Jan 23, 2013 ... Subject: Various Counties, 121GR13E011-FE01. Letting January 25, 2013. (1)
Added – Note – Page 14(a) of 44. (2) Revised – Work Location ...
January 23, 2013
CALL NO. 412 CONTRACT ID NO. 132716 ADDENDUM # 1
Subject:
(1) (2) (3) (4)
Added Revised Revised Revised
Various Counties, 121GR13E011-FE01 Letting January 25, 2013 – – – –
Note – Page 14(a) of 44 Work Location – Pages 15-16 of 44 Material Summary – Page 28 of 44 Bid Items – Page 44 of 44
Proposal revisions are available at http://transportation.ky.gov/ConstructionProcurement/. If you have any questions, please contact us at 502-564-3500. Sincerely,
Ryan Griffith Director Division of Construction Procurement RG:ks Enclosures
VARIOUS COUNTIES 121GR13E011-FE01
Added: 1-23-13 Contract ID: 132716 Page 14(a) of 44
SPECIAL NOTE FOR CONSTRUCTION AREAS: There is construction in District 3 from MP 18.520.5, and from MP 44-54. In District 4, construction is between MP 54-58.2, with construction activities stretching to near the 59.4. These areas will not be mowed in 2013, and are not reflected in the totals. It is anticipated that the mowing areas within these zones will be added by change order at a later time, if the contract is renewed.
Warren
Warren
Barren
Edmonson
Barren
Hart
Larue
Hardin
I-65
I-65***
I-65
I-65
I-65
I-65
I-65
I-65
FE01 047-0065078-104-M
FE01 062-0065074-079-M
FE01 050-0065053-075-M
FE01 005-0065045-054-M
FE01 031-0065043-0460M
FE01 005-0065042-044-M
FE01 114-0065020-029-M
FE01 114-0065013-043-M
PROJECT NUMBER FE01 107-0065 000-014-M
Larue Co. Ln. (MP 78.661)
Hart Co. Ln. (MP 72.622)
Barren Co. Ln. (MP 53.956)
Edmonson Co. Ln. (MP 45.935)
Barren Co. Ln. (MP 43.307)
Warren Co. Ln. (MP 42.890)
South of Intersection (MP 20.00)
Simpson Co. Ln. (MP 13.711)
FROM Tennessee St. Line (MP 0.000)
* A Batwing Mower will be allowed on this route(s).
COUNTY Simpson
ROUTE NUMBER I-65
Subtotal (D-4)
Bullitt Co. Ln. (MP 103.308)
Hardin Co. Ln. (MP 78.661)
Larue Co. Ln. (MP 74.622)
Subtotal (D-3)
Hart Co. Ln. (MP 53.956)
Barren Co. Ln. (MP 45.935)
Edmonson Co. Ln. (MP 43.307)
North of Intersection (MP 28.5)
Barren Co. Ln. (MP 42.890)
TO Warren Co. Ln. (MP 13.711)
LIMITS OF PROJECT
I-65 MOWING WORK LOCATION
49.352
24.647
4.039
20.666
53.956
8.021
2.628
0.417
29.179
Project Length 13.711
766
475
76
215
693
0
8
22
143
380
Type 3 Mowing Acres 140
3
3
3
0
3
3
3
3
49.5
24.7
4
20.7
62.4
8
2.6
0.4
8.5
29.2
5
5
5
5
5
5
3***
5
Litter Number Removal Number of Cntrln. of Cycles Miles Cycles 3 13.7 5
VARIOUS COUNTIES 121GR13E011-FE01 Revised: 1-23-13 Contract ID: 132716 Page 15 of 44
Jefferson
I-65
FE01 056-0065123-125-M
NUMBER FE01 015-0065103-124-M Bullitt Co. Ln. (MP 123.115)
FROM Hardin Co. Ln. (MP 103.308)
* A Batwing Mower will be allowed on this route(s). **Cycle one shall be Pre-Derby (D-5) ***Three partial cycles in addition to the regular cycles Maximum time to complete a cycle : 15 working days.
