May 24, 2011 ... AGENDA. ➢ Why we're here. ➢ An Enterprise Challenge. ➢ Infrastructure. ➢
Applications. ➢ Service Development & Delivery Process (SDDP).
Headquarters U.S. Air Force Integrity - Service - Excellence
A Vision For Development and Delivery of IT Capability for the War-Fighter
Mr. Kent Werner (SAF/USM-2) 24 May 11
AGENDA
Why we’re here
An Enterprise Challenge
Infrastructure
Applications
Service Development & Delivery Process (SDDP)
Actions Required to Achieve Success
Integrity - Service - Excellence
2
WHY WE’RE HERE
Include Industry Partners in IT Way-ahead Activities
Work in Progress: We are Identifying functions to be Performed and Requisite Skill-sets
Changes in Technology, Legislation/Policy and Commercial Business Practices
To be successful we need to address: Infrastructure Applications
Development and Delivery Process The cost of IT is the RESULT of our business practices – not the root cause! Integrity - Service - Excellence
3
AN ENTERPRISE CHALLENGE (NOT JUST ACQUISITION) REQUIREMENTS MEASURES INFRASTRUCTURES A6
N E T W O R K S
Cost/Risk Drivers
MAJCOM PMO D I S A
T R A N S P O R T
D O M A I N S
D O M A I N
Cost/Risk Drivers
PROGRAM OF RECORD
Cost/Risk Drivers
WORK STATEMENTS SOW VS SOO SCP/ICE
B U S I N E S S
OSD
R U L E S
PPBE ESC AFSPC AFMC ACC
Cost/Risk Drivers
DATA
Integrity - Service - Excellence
4
INFRASTRUCTURE
Focus on both legacy and future states simultaneously
Legacy: Live and operate in legacy state continuously Future: What will today’s technology allow in near-term future? New Security Model: E2E 2-way authentication & authorization Rapid delivery Deliver small reusable applications
Condition the institution at all levels
Address inherent disconnect between network and system developers Manage both legacy and future states simultaneously to exploit the rapid change of technology to our advantage
Out-of-the-box : Manage future & legacy states together NOT one vs the other! Integrity - Service - Excellence
5
The Dual Pathway Applications over Infrastructure CONTENT DELIVERY
6
MANAGEMENT
SERVICE REFERENCE MODEL VOCABULARIES SERVICES
DATA SOURCING DATA REFERENCE MODEL EXPOSURE SCHEMES ADS DOCUMENTATION
PRESENTATION SESSION
AMPS DISCOVERY
DOTMLP INFORMATION ASSET F
MDE
MISSION PROCESSES
STANDARDS
BUSINESS REFERENCE MODEL
TECHNICAL REFERENCE MODEL APPLICATION
Management Service Level ARCHITECTURE NETWORK
CAPABILITY DESIGN
Engineering and Management Assurance ARCHITECTURE Mission (CCS) IA/COOP/MA
Service Lifecycle Management
Process Architecture
CONTENT GENERATION
TRANSPORT
Integrity - Service - Excellence
NETWORK DATA LINK PHYSICAL 6
End to End Security in the OSI Stack Single Security Level Service Invoker
Service Provider
Application
Application
SOAP HTTP
TLS/SSL
Web Services Security (Authentication, Integrity, Confidentiality, Non-Repudiation)
SOAP HTTP
SSL (Integrity, Confidentiality)
TLS/SSL
TLS/SSL
TCP
TCP
IP
IP
IP
MAC
MAC
MAC
Client Application
SSL Endpoint
Service
TCP
UNTRUSTED NETWORK
Service SSL Processor Implementation or HTTP Code Integrity - Service - Excellence
7
Baseline Definitions Baseline Target CIO/CTO Phase The “To Be”
Implementation ACQUISITION Phase
Operational RUN TIME Phase The “As Is”
Description The Target Baseline specifies the standards, protocols and implementation constraints for the future state of the AF IT infrastructure. It is used to inform the development of the implementation baseline. The Target Baseline is not instantiated in any environment, but it is thoroughly documented. It is continually updated based upon emerging industry standards and the evolving AF enterprise architecture. The Implementation Baseline is the associated baseline of acquisition selected products and their target baseline informed/allowed configurations that implement the architecture, standards and protocols specified in the Target Baseline. The Implementation Baseline informs the Operational Baseline of the acquisition selected products and how they are to be configured to support deployment of user applications across the infrastructure topology. The Implementation Baseline governs the implementation of the Development and Integration/Test environments. The Operational Baseline is the set of components of the Implementation Baseline appropriately configured and deployed across the topology of the AF IT infrastructure to provide the required warfighter capabilities and performance. It specifies the exact laydown and configurations of HW and SW within all facilities in the AF infrastructure topology.
Governance The AF CEITB CCB will be the controlling body for all changes to AF CEITB documentation. This CCB reviews and approves/disapproves configuration item instantiations and change requests to existing configuration items. Approved items are submitted to the AF CIO Council by the CTO for validation. The Implementation Baseline is governed by the ITLC or Enterprise System Engineering function and validated by the CTO.
The Operational Baseline is managed by th the 24 AF validated by the Information Technology Lifecycle Center (ITLC) or Enterprise System Engineering function.
Integrity - Service - Excellence
8
APPLICATIONS Condition the enterprise to develop applications For commoditized infrastructure Standards and protocols defined & tightly configuration controlled
Independent of data Manage data at enterprise level For both C2 and business processes (e.g. readiness) Be able to attribute the user authorizations and access to the data
For IT – move from macro-level to more detailed requirements Align requirements to mission practices Inherently governmental function
Aligns to Commercial Delivery Model (e.g. Smart Phone Apps) Integrity - Service - Excellence
9
SDDP Contextual Model Need
Define Needed DOTMLPF Actions
Understand Processes...
Load Plane
T
Refuel Plane
P
T
G
T
P
Define the “M”...
Plan Mission
T
Legend T = Task
P = Info Put
. . . and the Info Puts/Gets w/in the Processes
EXECUTE REQUIREMENT
(Bomb a target)
Understand Need, LRP & Performance (w/in 3 min)
. . .including ADS & IT approaches
G = Info Get Integrity - Service - Excellence
10
SERVICE DEVELOPMENT AND DELIVERY PROCESS (SDDP) Focus on user/war-fighter trying to solve a problem Acquisition, engineering, testing, architecture, portfolio management
platform engineering & network ops are supporting functions
Solution derives directly from DOTMLPF Place IT requirements in user’s context
Supported by architectural sandbox
SDDP defines the function/work-to-be-done vs ownership Translates user needs into deployed capability
Pay it forward & Inherit it back! Integrity - Service - Excellence
11
Integrity - Service - Excellence
12 12
SDDP: Example Alignment FDD
MDD
BCL Processes Business Capability Definition
C
B
Investment Mgt
Engineering Development
A
Prototyping
Full Deploy
LTD Deploy
Full Deploy
Complete Sub-Capability Requirement section of PRM Template
Prioritization of Sub-Capability based on SME/Functional defined criteria
For the sub-capability, identify the Key Performance Attributes End 1.3
Begin 1.4
Complete performance measures and thresholds for each Key Performance Attributes of PRM Template
No
Process Information from SME
Start SDDP 2.0
Define Mission Processes to Deliver DOTMLPF Capability Requirements
Functional / SME
End 1.4
End 1.5 Engage the Enterprise Architecture Team Begin 1.5
Begin 1.6
Functional / SME
Provide basic process information to Process Team (I.E "Yellow Sticky's", "Napkins" etc)
Revisit work plan for additional resources required
Work Plan SDDP 1 & 2 - Tasks - Resources - Timelines - Milestones (from Step 1)
End 1.6
Submit Capabilities Requirements for approval
Functional / SME
No
Process Engineering Content Approved?
Yes
Ensure All expected outcomes from 1.0 are address/satisfied
Sponsor
Obtain SME Support for Process Engineering Activities
Inform/Adjudicate other processes that may be affected by modification of these processes (understand impacts)
Sponsor
Denied
All Stop
Characterize the DOTMLPF execution requirements to put the process into practice and be successful
Approved
Develop Implementation Plans
Revise
Obtain formal review Approved and approval to proceed
AF Corporate Structure Review Needed?
Define ROI and investment auditability
Determine Initial Scope with general cost estimate
Sponsor Approval?
AF Corporate Structure Review Needed?
Yes
Review Capability Requirements
Corporate Approval?
No
Define Start Points, Ends and Outcomes
Proceed to Sponsor Decision Point
Begin
Define Process Steps
Define required skill sets and proficiencies for each process step
Sequence Process Steps to create Discrete Process Steps including information dimension supporting process steps
Yes
Corporate Approval?
All Stop Validation of appropriate BPR
Package BPR Assertion Documentation
BPR Assertion Complete?
