panels only are visible. Return walls are compulsory ( SMALL FRAME ), NF: door panels only are visible. Return walls are compulsory ( NO FRAME ) Landing doors are installed in the hoistway or on the landing.
BUILDER'S WORK CATALOGUE Lux
5/38
PART 1: GENERAL INFORMATION
FAA29100H_BWC
Version : a-e
Date: 07-04-15
CAR OPERATING PANEL (COP) LOCATION (CAR CONTROL PANEL) The main COP is located on the car right side panel when entering in the car by the entrance. The option with a second auxiliary COP at the car opposite side is available. HALL BUTTONS LOCATION In case of single lift, the hall buttons are mounted on the return walls adjacent to the landing doors. The minimum lateral distance between the centre line of the button and any corner of adjacent walls shall be 500 mm. 1.2. 1.2.1
DIMENSIONS CAR INTERNAL SIZES Nb of passenger
Stamped duty load (kg)
CW (mm)
CD (mm)
10
800
1350
1400
Door CLD 800 CLD 900 CLD 900
13
1000
1600
1400
CLD 1000 CLD 1100
17
1275
21
1400
2000
1700
CLD 1100
2100
1600
CLD 1100
CLD 1100
HOISTWAY DIMENSIONS (PLAN) (MAXIMUM, MINIMUM COMMERCIAL DIMENSIONS IN mm)
CW/2 1 3
CW/2 2 4
Hoistway Axis Door Opening and Car Axis
OP RW1
RW2 HW/2 HW/2 HOISTWAY WIDTH (HW)
FRONT ENTRANCE
HOISTWAY DEPTH HD
CAR WIDTH (CW)
CD
1.2.2
1600
2000
BUILDER'S WORK CATALOGUE Lux
PART 1: GENERAL INFORMATION
FAA29100H_BWC
1.2.3
6/38
Version : a-e
HOISTWAY-DIMENSIONS-PLAN 1ENTRANCE CAR
(COUNTERWEIGHT
Date: 07-04-15
WITHOUT
OR
WITH
SAFETIES
TYFAC : SF LIFT CAPACITY Load & Number of passenger
800 kg 10 Pass.
CAR INTERNAL SIZE Car Width
Car Depth
Rated Speed
CW (mm)
CD (mm)
V (m/s)
Door Opening
Rise
Hoistway Depth
HOISTWAY DIMENSIONS Hoistway Return Walls all landings Width
OP (mm)
R (m)
HD (mm)
HW (mm)
RW1 (mm)
RW2 (mm)
800 1350
1400
2.50 900
900 1000 kg 13 Pass.
1600
1400
2.50
1000
1100 1275 kg 17 Pass. 1600 kg 21 Pass. 1600 kg 21 Pass.
2000
1400
2.50
1100
2000
1700
2.50
1100
2100
1600
2.50
1100
R≤80
2010
1950
525
525
R>80
2060
2000
550
550
R≤80
2010
2050
525
525
R>80
2060
2100
550
550
R≤80
2010
2200
600
600
R>80
2060
2250
625
625
R≤80
2010
2200
550
550
R>80
2060
2250
575
575
R≤80
2010
2400
600
600
R>80
2060
2450
625
625
R≤80
2010
2550
675
675
R>80
2060
2600
700
700
R≤80
2310
2550
675
675
R>80
2360
2600
700
700
R≤80
2210
2650
725
725
R>80
2260
2700
750
750
TYFAC : NF LIFT CAPACITY Load & Number of passenger
800 kg 10 Pass.
CAR INTERNAL SIZE Car Width
Car Depth
Rated Speed
CW (mm)
CD (mm)
V (m/s)
Door Opening
Rise
Hoistway Depth
HOISTWAY DIMENSIONS Hoistway Return Walls all landings Width
OP (mm)
R (m)
HD (mm)
HW (mm)
RW1 (mm)
RW2 (mm)
800 1350
1400
2.50 900
900 1000 kg 13 Pass.
1600
1400
2.50
1000
1100 1275 kg 17 Pass. 1600 kg 21 Pass. 1600 kg 21 Pass.
