96 Int. J Sup. Chain. Mgt
Vol. 5, No. 3, September 2016
Decision Making of Spare Parts Inventory Based on Risk Quantification Kamal Imran Sharif1, Jafni Azhan Ibrahim2, Zulkifli Mohamed Udin3, Abdul Aziz Othman4 1,2,3,4
School of Technology Management and Logistics, Universiti Utara Malaysia, 06010 UUM Sintok, Kedah, Malaysia 1
[email protected] 2 3
[email protected]
[email protected]
4
[email protected]
Abstract— Financial losses due to spare part breakdown in plant operation have created an upsetting situation among stakeholders. The failure increase the cost of repair and production downtime. . Obviously, maintenance planner tends to increase the spare part inventory level in order to meet the operational requirement and this in return has increased the inventory cost. The maintenance and inventory function is important in order to ensure the plant operate accordingly. Moreover, it is necessary for the plant maintenance to balance the issue of shortage and excess of inventory in plant maintenance. In view of this situation, the spare parts become a critical matters and it is good starting point to tackle the issues from looking at the perspective of spare parts inventory risk. This paper explain about the development of risk based technique using the shortage and excess situation of spare parts inventory by using the Breakdown Probability Table to quantify the risk for decision making purpose. Keywords— Spare part, Inventory Cost, Spare Part Probability Breakdown
1.
Introduction
Plant maintenance in manufacturing industries is a key driver towards achieving organizational performance. Due to the fierce market competition, it is critical for the organization to be selfcompetence and manage resources efficiently [1]. Often, maintenance cost is keep on increasing from time to time. According to the recent studies, companies spent average of RM40 million or 12% of the annual budget for the cost of maintenance [2]. In addition, [3] has discovered that manufacturing company spent about 80% from its operation cost to address issue on equipment failures and injury to people. Thus, these issues have drawn response among various industries to look into maintenance management seriously [4]. According to [5], inventory management has the largest impact towards maintenance productivity. Due to improper inventory management, resulting in stunted maintenance process and ultimately led to the issue of company opportunity loss. However, [6] claimed that the most difficult part of the whole ______________________________________________________________ International Journal of Supply Chain Management IJSCM, ISSN: 2050-7399 (Online), 2051-3771 (Print) Copyright © ExcelingTech Pub, UK (http://excelingtech.co.uk/
process was to select the right technique to address the maintenance issues. By selecting the right technique the maintenance manager would be able to assist the company to increase the plant reliability and reduce the operating cost.
2.
Literature Review
Spare parts are known to be related to uncertain demand and that nature of demand pattern required forecasting and stock control in order to achieve the optimum stock level [7]. The intermittent or uncertain demand [8], the large numbers of spare parts [9] and the risk of spare parts obsolescence [8] may cause the spare parts not meeting the supply chain points. Thus, being out of stock when a spare part is needed leads to downtime of capital goods, which is very expensive due to loss of operational continuity. According to [10], the commercial aviation industry has as much as $30 billion worth of spare engines on stock. Similarly, the loss of operational due to spare parts breakdown in this particular area will create a disastrous event to the whole industry. Meanwhile, in the semiconductor industry alone, the loss of production due to breakdown issues estimated at tens of thousands of euros per hour [11]. Hence, the problem of spare parts inventory is critical and the issues in spare parts management need to be solved accordingly. Risk-based approach is one of the technique that is commonly used in order to deal with issues of uncertainties in executing management choices. This approach helps decision makers to formulate a strategic options and decisions to assess various impacts and implications [12]. Specifically, risk perspective in plant maintenance is essential for ensuring asset integrity in a process facility [13]. With the increased mechanization and complexity in process plant, there is a rise in the number of equipment failure scenarios. Failure of equipment incurred downtime and unavailability of the plant, which may prolong with the inadequacy of spare parts. In view of this situation, the Risk Based Maintenance (RBM) is used by the plant maintenance to reduce the risk from the unexpected failure happen in the
97 Int. J Sup. Chain. Mgt
operation premises [14].[15] prioritized and quantified the risk from the risk based maintenance activity. Hence, [16] suggested on the implementation of regular inspection activity for the high gh risk spare part in order to avoid the potential failure and achieving appropriate risk toleration.[14] used the risk matrix to define the risk and consequences. . Besides that, [17] developed checklist for chemical industry and [18] used the check list for listing the possible risk that is related to plant hazard in operation. Assessing risk is crucial because the decision to maintain equipment can affect cost [15]. Subsequently, spare parts have great influence on all types of maintenance activités and the availability of process plant. For the case of critical equipment this could lead to severe consequences like excessive downtime costs, idle manpower cost and so on. Maintenance often depends on the spare parts availability and, thus, the adequacy of spare parts in stock has a direct impact on the operability of the system. It could easily be achieved by storing an adequate quantity of spares in the inventory. [13] develop a risk-based based approach for spare parts demand forecast and spare parts inventory management for effective allocation of limited resources. [19] used optimization technique to determine the best method to predict initial stock requirements and quantify the risk. Meanwhile, [20] used the binary decision in order to quantify the risk.The title of the paper is centred 17.8 mm (0.67") below the top of the page in 24 point font. Right below the title (separated by single line spacing) are the names of the authors. The font size for the authors is 11pt. Author affiliations shall be in 9 pt.
