A novel model for business process maturity ...

4 downloads 0 Views 512KB Size Report
with EFQM and ISO 9004:2009. Mohsen Moradi-Moghadam* and Hossein Safari. Faculty of Management,. University of Tehran,. Nasr Bridge, 6311-14155 ...
Int. J. Business Process Integration and Management, Vol. 6, No. 2, 2013

167

A novel model for business process maturity assessment through combining maturity models with EFQM and ISO 9004:2009 Mohsen Moradi-Moghadam* and Hossein Safari Faculty of Management, University of Tehran, Nasr Bridge, 6311-14155 Tehran, Iran E-mail: [email protected] E-mail: [email protected] *Corresponding author

Meysam Maleki UNIDEMI, Mechanical and Industrial Engineering Department, Faculty of Science and Technology, Universidade Nova de Lisboa, 2829-516 Caparica, Portugal E-mail: [email protected] Abstract: The importance of business process management is pointed out in extensive literature. As its realisation is less straightforward, maturity models have been developed to gradually assess and improve business processes. However, the proliferation of maturity models confuses organisations. They have no overview of existing models and their differences, which makes an informed choice difficult. This paper presents a novel framework for assessing process maturity. This framework compares maturity models with the process audit of Michael Hammer. In order to develop the process audit, EFQM and ISO 9004:2009 are suggested; thereafter, criteria are graded by RADAR. Practitioners may benefit from the proposed framework to plan and execute process-based transformations. Keywords: process management; process implementation; business process maturity models; BPMMs. Reference to this paper should be made as follows: Moradi-Moghadam, M., Safari, H. and Maleki, M. (2013) ‘A novel model for business process maturity assessment through combining maturity models with EFQM and ISO 9004:2009’, Int. J. Business Process Integration and Management, Vol. 6, No. 2, pp.167–184. Biographical notes: Mohsen Moradi-Moghadam received his MSc in Industrial Management from the Faculty of Management, University of Tehran, Iran. His research interests are: business process maturity models, organisational processes, management systems, business process management and quality. Hossein Safari received his PhD in Industrial Management from the University of Tehran, Iran. He is an Associate Professor at the University of Tehran. He is an expert in research performance evaluation, strategic planning, implementation of EFQM and ISO standards, and research methodologies. Meysam Maleki received his MSc of Production Engineering from Chalmers University of Technology, Sweden. He is currently a PhD candidate and Researcher in UNIDEMI: R&D Unit in Mechanical and Industrial Engineering, which is a research centre at the Faculty of Science and Technology, Universidade Nova de Lisboa, Portugal.

Copyright © 2013 Inderscience Enterprises Ltd.

168

1

M. Moradi-Moghadam et al.

Introduction

Today’s globalised market is characterised by demanding customers and growing IT possibilities. Organisations are therefore increasingly relying on their way of working, i.e., business processes, to excel (Harrington, 2006; Vom Brocke and Rosemann, 2010). However, merely modelling and deploying a business process does not imply that your business process is also an excellent one, or at least a good one. Therefore, the notion of ‘maturity’ is introduced as a measure to indicate how excellent business processes can perform (Harrington, 2006; Maier et al., 2008). Maturity requires continuous process improvements, which are not easy to realise. Hence, business process maturity models (BPMM) have been designed from which organisations gradually benefit. In general, a maturity model (MM) is a tool to systematically assess and improve capabilities, i.e., abilities or competences, to reach a goal. Translated to BPMM, it concerns the capabilities of business processes and their organisations to reach business (process) excellence. BPMM can be represented as a combination of coverage and skills (proficiency), and therefore it can be said that it is actually a combination of effectiveness and efficiency. With the help of the BPMM, companies should be able to analyse the strengths and the weaknesses of their current business and develop ‘to-be’ models to achieve the organisation’s business objectives. Moreover, BPMM should guide companies to achieve business objectives by executing the practices of the model. The basic concept underlying maturity is that mature organisations do things systematically while immature organisations achieve their outcomes as a result of heroic efforts of individuals using approaches that they create more or less spontaneously. Models related to quality such as ISO, total quality management (TQM), and excellence models are unknown for organisation performance assessment. ISO standard provides guidance to support the achievement of success for any organisation in a complex, demanding, and ever-changing environment, by a quality management approach. Sustained success can be achieved by the effective management of the organisation. This standard promotes self-assessment as an important tool for the review of the maturity level of the organisation, covering its strategy, management system, and processes, to identity areas of strength and weakness and opportunities for either improvements, or innovation, or both. EFQM model have eight of fundamental concepts for excellence organisations. One of these concepts is managing by processes. Excellent organisations are managed through structured and strategically aligned processes using factbased decision making to create balanced and sustained results. In the current paper we extract indexes related to process maturity through comparing MMs, EFQM, and ISO 9004:2009. After preparing table of indexes, an auditing organisations approach is developed to determine the current status of the business process efforts. Mature organisations achieve the precise goals they commit to achieve. Immature organisations often achieve some, but not all, of their goals. Mature organisations have systematic

processes and documented ways of doing things. MMs are used the base of assessment and comparison due to improvement and they are a good approach for increasing capabilities in organisations. Process maturity models (PMMs) are tools that help to organisation for implementing business process management. We evaluate the maturity of a business process by result, approach, development, assessment and refinement (RADAR). With this ruler, we can seek embedding of refinements over time, deploy with a flexibility to manage changes in environment and re-deploy if needed, measure both ‘efficiency’ and ‘effectiveness’ and use creativity to generate new/changed approaches and evaluate, priorities and use the outcomes for enablers of EFQM, after that we apply this ruler for results of EFQM. The PMMs are conceptual models which compare the maturity of organisation current practices against an industry standard. It helps the organisation set priorities for improving its product/service operations using a proven strategy and developing the capability required to execute its business strategy. Through a BPMM, an organisation can efficiently and effectively manage its business processes while trying to achieve and realise its business objectives and values. This paper structured as follows: Section 2 provides an overview of the related literature on BPMMs and a problem statement that outlines the intent of current and proposed research. Section 3 compares different MMs in terms of their criteria and indexes of process maturity and business process management maturity to identify the most important and most used models. After mining the factors and parameters influencing the maturity of business processes, the suitable approach to measure and assess the ruler is introduced in Section 4. Thereafter we conclude in Section 5.