No
Proceed to Process Engineering Activities
Sponsor
Lift information puts/gets for each process model Begin
Investigate potential solutions (COTS/GOTS/ Web Service Code / Systems) to satisfy all or part of the Contextual Model
Evaluate ability of source to satisfy part or all of Architecture No Contextual Model both from Support? a function and a feasibility of implementation
Architecture Support?
No
Auditable Process model 1
Auditable Process model N
Approve Review Package and Select COA?
Approved and COA Selected
Denied
AF Corporate Structure Review Needed?
Yes
Review Capability Requirements with AF Corporate Structure
Yes
Create Draft M- Implementation Plan
Assemble Governance package
Based on the COA selected, commence the information analysis
Receive Needs Data
Query 'As is' Repository for related LRP.
Complete Needs section of PRM Template
Achitecture Team
Identify Public Laws, DOD Directives, Manuals& Instructions, and OMB, GAO, BTA Findings
Complete LRP section of PRM Template
Query Architecture to look for similar Sub-Capabilities
Determine Sub-Capability requirements based on constraints (with user)
Achitecture Team
SubCapability PRM Tree 2.
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Open) - Performance Measures (Open)
Report: Identified attributes to satisfy the capability
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
Capture how the user wants to use each put/get (ex. Presentation, Usability)
Capture the business rules, authorization and access rules, service requirements for each put/get within the process
For each information flow describe the business rules and service levels requirements necessary to meet the process
Auditable Process model 2
Additional Process Flows?
No
Contextual model for Process 1 Contextual model for Process 2
Contextual model for Process N
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (Open) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -Compliance Requirements (Open) -On Boarding Requirements (Open)
System Engineering / Design
System Engineering / Design
BRM (From Step 2) -Mission Process Map (Close) -Auditable Process (Close) -Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Close)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (Open) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -Compliance Requirements (Open) -On Boarding Requirements (Open)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (Open) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -Compliance Requirements (WIP) -On Boarding Requirements (WIP)
System Engineering / Design "Sandbox"
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (WIP) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -Compliance Requirements (WIP) -On Boarding Requirements (Close)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Automated Information Assets (Open) -Detailed Design Requirements (Open) -Reuse components (WIP) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -Compliance Requirements (WIP) -On Boarding Requirements (Close)
BRM (From Step 2) -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Close)
DRM -COI Charter (Open) -List of information assets (Open) -Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (WIP) -Roles and permissions (WIP) -Example Data Record (WIP) -Ontology (WIP) -Reusable COI Artifacts (WIP)
Process Team
Process Team
SRM -Contextual Model (Close) -Web Service Code Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (WIP) -COTS/GOTS Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Open) -Reuse components (WIP) -System Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Open) -Reuse components (WIP) -Compliance Requirements (Close) -On Boarding Requirements (Close)
Task POCs for IMS Input Execute Appropriate IMS Activities
Update Implementation Plan
Package bounded user requirements for Product Center
Approve Bounded User Requirements?
System Engineering
Participate in Kickoff Session
DRM -COI Charter (WIP) -List of information assets (Close) Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Open) -Reusable COI Artifacts (WIP)
DRM -COI Charter (WIP) -List of information assets (Open) Vocabulary Package (WIP) -Authoritative Data Source (ADS) Mapping (WIP) -Roles and permissions (WIP) -Example Data Record (WIP) -Ontology (WIP) -Reusable COI Artifacts (WIP)
For the selected COA identify any information exchange reuse opportunities within the enterprise that will support the implementation of the contextual model
Assess capability coverage of solution options Search the Enterpise Architecture to identify additional compliance requirements
Achitecture Team
COI / EVT
Governance
Identify Business / War Fighter Enterpise Architecture Compliance Requirements
For each COA, identify the inherited attributes that sufficiently satisfy the compliance requirements checklist
Identify evidence that can satisfy compliance requirements
For each COA, Identify the reuse opportunities across the enterprise to support the DOTLPF change management requirements
Achitecture Team
Achitecture Team
Draft IMS (WIP) Programmatic (Open) - Product Center Activities (Open) -Contracting Activities -Acquisition Activities - PEO Activities (Open) -Resourcing -Training -Equipment - Finance Activities (Open) -Allocate Funds -Assign Resources - Architecture Activities (Open) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Open) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Open) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Open) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Open) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (Open)
Execute Appropriate IMS Activities
DRM -COI Charter (Close) -List of information assets (Close) Vocabulary Package (Close) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Close) -Reusable COI Artifacts (Close)
DRM -COI Charter (Close) -List of information assets (Close) Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (WIP) -Roles and permissions (WIP) -Example Data Record (WIP) -Ontology (WIP) -Reusable COI Artifacts (WIP)
SRM -Contextual Model (Close) -Web Service Code Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close)
DRM -COI Charter (Close) -List of information assets (Close) Vocabulary Package (Close) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Close) -Reusable COI Artifacts (Close)
SRM -Contextual Model (Close) -Web Service Code Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close)
Draft IMS (WIP) Programmatic (WIP) - Product Center Activities (WIP) -Contracting Activities -Acquisition Activities - PEO Activities (WIP) -Resourcing -Training -Equipment - Finance Activities (WIP) -Allocate Funds -Assign Resources - Architecture Activities (WIP) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (WIP) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (WIP) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (WIP) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (WIP) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (WIP)
Draft IMS (WIP) Programmatic (WIP) - Product Center Activities (WIP) -Contracting Activities -Acquisition Activities - PEO Activities (WIP) -Resourcing -Training -Equipment - Finance Activities (WIP) -Allocate Funds -Assign Resources - Architecture Activities (WIP) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (WIP) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (WIP) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (WIP) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (WIP) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (WIP)
Yes
Extract Reusable Information Exchange Assets from previous DRMs
Ensure ontology reuse
Achitecture Team
COI / EVT
COI Coordination Panel will make a recommendation to the Sponsor to either re-charter an existing COI or establish a new COI to meet information sharing requirement.
Initiate Deployment
Review Bounded User Requirements (Acquisition Strategy Package)
Identify Kickoff meeting attendees
Facilitate Kickoff Meeting
Identify the POC's that will support the Project Lead during the implementation of the Bounded User Requirements
Create Top Level IMS
Stand Up COI
Identify authoritative and source data from a process perspective
Identify ADS
Determine access rules ,roles and permissions for assets and planned services
Develop Draft Ontology
Complete IMS
Task POCs to execute IMS
Identify existing Key Performance Attributes to satisfy the Sub-Capability,
Achitecture Team
Step 1
Determine potential duplication/conflict with other enterprise requirements Verify Requirements Satisfy all relevant LRP Constraints
Achitecture Team
Conduct Enterprise Architecture Analysis
Conduct Enterprise Architecture Analysis
BRM -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Close)
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
LRP Compliance Requirements Checklist -Clinger & Cohen. (Open) -PIA (Open) -FISMA (Open) -NDAA (Open) *CCA *BEA *EITDR Registration *Business Process Reengineering *Section 508 Compliance *Records Management *FISMA *ETP *Investment included in AF Budget -DIACAP (Open)
SWG review of Governance Package
LRP Compliance Requirements Checklist -Clinger & Cohen. (Close) -PIA (Close) -FISMA (Close) -NDAA (Close) *CCA *BEA *EITDR Registration *Business Process Reengineering *Section 508 Compliance *Records Management *FISMA *ETP *Investment included in AF Budget -DIACAP (Close)
Governance
Proceed To Sponsor Review of Package
Proceed To Sponsor Review of Package
No Approved
Approved?
Greater than $1M
Identify Reuse Capability
Achitecture Team
Return to Sponsor Selected Point
No
Conduct Post Implementation Review (PIR)
Train Users Per Phasing Plan
PIR Successful?
Yes
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (Close) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
ITLC
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Close) -Operational Test & Evaluation Plans and Procedures (Close) -Post Implementation Review (PIR) Report (Open)
No
System Engineering
All Phases Complete?
"Sandbox"
System Engineering
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Close) -Operational Test & Evaluation Plans and Procedures (Close) -Post Implementation Review (PIR) Report (Open)
Yes
Update IMS with Fielding Activities
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Close) -Operational Test & Evaluation Plans and Procedures (Close) -Post Implementation Review (PIR) Report (Close)
Achitecture Team Task POCs for IMS Input
Testing
Generate Vocabulary Package
Testing
OT&E and KPP evaluation of Prototype
Return to Step 5
Architecture
COI / EVT
COI Panel Review Vocabulary Package and provide Recommendations to Sponsor
Architecture Execute Appropriate IMS Activities
Proceed To Sponsor Review of Package
Revise Yes
CMO review of Governance Package
Approved Approved?
Revise IRB review of Governance Package
Approved?
Denied
Approved DBSMC review of Governance Package
Charter Approved by SWG?
Approved Approved?
