Dec 20, 2013 ... 1. Grand Liard Marsh and Ridge Restoration (BA-68) ... 1. Page 37, SP-11 Landowner and Pipeline Requirements: Replace the first paragraph ...
ADDENDUM NO. 1 TO PLANS AND CONTRACT DOCUMENTS FOR

GRAND LIARD MARSH AND RIDGE RESTORATION (BA-68) PLAQUEMINES PARISH, LOUISIANA

STATE OF LOUISIANA COASTAL PROTECTION AND RESTORATION AUTHORITY DECEMBER 20, 2013

ADDENDUM NO. 1 Grand Liard Marsh and Ridge Restoration (BA-68) This addendum shall be considered part of the Plans, Specifications, and Contract Documents (except as noted otherwise) and is issued to change, amplify, or delete from or otherwise explain these documents where provisions of this addendum differ from those of the original documents. This addendum shall have precedence over the original documents and shall govern. I.

Revisions to Specifications: 1. Page 37, SP-11 Landowner and Pipeline Requirements: Replace the first paragraph with the following: “The Owner has obtained all temporary easements, servitudes, and right-of-way agreements required for construction of the project. The agreements executed with landowners for the Work at the site contain special requirements pertaining to access routes and insurance. A land rights memorandum is included in Appendix C. The Contractor shall give reasonable notice to landowner (Grantor) prior to initiation of access to the said lands for the purpose of implementing, constructing, operating, modifying, monitoring and maintaining the Project. The Contractor shall also provide proof of receipt of notification letters by landowner(s) and pipeline owner(s)/operator(s) by certified mail receipt, email, or FedEx delivery confirmation, to the CPRA Project Land Manager listed below, within thirty (30) calendar days after the Bid Contract’s Notice to Proceed is issued. Angela Thomas CPRA – Land Rights Division 450 Laurel Street, Suite 1200 Baton Rouge, LA 70801 The Contractor shall abide by the stipulations set forth by the respective landowners below:” 2. Appendix B- Dredge Data Sheet: Replace the second paragraph with: “The Dredge Data Sheet shall be submitted with the Work Plan. The Dredge Data Sheet is for informational purposes only. The information submitted is pertinent to the evaluation of the proposed dredges and their capability to perform the Work, as required and as agreed to by the Contractor through the submittal of a proposal. The Contractor may only omit data or information that he considers proprietary.” 3. Appendix G Design Survey Data: Missing survey data of the dredge pipeline and construction access route has been added to the FTP site listed below. ftp://ftp.coastal.la.gov/BA68%20Grand%20Liard%20Marsh%20and%20Ridge%20Restoration/

II.

MANDATORY PRE-BID CONFERENCE ATTENDANCE RECORD The Mandatory Pre-Bid Conference Attendance Record is attached.

CPRA/Engineering Division