2

Literature review

Key literature on the concept of business process management suggests both that organisations can enhance their overall performance by adopting a process view of business and that business-process orientation (BPO) has a positive impact on business performance (Aysar and Johnson, 2003; Davenport, 1993; Harmon, 2003). Attention to processes has increased as thousands of organisations have already adopted process-focused programmes such as ISO 9001 and TQM (Benner and Veloso, 2008). The core idea behind ‘process management’ principle of TQM is that organisations are sets of interlinked processes, and that improvement of these processes is the foundation of performance improvement (Lam et al., 2008). Process orientation has also been embodied in the European Foundation for Quality Management (EFQM) and the Malcolm Baldrige National Quality Award (MBNQA) models for business excellence (Lee and Dale, 1998). According to Sharma and Kodali (2008) process management as an element of total quality excellence has been supported by the majority of the award-based frameworks as well as research/academic-based frameworks. Hoang et al. (2006) also stated that process

A novel model for business process maturity assessment through combining maturity models management along with information and analysis and strategic planning are considered as mechanistic elements of TQM. The EFQM was founded in 1988 and is committed to promoting quality as the fundamental process for continuous improvement within a business. It is dedicated to stimulating and assisting management in applying innovative principles of TQM suited to the European environment. Its aim is to improve the competitiveness of European private and public sector organisations. Over 10,000 firms in the private and public sector all over Europe now incorporate the EFQM Excellence Model in their overall corporate management process. In 1999, 60% of the top 25 companies in Europe (and 30% of the top 100) were members of the EFQM. This pattern is pervasive and non-prescriptive framework that has three main components can be: a

fundamental concepts: eight items

b

model criteria: five enablers and four results

c

RADAR logic: the four elements.

The advocated advantages are established. The scoring process is demonstrated using the EFQM RADAR. Further original work is presented by the author on the scoring model to include the RADAR pentagonal scoring profile. This provides a simplistic, yet effective, method of communicating the self evaluation data to senior management for benchmarking purposes. The RADAR pentagonal profile has been endorsed by the EFQM. A generic implementation model for EFQM within surveying organisations is incorporated (Figure 1). The BPMM describes an evolutionary improvement path that guides organisations as they move from immature, inconsistent business activities to mature, disciplined processes. The BPMM orders these stages so that improvements at each stage provide a foundation on which to build improvements undertaken at the next stage. Thus, an improvement strategy drawn from the BPMM provides a roadmap for continuous process improvement. It helps identify process deficiencies in the organisation and guides the improvements in logical, incremental steps. Among the business process models that were proposed in the past, the PMM presented by Curtis and Alden (2006) is the only comprehensive model due to the fact that Curtis coined well defined and verified capability maturity model integration (CMMI) concepts and introduced them into the field of business process studies. His model was originally developed to assess the maturity of software development processes. Over the years it was extended to other domains as well. The successor to Curtis model is the CMMI which aimed to improve the usability of MMs by integrating different models into one framework (Ahern et al., 2004; Chrissis et al., 2006; Hofmann et al., 2007). There are several researches on business process maturity (Curtis and Alden, 2006; Fisher, 2004; Harmon, 2004); however, it has not been defined and standardised

169

well enough to be applied to an organisation’s business process in order to improve its performance. BPMM enable managers to describe current state of an enterprise, from the process maturity perspective with analysis of current state (as-is state) and desirable state (to-be state). According to Rosemann and Bruin (2005) the primary aims of BPMM are: a

describing current state: strengths and weaknesses

b

determining describe maturity level, depending on key factors of business process management

c

making business process management improvement easier, through maps, which show how desired state can be reached.

In recent years a number of BPMMs have been proposed (Fisher, 2004; Hammer, 2007; McCormack et al., 2009; Rohloff, 2010). Most models focus only on one dimension of measuring Business Process Maturity and very few applied studies are known. Rosemann and Bruin (2005) developed a model, which observes strategic business process management through holistic enterprise management. This model is known under the name of business process management MM. In the heart of this model there are five factors, critical for successful implementation of process management. A similar model, called BPMM, appeared in 2006th year, and was promoted by Curtis, Weber and Gardiner. Hammer (2007) also accepts the phase approach to process management, and emphasises that all the previous stages must be fully completed before the move to the next phase (to the higher level of maturity). Hammer’s model clearly highlights the difference between process maturity and the enterprise maturity (business process management maturity). In order to analyse process’s performance, the model takes into account the maturity of five drivers, and they are: design (purpose, context and documentation), performers – implementers (knowledge, skills, and behaviour of employees during the process realisation), owner (identity, activity and authority), infrastructure (information systems and human resources) and measures (definition and use). When it comes to enterprise’s maturity, hammer emphasises four skills, and they are: leadership (awareness, commitment, style, and behaviour), culture (team work, focus on customers, responsibility and integration). However, the models proposed by Curtis and Hammer are based on the Rosemann and Burin model, and very similar. Translated towards business processes, BPMM are evolutionary models for measuring (AS-IS) and improving (TO-BE) maturity, or the extent to which an organisation consistently implements processes within a defined scope that contributes to the achievement of its business goals. Mature business processes acquire the necessary capabilities to reach excellence. Capabilities are competencies (e.g., skills and knowledge) to achieve the targeted results, i.e., the ability to perform, or the expected performance of a business process. Related capabilities are collected into

170

M. Moradi-Moghadam et al.

capability areas together. Sometimes, capability levels are present to indicate the growth through each capability area separately (Hammer, 2007; McCormack, 2007). In order to provide a proposed model for Iranian organisations in the field of early MMs have been proposed Figure 1

Table 1

since 2004, were studied such as Hammer (2007), McCormack et al. (2009), Rohloff (2010), Andjelković (2004), Burlton (2001) and Rosemann et al. (2006). In addition, the models that are described below were also part of the process model, EFQM and ISO 9004:2009 standards.

The relationship between these three components

Advantages and disadvantages of models in the first stage

Model Fisher

Advantage

Disadvantage

The maturation process of the separation factor matrix

Factors are generally classified

Appropriate stage of maturity

No clearly defined procedures in every stage of implementation in organisations

Usable in all organisations

Two-dimensional and lack the scope

Rosemann, Bruin, power

Clarify on determined actions of the segregation factors Appropriate stages of maturity Three-dimensional nature and the scope Usable in all organisations

Factors are generally classified Actions separation factor is determined

Hammer

Classification factors with segregation process and organisation

Stages of maturity is lower than the other models

Actions with segregation factors of maturity stage the matrix

Two-dimensional and lack the scope (time and organisation)

Clarify on determined actions of the segregation factors and maturity stages Usable in all organisations EFQM processes Clarify on determined actions of the segregation factors Usable in all organisations It have professional criteria and is covered Paul Harmon

Factors are overall classified Actions is determined to segregation factors Lack of determine maturity stages It is one-dimension and have not factor, scope

Appropriate stages of maturity

Factors are overall classified

Usable in all organisations

Actions is determined to segregation factors Lack of clearly defined actions in every stage of implementation in organisations It is one-dimension and have not factor ,scope

Bill Curtis

Clarify on determined actions of the segregation factors Appropriate stages of maturity Three-dimensional and have a scope Usable in all organisations

Factors are overall classified Actions is determined to segregation factors It is one-dimension and have not factor, scope

A novel model for business process maturity assessment through combining maturity models

3

Comparison of models

The models of Rosemann, Bruin and Power (2006), and Michael Hammer (2007) are the two best options. Hence, the model of Michael Hammer, which has both the advantages at this point, is chosen as the base model. Other benefits can also be added to other models (Table 1).

3.1 The first step comparison Given that the basic aim of the model is discussed, some general properties of the models selected with criteria that included how the categories of business processes (separation of process maturity), how to determine the (separate invoices, process maturity), on the characteristics and actions of the maturity stage, the number of models being used in all organisations. Then the positive and negative aspects of each criterion, and determining the advantages and disadvantages of each model are summarised in Table 1.