COUNTY Bullitt
Project NUMBER I-65
1.820
21.692 125.000
Subtotal (D-5) GRAND TOTAL
Project Length 19.872
0.163 mi. S. of South Park Rd. (MP 125.000)
TO Jefferson Co. Ln. (MP 123.180)
MOWING WORK LOCATION
1,699
383
18
Type 3 Mowing Acres 365
4**
125
21.6
2
6
Litter Number Removal Number of Cntrln. of Cycles Miles Cycles 4** 20 6
Page 2 of 2
VARIOUS COUNTIES 121GR13E011-FE01 Revised: 1-23-13 Contract ID: 132716 Page 16 of 44
VARIOUS COUNTIES 121GR13E011-FE01
Revised: 1-23-13 Contract ID: 132716 Page 28 of 44
MATERIAL SUMMARY CONTRACT ID: 132716
121GR13E011-FE01
ME12100651330
RIGHT-OF-WAY MOWING, TRIMMING, AND LITTER REMOVAL ON I-65 IN DISTRICT 3 BEGIN AT (TENNESSEE STATE LINE) AND END AT (HART COUNTY LINE) ON I-65 IN DISTRICT 3 RIGHT OF WAY MOWING - LITTER REMOVAL, A DISTANCE OF 53.96 MILES. Project Line No 0010 0020 0030 0040
Bid Code 02167 03280 21741NC 02569
CONTRACT ID: 132716
DESCRIPTION RIGHT-OF-WAY MOWING - (REVISED: 1-23-13) LITTER REMOVAL - (REVISED: 1-23-13) MAINTAIN & CONTROL TRAFFIC - DISTRICT 3 DEMOBILIZATION
121GR13E011-FE01
Quantity
Unit
2,079.00 ACRE 295.00 MILE 5.00 EACH 1.00 LS
ME12100651331
RIGHT-OF-WAY MOWING, TRIMMING, AND LITTER REMOVAL ON I-65 IN DISTRICT 4 BEGIN AT (BARREN COUNTY LINE) AND END AT (BULLITT COUNTY LINE) ON I-65 IN DISTRICT 4 RIGHT OF WAY MOWING LITTER REMOVAL, A DISTANCE OF 24.65 MILES. Project Line No 0050 0060 0070 0080
Bid Code 02167 03280 21741NC 02569
CONTRACT ID: 132716
DESCRIPTION RIGHT-OF-WAY MOWING - (REVISED: 1-23-13) LITTER REMOVAL MAINTAIN & CONTROL TRAFFIC - DISTRICT 4 DEMOBILIZATION
121GR13E011-FE01
Quantity
Unit
2,298.00 ACRE 247.50 MILE 5.00 EACH 1.00 LS
ME12100651332
RIGHT-OF-WAY MOWING, TRIMMING, AND LITTER REMOVAL ON I-65 IN DISTRICT 5 BEGIN AT (HARDIN COUNTY LINE) AND END AT .0 (SOUTH PARK ROAD) ON I-65 IN DISTRICT 5 RIGHT OF WAY MOWING - LITTER REMOVAL, A DISTANCE OF 21.69 MILES. Project Line No 0090 0100 0110 0120
Bid Code 02167 03280 21741NC 02569
DESCRIPTION RIGHT-OF-WAY MOWING - (REVISED: 1-23-13) LITTER REMOVAL MAINTAIN & CONTROL TRAFFIC - DISTRICT 5 DEMOBILIZATION
Quantity
Unit
1,532.00 ACRE 130.20 MILE 6.00 EACH 1.00 LS
VARIOUS COUNTIES 121GR13E011-FE01
PROPOSAL BID ITEMS
132716
Revised: 1-23-13 Contract ID: 132716 Page 44 of 44
Page 1 of 1 Report Date
1/23/13
Section: 0001 - MOWING LINE 0010 0020 0030 0040 0050
BID CODE 02167 03280 21741NC 21741NC 21741NC
ALT DESCRIPTION RIGHT-OF-WAY MOWING(REVISED: 1-23-13) LITTER REMOVAL(REVISED: 1-23-13) MAINTAIN & CONTROL TRAFFICDISTRICT 3 MAINTAIN & CONTROL TRAFFICDISTRICT 4 MAINTAIN & CONTROL TRAFFICDISTRICT 5
QUANTITY 5,909.00 672.70 5.00 5.00 6.00
UNIT UNIT PRICEFP AMOUNT ACRE $ MILE $ EACH $ EACH $ EACH $
Section: 0002 - DEMOBILIZATION LINE 0060
BID CODE 02569
ALT DESCRIPTION DEMOBILIZATION
QUANTITY UNIT UNIT PRICEFP AMOUNT 1.00 LS $