Governance
Denied
Denied
All Stop
Denied
Governance All Stop
SWG Approval COI Vocabulary package
Yes
No
Proceed to Previous Sponsor Checkpoint
Governance
Yes
Stand Down COI
No
Participate in Kickoff Session
Platform Engineering
Task POCs for IMS Input Execute Appropriate IMS Activities
Platform Engineering
Platform Engineering
No
Provision Prototype to operational environment
All Stop
Register content in Business Reference Model
Proceed to Step 3
Validate BPR/process improvement effects at an enterprise level
Project Lead / Product Center
Project Lead / Product Center
Project Lead / Product Center
Identify Project Lead
Project Lead / Product Center
Achitecture Team
Platform Engineering
Ensure processes adequately define context for information assets
Step 2
Derive mission critical -Onboarding requirements
Define Platform Compliance Requirements
Conduct infrastructure topology analysis
Derive additional infrastructure service necessary to support COA
Platform Engineering
Platform Engineering
Platform Engineering
Determine Distributing Computing requirements
Develop service monitoring requirements
Develop Service Levels Agreements (SLA's) for each layer of service
Platform Engineering
"Sandbox" Onboarding Requirements (Close) -Mission Critical Requirements (Close) -Topology Requirements (Close) -Additional Infrastructure Requirements (Close) -Distributing Components Requirements (Close) -Service Monitoring Requirements (Close) -SLAs (Close) -Onboarding Compliance Requirements (Close)
Onboarding Requirements (close) -Mission Critical Requirements (Close) -Topology Requirements (Close) -Additional Infrastructure Requirements (Close) -Distributing Components Requirements (Open) -Service Monitoring Requirements (Open) -SLAs (Open) -Onboarding Compliance Requirements (Close)
Step 3
Project Lead / Product Center
Platform Engineering
Review Legacy System Requirements
Achitecture Team
Participate in Kickoff Session
Onboarding
Project Lead / Product Center
Certification Package (WIP) -Net-Worthiness (Close) -ATT (Close) -ATO (Open)
Platform Engineering
Proceed to Begin Vocabulary Work Participate in Kickoff Session
All Stop
Capture DOTMLPF interdependencies (temporal, decisional, informational) to other processes
Ensure other processes that may be affected by modification of these processes have been identified and impacts addressed
Obtain DAA Approval for the ATO
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (Close) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
Install Prototype
Install Successful?
Yes
Provision Per Phasing Plan
BCL Compliance Governance
Proceed To Sponsor Review of Package
Revise
Ensure alignment with AF Strategy
Sponsor Yes
Provide LRP compliance requirements checklist for each COA
BRM -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Open)
BRM -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Open)
Conduct Enterprise Architecture analysis
Complete performance measures and Key Performance Attributes section of PRM Template
Approved and Ready to Field?
Update DOT_LPF Implementation Plan
End SDDP
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Open) -Operational Test & Evaluation Plans and Procedures (Open) -Post Implementation Review (PIR) Report (Open)
Execute Appropriate IMS Activities
Testing
Execute Appropriate IMS Activities Task POCs for IMS Input
Testing
"Sandbox"
Complete Sub-Capability Requirements section of PRM Template
Assessment of Prototype
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (Close) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
Complete Help Desk Training
Proceed to Step 5
Project Lead / Product Center Task POCs for IMS Input
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (WIP) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
ITLC Help Desk Prototype Training
Acquire Capability
Project Lead / Product Center Begin Step 4
Participate in Kickoff Session
COI Coordination Panel reviews charter and provides a recommendation to the Sponsor
User Evaluation of Prototype
M-Implementation Plan (From Step 3) -Work Break Structure/ RTM (Close) -Service Implementation Schedule (Close) -Cost Estimate (Close) -DOTLPF Change Management Plan (Close) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (Close) -Resourcing (Close)
Return to Step 5
No
Sponsor
Perform User training for Prototype
Deployment Package (From Step 5) -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (WIP) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
Begin Step 6
"Sandbox"
Information Exchange Reuse?
COI / EVT
Functional / SME "Sandbox"
Engage users for Prototype Training
Obtain DAA Approval for the ATT for the Prototype
System Engineering
IMS (Close) Programmatic (Close) - Product Center Activities (Close) -Contracting Activities -Acquisition Activities - PEO Activities (Close) -Resourcing -Training -Equipment - Finance Activities (Close) -Allocate Funds -Assign Resources - Architecture Activities (Close) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Close) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Close) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Close) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Close) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations
Operational Baseline
COI / EVT
User Evaluation of Prototype
M-Implementation Plan (From Step 3) -Work Break Structure/ RTM (Close) -Service Implementation Schedule (Close) -Cost Estimate (Close) -DOTLPF Change Management Plan (Close) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (Close) -Resourcing (Close)
Sponsor
Yes
Task POCs for IMS Input
Go to SDDP Step 4
No
Discover existing potential solutions (COTS/GOTS / Web Service Code / Systems) to satisfy all or part of the Contextual Model
COI / EVT
Governance
Approve IMS
Task POCs for IMS Input
Participate in Kickoff Session Execute Appropriate IMS Activities
Approved
Update cost estimates to MImplementation Plan
Sponsor Champions ADS
System Engineering / Design DRM -COI Charter (WIP) -List of information assets (Close) Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Close) -Reusable COI Artifacts (WIP)
Functional / SME
Functional / SME
No
Sponsor Call Kickoff Meeting
Proceed to COA Evaluation Decision Revise
Yes
Match Compliance Requirements to individual information exchanges, services and function
Identify additional information exchanges requiring new implementation
System Engineering / Design
Target CEIT Baseline
End Process Engineering
Identify reuse opportunities for Web Services, Point to Point Interfaces, Data Services, and Exposure Services
Define Initial Functional Requirements to implement information exchanges
Finish
System Engineering / Design
Achitecture Team
Characterize Information Assets needed for Information Flows
BRM -Mission Process Map (Close) -Auditable Process (WIP) - Business Rules (Close) -Dependencies (Open) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Open)
High Level Process describing expected outcomes
Functional / SME
Proceed Back to Beginning of Step 4
Bounded User Requirements - M Implementation Plan -SRM -DRM
No
Submit COI Charter to SWG Denied
Revise
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
Draft a new COI charter or revise existing COI Charter
Prepare Bounded User Requirements for Implementation
Proceed to Begin Vocabulary Work
Sponsor Initiate COI Coordination
No
Yes Define the information flow necessary to satisfy each put/get from the process
Process Engineering Completion Criteria: A. Define process steps inputs and outputs. (Note: Put/Gets of Information Assets are process steps) B. Define business rules for each process step, including manipulations to information needed for process step, creation of record/store, workflow C. Define decisions taken in the step D. Define outputs from process steps, including information outputs to store or to next process step
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
Governance
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (WIP) - Performance attributes (Open) - Performance Measures (Open)
Identify information exchanges / assets
Participate in Kickoff Session
"Sandbox"
M-Implementation Plan -Work Break Structure/ RTM (Close) -Service Implementation Schedule (Close) -Cost Estimate (Close) -DOTLPF Change Management Plan (Close) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (Close) -Resourcing (Close)
M-Implementation Plan -Work Break Structure/ RTM (WIP) -Service Implementation Schedule (WIP) -Cost Estimate (WIP) -DOTLPF Change Management Plan (WIP) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (WIP) -Resourcing (WIP)
Information Analysis
Sponsor
Approve COI vocabulary package Corporate Approval?
No
ITLC
Architecture Team
SubCapability PRM Tree N.
Project Lead / Product Center
SubCapability PRM Tree 1. Needs PRM
Platform Engineering
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Open) - Performance attributes (Open) - Performance Measures (Open)
Architecture Team
PRM - Needs (Close) - LRP (WIP) - Sub-capabilities (Open) - Performance attributes (Open) - Performance Measures (Open)
Functional / SME
M-Implementation Plan -Work Break Structure/ RTM (WIP) -Service Implementation Schedule (WIP) -Cost Estimate (WIP) -DOTLPF Change Management Plan (WIP) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (WIP) -Resourcing (WIP)
Sponsor Revise
Conduct Cost Estimates for each COA
"Sandbox" PRM - Needs (Close) - LRP (Open) - Sub-capabilities (Open) - Performance attributes (Open) - Performance Measures (Open)
Functional / SME
"Sandbox" M-Implementation Plan -Work Break Structure/ RTM (WIP) -Service Implementation Schedule (WIP) -Cost Estimate (WIP) -DOTLPF Change Management Plan (WIP) -Governance Package (WIP) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Open) -Approval Signatures (Open) -Compliance Completion Plan (Close) -Onboarding Plan (WIP) (from SRM) -Resourcing (WIP)
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (Close) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (Close) - Reusability (Close) - Dependencies (Close) - Constraints (Close) -COA Change Management Plan (Close) -COA Cost Estimates (Close)
Sponsor For each COA determine the scope, scalability and degree of difficultly of its associated DOTLPF change management requirements
Define impacts for each COA to DOTLPF necessary to support the material solution
Functional/SME
Functional / SME
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (Close) - Reusability (Close) - Dependencies (Close) - Constraints (Close) -COA Change Management Plan (Close) -COA Cost Estimates (Close)
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (WIP) - Reusability (Close) - Dependencies (Close) - Constraints (Close) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (Open) - Reusability (Open) - Dependencies (Open) - Constraints (Open) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
Develop COAs that align the best uses of the various sources (combination of sources may be the most efficient path) to satisfy the Contextual Model
Yes
Yes
Information Exchange Requirements
Contextual Model -Information Puts/Gets (WIP) -Business Rules (WIP) -Authorization and Access (WIP) -End User Design Guidelines (WIP)
BRM from Step 2
Yes Architecture Team
Characterize Information Flows ( input, manipulation of information, output)
Process Team
Sponsor
Build evaluation criteria for COAs to satisfy the Contextual Model
All Stop
Yes
Approved
Denied Revise
All Stop
Review Approved Request SME support for and Approve, COA evaluation criteria Contextual Model development and Work Plan
Design Contextual Model
No
Conduct Process Engineering
Revise
Sponsor
Denied All Stop
Sponsor
Process Team
Sponsor
No
Approved
Approved Prioritized Sub-Capabilities Requirements?