2000
1400
2.50
1100
2000
1700
2.50
1100
2100
1600
2.50
1100
R≤80
2010
1950
545
545
R>80
2060
2000
570
570
R≤80
2010
2050
545
545
R>80
2060
2100
570
570
R≤80
2010
2200
620
620
R>80
2060
2250
645
645
R≤80
2010
2200
570
570
R>80
2060
2250
595
595
R≤80
2010
2400
620
620
R>80
2060
2450
645
645
R≤80
2010
2550
695
695
R>80
2060
2600
720
720
R≤80
2310
2550
695
695
R>80
2360
2600
720
720
R≤80
2210
2650
745
745
R>80
2260
2700
770
770
BUILDER'S WORK CATALOGUE Lux
PART 1: GENERAL INFORMATION
FAA29100H_BWC
1.2.4
7/38
Version : a-e
Date: 07-04-15
HOISTWAY DIMENSIONS (ELEVATION) (MAXI, MINI, COMMERCIAL DIMENSIONS)
1.2.4.1 PIT DEPTH: S (mm) Speed (m/s)
Door type
2,50
Centre opening
Rise (m)
S mini (mm)
90
2370
>90
2370
S maxi (mm) 2500
1.2.4.2 OVERHEAD HEIGHT : K (mm) Speed (m/s)
K mini (mm)
K maxi (mm)
2,50
CH + 2050*
10000
* For CH=2200 : K mini = CH+2150 1.2.4.3 AVAILABLE DOOR and CAR HEIGHTS Door opening Height OPH (mm)
1.2.5
Car height CH (mm)
2000
2200
2300
2400
-
2100
-
2300
2400
2500
2200
-
-
2400
2500
2300
-
-
-
2500
HOISTWAY DIMENSIONS: RISE - DISTANCE BETWEEN DOORS SILLS MAXIMUM RISE IN METERS Speed (m/s)
R Maxi (m)
2,50
150
MAXIMUM DISTANCE BETWEEN DOORS SILLS: FH IN METERS FH max: 11 m, limitation given by the CEN code if there is no means of evacuating the passengers. If more than 11 m is required, contact Otis. MINIMUM DISTANCE BETWEEN DOORS SILLS: FH MIN (IN MILLIMETERS)
Door opening height
FH min (mm)
2000
2470
2100
2570
2200
2670
2300
2770
BUILDER'S WORK CATALOGUE Lux
PART 1: GENERAL INFORMATION
FAA29100H_BWC
Date: 07-04-15
REQUIREMENTS FOR THE WELL – GENERAL WELL TOLERANCES
HOISTWAY DEPTH AND WIDTH TOLERANCES HOISTWAY TOLERANCES FOR SIMPLEX R 80M
MINI HOISTWAY DEPTH 25
25
MAXI HOISTWAY DEPTH
COMMERCIAL HOISTWAY DEPTH
25
25
Maximum out of plumb of each hoistway wall ± 25 mm
MINI HOISTWAY WIDTH 25
25 COMMERCIAL HOISTWAY WIDTH
25
25 MAXI HOISTWAY WIDTH
FRONT
OPENING
The actual hoistway walls are included between the two perfect vertical parallelepipeds Maximum out of plumb of each hoistway wall = 50 mm
25mm
H
Commercial HW request to the builder
C om m
er ci
al
ci a er Commercial HW - 50
25mm
D
lH D
+
-5 0
50
Commercial HW + 50
om m
1.3.1
Version : a-e
C
1.3.
8/38
Actual location of the hoistway walls
Minimum authorized location for the wall Maximum authorized location for the wall Effective constructed wall
BUILDER'S WORK CATALOGUE Lux
PART 1: GENERAL INFORMATION
FAA29100H_BWC
Version : a-e
Date: 07-04-15
HOISTWAY DEPTH AND WIDTH TOLERANCES HOISTWAY TOLERANCES FOR SIMPLEX R> 80M
MINI HOISTWAY DEPTH 50
50
MAXI HOISTWAY DEPTH
COMMERCIAL HOISTWAY DEPTH
50
50
Maximum out of plumb of each hoistway wall ± 50 mm
MINI HOISTWAY WIDTH 50
50 COMMERCIAL HOISTWAY WIDTH
50
50 MAXI HOISTWAY WIDTH
FRONT
OPENING
Maximum out of plumb of each hoistway wall = 100 mm The actual hoistway walls are included between the two perfect vertical parallelepipeds
50mm Commercial HW request to the builder
er ci al
er ci al m
Commercial HW - 100
C
om
m
om
50mm
H D
H
D
-1
+
00
10
0
Commercial HW + 100
C
1.3.2
9/38
Actual location of the hoistway walls
Minimum authorized location for the wall Maximum authorized location for the wall Effective constructed wall
BUILDER'S WORK CATALOGUE Lux
10/38
PART 1: GENERAL INFORMATION
FAA29100H_BWC
Version : a-e
Date: 07-04-15
The commercial dimensions HW; HD used to order the lift must be included between the maximum and minimum values (hoistway, commercial dimensions maximum, minimum : see part 2 ). The maximum out of plumb of each hoistway wall is ± 25 mm for rise R rise R> 80m
80m and ± 50 mm for
Consequently, the equipment supplied is manufactured for installation in a well, the walls of which are inscribed in two perfect rectangular parallelepipeds defined in the sketches (dotted line : chapter 1-3-1 & 1-3-2 ). ELEVATION - TOLERANCES
1.3.3
-
Pit depth (s) tolerances The pit depth (maxi & mini values defined chapter 1.2.4.1) is determined with a building tolerance of + 20 mm. The effective pit depth given to Otis and included in these limits must be also with a tolerance of + 20 mm.
-
Overhead dimension (K) tolerances The minimum overhead K defined in chapter 1.2.4.2 is determined with a building tolerance of – 20 mm. The effective overhead dimension (equal or above the minimum) is requested by Otis for the lift manufacturing (limit = 10000mm).
STRENGTH OF THE WALLS For the safe operation of the lift, the walls shall have a mechanical strength such that when a force of 300 N, being evenly distributed over an area of 5 cm² in round or square, section, is applied at right angles to the wall at any point on either face they shall: - Resist without permanent deformation, - Resist without elastic deformation greater than 15 mm. The mechanical reactions exerted by the lift on the building are given in the drawings part 2. The building walls thickness must be in accordance with the fire regulation.
1.3.4
STRENGTH ON THE PIT FLOOR The reactions on the pit floor are given in part 2. If accessible spaces do exist below the car or the counterweight, the base of the pit shall be designed for an imposed load of at least 5000 N/m² and: a) Either there shall be installed below the counterweight buffer, a solid pier extending down to solid grown or, b) The counterweight shall be equipped with safety gear. The lower part of the hoistway shall consist of a pit, the bottom of which shall be smooth and approximately level, except for any water drainage devices. After the building-in of guide rail fixings, buffers, any grids, etc., the pit shall be impervious to infiltration of water. For a tanked pit, the builder shall provide a 150 mm thick material (concrete…) for fixing bolts and dowels.