3.
Vol.. 5, No. 3, September 2016
Figure 1. Risk-Based Based Technique Development Steps The process includes identifying spare parts failure history, analysing spare part failure and stock level, calculating stock excess, calculating stock out, determining the probability of excess stock and stock out, calculating excess of stock impact and shortage impact and developing risk based calculation. [19, 20] underlined some important elements such as determining the spare parts breakdown and quantifying the inventory consequences in order to calculate the spare parts risk.
3.1 Derivation tion of Spare Parts Breakdown Probability The breakdown probability table is referring to the probability of all possible breakdown for every spare part. In order to achieve this, the probability of breakdown for each spare part will be calculated by dividing ding the possible breakdown with the number of observation. The probability of (i, j) is given by:
Methodology
In this paper, a specific steps were developed to transform the input and formulation into a technique that can generate information for decision making purposes. The elements for each component was identified based on the detail discussion donee between the researcher, plant manager and inventory executive after obtaining the appropriate items from the literature. The following figure 1 illustrates the steps required to perform the risk based technique.
Pr (i,j) =
∑ i _ for _ j
(1)
∑k
Where: i = breakdown j = spare part k = observation 3.2 Development of Spare Parts Impact Table This section will discuss the development of Shortage Impact (SI) due to spare parts unavailability in process operation. Some of these spare parts are essential to the operation in a manufacturing plant and other spare parts do not have such a severe impact ct on the process. By considering the worst case event, the formulation of shortage impact is depicted as below:
98 Int. J Sup. Chain. Mgt
SIsp = ∑0n SP x (PFL + TR + Price)
Vol. 5, No. 3, September 2016
(2)
Where: SIsp = Shortage Impact for Total Plant Breakdown PFL = Plant Financial Loss TR = Transportation Cost SP = Number of spare part Subsequently the value of PFL is referring to the production loss in daily operation. Thus, the value of PFL is formulated as below: PFL = PQ x PrNH (3) Where: PQ = Quantity production per daily PrNH = Ammonia (NH3) Price On the other hand, the Excess Stock Impact of spare parts happened when the spare parts were underutilized by the operation. According to [21], holding cost is formed in four components which are the stock unit, reorder, holding and shortage costs. [22] and [23] have same thoughts in terms of the holding cost components such as space rental, storage facilities, material handling, insurance, pilferage, breakage, obsolescence, depreciation, taxes and opportunity cost of capital. The formulation of the excess stock impact was showed in calculation below: ESIsp = (SC + MH + DV) x SP (4) Where: ESIsp = Excess Stock Impact SC = Space cost MH = material handling DV = depreciation value SP = number of spare parts The risk-based spare parts inventory technique proposed in this study is based on the concept corresponding to the probability of breakdown and impact value. Hence, the risk associated with the value of spare parts shortage and excess in inventory. Both notified components have potential impact on the operational of the plant. The formulation of the quantified risk is developed by multiplying the probability spare parts breakdown table with the value of spare parts shortage impact table and excess impact table. Below is the formulation of the quantified risk: RSO = PrSO x ISI (5) RES = PrES x IESI (6)
Where: RSO, RES
= Spare Part risk for shortage and excess spare parts PrSO, PrES = Probability table for shortage and excess spare parts ISI, IESI = Impact Table for shortage and excess spare parts Based on the above table the value of RSO and RES will be added in order to obtain the total risk. Table 1. Total Risk Table (RM) Spare Part
RSO
RES
Total Risk
A
576,680.00
68,120.00
644,800.00
B
145,070.00
133,088.00
278,158.00
C
0
245,184.00
245,184.00
D
1,458,200.00
28,704.00
1,486,904.00
E
295,540.00
89,768.00
385,308.00
F
2,026,780.00
7,818.00
2,034,598.00
G
1,893,710.00
18,636.00
1,912,346.00
In this study, by completing all the risk quantification steps it indicated that every combination of spare parts inventory will have its own risk value for shortage and excess of spare part. 3.0 Conclusion The main aim of this study is to develop risk based technique that includes the quantification of spare part shortage and excess. The risk based technique quantify the excess and shortage values and offers a useful tool in assessing the impact of risk which quantified total risk in monetary unit. Later the inventory planner can decide the quantity level of spare parts that required by the maintenance based on the risk options. The concepts of incorporating risk in forecasting of stock for inventory management. To date, less study has been performed on the risk based technique in order to determine the stock level based on financial risk. The developed technique has showed on how the risk is quantified based on the spare parts breakdown event, probability of breakdown and impact consequences. It also provides additional insights on the relationships between inventory forecasting and risk practices in plant operation environment. In further, it can assist decision makers particularly inventory and maintenance managers to decide spare parts requirement effectively.