Approved
Sponsor
Update DOTMLPF Implementation plan
All Stop
Proceed Previous Sponsor Decision Point
Denied
Revise
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Open) -Onboarding Compliance Rqts (Open) -BEA Compliance Rqts (Open) -LRP Compliance Rqts (Open) -COA DOTLPF Impact Analysis (Open) - Reusability (Open) - Dependencies (Open) - Constraints (Open) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
Sponsor
Revise
SME Validation of Yes Contextual Model?
Proceed to Sponsor Decision Point
"Sandbox"
Review and Approve statement of need/problem statement and work plan with Sponsor.
Get SME validation on contextual model
All Stop
Yes
Generate BCA
Functional / SME
Functional / SME Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (WIP) -COA Components (Open) -COA Sequence (Open) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Open) -Onboarding Compliance Rqts (Open) -BEA Compliance Rqts (Open) -LRP Compliance Rqts (Open) -COA DOTLPF Impact Analysis (Open) - Reusability (Open) - Dependencies (Open) - Constraints (Open) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
Build Material Solution Implementation Plan
Start Material Solution Design
Denied
Denied
Sponsor
Provide to Sponsor recommended evaluation criteria for COAs to satisfy the Contextual Model
Work Plan to build the M-Implementation Plan - Tasks - Resources - Timelines - Milestones
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
Sponsor Scope Work Plan to build the M-Implementation
Approval Success Criteria A. Institutionalization of business processes through AFI/policy documentation (includes LRP) B. Prioritization of information assets by SRA D. Validation of adherence to EA standards by CIO F. Obtain approval to execute requirements to put the process into practice from appropriate authority (depending on scope) G. Capture auditable process models into Business Reference Model H. Contextual description of information assets clearly delineated from information flows within auditable business processes
No Review Capability Requirements with AF Corporate Structure
Build work plans
All Stop
Return to Material Solution Design
Validate Contextual Model content
No
Revise Execution Requirements Approved?
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
Begin 3.0
Proceed to Sponsor Decision Point
Denied Approved
Functional / SME
Functional / SME Proceed to Define Mission Processes to Deliver DOTMLPF Capability Requirements
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
All Stop Revise
Work plan approved?
Yes
Sponsor
Functional / SME Enterprise Architecture Assistance Needed?
ITLC
Determine Sub-Capability requirements based on constraints
Architecture
Obtain formal Review and approval to proceed
Identify Key Performance Attributes
Report: Performance Requirements for the Capability
Capability Requirements Completion Criteria: 1. Prioritized by Sponsor 2. Satisfies all relevant LRP constraints 3. Does not duplicate other required capabilities 4. Reviewed and approved by AF Corporate Structure, as appropriate 5. Meets EA standards for representation 6. Registered in PRM 7. Performance Measures defined
No
Yes
Sponsor
Conduct Enterprise Architecture analysis
. Determine, prioritize, and present DOTMLPF capability requirements to Sponsor
Enterprise Architecture Assistance Needed?
Testing
Decompose Need/Problem Statement into Sub-Capabilities
Platform Engineering
Begin 1.3
Network Op's
End 1.2
ITLC
Task POCs for IMS Input Execute Appropriate IMS Activities
ITLC
Provide Sponsor Cost Estimate Updates
Participate in Kickoff Session
AQ Authority
Participate in Kickoff Session
Participate in Kickoff Session
Participate in Kickoff Session
Participate in Kickoff Session
Task POCs for IMS Input
Task POCs for IMS Input
Finance PEO/PMO Governance (C&A)
Task POCs for IMS Input
Task POCs for IMS Input
Task POCs for IMS Input
Execute Appropriate IMS Activities
Project Lead / Product Center
Analyze for relevance (Down-select pertinent LRP.)
System Engineering
Functional / SME
Report: Sub-Capabilities for the Need
Complete LRP section of PRM Template
Project Lead / Product Center
Identify Public Laws, DOD No Directives, Manuals& Instructions, and OMB, GAO, BTA Findings
Yes
Architecture
Enterprise Architecture Assistance Needed?
Platform Engineering
Begin 1.2
Testing
Gather known LRP requirements End 1.1
AQ Authority
Scope the downstream efforts to complete steps 1 and 2 (define scope, charter, schedule of milestones and deliverables, resource requirements)
Contracting
Complete Needs section of PRM Template
Finance
No
Yes
Associated PEO/PMO
Enterprise Architecture Assistance Needed?
Governance (C&A)
Draft Initial Statement of Need/Problem Statement
Sponsor
Functional/ SME
Document: Laws, Regulations and Policy constrains/ mandates with findings for relevance
"Sandbox"
Begin 1.1
System Engineering / Design
Identify relevant legal, regulatory, and policy constraints List: Laws, Regulations, Policies
Functional / SME
Go to Step 2 Start SDDP 1.0
COI/EVT
Define statement of need/problem statement Document : Statement of Need / Problem Statement
Functional/ SME
Identified Top Level Need
Functional/SME
Functional/SME
SDDP Delivery Process
LTD Deploy
AQ Authority
Execute Appropriate IMS Activities
Execute Appropriate IMS Activities
Execute Appropriate IMS Activities
Execute Appropriate IMS Activities
Finance PEO/PMO Governance (C&A)
Step 4
Step 5
IMS (Close) Programmatic (Close) - Product Center Activities (Close) -Contracting Activities -Acquisition Activities - PEO Activities (Close) -Resourcing -Training -Equipment - Finance Activities (Close) -Allocate Funds -Assign Resources - Architecture Activities (Close) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Close) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Close) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Close) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Close) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (Close)
Certification Package (Close) -Net-Worthiness (Close) -ATT (Close) -ATO (Close)
Network Op's
Network Op's
Provision User Access for Prototype
Project Lead / Product Center
Project Lead / Product Center
Provision Access to trained users per phasing plan
IMS (Close) Programmatic (Close) - Product Center Activities (Close) -Contracting Activities -Acquisition Activities - PEO Activities (Close) -Resourcing -Training -Equipment - Finance Activities (Close) -Allocate Funds -Assign Resources - Architecture Activities (Close) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Close) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Close) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Close) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Close) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (Close)
Step 6
User Gets
User needs
Infrastructure Processes
Platform as a Service (PaaS) (A configuration-managed and delivered infrastructure)
We keep attacking the problem too late - i.e. SDDP Steps 4 & 5 Integrity - Service - Excellence
13
SDDP (1) Identify DOTMLPF Capability Requirements
Prioritization of Sub-Capability based on SME/Functional defined criteria
For the sub-capability, identify the Key Performance Attributes End 1.3
Begin 1.4
Complete performance measures and thresholds for each Key Performance Attributes of PRM Template
No
Process Information from SME
Start SDDP 2.0
Define Mission Processes to Deliver DOTMLPF Capability Requirements
Functional / SME
End 1.4
End 1.5 Engage the Enterprise Architecture Team Begin 1.5
Begin 1.6
Functional / SME
Provide basic process information to Process Team (I.E "Yellow Sticky's", "Napkins" etc)
Revisit work plan for additional resources required
Work Plan SDDP 1 & 2 - Tasks - Resources - Timelines - Milestones (from Step 1)
End 1.6
Submit Capabilities Requirements for approval
Functional / SME
No
Process Engineering Content Approved?
Yes
Ensure All expected outcomes from 1.0 are address/satisfied
Sponsor
Obtain SME Support for Process Engineering Activities
Inform/Adjudicate other processes that may be affected by modification of these processes (understand impacts)
Sponsor
Denied
All Stop
Characterize the DOTMLPF execution requirements to put the process into practice and be successful
Approved
Develop Implementation Plans
Revise
Yes
Define ROI and investment auditability
Review Capability Requirements with AF Corporate Structure
Determine Initial Scope with general cost estimate
Sponsor Approval?