BUILDER'S WORK CATALOGUE Lux
PART 1: GENERAL INFORMATION
FAA29100H_BWC
1.3.5
11/38
Version : a-e
Date: 07-04-15
VENTILATION OF THE WELL AND THE MACHINE ROOM The hoistway and the machine room shall be suitable ventilated. It shall not be used to provide ventilation of rooms other than those belonging to the lift. Note: in the absence of relevant regulations or standards, it is recommended to provide ventilation openings at the top of the well, with a minimum area of 1% of the horizontal section of the well. The ambient temperature in hoistway and in the machine room shall be maintained between 0 °C and + 45 °C, taking into account the heat dissipated by the lift. See Para: Heat dissipation.
1.3.6
FLOOR USED FOR MATERIAL INTRODUCTION IN THE HOISTWAY In order to facilitate the handling of the lift material it is requested do not construct before material installation at the level determined for material introduction. Both the return walls will be constructed at this floor after the material installation inside the hoistway.
BUILDER'S WORK CATALOGUE Lux
PART 1: GENERAL INFORMATION
FAA29100H_BWC
1.3.7
12/38
Version : a-e
Date: 07-04-15
BUILDING STRUCTURE Gen2 models can be installed in several types of buildings: - Concrete well, - Concrete beams and concrete slabs with bricks or block works wall, - Steel structure - Block works. List of the lift components with structural interfaces with the well : - Guide rail bracket - Landing door fixations - Hooks for handling the equipment. CONCRETE WELL Minimum compression strength of 30 MPa is required for the concrete. Two fixation methods are available: - Steel anchorages: Otis installs the steel dowels after drilling of the concrete. - The constructor installs suitable rail inserts. The bolts are delivered and installed by Otis. Contact otis for precise definition. The maximum vertical distance between guide rails fixation is 3 m. CONCRETE BEAMS AND CONCRETE SLABS WITH BRICKS OR BLOCK WORKS WALL The structural Lift components interface on the concrete parts with the same requirements as for concrete walls. The maximum distance between slabs is 3 m. One additive concrete beam is required at the level of the highest guide rails fixations (see part 2). Consult Otis for detailed information. STEEL STRUCTURE The structural lift components are interfaced at the level of the floor beams with a maximum distance between beams of 3 m. Additive beams are required at the level of the highest guide rails (side walls). Consult Otis for detailed information. The natural frequency of the steel structure, which supported the lift, shall be above 5 Hz. The building beams on which the guide rails brackets are fixed shall have a maximum deflexion on 2 mm in the local area where the efforts are applied by the lift. Consult Otis for the value and the location of these efforts. BLOCK WORKS (Block works, cellular concrete, full body bricks) Specific anchorages (chemical dowels...) must be selected by the constructor and Otis, regarding the max load applied on interfaces components: (guide rails and landing doors). The maximum vertical distance between guide rails fixation is 3 m. Consult Otis for detailed information. See sketches in the following sheets.
BUILDER'S WORK CATALOGUE Lux
PART 1: GENERAL INFORMATION
FAA29100H_BWC
Version : a-e
Date: 07-04-15
BUILDING STRUCTURE CONCRETE HOISTWAY Sketch 1 Hoistway roof level
Top of hoistway
CONCRETE BEAMS AND CONCRETE SLABS WITH BRICKS OR BLOCK WORKS WALL
400
Hoistway roof level
3000 Maxi
Sketch 2
Top level
1.3.8
13/38
BUILDER'S WORK CATALOGUE Lux
14/38
PART 1: GENERAL INFORMATION
FAA29100H_BWC
Version : a-e
Date: 07-04-15
STEEL DRY LINED BUILDING
3000 maxi
Top level
400
Hoistway roof level
BLOCK WORKS Sketch 4 Hoistway roof level
Top of hoistway
BUILDER'S WORK CATALOGUE Lux
PART 1: GENERAL INFORMATION
FAA29100H_BWC
1.4.
15/38
Version : a-e
Date: 07-04-15
ELECTRICAL POWER SUPPLY AND TELEPHONE LINE
1.4.1
ELECTRICAL CABLES INPUT Suitable electrical conduits shall be routed to the machine room for the following electrical functions: - Main power supply: 3 phases (see below 1.4.2) - Electrical supply for car lighting, hoistway lighting, alarm device and car and pit car and pit sockets (see below 1.4.3) - Telephone line (see below 1.4.4) - Other electrical options : car arrival hall light, car position contact, Intercommunication unit (car – porter lodge) (see below 1.4.5)
1.4.2
MAIN POWER SUPPLY (WITHOUT POWER SUPPLY FOR LIGHTING, SEE 1.4.3) For each lift, the power supply lines (3 phases + neutral + earth) shall be routed to the machine room. Definition in line with (IEC 364-4-63): IB = Useful current (current for which the circuit is designed) IZ = Continuous current-carrying capacity of the cable In = Nominal current of the protective device Operating characteristic of a device protecting a cable against overload shall satisfy, at least: I B ≤ In ≤ IZ
Table for electrical power supply (DATA NOT CONTRACTUAL)
All the following data are given for a 400 V AC power supply 40A/60A - Regenerative Drives are used .