99 Int. J Sup. Chain. Mgt
References [1]
[2]
[3]
[4]
[5]
[6]
[7]
[8]
[9]
[10] [11]
[12]
[13]
[14]
[15]
T. Wang and C. Liu, “Research on inventory optimization model of spare parts under zeroout-of-stock constraint,” ICOIP 2010, 2, 251– 254, 2010. A. Heng, S. Zhang, A.C. Tan, and J. Mathew, “Rotating machinery prognostics: State of the art, challenges and opportunities”. Mechanical Systems and Signal Processing, 23(3), 724-739,2009. L. Krishnasamy, L.F. Khan and M. Haddara, “Development of a risk-based maintenance Strategy for a power-generating plant”,. Journal of Loss Prev. in the Process Ind., 18(2), 69–81, 2005. J.P. Liyanage and U. Kumar, (2003), “Towards a value-based view on operations and maintenance performance management” J. Qual. in Maint. Eng., 9(4), 333-350, 2003. S. Buffett and N. Scott, “An algorithm for procurement in supply chain management”, AAMAS 2004 Workshop on Trading Agent Design and Analysis, 2004. W.P.G Schlechter, “Facility risk review as a mean to addressing existing risks during the life cycle of a process unit, operation or facility”, Int. J. of Pressure Vessels and Piping, 66(1–3), 387–402, 1996. D. Lengu, A. A. Syntetos and M. Z. Babai, “Spare parts management: Linking distributional assumptions to demand classification”, European Journal of Operational Research, 235(3), 624–635, 2014. R. Borter and L. Fortuin, “Stocking strategy for service parts: a case study”, Int. J. Opr. Prod. Mgmt, 20: 656–74, 2000. J. E. Boylan and A. A. Syntetos, “Spare parts management: a review of forecasting research and extensions”, IMA, 21: 227–37,2010. P. Flint, “Plenty of Life in the Cycle”, 2006. A. A. Kranenburg, “Spare parts inventory control under system availability constraints”, PhD thesis, Eindhoven University of Technology,2006. G. A. Zsidisin, “A Grounded Definition of Supply Risk”, J. Purch.and Sup. Mgmt. 9, 217-224,2003. J. Hassan, F. Khan and M. Hasan, “A riskbased approach to manage non-repairable spare parts inventory”, J. Qual. in Maint. Eng., 18(3), 344–362,2012. F. I. Khan, and I. Haddara, “Risk-based maintenance (RBM): a new approach for process plant inspection and maintenance Process Safety, 252-265, 2004. N.S. Arunraj and J. Maiti, N, “Risk-based maintenance- Techniques and applications”, J. Haz. Mat., 653-661, 2007.
Vol. 5, No. 3, September 2016
[16] S. J. Brown and I. J. May, “Risk-based hazardous protection and prevention by inspection and maintenance”, J.Press.Ves.Technol, 362-367, 2003. [17] Balemans, “Check-list Guide Line for Safe Design of Process Plant”, First international Loss Prevention Symposium, 7-33, 1947. [18] R.L Rogers, “The RASE project: Methodology for the Risk Assessment of Unit Operations and Equipment for Use in Potentially Explosive Atmospheres”, 2000. [19] C.M. Adams, “Inventory optimization techniques, system vs. item level inventory analysis”, IEEE 2004 RAMS, pp. 55-60, 2004. [20] K. I. Sharif, J. A. Ibrahim, and Z. M. Udin, “Inventory Risk Based Technique for Spare Parts Utilization,” J. Teknologi., vol. 5, pp. 79–84, 2015. [21] D. Waters, “Inventory control and management”, John Wiley & Sons, 2008. [22] R.B. Chase, N.J. Aquilano and F.R. Jacobs, “Operations Management for Competitive Advantage”, McrawHill/Irwin, New York, 2001. [23] R. S. Russell and B.W. Taylor, “Operations management: Creating value along the supply chain”, Hoboken, NJ: John Wiley & Sons, 2009.