All Stop
Review Approved Request SME support for and Approve, COA evaluation criteria Contextual Model development and Work Plan
Yes
Review Capability Requirements
Corporate Approval?
No
Define Start Points, Ends and Outcomes
Proceed to Sponsor Decision Point
Begin
Define Process Steps
Define required skill sets and proficiencies for each process step
Sequence Process Steps to create Discrete Process Steps including information dimension supporting process steps
Characterize Information Flows ( input, manipulation of information, output)
Process Team
Sponsor
Investigate potential solutions (COTS/GOTS/ Web Service Code / Systems) to satisfy all or part of the Contextual Model
Evaluate ability of source to satisfy part or all of Architecture No Contextual Model both from Support? a function and a feasibility of implementation
Architecture Support?
No
Begin
Generate BCA
Validation of appropriate BPR
Package BPR Assertion Documentation
BPR Assertion Complete?
No
Proceed to Process Engineering Activities
Sponsor
BRM from Step 2
Auditable Process model 1
Auditable Process model N
Yes
Capture how the user wants to use each put/get (ex. Presentation, Usability)
Capture the business rules, authorization and access rules, service requirements for each put/get within the process
Auditable Process model 2
Additional Process Flows?
Approve Review Package and Select COA?
Approved and COA Selected
Denied
AF Corporate Structure Review Needed?
Yes
Review Capability Requirements with AF Corporate Structure
Yes
Create Draft M- Implementation Plan
Receive Needs Data
Query 'As is' Repository for related LRP.
Complete Needs section of PRM Template
Achitecture Team
Identify Public Laws, DOD Directives, Manuals& Instructions, and OMB, GAO, BTA Findings
Complete LRP section of PRM Template
Query Architecture to look for similar Sub-Capabilities
Achitecture Team
Determine Sub-Capability requirements based on constraints (with user)
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Open) - Performance Measures (Open)
Report: Identified attributes to satisfy the capability
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
Based on the COA selected, commence the information analysis
Finish
System Engineering / Design Contextual model for Process 1 Contextual model for Process 2
Contextual model for Process N
System Engineering / Design
System Engineering / Design
BRM (From Step 2) -Mission Process Map (Close) -Auditable Process (Close) -Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Close)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (Open) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -Compliance Requirements (Open) -On Boarding Requirements (Open)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (Open) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -Compliance Requirements (Open) -On Boarding Requirements (Open)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (Open) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -Compliance Requirements (WIP) -On Boarding Requirements (WIP)
System Engineering / Design "Sandbox"
Process Team
Process Team
Functional/SME
Functional/SME
Task POCs for IMS Input Execute Appropriate IMS Activities
Discover existing potential solutions (COTS/GOTS / Web Service Code / Systems) to satisfy all or part of the Contextual Model
System Engineering / Design DRM -COI Charter (Open) -List of information assets (Open) -Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (WIP) -Roles and permissions (WIP) -Example Data Record (WIP) -Ontology (WIP) -Reusable COI Artifacts (WIP)
For the selected COA identify any information exchange reuse opportunities within the enterprise that will support the implementation of the contextual model
Assess capability coverage of solution options Search the Enterpise Architecture to identify additional compliance requirements
Achitecture Team
COI / EVT
COI / EVT
Governance
Governance
Identify Business / War Fighter Enterpise Architecture Compliance Requirements
For each COA, identify the inherited attributes that sufficiently satisfy the compliance requirements checklist
Identify evidence that can satisfy compliance requirements
For each COA, Identify the reuse opportunities across the enterprise to support the DOTLPF change management requirements
Approve IMS
Task POCs for IMS Input
Sponsor
Yes
SRM -Contextual Model (Close) -Web Service Code Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (WIP) -COTS/GOTS Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Open) -Reuse components (WIP) -System Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Open) -Reuse components (WIP) -Compliance Requirements (Close) -On Boarding Requirements (Close)
Update cost estimates to MImplementation Plan
Sponsor Champions ADS
Approved Update Implementation Plan
Package bounded user requirements for Product Center
Approve Bounded User Requirements? Go to SDDP Step 4
System Engineering / Design DRM -COI Charter (WIP) -List of information assets (Close) Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Open) -Reusable COI Artifacts (WIP)
DRM -COI Charter (WIP) -List of information assets (Open) Vocabulary Package (WIP) -Authoritative Data Source (ADS) Mapping (WIP) -Roles and permissions (WIP) -Example Data Record (WIP) -Ontology (WIP) -Reusable COI Artifacts (WIP)
DRM -COI Charter (WIP) -List of information assets (Close) Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Close) -Reusable COI Artifacts (WIP)
Achitecture Team
Achitecture Team
System Engineering
Participate in Kickoff Session
Execute Appropriate IMS Activities
Task POCs for IMS Input
Draft IMS (WIP) Programmatic (Open) - Product Center Activities (Open) -Contracting Activities -Acquisition Activities - PEO Activities (Open) -Resourcing -Training -Equipment - Finance Activities (Open) -Allocate Funds -Assign Resources - Architecture Activities (Open) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Open) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Open) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Open) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Open) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (Open)
DRM -COI Charter (Close) -List of information assets (Close) Vocabulary Package (Close) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Close) -Reusable COI Artifacts (Close)
DRM -COI Charter (Close) -List of information assets (Close) Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (WIP) -Roles and permissions (WIP) -Example Data Record (WIP) -Ontology (WIP) -Reusable COI Artifacts (WIP)
SRM -Contextual Model (Close) -Web Service Code Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close)
DRM -COI Charter (Close) -List of information assets (Close) Vocabulary Package (Close) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Close) -Reusable COI Artifacts (Close)
SRM -Contextual Model (Close) -Web Service Code Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close)
Draft IMS (WIP) Programmatic (WIP) - Product Center Activities (WIP) -Contracting Activities -Acquisition Activities - PEO Activities (WIP) -Resourcing -Training -Equipment - Finance Activities (WIP) -Allocate Funds -Assign Resources - Architecture Activities (WIP) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (WIP) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (WIP) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (WIP) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (WIP) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (WIP)
Draft IMS (WIP) Programmatic (WIP) - Product Center Activities (WIP) -Contracting Activities -Acquisition Activities - PEO Activities (WIP) -Resourcing -Training -Equipment - Finance Activities (WIP) -Allocate Funds -Assign Resources - Architecture Activities (WIP) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (WIP) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (WIP) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (WIP) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (WIP) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (WIP)
Complete Sub-Capability Requirements section of PRM Template
Complete performance measures and Key Performance Attributes section of PRM Template
Initiate Deployment
Yes
Extract Reusable Information Exchange Assets from previous DRMs
Ensure ontology reuse
Achitecture Team
COI / EVT
COI Coordination Panel will make a recommendation to the Sponsor to either re-charter an existing COI or establish a new COI to meet information sharing requirement.
Stand Up COI
Identify authoritative and source data from a process perspective
Identify ADS
Determine access rules ,roles and permissions for assets and planned services
Develop Draft Ontology
Acquire Capability
Proceed to Step 5
Project Lead / Product Center Begin Step 4
Review Bounded User Requirements (Acquisition Strategy Package)
Identify Kickoff meeting attendees
Facilitate Kickoff Meeting
Identify the POC's that will support the Project Lead during the implementation of the Bounded User Requirements
Create Top Level IMS
Project Lead / Product Center Task POCs for IMS Input
Achitecture Team
Verify Requirements Satisfy all relevant LRP Constraints
Achitecture Team
Conduct Enterprise Architecture Analysis
Conduct Enterprise Architecture Analysis
BRM -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Close)
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
LRP Compliance Requirements Checklist -Clinger & Cohen. (Open) -PIA (Open) -FISMA (Open) -NDAA (Open) *CCA *BEA *EITDR Registration *Business Process Reengineering *Section 508 Compliance *Records Management *FISMA *ETP *Investment included in AF Budget -DIACAP (Open)
SWG review of Governance Package
LRP Compliance Requirements Checklist -Clinger & Cohen. (Close) -PIA (Close) -FISMA (Close) -NDAA (Close) *CCA *BEA *EITDR Registration *Business Process Reengineering *Section 508 Compliance *Records Management *FISMA *ETP *Investment included in AF Budget -DIACAP (Close)
Governance
Proceed To Sponsor Review of Package
Proceed To Sponsor Review of Package
No Approved
Approved?
Greater than $1M
COI Panel Review Vocabulary Package and provide Recommendations to Sponsor
Complete IMS
Task POCs to execute IMS
Identify Reuse Capability
Step 1 Identify DOTMLPF Capability Requirements
Achitecture Team
Sponsor
M-Implementation Plan (From Step 3) -Work Break Structure/ RTM (Close) -Service Implementation Schedule (Close) -Cost Estimate (Close) -DOTLPF Change Management Plan (Close) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (Close) -Resourcing (Close)
Obtain DAA Approval for the ATO
Yes
Return to Sponsor Selected Point
No
Conduct Post Implementation Review (PIR)
Train Users Per Phasing Plan
PIR Successful?