Number of Passengers
Speed (m/s)
Starting Current IS (A)
Useful Current IB (A)
For information
Rated Line Power S (kVA)
Power Main Line P (kW)
Copper cross Section (mm2 )
Calibration of Protection Device ( A )
10 (800kg )
2.50
32
26
18
18
10
50
13 (1000kg)
2.50
37
31
21.5
21.5
10
50
17 (1275kg)
2.50
38
31
21.5
21.5
10
50
21 (1600kg)
2.50
47
39
37
37
10
50
Additional information : It is strongly recommended to separate neutral and protective conductor according to a TN-S system (5-wire net: 3 phases + neutral + earth). Rated voltage available: 380 or 400 or 415 V, tolerance: + 10%. Frequency: 50 or 60 Hz If an earth leakage circuit breaker is used at the starting point of the power line, the required rating is 500 mA or more. Copper cross section of the cable between building and controller in the machine room has to be calculated following the local code (i.e. IEC 364), considering the rated voltage, the currents determined with the here-above table and the external influences which can exist.
BUILDER'S WORK CATALOGUE Lux
16/38
PART 1: GENERAL INFORMATION
FAA29100H_BWC
Version : a-e
Date: 07-04-15
Electrical supply for lighting and SOcket outlets (en81-1) For each lift, the power supply line for lighting (1 phase + neutral + earth) shall be routed to the machine room. Rated voltage 220 or 230 or 240 V (tolerance + 10%) Frequency 50 or 60 Hz Single phase + neutral + earth This line shall be protected at the starting point according local code (IEC 364). Useful Current IB (A
Machinery location
RISE (meter))
Starting Current IS (A)
< 50
35
25
16 (∆: 10mA)
6 or 10
≥ 50
50
35
16 (∆: 10mA)
10 or 20
Protection device for car and socket machinery
FUSE (A) for Lighting In Hoistway (LIH)
Note: This power supply for lighting could be connected to the main power line, on the supply side of the main switch. In this case the value of the current for the lighting must be added to the value of the current of the main power supply defined in the 1.4.2 In case of interruption of the normal lighting supply, there shall be an automatically rechargeable emergency supply which is capable of feading a lamp installed in the top of the hoistway (not supplied by Otis). 1.4.3
TELEPHONE LINE – EMERGENCY ALARM DEVICE For each Simplex or for each bank of lifts (Duplex, Triplex…), the telephone line shall be routed to the machine room of the first lift (Unit A see part 3). Provide 3 m of free cable from the machine room entrance with a RJ11 plug termination. Note: to comply with the EN81.1 chapter 14.2.3 (two-way voice communication allowing permanent contact with a rescue service), the basic device is the Otis REM® device connected to Otis through a public network. Additional devices are available as options (one between all these 4 options): a) Car alarm button and wiring to the controller. Otis provides a normal open switch 2 A ; 50 VAC and the wiring to the controller. The customer alarm system can be connected to the controller; provide 3 m of free cable from the machine room entrance to each controller. b) Car alarm button and wiring to the pit Similar to a) but wiring to the pit of the lift instead to the controller. c) Car alarm button, wiring, alarm bell and battery (12 V DC) All these components are delivered and installed by Otis in the well (no external interfaces). d) Intercommunication Unit Communication between the car and a porter lodge. Otis provides the wiring to the controller Provide 1 cable (2 wires 0,5 or 1 mm²) maxi length 200 m from the porter lodge to the first controller (3 m of free wiring from the machine room entrance).
1.4.4
OTHER ELECTRICAL OPTIONS - AHL2 (car arrival hall light). When the lift arrives to a floor, the floor corridor lighting shall come on automatically. For this purpose, Otis provides one contact per floor with the following characteristics: . maximum braking switch voltage : 250 V AC . maximum power rating 2000 VA (AC voltage). For each lift , the wiring for this function shall be routed to the bottom of the controller (10 m of free cable from the machine room entrance).
BUILDER'S WORK CATALOGUE Lux
PART 1: GENERAL INFORMATION
FAA29100H_BWC
1.5.
17/38
Version : a-e
Date: 07-04-15
HEAT DISSIPATION Lift heat release in the machine room: Number of Passengers
10 13 17 21
1.6. 1.6.1
Speed (m/s)
Heat Release (kJ/s)
2.50
3,51
2.50
3,67
2.50
4,30
2.50
5,93
MAIN BUILDING LIMITATIONS GLASS HOISTWAY Only for totally enclosed well (hoistway) installed inside a building (e.g. atrium). The glass hoistway structure must comply with EN81.1 requirements (chapters 5.2.1.1 and 5.3.1).
1.6.2
HOISTWAY AND MACHINE ROOM ENVIRONMENT Environmental conditions: AE1: presence of foreign solid bodies: negligible AD1: presence of water: negligible AG2: mechanical stresses: medium severity According to IEC 60364 part 5 international standard - Electrical installation of buildings, low voltage electrical installation. Degree of protection: IP21: IP code according to EN 50 102 standard. IK = 5: IK code according to EN 60 529 standard. Ambient temperature: The ambient temperature in the machine room is assumed to be maintained between 0 °C and + 45 °C.
1.6.3
SILLS FOR LANDING DOORS It is recommended to provide a slight counter slope in front of each landing sill to avoid water from washing, sprinkling, etc., draining into the well.
1.6.4
EARTHQUAKE Option: earthquake (Consult OTIS for detailed information)
1.6.5
FIREFIGHTERS LIFTS
In case of lift in conformance with the EN81-72 code the building must answer the following requirements. Refer to EN81-72 chapter 5-1-1; 5-1-4; 5-1-5; 5-1-6; 5-2-2; and 5-3-4. The maximum distance between floors is limited. Refer to EN81-72 chapter 5-4-7 and consult Otis to determine this limit for the contract.