3.2 The second step comparison The purpose of this phase is to ensure that the choice of the base model, and the factors affecting the integrity of business processes are mature. Therefore, Table 2 shows a comparison of the models, the base model’s alignment with strategy, assessment or review, equipment and instruments, information and knowledge, as well as deployment, measurement and performance is defective (Table 2).

Comparison of factors associated with the process parameters in various models of Hammer models Index

EFQM

ISO 9004:2009

Purpose

5b

2.7

Bruin

Rosemann, Bruin, Power

Fisher

McCormack

Rohloff

Burlton

Andjelković

Criteria 3 Criteria 3

Criteria 4

***

Criteria 2, 3,4, 5

Criteria 1

***

Content

5a

2.7

Criteria 3 Criteria 3

Criteria 4

Criteria 1

Criteria 2, 3,4, 5

Criteria 1

***

Documentation

5b

2.7

Criteria 3 Criteria 3

Criteria 4

Criteria 1

Criteria 2, 3,4, 5

Criteria 1

***

Knowledge

5c

2.7.6

Criteria 5 Criteria 5

Criteria 3

***

Criteria 6

Criteria 3

Criteria 4

5c

***

Criteria 5 Criteria 5

Criteria 3

***

Criteria 6

Criteria 3

Criteria 4

5c

***

Criteria 5 Criteria 5

Criteria 3

***

Criteria 6

Criteria 3

Criteria 4

5b

3.7

Criteria 5 Criteria 5

Criteria 3

Criteria 2

Criteria 6

Criteria 3

Criteria 4

5b

1.7

Criteria 5 Criteria 5

Criteria 3

Criteria 1

Criteria 6

Criteria 3

Criteria 4

Authority

5b

3.7

Criteria 5 Criteria 5

Criteria 3

Criteria 2

Criteria 6

Criteria 3

Criteria 4

Information systems

***

7.6

Criteria 4 Criteria 4

Criteria 5

Criteria 3

Criteria 8, 9

Criteria 4

Criteria 3

Human resource systems

5c

5.6

Criteria 4 Criteria 4

Criteria 5

Criteria 3

Criteria 8, 9

Criteria 4

Criteria 3

Definition

5d

3.8

Criteria 2 Criteria 2

Criteria 2

Criteria 3

Criteria 2, 3,4, 5

***

***

Uses

5d

3.8

Criteria 2 Criteria 2

Criteria 2

Criteria 3

Criteria 2, 3,4, 5

***

***

Owner

Identity Activities

Infrastructure

Skills Behaviour

Measurement

Performers

Design

Criteria

Table 2

171

Table 3

Comparison of basic research (CMMI) with other models

Research model (CMMI) Initial

Paulk et al. (1993)

Fisher (2004)

Rosemann and Bruin (2005)

Curtis and Alden (2006)

Andjelković (2007)

Initial

Siloed

Initial

Initial

Initial

Managed

Repeatable

Tactically integrated

Repeatable

Managed

Managed

Defined

Defined

Process driven

Defined

Standardised

Defined

Quantitatively managed

Managed

Optimised enterprise

Managed

Predictable

Quantitatively managed

Optimising

Intelligent operating network

Optimising

Optimising

Optimising

Optimising

172

M. Moradi-Moghadam et al.

Table 3

Comparison of basic research (CMMI) with other models (continued)

Research model (CMMI)

Lee et al. (2007)

Initial

McCormack et al. (2009)

Wolf and Harmon (2010)

Rohloff (2010)

Burlton (2011)

Initial

Ad hoc

Initial

Initial

Initial

Managed

Managed

Defined

Managed

Managed

Repeatable

Defined

Defined

Linked

Defined

Defined

Defined

Quantitatively managed

Integrated

Quantitatively managed

Quantitatively managed

Managed

Optimising

Optimising

Optimising

Quantitatively managed Optimising

Optimising

3.3 The third step comparison The purpose of this phase is to ensure that the choice of the base model (CMMI), in terms of stages of maturity has more integrity than the other models. Therefore, Table 3 shows the comparison of models.

3

the next ruler to measure RADAR model has been used.

4

The proposed model

The proposed BPMM has the following dimensions:

3.4 A new model is required According to the aforementioned comparisons, a new model is required to include all factors affecting business processes in adulthood more specifically, the identified gaps in available models which are addressed in our proposed model are: 1

2

indexes: alignment with strategy, assessment or review, equipment and instruments, information and knowledge, deployment, measurement, performance in the EFQM model expressed RADAR basic model with two factors and stages of maturity

Figure 2

1

level of maturity: maturity stages, each associated with process maturity index

2

criteria and indexes related to the process maturity

3

assessment maturity indexes.

4.1 Level of maturity As noted in Section 3.3, most of the process management maturity and process maturity of Authors, the CMMI models have been fully described in previous sections. Therefore, the comparison between PMMs chosen for the model is illustrated in Figure 2.

The maturity level and scoring (see online version for colours)

A novel model for business process maturity assessment through combining maturity models a

The model has five levels of maturity in each of the levels namely: initial, managed, defined, quantitatively managed and optimising. 1

b

Initial: The first phase of activity integrated maturity level regarding the process is not. In fact, the organisation has not yet formed, so that such organisations have the following characteristics: a no generalised approach b carry out activities independently c alternative approaches and the lack of integration between the tools and methods d based on the limited scope of activities e low involvement of employees f high intervention level and non-value added tasks g the lack of a plan and schedule for streaming real h restrictions huge improvement activities and learning i lack of appropriate goals for outcomes j lack of alignment approaches and strategies.

2

Managed: The second degree of maturity, experience, and passed initial process improvement and process management capabilities central to the process has started. Such a process view of the organisation who are looking to increase somewhat. Such an organisation is a combination of the following characteristics: a elementary processes documented b recognise and understand the importance of central c greater involvement of executives and top managers d a main goal of the implementation process e extensive use of modelling processes with simple data warehouse f initial efforts by having a structured approach and common standards g there is some evidence of an actual implementation plan and schedule for the current h initial performance improvement activities and learning i small set goals for results j alignment with strategies to approach the limit.

3

Defined: The degree of maturity of the third stage of the integration process is more motivated to develop capabilities. Organisations who are trying to look at the view of the process increases. Such an organisation is a combination of the following characteristics:

c

d

e f g h i

173

emphasis on early life-cycle management processes application of tools and techniques which have full details (using tools such as process mapping) a combination of tools and techniques for managing various processes (e.g., process redesign, workflow management and process-oriented risk management) more use of new technologies for communication between processes (e.g., process design that is available to users via the Internet.) formal and conceptual process-oriented training sessions there is evidence of an actual implementation plan and schedule for the current key activities to improve the organisation’s activities determine appropriate goals for outcomes alignment with organisational strategies relative approaches.