Yes
End SDDP
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Close) -Operational Test & Evaluation Plans and Procedures (Close) -Post Implementation Review (PIR) Report (Open)
System Engineering
Execute Appropriate IMS Activities
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (Close) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (Close) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
ITLC
"Sandbox"
No
System Engineering
All Phases Complete?
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Close) -Operational Test & Evaluation Plans and Procedures (Close) -Post Implementation Review (PIR) Report (Open)
Yes
Update IMS with Fielding Activities
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Close) -Operational Test & Evaluation Plans and Procedures (Close) -Post Implementation Review (PIR) Report (Close)
Testing
Testing
OT&E and KPP evaluation of Prototype
Return to Step 5
Architecture Execute Appropriate IMS Activities
Proceed To Sponsor Review of Package
Revise Yes
CMO review of Governance Package
Approved Approved?
Revise IRB review of Governance Package
Approved?
Denied
Approved DBSMC review of Governance Package
Charter Approved by SWG?
Approved Approved?
Governance
Denied
Denied
All Stop
Denied
Governance All Stop
SWG Approval COI Vocabulary package
Yes
No
Proceed to Previous Sponsor Checkpoint
Governance
Yes
Stand Down COI
No
Participate in Kickoff Session
Platform Engineering
Task POCs for IMS Input Execute Appropriate IMS Activities
Platform Engineering
Proceed to Begin Vocabulary Work Participate in Kickoff Session
All Stop
All Stop
Register content in Business Reference Model
Proceed to Step 3
Validate BPR/process improvement effects at an enterprise level
Project Lead / Product Center
Project Lead / Product Center
Project Lead / Product Center
Project Lead / Product Center
Identify Project Lead
Project Lead / Product Center
Achitecture Team
Achitecture Team
Platform Engineering
Derive mission critical -Onboarding requirements
Define Platform Compliance Requirements
Conduct infrastructure topology analysis
Derive additional infrastructure service necessary to support COA
Platform Engineering
Platform Engineering
Platform Engineering
Determine Distributing Computing requirements
Develop service monitoring requirements
Develop Service Levels Agreements (SLA's) for each layer of service
Platform Engineering
"Sandbox" Onboarding Requirements (Close) -Mission Critical Requirements (Close) -Topology Requirements (Close) -Additional Infrastructure Requirements (Close) -Distributing Components Requirements (Close) -Service Monitoring Requirements (Close) -SLAs (Close) -Onboarding Compliance Requirements (Close)
Onboarding Requirements (close) -Mission Critical Requirements (Close) -Topology Requirements (Close) -Additional Infrastructure Requirements (Close) -Distributing Components Requirements (Open) -Service Monitoring Requirements (Open) -SLAs (Open) -Onboarding Compliance Requirements (Close)
Project Lead / Product Center
Platform Engineering
Review Legacy System Requirements
Ensure processes adequately define context for information assets
Participate in Kickoff Session
Onboarding
Capture DOTMLPF interdependencies (temporal, decisional, informational) to other processes
Ensure other processes that may be affected by modification of these processes have been identified and impacts addressed
Return to Step 5
Approved and Ready to Field?
Platform Engineering
Platform Engineering
No
Provision Prototype to operational environment
Install Prototype
Install Successful?
Yes
Provision Per Phasing Plan
BCL Compliance Governance
Proceed To Sponsor Review of Package
BRM -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Open)
BRM -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Open)
Conduct Enterprise Architecture analysis
Determine potential duplication/conflict with other enterprise requirements
"Sandbox"
Update DOT_LPF Implementation Plan
Task POCs for IMS Input
Architecture
COI / EVT Generate Vocabulary Package
Assessment of Prototype
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (Close) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
Complete Help Desk Training
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Open) -Operational Test & Evaluation Plans and Procedures (Open) -Post Implementation Review (PIR) Report (Open)
Achitecture Team Participate in Kickoff Session
COI Coordination Panel reviews charter and provides a recommendation to the Sponsor
User Evaluation of Prototype
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (WIP) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
ITLC Help Desk Prototype Training
Provide LRP compliance requirements checklist for each COA
Revise
Ensure alignment with AF Strategy
Sponsor
Perform User training for Prototype
Deployment Package (From Step 5) -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (WIP) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
Begin Step 6
"Sandbox"
Information Exchange Reuse?
COI / EVT
Functional / SME M-Implementation Plan (From Step 3) -Work Break Structure/ RTM (Close) -Service Implementation Schedule (Close) -Cost Estimate (Close) -DOTLPF Change Management Plan (Close) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (Close) -Resourcing (Close)
No
System Engineering
IMS (Close) Programmatic (Close) - Product Center Activities (Close) -Contracting Activities -Acquisition Activities - PEO Activities (Close) -Resourcing -Training -Equipment - Finance Activities (Close) -Allocate Funds -Assign Resources - Architecture Activities (Close) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Close) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Close) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Close) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Close) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activit
Operational Baseline
COI / EVT
User Evaluation of Prototype
Engage users for Prototype Training
Participate in Kickoff Session Execute Appropriate IMS Activities
Revise
Yes
Testing
Execute Appropriate IMS Activities Task POCs for IMS Input
Testing
"Sandbox"
Identify existing Key Performance Attributes to satisfy the Sub-Capability,
Functional / SME
Functional / SME
No
Sponsor Call Kickoff Meeting
Proceed to COA Evaluation Decision
No
Submit COI Charter to SWG
Match Compliance Requirements to individual information exchanges, services and function
Identify additional information exchanges requiring new implementation
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (WIP) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -Compliance Requirements (WIP) -On Boarding Requirements (Close)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Automated Information Assets (Open) -Detailed Design Requirements (Open) -Reuse components (WIP) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -Compliance Requirements (WIP) -On Boarding Requirements (Close)
BRM (From Step 2) -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Close)
Target CEIT Baseline
End Process Engineering
Draft a new COI charter or revise existing COI Charter
Prepare Bounded User Requirements for Implementation
Proceed to Begin Vocabulary Work
Sponsor Initiate COI Coordination
Identify reuse opportunities for Web Services, Point to Point Interfaces, Data Services, and Exposure Services
No
Achitecture Team
Characterize Information Assets needed for Information Flows
BRM -Mission Process Map (Close) -Auditable Process (WIP) - Business Rules (Close) -Dependencies (Open) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Open)
High Level Process describing expected outcomes
Identify information exchanges / assets
Denied
Revise
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
Functional / SME
Proceed Back to Beginning of Step 4
Bounded User Requirements - M Implementation Plan -SRM -DRM
Obtain DAA Approval for the ATT for the Prototype
Assemble Governance package
No
Define Initial Functional Requirements to implement information exchanges
Process Engineering Completion Criteria: A. Define process steps inputs and outputs. (Note: Put/Gets of Information Assets are process steps) B. Define business rules for each process step, including manipulations to information needed for process step, creation of record/store, workflow C. Define decisions taken in the step D. Define outputs from process steps, including information outputs to store or to next process step
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
Governance
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (WIP) - Performance attributes (Open) - Performance Measures (Open)
Participate in Kickoff Session
"Sandbox"
M-Implementation Plan -Work Break Structure/ RTM (Close) -Service Implementation Schedule (Close) -Cost Estimate (Close) -DOTLPF Change Management Plan (Close) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (Close) -Resourcing (Close)
M-Implementation Plan -Work Break Structure/ RTM (WIP) -Service Implementation Schedule (WIP) -Cost Estimate (WIP) -DOTLPF Change Management Plan (WIP) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (WIP) -Resourcing (WIP)
Information Analysis
Sponsor
Approve COI vocabulary package Corporate Approval?
No
No
ITLC
Architecture Team
SubCapability PRM Tree N.
SubCapability PRM Tree 2.