BUILDER'S WORK CATALOGUE 18/38
Lux
PART 3: INFORMATION CONCERNING BANKS OF LIFTS
FAA29100H_BWC
Version : a-e
Date: 07-04-15
2 PART 2: EFFORTS ON THE HOISTWAY WALLS Gen2 models can be installed in several types of hoistway structures: see sheet 12. In the sketches presented in the following sheets of this catalogue, the slabs and walls around lift wells are shown in blue color, whatever the building structure. LIST OF THE COMPONENTS EXERTING EFFORT ON THE WALL AND ON Hoistway width
ow Wall t
all
ROOF OF THE MACHINERY
3
Hooks Location
ROOF OF THE HOISTWAY
Overhead dimensions
2.1.
Holes
1
1
1
1 2
TOP LEVEL
FRONT
CEILING Guide rail bracket Landing door fixation Hooks for handling the equipment
ENTRANCE
BUILDER'S WORK CATALOGUE 19/38
Lux
PART 3: INFORMATION CONCERNING BANKS OF LIFTS
FAA29100H_BWC
2.1.1
Version : a-e
Date: 07-04-15
HOISTWAY DEPTH - DOORS IN THE HOISTWAY (For doors installed on the landing: consult Otis) DIMENSIONS TABLE HOISTWAY DEPTH (HD) AND FRONT TO REAR WALL DIMENSIONS (WTW) WTW=HD
LIFT CAPACITY Load & Number of passenger
800 kg 10 Pass.
CAR INTERNAL SIZE Car Width
Car Depth
Door Opening
CW (mm)
CD (mm)
OP (mm)
800 1350
1400 900
900 1000 kg 13 Pass.
1600
1400
1000
1100 1275 kg 17 Pass. 1600 kg 21 Pass. 1600 kg 21 Pass.
2000
1400
1100
2000
1700
1100
2100
1600
1100
Rise
Wall to wall mini
HOISTWAY DIMENSIONS Wall to wall Hoistway maxi Depth mini
R (m)
WTW (mm)
WTW (mm)
HD (mm)
HD (mm)
R≤80
2010
2350
2010
2350
R>80
2060
2300
2060
2300
R≤80
2010
2350
2010
2350
R>80
2060
2300
2060
2300
R≤80
2010
2350
2010
2350
R>80
2060
2300
2060
2300
R≤80
2010
2350
2010
2350
R>80
2060
2300
2060
2300
R≤80
2010
2350
2010
2350
R>80
2060
2300
2060
2300
R≤80
2010
2350
2010
2350
R>80
2060
2300
2060
2300
R≤80
2310
2650
2310
2650
R>80
2360
2600
2360
2600
R≤80
2210
2550
2210
2550
R>80
2260
2500
2260
2500
Hoistway Depth maxi
BUILDER'S WORK CATALOGUE 20/38
Lux
PART 3: INFORMATION CONCERNING BANKS OF LIFTS
FAA29100H_BWC
2.2.
Date: 07-04-15
GENERAL VIEW MACHINE ROOM INTERFACE
P8
P2 P1
1
2
Car axis
3
4 P3
P4 335
335
HW
ENTRANCE Number of passenger 10 pass.
13 pass.
17 pass.
21 pass. CW 2000 x CD 1700
21 pass. CW 2100 x CD 1600
DIM1 (mm)
863
863
863
1013
963
P1 (N)
21000
22500
29800
37000
37000
P2 (N)
23000
24000
31000
38000
38000
P3 (N)
23000
25500
33600
42000
42000
P4 (N)
23500
25500
33700
42500
42500
P7 (N)
2300
2300
2300
2300
2300
P8 (N)
2300
2300
2300
2300
2300
HD
P7
Car axis
DIM1
2.2.1
Version : a-e
BUILDER'S WORK CATALOGUE 21/38
Lux
PART 3: INFORMATION CONCERNING BANKS OF LIFTS
FAA29100H_BWC
Date: 07-04-15
PIT INTERFACE
Car rail axis
HW 1
Number of passenger 10 pass.
13 pass.
17 pass.
21 pass.