4

Quantitatively managed: The degree of maturity of the fourth stage of the placement process and the composition of the organisation’s strategic plan benefits. This organisation is a combination of the following characteristics: a establish processes for management and protection of standards for excellence b evaluation of process control technologies and business methods c combination of business and IT process-oriented perspective (e.g., workflow management and activity-based costs) d formal and determined to processes e extensive use of acceptable methods and technology f integration of the results of the process g process orientation as one of the essential components of the project h continued development and integration activities associated with the process i elevated levels of performance improvement activities within the organisation j process change based on changes in strategy.

5

Optimising: The degree of maturity of the fifth stage of the placement process as the main part of the strategic management and operational benefits and strategic planning algorithm-based company processes and implementation are outlined. Such an organisation is a combination of the following characteristics:

174

M. Moradi-Moghadam et al. a b c

d e

f g h

as part of the orientation process management activities acceptance and widespread use of standard technologies and methods process-oriented approach for the integration of the organisation, customers, suppliers, distributors and other stakeholders are life cycle management of business processes management processes for excellence has been established, the process management and business activity is part of a staff reduction is smaller focus on improving organisational performance development of new processes and organisational strategies stems for all results, set goals and make them happen.

suppliers to create (activities). In the field of authority, owner must control IT systems that support process and regulatory forces and budgets will have the choice to take control of the budget process in the future may have a direct effect on selection forces and assess their. 3

They have the necessary skills in teamwork; problem solving, decision-making and management have evolved. Performers must be familiar with the concepts of traditional and new business processes and understand what impact on other processes and organisations, and also keep track of their industry developments in order to explain the impact of these changes on performance. They have the necessary skills in teamwork; problem solving, decision-making and management have evolved.

4.2 Criteria and indexes After comparing criteria and indicators to assess the maturity of processes (Table 2), the seven criteria and 25 indexes were identified and are described in the following: 1

Design: Process design should be checked. If not properly process involved does not know what to do and when to do it. The design must consider five indicators or factors: 1 purpose 2 content 3 alignment with strategy 4 assessment or review 5 documentation.

4

In the Hammer model to align with strategy and update or revision is not mentioned, however, that in most models and strategy papers referred to the alignment process (Rosemann and Bruin, 2005, Fisher, 2004; EFQM, 2010; ISO 9004, 2009). 2

Owner: Each process requires an ‘owner’: the senior manager’s responsibility and authority to develop and deliver the process is concluded. In the absence of such a charge, the process will take place. The factors considered are three indicators which include: 1 entity 2 activities 3 authority. Owner must try to allocate the time and target participation of people thought to be the first member to be the highest decision-making organ identity (identify). Also, owners must work together in order to achieve integration goals, and their future together strategically to support the processes of customers and

Performers: Those who are responsible for implementing the process should have the necessary skills. They should have the following three characteristics: 1 knowledge 2 skills 3 behaviour.

Infrastructure: The company should be adjusted so that the infrastructure and support for the process and not hinder its performance. In this case, they cannot implement their plans. Including infrastructure related factors can be: 1 information systems 2 equipment and instruments 3 knowledge and information 4 human resources systems. An integrated information system taking into account the process needs to be upgraded to support the standard. However, the right tools and equipment for the proper functioning of information systems should be able to process information in order to operate properly. Also within the knowledge of information systems should be reliable, accessible, and can be integrated.

5

Deployment: After introducing the factors associated with the planning and design process, it is the turn of this building, the two parameters that must be evaluated include: 1 implemented 2 systematic. First, we see that the design has been fully implemented in all areas. The process has been fully implemented in the sector. After the design process is well implemented, should be studied systematically and timely and structured design of the runs.

A novel model for business process maturity assessment through combining maturity models 6

impressive and formidable dramatic results. But things are not durable and less repeats. The important point is that the intensity varies with factors exist in all organisations. May be organised in an ‘owner’ is a good choice but the necessary authority to implement a comprehensive national plan is good, he should not be delegated.

Measurement: The sixth feature is the need to develop criteria and indicators for performance assessment process. No criteria not having been aware of the actual process output. These are processes that provide excellent performance in rough indicators will include: 1 definition 2 learning and creativity 3 improvement and innovation 4 uses.

4.3 Assessment maturity indexes This model is then evaluated, based on a questionnaire that was introduced in the last section of the index is based on RADAR. In this model, the 5-level indicator and is measured from 0 to 100 points. So that the first level, rated from 0 to 10, the next level rating from 15 to 35, the third level points from 40 to 60, in quarter-point from 65 to 85 and the final score is 90 to 100 (Table 4). The complete questionnaire is provided in Appendix A.

Process metrics should be defined according to the organisation’s strategic goals and objectives of the organisation, as well as a system for the identification of positive results and the lessons learned there. To make use of creativity and design new or modified processes to improve the learning and innovation are essential. Efforts to improve the performance of key processes and innovative new processes to identify changes in the environment and the results obtained in the process of improving the performance enhancement organisation. 7

5

We are looking at whether the performance is in line with the organisation’s goals and objectives for the results and performance are set then. Sometimes it is necessary to review the current state and desired future. Finally, the relationship between performance, achieved results, and future of affirmative actions are ensured. Seven criteria common to a close, they are complex and interrelated. Each of them was caused others to be inefficient. A ‘business owner’ using a low power process is not well designed. If untrained performers, they cannot do well to implement the plan. A poor design cannot meet the expectations that have to be included in the evaluation and performance index, and the chain continues. In the absence of one or more criteria may be a ‘work of’ some of the most

Index

Criteria

Conclusions

In this research, we studied models such as EFQM, ISO 9004:2009 thereafter processed MMs and identified factors and indicators; then, employed RADAR ruler to score indicators. Ultimately, the decision table was presented to prioritise maturity processes. The BPMM application provide with several additional benefits. For instance, the analysis took the approximation out of planning; the process owner’s team had not addressed certain issues simply because it had not thought of them. The framework allowed team members to decide where to focus their resources instead of forcing them to rely on intuition and flashes of imagination. Furthermore, the BPMM analysis gave leaders answers they could offer the many employees who had become enthusiastic about the company’s focus on business processes and were asking what they could be doing to help. The BPMM framework does not make the road to process transformation easy to travel. Executives must do a lot of difficult, even painful, work to design high-performance processes and create an environment in which those processes flourish. In fact, organisations are often surprise by the results of BPMM analyses; they feel they have made more progress than the model shows. However, in process transformations, as in life, knowing where you stand and having a road map to follow beats stumbling in the dark.

Performance: The last factor in assessing process maturity and performance. After the planning, implementation, measurement, control, and operation processes have been implemented well. Indicators associated with this element are: 1 trends 2 targets 3 comparisons 4 causes.

Table 4

175

Assessment maturity indexes Level 2 (managed)

Level 1 (initial) 0

5

10

15

20

25

30

Level 3 (defined) 35

40

45

50

55

60

Level 4 (quantitatively managed) 65 70 75 80

Level 5 (optimising) 85

90

95

100

176

M. Moradi-Moghadam et al.

The BPMM presented in this study is distinct in the following way: 1

it grasps the organisations’ current business processes

2

it introduces appropriate KPAs which are suitable for software and systems processes with business process

3

it covers shortcomings of the existing PMM/PMMM

4

it reflects the opinions of experts

5

it clarifies the difference between maturity levels.