Project Lead / Product Center
SubCapability PRM Tree 1. Needs PRM
Platform Engineering
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Open) - Performance attributes (Open) - Performance Measures (Open)
Architecture Team
PRM - Needs (Close) - LRP (WIP) - Sub-capabilities (Open) - Performance attributes (Open) - Performance Measures (Open)
Functional / SME
M-Implementation Plan -Work Break Structure/ RTM (WIP) -Service Implementation Schedule (WIP) -Cost Estimate (WIP) -DOTLPF Change Management Plan (WIP) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (WIP) -Resourcing (WIP)
Sponsor Revise
Conduct Cost Estimates for each COA
Information Exchange Requirements
For each information flow describe the business rules and service levels requirements necessary to meet the process
"Sandbox" PRM - Needs (Close) - LRP (Open) - Sub-capabilities (Open) - Performance attributes (Open) - Performance Measures (Open)
Functional / SME
"Sandbox" M-Implementation Plan -Work Break Structure/ RTM (WIP) -Service Implementation Schedule (WIP) -Cost Estimate (WIP) -DOTLPF Change Management Plan (WIP) -Governance Package (WIP) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Open) -Approval Signatures (Open) -Compliance Completion Plan (Close) -Onboarding Plan (WIP) (from SRM) -Resourcing (WIP)
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (Close) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (Close) - Reusability (Close) - Dependencies (Close) - Constraints (Close) -COA Change Management Plan (Close) -COA Cost Estimates (Close)
Sponsor For each COA determine the scope, scalability and degree of difficultly of its associated DOTLPF change management requirements
Define impacts for each COA to DOTLPF necessary to support the material solution
Yes Define the information flow necessary to satisfy each put/get from the process
Contextual Model -Information Puts/Gets (WIP) -Business Rules (WIP) -Authorization and Access (WIP) -End User Design Guidelines (WIP)
No
All Stop
Functional / SME
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (Close) - Reusability (Close) - Dependencies (Close) - Constraints (Close) -COA Change Management Plan (Close) -COA Cost Estimates (Close)
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (WIP) - Reusability (Close) - Dependencies (Close) - Constraints (Close) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (Open) - Reusability (Open) - Dependencies (Open) - Constraints (Open) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
Develop COAs that align the best uses of the various sources (combination of sources may be the most efficient path) to satisfy the Contextual Model
Yes
Yes
All Stop
Conduct Process Engineering
AF Corporate Structure Review Needed?
Build evaluation criteria for COAs to satisfy the Contextual Model
All Stop
Lift information puts/gets for each process model
Yes
Approved
Denied Revise
Process Team
Sponsor
No Revise
Sponsor
Denied All Stop
Sponsor
Update DOTMLPF Implementation plan
Proceed to Sponsor Decision Point
Proceed Previous Sponsor Decision Point Approved
Approved Prioritized Sub-Capabilities Requirements?
Approved
Sponsor
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Open) -Onboarding Compliance Rqts (Open) -BEA Compliance Rqts (Open) -LRP Compliance Rqts (Open) -COA DOTLPF Impact Analysis (Open) - Reusability (Open) - Dependencies (Open) - Constraints (Open) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
Sponsor
Revise
SME Validation of Yes Contextual Model?
Design Contextual Model
Architecture Team
Sponsor All Stop
Get SME validation on contextual model
All Stop
Corporate Approval?
Yes Denied
Denied
Functional / SME
Functional / SME Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (WIP) -COA Components (Open) -COA Sequence (Open) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Open) -Onboarding Compliance Rqts (Open) -BEA Compliance Rqts (Open) -LRP Compliance Rqts (Open) -COA DOTLPF Impact Analysis (Open) - Reusability (Open) - Dependencies (Open) - Constraints (Open) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
Build Material Solution Implementation Plan
Start Material Solution Design
Denied
Approval Success Criteria A. Institutionalization of business processes through AFI/policy documentation (includes LRP) B. Prioritization of information assets by SRA D. Validation of adherence to EA standards by CIO F. Obtain approval to execute requirements to put the process into practice from appropriate authority (depending on scope) G. Capture auditable process models into Business Reference Model H. Contextual description of information assets clearly delineated from information flows within auditable business processes
No AF Corporate Structure Review Needed?
Build work plans
Revise
Provide to Sponsor recommended evaluation criteria for COAs to satisfy the Contextual Model
Work Plan to build the M-Implementation Plan - Tasks - Resources - Timelines - Milestones
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
Sponsor Scope Work Plan to build the M-Implementation
Obtain formal review Approved and approval to proceed
"Sandbox"
Review and Approve statement of need/problem statement and work plan with Sponsor.
Return to Material Solution Design
Validate Contextual Model content
No
Revise Execution Requirements Approved?
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
Begin 3.0
Proceed to Sponsor Decision Point
Denied Approved
Functional / SME
Functional / SME Proceed to Define Mission Processes to Deliver DOTMLPF Capability Requirements
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
All Stop Revise
Work plan approved?
Yes
Sponsor
Functional / SME Enterprise Architecture Assistance Needed?
ITLC
Complete Sub-Capability Requirement section of PRM Template
Architecture
Obtain formal Review and approval to proceed
Identify Key Performance Attributes
Report: Performance Requirements for the Capability
Capability Requirements Completion Criteria: 1. Prioritized by Sponsor 2. Satisfies all relevant LRP constraints 3. Does not duplicate other required capabilities 4. Reviewed and approved by AF Corporate Structure, as appropriate 5. Meets EA standards for representation 6. Registered in PRM 7. Performance Measures defined
Determine Sub-Capability requirements based on constraints
Yes
Sponsor
Conduct Enterprise Architecture analysis
. Determine, prioritize, and present DOTMLPF capability requirements to Sponsor
Enterprise Architecture No Assistance Needed?
TRM
Testing
Decompose Need/Problem Statement into Sub-Capabilities
BRM
SRM DRM
Platform Engineering
Begin 1.3
PRM
ITLC
Task POCs for IMS Input Execute Appropriate IMS Activities
ITLC
Provide Sponsor Cost Estimate Updates
Participate in Kickoff Session
AQ Authority
Participate in Kickoff Session
Participate in Kickoff Session
Participate in Kickoff Session
Participate in Kickoff Session
Finance PEO/PMO Governance (C&A)
Task POCs for IMS Input
Execute Appropriate IMS Activities
Task POCs for IMS Input
Execute Appropriate IMS Activities
Task POCs for IMS Input
Task POCs for IMS Input
Task POCs for IMS Input
Execute Appropriate IMS Activities
Execute Appropriate IMS Activities
Execute Appropriate IMS Activities
AQ Authority Finance PEO/PMO Governance (C&A)
Step 2
Step 3
Step 4
Define DOTMLPF executable actions
Define Material Solution and Implementation Plan
Plan / implement developmental components of the Material Solution
Certification Package (WIP) -Net-Worthiness (Close) -ATT (Close) -ATO (Open)
Network Op's
End 1.2
CAPTURED IN AND INFORMED BY ENTERPRISE ARCHITECTURE
Project Lead / Product Center
Analyze for relevance (Down-select pertinent LRP.)
System Engineering
Functional / SME
Report: Sub-Capabilities for the Need
Complete LRP section of PRM Template
Project Lead / Product Center
Identify Public Laws, DOD No Directives, Manuals& Instructions, and OMB, GAO, BTA Findings
Yes
Architecture
Enterprise Architecture Assistance Needed?
Platform Engineering
Begin 1.2
Testing
Gather known LRP requirements End 1.1
AQ Authority
Scope the downstream efforts to complete steps 1 and 2 (define scope, charter, schedule of milestones and deliverables, resource requirements)
Contracting
Complete Needs section of PRM Template
Finance
No
Yes
Associated PEO/PMO
Enterprise Architecture Assistance Needed?
Governance (C&A)
Draft Initial Statement of Need/Problem Statement
Sponsor
Functional/ SME
Document: Laws, Regulations and Policy constrains/ mandates with findings for relevance
"Sandbox"
Begin 1.1
System Engineering / Design
Identify relevant legal, regulatory, and policy constraints List: Laws, Regulations, Policies
Functional / SME
Go to Step 2 Start SDDP 1.0
COI/EVT
Define statement of need/problem statement Document : Statement of Need / Problem Statement
Functional/ SME
Identified Top Level Need
Functional/SME
STEP OUTCOMES • Alignment of user with a problem to a Sponsor to support solving that problem • Commitment from Air Force corporate structure to support possible solution to the user’s problem PRODUCT OUTCOMES • Clear, concise statement of the user’s problem and/or needs • Delineation of a proposed set of capabilities that will solve the user’s problem or meet the user’s needs • Documentation of relevant Legislation, Regulation and Policy • A set of performance measures that indicate how the capabilities, once implemented, actually solve the user’s problem or meet the user’s need
IMS (Close) Programmatic (Close) - Product Center Activities (Close) -Contracting Activities -Acquisition Activities - PEO Activities (Close) -Resourcing -Training -Equipment - Finance Activities (Close) -Allocate Funds -Assign Resources - Architecture Activities (Close) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Close) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Close) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Close) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Close) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (Close)
Step 5 Sustain Application Lifecycle
Certification Package (Close) -Net-Worthiness (Close) -ATT (Close) -ATO (Close)
Network Op's
Network Op's
Provision User Access for Prototype
Project Lead / Product Center
Project Lead / Product Center
Provision Access to trained users per phasing plan
IMS (Close) Programmatic (Close) - Product Center Activities (Close) -Contracting Activities -Acquisition Activities - PEO Activities (Close) -Resourcing -Training -Equipment - Finance Activities (Close) -Allocate Funds -Assign Resources - Architecture Activities (Close) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Close) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Close) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Close) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Close) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (Close)
Step 6 Deploy/Operate the Material Solution
The Service Development and Delivery Process Integrity - Service - Excellence
14
SDDP (2) Define DOTMLPF executable actions CAPTURED IN AND INFORMED BY ENTERPRISE ARCHITECTURE
STEP OUTCOMES • Sponsor approval to pursue the investigation of a Materiel Solution to support the improved mission processes PRODUCT OUTCOMES • Definition of the DOTMLPF executable actions and the implementation plan to institutionalize the improved mission processes • Re-engineered Air Force processes that improve mission efficiency and effectiveness
PRM
BRM
SRM DRM
Prioritization of Sub-Capability based on SME/Functional defined criteria
For the sub-capability, identify the Key Performance Attributes End 1.3
Begin 1.4
Complete performance measures and thresholds for each Key Performance Attributes of PRM Template
No
Process Information from SME
Start SDDP 2.0
Define Mission Processes to Deliver DOTMLPF Capability Requirements
Functional / SME
End 1.4
End 1.5 Engage the Enterprise Architecture Team Begin 1.5
Begin 1.6
Functional / SME
Provide basic process information to Process Team (I.E "Yellow Sticky's", "Napkins" etc)
Revisit work plan for additional resources required
Work Plan SDDP 1 & 2 - Tasks - Resources - Timelines - Milestones (from Step 1)
End 1.6
Submit Capabilities Requirements for approval
Functional / SME
No
Process Engineering Content Approved?
