Open Minds Magazine | Open Minds Radio | OpenMinds.tv. Presenting ... To do
this, Open Minds utilizes a website, a magazine, a radio show, the largest UFO ...
MODEL. KB 240. KB 240. KB 250 D-TEQ. KB 250 D-TEQ. KB 300 D-TEQ. KB 300
D-TEQ. KB 300 D-TEQ. TRIM. LE. LE. LE. LE. LX. LX AUTO. LX.
2. Dell – Dell PowerEdge Servers R Series: R200, R300, R1950, R2950. 3. Asus
– Asus RS120E5/PA2/4, RS160E4/PA4. User can also use other hardware or ...
Isuzu 4JJ1-TC turbocharged intercooled ... 2016 ISUZU N-SERIES DIESEL.
WARRANTY ... Isuzu Commercial Truck of America, Inc. reserves the right to
make ...
Sep 26, 2013 ... Beetle Specifications and Options. MY14 ... Automatic activation of hazard
warning lights if full braking is applied. ○. Warning tone and lamp if ...
Technical Specifications. Belcher Center ... Performance Center seats over 2,000
people. ... features motorized rigging, a Yamaha PM5D digital audio console, and
an .... 1200, RGBHV, HDTV, component, S-Video ... 4 community XLT 48E-64.
obtener nuestra línea completa de productos ..... Le modèle de batteur à main est
indiqué sur le carton du batteur à main ou sous le ..... Grupo HB PS, S.A. de C.V.
cuenta con una Red de Centros de Servicio Autorizada, por favor consulte en ...
Features. • YB4409: 7,7 t (8.5 USt) three-section boom with 7,6 m (25 ft 2 in) tip
height. • YB4409XL: 7,7 t (8.5 USt) three-section boom with 10,2 m (33 ft 6 in) tip
...
GRAND RAPIDS, MI 49544. Phone: (616) ... Stage deck is black sprung
hardwood flooring. No nails or ... 2,000 lbs. Batten maximum trim height. 42'-0”.
Batten minimum trim height. 5'-0” ... Elevator from stage level to rear of house and
boot
You only need to step inside the 2009 HUMMER H2 to realize the outdoors are
much .... Bumper-mounted rear tire carrier with spare tire cap. Chrome fuel filler ...
Local entry of an HD outlet will affect the specification in several ..... S3 (19.4%) ..... aWeighted average across the four segments, using segment sizes as weight.
RANGER. 2009 Ranger. Dimensions. June 2008. Ranger. Ranger. Ranger.
Ranger. 28 ..... Ford SLA (Short/Long Arm) Independent Front Suspension. Max.
Sep 30, 2007 ... outstanding technical article on the subject of timing & vacuum advance .... 1973
Camaro 350 High Perf. ... 1969-70 Corvette 350 Exc. High Perf. ..... signal lines (
such as SHP big blocks and '63 327/360) should be converted ..
... 24 (1), 88â107. Haans, Hans and Els Gijsbrechts (2010), âSales Drops from Clos- ... 13 (3), 637â49. Kennedy, Peter (2013), A Guide to Econometrics, 6th ed. ... Netzer, Oded, Ronen Feldmann, Jacob Goldenberg, and Moshe. Fresko (2012) ...
45°a: 0°(annular illumination) *1. Conforms to CIE No. 15, ISO 7724/1, DIN 5033
Teil 7, ASTM E 1164, and JIS Z 8722 Condition a for reflectance measurements.
Jun 14, 2012 ... Security locking module, Body processor module, Drivers door module, ... Right,
Tyre Pressure Monitor Module, Gear Shift Module, Vehicle ...
1.1 The clearwell baffles described in this specification shall be custom ...
assemblies shall utilize 3/8” Ø x 3” long stainless steel expansion anchor bolts, 3/
8” Ø.