The proposed model can be used by companies in order to improve their efficiency, decrease costs, improve customer satisfaction, grow the top line, and achieve competitive advantage. These advantages become more visible as the company progresses. On the flip side, companies will find themselves in a disadvantageous state if they do not progress, as their competitors will likely be trying to accomplish this same feat. Ultimately, to climb the mountain and realise these benefits, companies must understand that there will be high hurdles to overcome at each step in the maturity process, and the only way to overcome these challenges is to achieve organisational alignment around all five levers of change by creating an enterprise-wide environment that supports and rewards the appropriate behaviour at each step of the way. Our research tries to fill this gap by conducting a comparative study on a popular models. This paper only focuses on a small, though important part of that research. Particularly, it presents a questionnaire with 7 criteria and 25 indexes, derived by a content analysis of the design documents from the sampled BPMMs. It can be used by practitioners to select a BPMM that best fits their organisational needs. Indeed, organisations wishing to start improving business process maturity must first choose a BPMM out of a wide array. Since existing BPMMs vary on many design elements, this choice may impact their further progression in business process management. Frequently, such organisations are not aware of those differences. Therefore, our questionnaire supports their BPMM choice by considering the most important design differences among existing BPMMs.

Acknowledgements The authors would like to thank all colleagues at Qods-Niroo company, especially Mr. Kamali-Zadeh, Mr. Naseri, Mr. Fallahnezhad, Mr. Bakhshandeh. Special thank to Mr. Drafshan, CEO of Integrated Systems in Management, for his cooperation in providing input information. In addition, in developing this research we significantly benefited from thoughts and idea of Professor Asghar-Zadeh. Meysam Maleki also acknowledges Fundação para a Ciência e Tecnologia da Faculdade de Ciências e Tecnologia Project MIT-Pt/EDAM-IASC/0022/2008, he is supported by a PhD fellowship from this foundation.

References Ahern, D., Clouse, A. and Turner, R. (2004) CMMI Distilled: A Practical Introduction to Integrated Process Improvement, Addison-Wesley, Boston. Andjelković, M. (2004) ‘Six Sigma project implementation’, YUPMA – VIII International Symposium in Project Management, Belgrade, pp.191–197. Andjelković, M. (2007) ‘Business process management maturity model and Six Sigma: an integrated approach for easier networking’, International Conference on Economics and Management of Networks, Vienna. Aysar, P.S. and Johnson, W.C. (2003) ‘Strategic capabilities of business process: looking for competitive advantage’, Competitiveness Review, Vol. 13, No. 2, pp.46–52. Benner, M.J. and Veloso, F.M. (2008) ‘ISO9000 practices and financial performance: a technology coherence perspective’, Journal of Operations Management, Vol. 26, No. 5, pp.611–629. Burlton, R. (2011) ‘BPM critical success factors lessons learned from successful BPM organizations’, Business Process Trends, October, pp.1–6. Burlton, R.T. (2001) Business Process Management: Profiting from Process, Sams, Indianapolis, IN. Chrissis, M., Konrad, M. and Shrum, S. (2006) CMMI Guidelines for Process Integration and Product Improvement, Addison-Wesley, Boston. Curtis, B. and Alden, J. (2006) ‘The BPM & organizational maturity’, Business Process Trends, November, pp.1–5. Davenport, T.H. (1993) Process Innovation: Reengineering Work through Information Technology, Harvard Business School Press, Boston, MA. Fisher, D.M. (2004) ‘The business process maturity model: a practical approach for identifying opportunities for optimization’, Business Process Trends, September, pp.1–7. Hammer, M. (2007) ‘The process audit’, Harvard Business Review, Vol. 82, No. 4, pp.111–123. Harmon, P. (2003) Business Process Change: A Manager’s Guide to Improving, Redesigning, and Automating Processes, Morgan Kaufmann Publishers, San Francisco, CA. Harmon, P. (2004) ‘Evaluating an organization’s business process maturity’, Business Process Trends, Vol. 2, No. 3, pp.1–11. Harrington, H.J. (2006) Process Management Excellence, Paton Press, California. Hoang, D.T., Igel, B. and Laosirihongthong, T. (2006) ‘The impact of total quality management on innovation: findings from a developing country’, International Journal of Quality and Reliability Management, Vol. 23, No. 9, pp.1092–1117. Hofmann, H., Yedlin, D., Mishler, J. and Kushner, S. (2007) CMMI for Outsourcing: guidelines for Software, Systems, and IT Acquisition, Addison-Wesley, Boston. Lam, K.C., Wang, D. and Lam, M.C.K. (2008) ‘The TQM journey of Hong Kong building contractors: from a self-assessment perspective’, The TQM Magazine, Vol. 20, No. 6, pp.556–569. Lee, J., Lee, D. and Kang, S. (2007) ‘An overview of the business process maturity model (BPMM)’, in Chang, K.C. et al. (Eds.): Advances in Web and Network Technologies, and Information Management, pp.384–395, Springer Berlin Heidelberg.

A novel model for business process maturity assessment through combining maturity models Lee, R.G. and Dale, B.G. (1998) ‘Business process management: a review and evaluation’, Journal of Business Process Management, Vol. 4, No. 3, pp.214–225. Maier, A.M., Moultrie, J. and Clarkson, P.J. (2008) ‘Developing maturity grids for assessing organizational capabilities: practitioner guidance’, 4th International Conference on Management Consulting, pp.1–29, Vienna. McCormack, K. (2007) ‘Supply chain management maturity’, Business Process Maturity. Theory and Application, Booksurge Publishing, South Carolina, pp.73–103. McCormack, K., Willems, J., van den Bergh, J., Deschoolmeester, D., Willaert, P., Stemberger, M.I., Skrinjar, R., Trkman, P., Ladeira, M.B., de Oliveira, M.P.V., Vuksic, V.B. and Vlahovic, N. (2009) ‘A global investigation of key turning points in business process maturity’, Journal of Business Process Management, Vol. 15, No. 5, pp.792–815. Paulk, M.C., Curtis, B., Chrissis, M.B. and Weber, C.V. (1993) ‘Capability maturity model’, Software IEEE, Vol. 10, No. 4, pp.18–27.

177

Rohloff, M. (2010) ‘Advances in business process management implementation based on a maturity assessment and best practice exchange’, Information Systems and E-Business Management, Vol. 9, No. 3, pp.383–403. Rosemann, M. and Bruin, T. (2005) ‘Application of a holistic model for determining BPM maturity’, Business Process Trends, February, pp.1–20. Rosemann, M., Bruin, T. and Power, B. (2006) ‘A model to measure BPM maturity and improve performance’, Business Process Management: Practical Guidelines for Successful Implementation, Elsevier, Oxford. Sharma, M. and Kodali, R. (2008) ‘TQM implementation elements for manufacturing excellence’, The TQM Magazine, Vol. 20, No. 6, pp.599–621. Vom Brocke, J. and Rosemann, M. (2010) Handbook on Business Process Management, Vol. 2, pp.vii–ix, Springer, Berlin. Wolf, C. and Harmon, P. (2010) ‘The state of business process management’, Business Process Trends, February, pp.1–52.