P11 (N)
62000
68300
77000
84000
P12 (N)
100000
115000
138000
165000
P13 (N)
85000
94000
1110000
131000
P17 (N)
41000
46000
52000
58100
Simultaneous loads : P11 or P17 or P12 or P13
HD
2.2.2
Version : a-e
BUILDER'S WORK CATALOGUE Lux
22/38 PART 3: INFORMATION CONCERNING BANKS OF LIFTS
FAA29100H_BWC
Date: 07-04-15
HOOKS – ( MACHINE ROOM ROOF )
CWT DBG/2+30
CWT DBG/2+30
CWT axis
T6 T5
T4
Car DBG/2+90
CTC
150
135
Car DBG/2+90
Car rail axis
T1
T2 T3
220
2.2.3
Version : a-e
HW1
HW2 HW
ENTRANCE
Rails hoisting and Car suspension Material distribution Rails hoisting and suspension Machine introduction and CWT suspension
Simultaneous loads on the hooks T1; T2; T6 SWL: Safe Working Load
Location
SWL (kN)
T1; T2 T3 T4; T5 T6
10 10 5 10
BUILDER'S WORK CATALOGUE 23/38
Lux
PART 3: INFORMATION CONCERNING BANKS OF LIFTS
FAA29100H_BWC
Date: 07-04-15
ALL LANDINGS TYFAC : SF
For RW1 and RW2 values see part 1 sheet 6 DOORS IN HOISTWAY
OPH + 50 ± 20
RW1
RW2 OP + 100 ± 20
100 for CLD
SILL "0" FINISHED FLOOR
80 mini
HW
WTW = HD
RW1
OPH + 270 ± 20
OPH + 50 ± 20
DOORS ON LANDING
RW2
OP + 100 ± 20
100 for CLD
SILL "0" FINISHED FLOOR
60 mini
2.2.4
Version : a-e
WTW HD
HW
BUILDER'S WORK CATALOGUE 24/38
Lux
PART 3: INFORMATION CONCERNING BANKS OF LIFTS
FAA29100H_BWC
Date: 07-04-15
ALL LANDINGS For RW1 and RW2 values see part 1 sheet 6 DOORS IN HOISTWAY
TYFAC : NF
OPH + 50 ± 20
RW1
RW2 OP + 60 ± 20
100 for CLD
80 mini
SILL "0" FINISHED FLOOR
HW
WTW = HD
RW1
OPH + 270 ± 20
OPH + 50 ± 20
DOORS ON LANDING
RW2
OP + 60 ± 20
100 for CLD
SILL "0" FINISHED FLOOR
60 mini
2.2.5
Version : a-e
WTW HD
HW
BUILDER'S WORK CATALOGUE 25/38
Lux
PART 3: INFORMATION CONCERNING BANKS OF LIFTS
FAA29100H_BWC
Version : a-e
Date: 07-04-15
3 PART 3: INFORMATION CONCERNING BANKS OF LIFTS 3.1. 3.1.1
REQUIREMENTS CONCERNING BANKS OF LIFTS MAIN INFORMATION The Gen2 models 10 to 21 passengers are available in a bank of two to height lifts . Each lift is available with the same limitations as the single car lift. To be installed in a bank, all the lifts shall have the following parameters: Same speed. Same lift capacity (number of passengers and car size). Same number of floors, and location of entrances.
3.1.2
HOISTWAY LOCATION Lifts in bank can be installed in the same hoistway or in separated hoistway. For each lift, all simplex arrangements are available; use the information for single car (SIMPLEX).
3.1.3
PROTECTION IN THE HOISTWAY Where the hoistway contains several lifts an 1100 mm height top of car balustrade is installed.
3.1.4
ELECTRICAL POWER SUPPLY Use the information for single car (simplex).
BUILDER'S WORK CATALOGUE 26/38
Lux
PART 3: INFORMATION CONCERNING BANKS OF LIFTS
FAA29100H_BWC
Version : a-e
Date: 07-04-15
GENERAL WELL TOLERANCES DUPLEX
SEPARATOR BEAMS
MAXI HOISTWAY DEPTH 25 25 COMMERCIAL HOISTWAY DEPTH 25 25 MINI HOISTWAY DEPTH
Rise 80m
UNIT A
50 50
UNIT B 160
MINI TOTAL HOISTWAY WIDTH COMMERCIAL TOTAL HOISTWAY WIDTH MAXI TOTAL HOISTWAY WIDTH
FRONT
OPENING
50 50
BUILDER'S WORK CATALOGUE 27/38
Lux
PART 3: INFORMATION CONCERNING BANKS OF LIFTS
FAA29100H_BWC
Version : a-e
Date: 07-04-15
TRIPLEX
160
UNIT B 160
SEPARATOR BEAMS
UNIT A
SEPARATOR BEAMS
MAXI HOISTWAY DEPTH 25 25 COMMERCIAL HOISTWAY DEPTH 25 25 MINI HOISTWAY DEPTH
Rise 80m
MINI TOTAL HOISTWAY WIDTH COMMERCIAL TOTAL HOISTWAY WIDTH MAXI TOTAL HOISTWAY WIDTH
FRONT
OPENING
UNIT C
50 50
BUILDER'S WORK CATALOGUE 28/38
Lux
PART 3: INFORMATION CONCERNING BANKS OF LIFTS
FAA29100H_BWC
Version : a-e
Date: 07-04-15
QUADRUPLEX
160
UNIT C 160
SEPARATOR BEAMS
160
UNIT B
SEPARATOR BEAMS
UNIT A
SEPARATOR BEAMS
25
MINI HOISTWAY DEPTH
25
25
COMMERCIAL HOISTWAY DEPTH
25
MAXI HOISTWAY DEPTH
Rise 80m
UNIT D
50 50
BUILDER'S WORK CATALOGUE 29/38
Lux