CLEARWELL BAFFLES 1.0
General Description 1.1
2.0
3.0
4.0
The clearwell baffles described in this specification shall be custom manufactured factory prefabricated hydraulic barrier curtain(s) designed to improve flow characteristics in a new or existing clearwell system. The manufacturer shall utilize virgin quality elastomeric geomembrane materials and factory dielectric and thermal seaming processes throughout. The clearwell baffle support hardware shall be manufactured in prefabricated kits to minimize field cutting and drilling. The clearwell baffles shall be designed for ease of installation in a new or existing clearwell.
Scope 2.1
Furnish and install Clearwell Baffles with appurtenances necessary to complete work as directed in the project specifications and drawings.
2.2
Each Clearwell Baffle shall include factory fabricated geomembrane panel(s) and related hardware required to complete the installation.
Qualifications 3.1
The diversion curtains shall be equivalent in all respects to the Suspended baffle series curtain manufactured by EC Applications, Inc.
3.2
Qualified manufacturers must have at least 20 years experience in the fabrication of geomembrane products and must have manufactured a minimum of 10,000,000 square feet of company experience for geomembrane fabrication for water reservoir applications.
3.3
Alternate manufacturers wishing to pre-qualify shall submit to the engineer, no later than 15 days prior to the bid date, a list of clearwell baffle projects with detail drawings meeting the requirements of this project specification.
Materials 4.1
Baffle Curtain Material 4.1.1
The floating baffles shall be fabricated from NSF 61 approved polyester reinforced geomembrane material (45 mil RPP) The curtain materials shall meet or exceed the attached material specifications. Any proposed substitution must be approved by the Engineer.
4.1.2
Nylon reinforced materials will not be acceptable. The nylon reinforcing fabric will absorb water through the exposed scrim causing swelling and material delaminating.
4.1.3 Baffle Anchoring Hems - The baffle manufacturer shall provide a 3” wide two ply hem on all edges of the baffle curtains for anchoring purposes.
650 N. Batavia Street Orange, California 92868 Office (714) 921-9848 Fax (866) 475-1225 www.ECApplications.com
4.2
Anchoring Hardware 4.2.1 The top of the baffle shall be suspended in the clearwell structure by a 3/8” Ø stainless steel cable thermally welded in the top hem of the baffle panel. Intermediate top cable support assemblies shall be attached below the top support cable with 2 Ea. 1/8” x 2” x 4” stainless steel plates with 1/4” Ø stainless steel cable attaching to the clearwell ceiling. All cable assemblies shall utilize 3/8” Ø x 3” long stainless steel expansion anchor bolts, 3/8” Ø stainless steel eye nuts as required. 4.2.2 The bottom and side hems of the baffle shall be attached to the clearwell structure by clamping the baffle material between batten strips and concrete structure and secured with expansion anchor bolts. This procedure also applies to intermediate support columns, if applicable. 4.2.2.1 The batten strips shall be minimum 3/16” x 1.5” 4.2.2.2 The expansion anchor bolts shall be minimum 3/8” Ø x 3” long. 4.2.3 All hardware shall be supplied in ready to install kits with angle and batten cut and pre-drilled to minimize field cutting and drilling of attachment hardware. 4.2.5 All support hardware shall be type 304 stainless steel.
5.0
Execution 5.1
Installation 5.1.1 The installation contractor shall install the clearwell baffle(s) in the position(s) shown on the project drawings. 5.1.2 The clearwell baffle(s) shall be installed in accordance with the manufacturer's drawings, instructions and recommendations. 5.1.3 The contractor shall provide acceptance of baffle dimensions prior to approving fabrication.
5.1.4 The manufacturer shall, upon request, provide the services of a qualified on-site installation supervisor to ensure proper installation of the baffle system. 5.2
Warranty 5.2.1 Clearwell baffles shall have a limited 1-year warranty from the date of shipment covering workmanship and materials. All warranties must be submitted in writing by the manufacturer and confirmed by the end user.
650 N. Batavia Street Orange, California 92868 Office (714) 921-9848 Fax (866) 475-1225 www.ECApplications.com