Appendix A Table A1

Business process maturity assessment questionnaire Business process maturity assessment

Criteria

Index Purpose

Initial The process is not yet fully developed. Areas of project managers to improve their performance in the field are not used.

Design

Content

Inputs, outputs, supplier and customer processes have not been identified. Alignment All new design with the aim of with strategy improving the process is not operational. Assessment or There is no approach to review review and update process. Documentation Process documentation and communication between the enterprise and Mlyany are not specified in the implementation process. Identity

Owner is not responsible for improving process performance. Owner does not recognize the process, it does not account for all the users and does not support any changes.

Authority

Owner does not promote a business process-driven, task-oriented managers do not invite to accept the transformation.

Owner

Activities

Level 1 0 5 10

Managed

Level 2 15 20 25

30

35

15 20 25

30

35

15 20 25

30

35

15 20 25

30

35

15 20 25

30

35

15 20 25

30

35

0 5 10 The process owner is an individual 15 20 25 or a group informally charged with improving the process’s performance. 0 5 10 The process owner identifies and 15 20 25 documents the process, communicates it to all the performers, and sponsors small scale change projects. 0 5 10 The process owner lobbies for the 15 20 25 process but can only encourage functional managers to make changes.

30

35

30

35

30

35

0 5 10 The process has not been designed on an end-to-end basis. Functional managers use the legacy design primarily as a context for functional performance improvement. 0 5 10 The process’s inputs, outputs, suppliers, and customers have been identified. 0 5 10 The new process is designed to improve the operation is performed. 0 5 10 Periodic review and update is done to improve the process. 0 5 10 The documentation of the process is primarily functional, but it identifies the interconnections among the organizations involved in executing the process.

178

M. Moradi-Moghadam et al.

Table A1

Business process maturity assessment questionnaire (continued) Business process maturity assessment

Criteria

Index

Performers Infrastructure

0 5 10

Managed

Level 2 15 20 25

30

35

0 5 10 Performers can name the process they execute and identify the key metrics of its performance.

15 20 25

30

35

Performers are not technology problem solving and process improvement skills.

0 5 10 Performers are skilled in problem solving and process improvement techniques.

15 20 25

30

35

Performers are not at all faithful to the task as well as their activities are not significant.

0 5 10 Performers have some allegiance to 15 20 25 the process, but owe primary allegiance to their function.

30

35

Elementary and separate information systems, the process does not support.

0 5 10 Fragmented legacy IT systems support the process.

15 20 25

30

35

Equipment and The organization does not have instruments the proper equipment, software and hardware.

0 5 10 Equipment and tools for hardware 15 20 25 and software part (1/4) can be seen in the organization.

30

35

Information Information and knowledge and knowledge integration, reliability and availability are not relevant persons.

0 5 10 There are the process integrity, availability and reliability of information and knowledge.

15 20 25

30

35

Skills

Behaviour

Information systems

Deployment

Level 1

Performers are not able to identify the main criteria for measuring performance.

Knowledge

Measurement

Initial

Human resource systems

Task-oriented managers are not responsible for operations excellence and operational problems in the process.

15 20 25 0 5 10 Functional managers reward the attainment of functional excellence and the resolution of functional problems in a process context.

30

35

Implemented

Design and approach is not implemented and there is not evidence and anecdotal.

0 5 10 Implemented in about 1/4 of relevant areas.

15 20 25

30

35

Systematic

There is not any plan for deploying and it cannot manage changes in environment and implement in the best time.

0 5 10 Same evidence.

15 20 25

30

35

Definition

Cost and quality measures for the process have not determined.

0 5 10 The process has some basic cost and quality metrics.

15 20 25

30

35

Learning and creativity

There is no individual learning and sharing knowledge. From creativity to create new or modified approaches cannot be used.

0 5 10 There are processes for sharing information and knowledge. Creative approaches to develop new or changed somewhat used.

15 20 25

30

35

15 20 25 0 5 10 Basic improvement processes, based on corrective and preventive actions, are in place and Innovation activities are based on data concerning the needs and expectations of customers.

30

35

0 5 10 Managers use the process’s metrics 15 20 25 to track its performance, identify root causes of faulty performance, and drive functional improvements.

30

35

Innovation and Improvement activities are ad Improvement hoc and based on customer or regulatory complaints.

Uses

Management process to track the performance criteria cannot be used to improve operations, root causes of performance failures are not identify.

A novel model for business process maturity assessment through combining maturity models Table A1

179

Business process maturity assessment questionnaire (continued) Business process maturity assessment

Performance

Criteria

Index

Level 2

Managed

0 5 10

15 20 25

30

35

Trends

Trends are not aligned with strategic goals and with the ‘ideal’ trend. There are not positive trends and sustained good performance.

0 5 10 Positive trends and/or satisfactory performance on some results.

15 20 25

30

35

Targets

Targets are not achieved. targets are not appropriate.

0 5 10 For nearly quarter results, objectives, and achieves good.

15 20 25

30

35

Comparisons

Comparisons with external organizations do not takes place and results do not compare well with industry averages or acknowledged ‘best in class’.

0 5 10 For about 1/4 results, by comparison, are appropriate and represents good condition.

15 20 25

30

35

Results are not caused by approach.

0 5 10 For about 1/4 of the impact on their 15 20 25 empowerment is evident and there is evidence indicating stable performance.

30

35

Causes

Table A2

Level 1

Initial

Business process maturity assessment questionnaire Business process maturity assessment

Defined

Level 3

Quantitatively managed

Level 4 65 70 75 80 85

Optimizing

Level 5 90

95

100

45 50 55 60 The process has been 65 70 75 80 85 The process has been designed to fit with designed to fit with other enterprise customer and supplier processes and with the processes in order to enterprise’s IT optimize the enterprise systems in order to performance. optimize the enterprise’s performance.

90

95

100

65 70 75 80 85 The process owner and the owners of customer and supplier processes with which the process interfaces have established mutual performance expectations.

90

95

100

90

95

100

90 65 70 75 80 85 Reviewed and updated and shared between all units of output results show the effectiveness of the review and update of the activities.

95

100

40

45 50 55 60

The process has been redesigned from end to end in order to optimize its performance.

40

The needs of the process’s customers are known and agreed upon.

40

45 50 55 60 The process owner and the owners of the other processes with which the process interfaces have established mutual performance expectations.

The new process is designed to identify the processes that are carried out in order to achieve bottleneck.

40

45 50 55 60 Design new processes 65 70 75 80 85 In addition to designing of identifying process new processes identified bottlenecks and in the organization’s identify process strategy stems from the changes resulted from application of process the strategy shift is improvement can be done. done.

Revisions and updates to be done systematically and regularly.

40

45 50 55 60 Review and update the output of some units can be multiplexed for further learning and collaboration.

180 Table A2

M. Moradi-Moghadam et al. Business process maturity assessment questionnaire (continued) Business process maturity assessment

Defined

Level 3

Quantitatively managed

Level 4

Level 5 90 95

100

45 50 55 60 The process 65 70 75 80 85 An electronic documentation representation of the describes the process’s process design supports interfaces with, and its performance and expectations of, other management and allows processes and links the analysis of process to the environmental changes enterprise’s system and process and data architecture. reconfigurations.

