Jun 10, 2015 - CSRe Side View. 300kV Electron Cooler. Gas Jet Target. H. 2. >1Ã1013/cm2. N. 2. 2Ã1013/cm2. Ne ~2Ã1013/cm2. Ar 7Ã1013/cm2 ...
Commission of CSR in Lanzhou Wenlong Zhan and CSR Group Institute of Modern Physics, CAS
•Introduction •Improvement of Injection Beam •CSRm Commission •RIBLL2 & CSRe Commission •Conclusion
Oct. 3
HIRFL Layout 9.6 Tm 500AMev U92+
• ECR Ion Source • SFC K~70--10AMev • SSC K=450 –100AMev 12.16 Tm
10AMev
100AMev
1100AMev 12C 520AMev U72+
•CSRm cooler synchrotron • CSRe: Accel. & Deccel. And High Sensitive & Accuracy (~10-6) Spectrometer
HIRFL Main Performances SFC
SSC
E(MeV) C(MeV/u) U(MeV/u)
Proton, HI K=70 >10 0.8(Q=26)
Proton, HI Proton, HI, Proton, HI, RIB? RIB, HCI K=450 P=2880 P=2000 ~100 1100 760 11(Q=40) 520(Q=72) 500(Q>90)
∆P/P
~10-2
~10-3
Species
δP/P (%) (entrance) Emmitance >50π (mm-mrad)
~20 π
CSRm
CSRe
~10-4
~10-5
±0.15
±0.25~0.5
•5 π
•1 π
Main Physics Goals at HIRFL-CSR ØNuclear Structure (RIB) ØEOS of Nuclear Matter ØHadrons-Nucleon Physics in E 1puA 20π mm-mrad •P/P < ± 0.15% Switching Top: 1~5ms
Collimating
Stripping Injection at CSRm BumpPS
m a e B
2900A, 8600G
20~400µs 3200A 1600V
Beam Accumulation with e-cooing in CSRm Iinj=10.2µA, Beam current: 3200•A, 1.6×1010, 8min., Gain=300
8 min
06/12/29 5:00
E-cooing for
C6+-beam
06/12/27 08:15
at 7MeV/A
•P/P 4× 10-3 ↓ ↓ ↓
2× 10-4
PS & RF Ramping
06/10/15 22:45
7•1000MeV/u Ramping Test, H = 2(4)•1, frf = 0.45• 1.63MHz
06/7/29 17:22
A Bunch C6+ Beam Accumulation at CSRm Gain = 30
DCCT Res.: 1µA
220µA~109
07/09/29 6:25
Stripping+ E_CooingAccumulation + Acceleration at CSRm 12C~7×109
ppp, & 600MeV/u
18 time Injection for 0.5Sec. Cooling/bunch
Lifetime of C6+ beam in CSRm with e-cooling SFC-12C4+-7MeV/u, STI , 1/e Life-time = 1088s
07/09/10 09:04
CSRm β & • Measurement
Emittance:
Ex(5•)n 1.6•mm.mrad
07/09/11-12
Ey(5•)n 1•mm.mrad
Scheme of MMI of Ar Test at CSRm 36Ar8+-
2 MeV/u Peak>10uA ECR
36Ar8+-
22 MeV/u Peak>3.5uA
Ar8+
Ar18+
Stripper
MMI-36Ar18+
MMI Injection at CSRm 20007.03
Bump-PS Orbits of the Multiple MultiMulti-turn Injection
• 0.1mm
Septum (Wolfram silk)
m Bea L=2m Vmax .= 160 kV Gap=23mm Static--electric septum Static
CSRm MMI (36Ar18+--22~1000MeV/u) 07/04/29 16:00
650uA
MMI+E_Cool+Acc. 36Ar~1.4×108ppp & 1000Mev/u 0.35 /Cooling
MMI+Acc. (129Xe27+ 2.9-235MeV/u) 07/06/25 07:20
500uA, 1×108, •=83%
2.86 à 235MeV/u & >1×108ppp SECRALà SFCà CSRm(MMI+E_Cool+Acc.) Extract 129Xe27+
RIBLLII
External Target II
Primary Target
CSRe Side View 300kV Electron Cooler
Gas Jet Target H2 >1×1013/cm 2 N2 2×1013/cm2 Ne ~2×1013/cm 2 Ar 7×1013/cm2
07/08/30 07:00
30BPM4 RIBLL2
30FC4
PT
30VS4
Features of CSR
1, new Generation E_Cooler:halo E-beamàhigh Accum. 2, RIB reaction Exp. at CSRe 3, 10-12mbar UHV 4, Web+Internet+DB Control 5, Flexible Lattice by control Q_ps individually
Summary • SECRAL provide higher intensity of HCI online • Injection beam intensity – SFC: 1012~1013pps; – SSC: 1011 ~1012 pps for A