PART 3: INFORMATION CONCERNING BANKS OF LIFTS
FAA29100H_BWC
Version : a-e
Date: 07-04-15
QUINTUPLEX
160
160
160
UNIT D
SEPARATOR BEAMS
UNIT C
SEPARATOR BEAMS
UNIT B
SEPARATOR BEAMS
UNIT A
SEPARATOR BEAMS
25 MINI HOISTWAY DEPTH 25
25 MAXI HOISTWAY DEPTH 25
COMMERCIAL HOISTWAY DEPTH
Rise 80m
UNIT E
160
MINI TOTAL HOISTWAY WIDTH 50
50 COMMERCIAL TOTAL HOISTWAY WIDTH
50
50 MAXI TOTAL HOISTWAY WIDTH
FRONT
OPENING
BUILDER'S WORK CATALOGUE 30/38
Lux
PART 3: INFORMATION CONCERNING BANKS OF LIFTS
FAA29100H_BWC
Version : a-e
Date: 07-04-15
SEXTUPLEX
160
UNIT B 160
SEPARATOR BEAMS
UNIT A
SEPARATOR BEAMS
MINI HOISTWAY DEPTH
MAXI HOISTWAY DEPTH
25 25 COMMERCIAL HOISTWAY DEPTH 25 25
Rise 80m
UNIT B 160
MINI TOTAL HOISTWAY WIDTH 50
50 COMMERCIAL TOTAL HOISTWAY WIDTH
50
50 MAXI TOTAL HOISTWAY WIDTH
FRONT
OPENING
FRONT
OPENING
MAXI TOTAL HOISTWAY WIDTH 50
50 COMMERCIAL TOTAL HOISTWAY WIDTH 50
50
UNIT F
160
UNIT E
SEPARATOR BEAMS
160
SEPARATOR BEAMS
50 MAXI HOISTWAY DEPTH 50
COMMERCIAL HOISTWAY DEPTH 50 50 MINI HOISTWAY DEPTH
MINI TOTAL HOISTWAY WIDTH
UNIT D
BUILDER'S WORK CATALOGUE 31/38
Lux
PART 3: INFORMATION CONCERNING BANKS OF LIFTS
FAA29100H_BWC
Version : a-e
Date: 07-04-15
OCTOPLEX
UNIT B 160
UNIT C 160
SEPARATOR BEAMS
160
SEPARATOR BEAMS
UNIT A
SEPARATOR BEAMS
MINI HOISTWAY DEPTH
25
25 25
MAXI HOISTWAY DEPTH 25
COMMERCIAL HOISTWAY DEPTH
Rise 80m
UNIT D
MINI TOTAL HOISTWAY WIDTH 50
50 COMMERCIAL TOTAL HOISTWAY WIDTH
50
50 MAXI TOTAL HOISTWAY WIDTH
FRONT
OPENING
FRONT
OPENING
MAXI TOTAL HOISTWAY WIDTH 50
50 COMMERCIAL TOTAL HOISTWAY WIDTH
50
50
UNIT F
SEPARATOR BEAMS
UNIT G
160
SEPARATOR BEAMS
UNIT H
160
SEPARATOR BEAMS
50
MINI HOISTWAY DEPTH
160
50
COMMERCIAL HOISTWAY DEPTH
50
MAXI HOISTWAY DEPTH
50
MINI TOTAL HOISTWAY WIDTH
UNIT E
BUILDER'S WORK CATALOGUE 32/38
Lux
PART 3: INFORMATION CONCERNING BANKS OF LIFTS
FAA29100H_BWC
3.1.5
Version : a-e
Date: 07-04-15
HOISTWAY DEPTH DIMENSION (PLAN) Same dimensions as the dimensions defined for simplex lift (see Part 1 Para 1.3)
3.1.6
HOISTWAY WIDTH DIMENSIONS HW (PLAN) FOR LIFTS IN THE SAME HOISTWAY DUPLEX Lifts in line in the same hoistway
R Number of passenger
CW
CD
10 pass.
1350
1400
13 pass.
17 pass. 21 pass. 21 pass.
80m
DOOR
OP
THW MINI
THW MAXI
CLD
800
4010
4810
CLD
900
4210
4810
CLD
900
4510
5310
1000
4510
5310
1600
1400
CLD CLD
1100
4910
5310
2000
1400
CLD
1100
5210
6110
2000
1700
CLD
1100
5210
6110
2100
1600
CLD
1100
5410
6310
DOOR
OP
THW MINI
THW MAXI
CLD
800
4060
4760
CLD
900
4260
4760
CLD
900
4560
5260
CLD
1000
4560
5260
CLD
1100
4960
5260
CLD
1100
5260
6060
R> 80m Number of passenger
CW
CD
10 pass.
1350
1400
13 pass.
1600
1400
17 pass.
2000
1400
21 pass.
2000
1700
CLD
1100
5260
6060
21 pass.
2100
1600
CLD
1100
5460
6260
BUILDER'S WORK CATALOGUE 33/38
Lux
PART 3: INFORMATION CONCERNING BANKS OF LIFTS
FAA29100H_BWC
Version : a-e
Date: 07-04-15
TRIPLEX Lifts in line in the same hoistway
R Number of passenger
CW
CD
10 pass.
1350
1400
13 pass.
17 pass. 21 pass. 21 pass.
80m
DOOR
OP
THW MINI
THW MAXI
CLD
800
6070
7320
CLD
900
6370
7320
CLD
900
6820
8070
1000
6820
8070
1600
1400
CLD CLD
1100
7420
8070
2000
1400
CLD
1100
7870
9270
2000
1700
CLD
1100
7870
9270
2100
1600
CLD
1100
8170
9570
DOOR
OP
THW MINI
THW MAXI
CLD
800
6120
7270
CLD
900
6420
7270
CLD
900
6870
8020
CLD
1000
6870
8020
CLD
1100
7470
8020
CLD
1100
7920
9220
R> 80m Number of passenger
CW
CD
10 pass.
1350
1400
13 pass.
1600
1400
17 pass.
2000
1400
21 pass.
2000
1700
CLD
1100
7920
9220
21 pass.
2100
1600
CLD
1100
8220
9520
BUILDER'S WORK CATALOGUE 34/38
Lux
PART 3: INFORMATION CONCERNING BANKS OF LIFTS
FAA29100H_BWC
Version : a-e
Date: 07-04-15
QUADRUPLEX Lifts in line in the same hoistway
R Number of passenger
CW
CD
10 pass.
1350
1400
13 pass.
17 pass. 21 pass. 21 pass.