90 95

100

40

45 50 55 60 The process comes 65 70 75 80 85 The process owner is a first for the owner in member of the terms of time enterprise’s most senior allocation, mind share, decision-making body. and personal goals.

90 95

100

The process owner articulates the process’s performance goals and a vision of its future; sponsors redesign and improvement efforts; plans their implementation; and ensures compliance with the process design.

40

45 50 55 60 The process owner works with other process owners to integrate processes to achieve the enterprise’s goals.

90 95 65 70 75 80 85 The process owner develops a rolling strategic plan for the process, participates in enterprise-level strategic planning, and collaborates with his or her counterparts working for customers and suppliers to sponsor enterprise process redesign initiatives.

100

The process owner can convene a process redesign team and implement the new design and has some control over the technology budget for the process.

40

90 95 65 70 75 80 85 The process owner 45 50 55 60 The process owner controls the process’s controls the IT budget and exerts strong systems that support influence over personnel the process and any assignments and projects that change evaluations. the process and has some influence over personnel assignments and evaluations as well as the process’s budget.

100

Performers can describe the process’s overall flow; how their work affects customers, other employees in the process, and the process’s performance; and the required and actual performance levels.

40

45 50 55 60 Performers are familiar both with fundamental business concepts and with the drivers of enterprise performance and can describe how their work affects other processes and the enterprise’s performance.

90 95

100

Performers are skilled in teamwork and self-management.

40

65 70 75 80 85 Performers are skilled at 90 95 45 50 55 60 Performers strive to change management and ensure that the process change implementation. delivers the results needed to achieve the enterprise’s goals.

100

40

45 50 55 60

There is end-to-end documentation of the process design.

40

Enterprise leadership has created an official process owner role and has filled the position with a senior manager who has clout and credibility.

65 70 75 80 85

Optimizing

65 70 75 80 85 Performers are familiar with the enterprise’s industry and its trends and can describe how their work affects interenterprise performance.

A novel model for business process maturity assessment through combining maturity models Table A2

181

Business process maturity assessment questionnaire (continued) Business process maturity assessment

Defined

Level 3

Quantitatively managed

Level 4 65 70 75 80 85

Optimizing

Level 5 90 95

100

90 95

100

90 95 65 70 75 80 85 An IT system with a modular architecture that adheres to industry standards for enterprise communication supports the process.

100

40

65 70 75 80 85 Equipment and software 90 95 45 50 55 60 There are clear tools are fully observed evidence (3/4) of in the organization. hardware and software equipment and tools to improve the processes in the organization.

100

Information and knowledge are shared with the organization and is reviewed periodically.

40

45 50 55 60 Between the partners and the relevant units of information and knowledge is shared.

65 70 75 80 85 The results of knowledge management is compared with other organizations.

90 95

100

The process’s design drives role definitions, job descriptions, and competency profiles. Job training is based on process documentation.

40

45 50 55 60 Hiring, development, reward, and recognition systems emphasize the process’s needs and results and balance them against the enterprise’s needs.

65 70 75 80 85 Hiring, development, reward, and recognition systems reinforce the importance of intra- and enterprise collaboration, personal learning, and organizational change.

90 95

100

Implemented in abut 1/2 of relevant areas.

40

45 50 55 60 Implemented in about 3/4 of relevant areas.

65 70 75 80 85 Implemented in all relevant areas.

90 95

100

Evidence.

40

45 50 55 60 Clear evidence.

65 70 75 80 85 Comprehensive evidence.

90 95

100

The process has end-to-end process metrics derived from customer requirements.

40

45 50 55 60 The process’s metrics as well as cross-process metrics have been derived from the enterprise’s strategic goals.

65 70 75 80 85 The process’s metrics have been derived from enterprise goals.

90 95

100

There is a system for detecting positive results and lessons learned. From creativity to create new or modified approaches are used.

40

90 95 45 50 55 60 Enhance learning and 65 70 75 80 85 Learning culture in the organization is innovation processes institutionalized and is essential. Clear comprehensive evidence evidence of the use of of the creativity used to innovative approaches create new or modified to the creation of new approaches exist. or changed there.

100

40

45 50 55 60

Performers try to follow the process design, perform it correctly, and work in ways that will enable other people who execute the process to do their work effectively.

40

65 70 75 80 85 Performers look for 45 50 55 60 Performers strive to signs that the process ensure that the process should change, and they delivers the results propose improvements needed to achieve the to the process. enterprise’s goals.

An IT system constructed from functional components supports the process.

40

45 50 55 60 An integrated IT system, designed with the process in mind and adhering to enterprise standards, supports the process.

There are evidence (1/2) of hardware and software equipment and tools for improving processes in an organization.

182 Table A2

M. Moradi-Moghadam et al. Business process maturity assessment questionnaire (continued) Business process maturity assessment

Defined

Level 3

Quantitatively managed

Level 4 65 70 75 80 85

Optimizing

Level 5

40

45 50 55 60

90 95

100

Improvement efforts can be demonstrated in most of the products and key processes of the organization and The innovation process for new products and processes is able to identify changes in the organization’s environment, in order to plan innovations.

40

45 50 55 60 Results generated 65 70 75 80 85 Focusing on improving 90 95 from the improvement organizational processes enhance the performance and change performance of the and learning. Innovation organization and The in processes, effectiveness and organizational structure, efficiency of the operating model and innovation processes management systems are are assessed regularly used. as a part of the learning process.

100

Managers use the process’s metrics to compare its performance to benchmarks, best-in-class performance, and customer needs and to set performance targets.

40

45 50 55 60 Managers present the metrics to process performers for awareness and motivation. They use dashboards based on the metrics for day-to-day management of the process.

90 95

100

Positive trends and/or sustained good performance on many results over the last three years.

40

65 70 75 80 85 Strongly positive trends 90 95 45 50 55 60 Strongly positive and/or sustained trends and/or sustained excellent performance in excellent performance all areas over at least on most results over at five years. least three years.

100

For nearly half results, objectives, and achieves good.

40

45 50 55 60 For about 3/4 results, objectives, and achieves good.

65 70 75 80 85 For all results, set goals, and achieves good.

90 95

100

For about 1/2 results compared to the fit and proper status displays.

40

45 50 55 60 For about 3/4 results, by comparison, are appropriate and represents good condition.

65 70 75 80 85 Excellent in most areas and ‘best in class’ in many areas.

90 95

100

For about half of the impact on their empowerment is evident and there is evidence indicating stable performance.

40

45 50 55 60 For about 3/4 of the impact on their empowerment is evident and there is evidence indicating stable performance.

65 70 75 80 85 For all results, the effect 90 95 is evident on empowerment and comprehensive evidence exists evidence of performance persistence.

100

65 70 75 80 85 Managers regularly review and refresh the process’s metrics and targets and use them in strategic planning.

A novel model for business process maturity assessment through combining maturity models

183

Appendix B Table B1

Business process maturity assessment: corporate results

Management of financial resources

Asset management

40.3 40.3 31.3 41.0 34.3 46.5

Activities

47.3 43.0 51.8 38.5 32.3 32.8 59.0 29.5 34.5

27.0

37.0 37.8 29.3 40.0 33.5 46.5

Criteria Design Owner

Authority

Performers Infrastructure Deployment

30.5 31.3 31.0 28.8 27.3 29.8

38.8 38.8 35.0 37.5 34.0 36.8

61.2 64.3 57.3 63.5 65.5 62.3

30.5 31.5 33.0 30.3 33.5 31.8

45.8 44.8 38.8 41.0 43.5 42.8

35.0 34.8 34.8 35.5 36.3 35.3

53.0 55.0 45.3 45.3 52.8 51.2

44.0 38.5 52.5 38.0 31.3 30.8 58.8 28.0 32.8

27.3

35.5 35.8 30.5 36.5 31.0 45.3

27.1

37.6 37.9 30.3 39.2 32.9 46.1

Knowledge

57.3 46.8 58.0 44.5 38.5 43.8 68.5 39.3 43.5

38.0

45.5 49.8 37.5 47.8 42.8 55.3

Skills

58.5 51.3 55.8 48.5 36.8 45.5 68.8 40.3 46.3

37.8

41.0 48.8 36.3 49.0 41.3 56.8

Behaviour

58.0 51.0 54.5 44.0 35.0 40.5 62.0 36.3 42.8

37.3

42.8 46.0 37.5 43.5 38.3 57.3

Average

57.9 49.7 56.1 45.7 36.8 43.3 66.4 38.6 44.2

37.7

43.1 48.2 37.1 46.8 40.8 56.4

Information systems

50.5 48.0 45.0 41.0 35.0 40.3 56.8 38.0 35.5

37.0

42.5 41.5 37.3 48.5 38.3 52.3

Equipment and Instruments

53.0 53.8 49.5 44.5 42.0 43.0 59.8 37.3 46.8

37.5

47.5 42.3 39.8 55.3 38.3 56.5

Information and knowledge

52.0 48.5 51.0 44.5 35.0 41.3 62.8 36.8 36.5

32.3

40.5 45.0 36.8 46.5 35.8 51.0

Human resource systems

45.3 41.3 42.3 36.5 30.0 36.5 51.8 30.3 31.3

28.5

35.0 38.8 35.3 38.0 27.8 49.5

Average

50.2 47.9 46.9 41.6 35.5 40.3 57.8 35.6 37.5

33.8

41.4 41.9 37.3 47.1 35.0 52.3

Implemented

56.0 40.8 59.0 41.5 36.5 38.3 64.0 28.3 28.3

24.8

48.3 50.8 40.5 55.3 31.3 63.0

Systematic

55.3 41.0 60.3 41.0 34.5 38.3 64.8 26.8 26.3

26.3

47.5 45.5 42.5 54.0 34.0 66.0

55.6 40.9 59.6 41.3 35.5 38.3 64.4 27.5 27.3

25.5

47.9 48.1 41.5 54.6 32.6 64.5

Definition

48.3 33.0 45.3 38.8 32.5 38.3 59.5 30.5 30.3

29.0

38.0 38.5 30.8 42.0 31.3 49.0

Learning and creativity

44.0 37.3 49.0 39.5 31.8 35.3 59.5 32.5 31.3

26.5

32.0 34.8 30.3 42.0 29.3 45.8

Innovation and improvement

43.0 41.0 47.3 40.5 29.5 34.3 58.5 30.8 32.3

26.5

37.3 35.5 30.8 43.5 30.8 45.5

Uses

40.8 39.3 47.5 36.3 31.0 35.5 54.8 31.5 34.3

26.3

39.0 35.0 29.3 41.0 28.5 43.5

44.0 37.6 47.3 38.8 31.2 35.8 58.1 31.3 32.0

27.1

36.6 35.9 30.3 42.1 29.9 45.9

Trends

49.8 37.3 52.3 42.8 31.0 38.0 61.0 32.3 30.8

29.3

43.3 41.5 36.0 45.8 35.5 48.0

Targets

53.8 40.8 53.0 44.0 35.8 40.5 62.0 32.3 32.3

27.8

43.0 44.8 38.5 47.0 35.3 52.3

Comparisons

54.0 41.5 51.5 37.0 30.8 37.5 58.5 31.8 31.0

25.5

40.8 44.0 36.8 44.8 33.3 50.3

Causes

51.0 42.3 52.0 39.5 31.0 36.5 58.8 31.8 30.0

25.8

37.8 42.8 36.5 45.8 33.0 51.3

Average

52.1 40.4 52.2 40.8 32.1 38.1 60.1 32.0 31.0

27.1

41.2 43.3 36.9 45.8 34.3 50.4

Total average

50.0 43.3 52.4 40.9 33.2 37.8 61.2 32.3 34.4

29.6

Average Measurement

40.0 42.0 42.0 40.5 40.0 40.9

45.4 41.6 49.8 37.4 31.3 32.4 59.1 29.1 33.6

Average

Average Performance

52.0 53.5 48.8 57.0 62.0 54.7

Management support services

Human resource management

27.0

44.3 46.3 44.0 43.5 45.5 44.7

Management information and communication technologies Management of external communications

Investment projects (BOO, BOT)

45.0 43.3 45.3 35.8 30.5 33.8 59.5 29.8 33.5

45.5 46.0 37.8 43.8 50.0 44.6

Engineering and consulting services Design, procurement and construction (EPC)

Identity

Supply management

31.3 34.0 28.8 35.5 32.0 32.3

Marketing and sales

44.3 44.5 38.8 45.0 50.0 44.5

Systems design and methods

42.0 39.0 40.0 41.3 41.5 40.8

Quality, health, safety and environment (QHSE)

27.5 26.8 36.8 27.8 26.8 29.1

purpose Content Alignment with strategy Assessment or review Documentation Average

Knowledge management, improvement and change

33.3 34.0 40.3 34.5 35.5 35.5

Indexes

Strategic management and performance management

Management contract (MC)

Business process maturity assessment: corporate results Processes

Average maturity level of the organization and its processes:

41.6

41.2 42.8 35.1 45.5 34.4 52.4 Maturity level 3

184

M. Moradi-Moghadam et al.

Table B2

Business process maturity assessment: corporate results Process

Score

Maturity level

61.2

3

1

Strategic management and performance management

2

Knowledge management, improvement and change

52.4

3

3

Quality, health, safety and environment (QHSE)

52.4

3

4

Systems design and methods

50.0

3

5

Marketing and sales

45.5

3

6

Supply management

43.3

3

7

Engineering and consulting services

42.8

3

8

Design, procurement and construction (EPC)

41.2

3

9

Management contract (MC)

40.9

3

10

Investment projects (BOO, BOT)

37.8

3

11

Human resource management

35.1

2

12

Management of financial resources

34.4

2

13

Asset management

34.4

2

14

Management information and communication technologies

33.2

2

15

Management of external communications

32.3

2

16

Management support services

29.6

2

Average maturity level of processes

41.6

3