1600
1400
80m
DOOR
OP
THW MINI
THW MAXI
CLD
800
8130
9830
CLD
900
8530
9830
CLD
900
9130
10830
CLD
1000
9130
10830
CLD
1100
9930
10830
2000
1400
CLD
1100
10530
12430
2000
1700
CLD
1100
10530
12430
2100
1600
CLD
1100
10930
12830
DOOR
OP
THW MINI
THW MAXI
CLD
800
8180
9780
CLD
900
8580
9780
CLD
900
9180
10780
CLD
1000
9180
10780
CLD
1100
9980
10780
CLD
1100
10580
12380
R> 80m Number of passenger
CW
CD
10 pass.
1350
1400
13 pass.
1600
1400
17 pass.
2000
1400
21 pass.
2000
1700
CLD
1100
10580
12380
21 pass.
2100
1600
CLD
1100
10980
12780
BUILDER'S WORK CATALOGUE 35/38
Lux
PART 3: INFORMATION CONCERNING BANKS OF LIFTS
FAA29100H_BWC
Version : a-e
Date: 07-04-15
QUINTUPLEX Lifts in line in the same hoistway
R Number of passenger
CW
CD
10 pass.
1350
1400
80m
DOOR
OP
THW MINI
THW MAXI
CLD
800
10190
12340
CLD
900
10690
12340
CLD
900
11440
13590
CLD
1000
11440
13590
CLD
1100
12440
13590
2000
1400
CLD
1100
13190
15590
21 pass.
2000
1700
CLD
1100
13190
15590
21 pass.
2100
1600
CLD
1100
13690
16090
DOOR
OP
THW MINI
THW MAXI
CLD
800
10240
12290
CLD
900
10740
12290
CLD
900
11490
13540
CLD
1000
11490
13540
CLD
1100
12490
13540
13 pass.
17 pass.
1600
1400
R> 80m Number of passenger
CW
CD
10 pass.
1350
1400
13 pass.
1600
1400
17 pass.
2000
1400
CLD
1100
13240
15540
21 pass.
2000
1700
CLD
1100
13240
15540
21 pass.
2100
1600
CLD
1100
13740
16040
BUILDER'S WORK CATALOGUE 36/38
Lux
PART 3: INFORMATION CONCERNING BANKS OF LIFTS
FAA29100H_BWC
Version : a-e
Date: 07-04-15
SEXTUPLEX Dimensions for a single hoistway for 3 Lifts
R Number of passenger
CW
CD
10 pass.
1350
1400
13 pass.
1600
1400
80m
DOOR
OP
THW MINI
THW MAXI
CLD
800
6070
7320
CLD
900
6370
7320
CLD
900
6820
8070
CLD
1000
6820
8070
CLD
1100
7420
8070
17 pass.
2000
1400
CLD
1100
7870
9270
21 pass.
2000
1700
CLD
1100
7870
9270
2100
1600
CLD
1100
8170
9570
DOOR
OP
THW MINI
THW MAXI
CLD
800
6120
7270
CLD
900
6420
7270
CLD
900
6870
8020
CLD
1000
6870
8020
CLD
1100
7470
8020
2000
1400
CLD
1100
7920
9220
21 pass.
2000
1700
CLD
1100
7920
9220
21 pass.
2100
1600
CLD
1100
8220
9520
21 pass.
R> 80m Number of passenger
CW
CD
10 pass.
1350
1400
13 pass.
17 pass.
1600
1400
BUILDER'S WORK CATALOGUE 37/38
Lux
PART 3: INFORMATION CONCERNING BANKS OF LIFTS
FAA29100H_BWC
Version : a-e
Date: 07-04-15
OCTOPLEX Dimensions for a single hoistway for 4 Lifts
R Number of passenger
CW
CD
10 pass.
1350
1400
80m
DOOR
OP
THW MINI
THW MAXI
CLD
800
8130
9830
CLD
900
8530
9830
CLD
900
9130
10830
CLD
1000
9130
10830
CLD
1100
9930
10830
2000
1400
CLD
1100
10530
12430
21 pass.
2000
1700
CLD
1100
10530
12430
21 pass.
2100
1600
CLD
1100
10930
12830
DOOR
OP
THW MINI
THW MAXI
CLD
800
8180
9780
CLD
900
8580
9780
CLD
900
9180
10780
CLD
1000
9180
10780
CLD
1100
9980
10780
13 pass.
17 pass.
1600
1400
R> 80m Number of passenger
CW
CD
10 pass.
1350
1400
13 pass.
1600
1400
17 pass.
2000
1400
CLD
1100
10580
12380
21 pass.
2000
1700
CLD
1100
10580
12380
21 pass.
2100
1600
CLD
1100
10980
12780
BUILDER'S WORK CATALOGUE 38/38
Lux
PART 3: INFORMATION CONCERNING BANKS OF LIFTS
FAA29100H_BWC
3.2.
Version : a-e
Date: 07-04-15
RECOMMENDED HOISTWAY DIMENSIONS (ELEVATION) PIT DEPTH AND OVERHEAD DIMENSIONS (S & K) Same dimensions as the dimensions defined for simplex lift see Part 1: Para 1-2-4
3.3.
HOOKS AND REACTION THE PIT For each lift use the same values and location as the values and location defined for simplex lift. See Part 2 Para 2.2 & Part 2 Para 2.3.
3.4.
LOCATION OF THE HOISTWAY FIXTURES The following hoistway fixtures: direction indicator arrows (hall lantern); hall position if any; key switches for service operation are affected to each lift and are installed in a same possible location as for simplex lift. The hall buttons (HB) are affected to the bank and the number is less or equal to the number of lifts. Number of hall button rise: 1, 2, 3 , 4 or 5. NBR1/NBR2/NBR3/NBR4 or NBR5.