Yes
Ensure All expected outcomes from 1.0 are address/satisfied
Sponsor
Obtain SME Support for Process Engineering Activities
Inform/Adjudicate other processes that may be affected by modification of these processes (understand impacts)
Sponsor
Denied
All Stop
Characterize the DOTMLPF execution requirements to put the process into practice and be successful
Approved
Develop Implementation Plans
Revise
Define ROI and investment auditability
Yes
Review Capability Requirements with AF Corporate Structure
Determine Initial Scope with general cost estimate
Sponsor Approval?
All Stop
Review Approved Request SME support for and Approve, COA evaluation criteria Contextual Model development and Work Plan
Yes
Review Capability Requirements
Corporate Approval?
No
Define Start Points, Ends and Outcomes
Proceed to Sponsor Decision Point
Begin
Define Process Steps
Define required skill sets and proficiencies for each process step
Sequence Process Steps to create Discrete Process Steps including information dimension supporting process steps
Characterize Information Flows ( input, manipulation of information, output)
Process Team
Sponsor
Investigate potential solutions (COTS/GOTS/ Web Service Code / Systems) to satisfy all or part of the Contextual Model
Evaluate ability of source to satisfy part or all of Architecture No Contextual Model both from Support? a function and a feasibility of implementation
Architecture Support?
No
Generate BCA
Begin
Validation of appropriate BPR
Package BPR Assertion Documentation
BPR Assertion Complete?
No
Proceed to Process Engineering Activities
Sponsor
BRM from Step 2
Auditable Process model 1
Auditable Process model N
Yes
Capture how the user wants to use each put/get (ex. Presentation, Usability)
Capture the business rules, authorization and access rules, service requirements for each put/get within the process
Auditable Process model 2
Additional Process Flows?
Approve Review Package and Select COA?
Approved and COA Selected
Denied
AF Corporate Structure Review Needed?
Yes
Review Capability Requirements with AF Corporate Structure
Yes
Create Draft M- Implementation Plan
Receive Needs Data
Query 'As is' Repository for related LRP.
Complete Needs section of PRM Template
Achitecture Team
Identify Public Laws, DOD Directives, Manuals& Instructions, and OMB, GAO, BTA Findings
Complete LRP section of PRM Template
Query Architecture to look for similar Sub-Capabilities
Achitecture Team
Determine Sub-Capability requirements based on constraints (with user)
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Open) - Performance Measures (Open)
Report: Identified attributes to satisfy the capability
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
Based on the COA selected, commence the information analysis
Finish
System Engineering / Design Contextual model for Process 1 Contextual model for Process 2
Contextual model for Process N
System Engineering / Design
System Engineering / Design
BRM (From Step 2) -Mission Process Map (Close) -Auditable Process (Close) -Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Close)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (Open) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -Compliance Requirements (Open) -On Boarding Requirements (Open)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (Open) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -Compliance Requirements (Open) -On Boarding Requirements (Open)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (Open) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -Compliance Requirements (WIP) -On Boarding Requirements (WIP)
System Engineering / Design "Sandbox"
Process Team
Process Team
Functional/SME
Functional/SME
Task POCs for IMS Input Execute Appropriate IMS Activities
Discover existing potential solutions (COTS/GOTS / Web Service Code / Systems) to satisfy all or part of the Contextual Model
System Engineering / Design DRM -COI Charter (Open) -List of information assets (Open) -Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (WIP) -Roles and permissions (WIP) -Example Data Record (WIP) -Ontology (WIP) -Reusable COI Artifacts (WIP)
For the selected COA identify any information exchange reuse opportunities within the enterprise that will support the implementation of the contextual model
Assess capability coverage of solution options Search the Enterpise Architecture to identify additional compliance requirements
Achitecture Team
COI / EVT
COI / EVT
Governance
Governance
Identify Business / War Fighter Enterpise Architecture Compliance Requirements
For each COA, identify the inherited attributes that sufficiently satisfy the compliance requirements checklist
Identify evidence that can satisfy compliance requirements
For each COA, Identify the reuse opportunities across the enterprise to support the DOTLPF change management requirements
Approve IMS
Task POCs for IMS Input
Sponsor
Yes
SRM -Contextual Model (Close) -Web Service Code Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (WIP) -COTS/GOTS Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Open) -Reuse components (WIP) -System Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Open) -Reuse components (WIP) -Compliance Requirements (Close) -On Boarding Requirements (Close)
Update cost estimates to MImplementation Plan
Sponsor Champions ADS
Approved Update Implementation Plan
Package bounded user requirements for Product Center
Approve Bounded User Requirements? Go to SDDP Step 4
System Engineering / Design DRM -COI Charter (WIP) -List of information assets (Close) Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Open) -Reusable COI Artifacts (WIP)
DRM -COI Charter (WIP) -List of information assets (Open) Vocabulary Package (WIP) -Authoritative Data Source (ADS) Mapping (WIP) -Roles and permissions (WIP) -Example Data Record (WIP) -Ontology (WIP) -Reusable COI Artifacts (WIP)
DRM -COI Charter (WIP) -List of information assets (Close) Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Close) -Reusable COI Artifacts (WIP)
Achitecture Team
Achitecture Team
System Engineering
Participate in Kickoff Session
Execute Appropriate IMS Activities
Task POCs for IMS Input
Draft IMS (WIP) Programmatic (Open) - Product Center Activities (Open) -Contracting Activities -Acquisition Activities - PEO Activities (Open) -Resourcing -Training -Equipment - Finance Activities (Open) -Allocate Funds -Assign Resources - Architecture Activities (Open) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Open) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Open) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Open) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Open) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (Open)
DRM -COI Charter (Close) -List of information assets (Close) Vocabulary Package (Close) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Close) -Reusable COI Artifacts (Close)
DRM -COI Charter (Close) -List of information assets (Close) Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (WIP) -Roles and permissions (WIP) -Example Data Record (WIP) -Ontology (WIP) -Reusable COI Artifacts (WIP)
SRM -Contextual Model (Close) -Web Service Code Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close)
DRM -COI Charter (Close) -List of information assets (Close) Vocabulary Package (Close) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Close) -Reusable COI Artifacts (Close)
SRM -Contextual Model (Close) -Web Service Code Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close)
Draft IMS (WIP) Programmatic (WIP) - Product Center Activities (WIP) -Contracting Activities -Acquisition Activities - PEO Activities (WIP) -Resourcing -Training -Equipment - Finance Activities (WIP) -Allocate Funds -Assign Resources - Architecture Activities (WIP) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (WIP) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (WIP) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (WIP) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (WIP) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (WIP)
Draft IMS (WIP) Programmatic (WIP) - Product Center Activities (WIP) -Contracting Activities -Acquisition Activities - PEO Activities (WIP) -Resourcing -Training -Equipment - Finance Activities (WIP) -Allocate Funds -Assign Resources - Architecture Activities (WIP) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (WIP) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (WIP) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (WIP) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (WIP) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (WIP)
Complete Sub-Capability Requirements section of PRM Template
Complete performance measures and Key Performance Attributes section of PRM Template
Initiate Deployment
Yes
Extract Reusable Information Exchange Assets from previous DRMs
Ensure ontology reuse
Achitecture Team
COI / EVT
COI Coordination Panel will make a recommendation to the Sponsor to either re-charter an existing COI or establish a new COI to meet information sharing requirement.
Stand Up COI
Identify authoritative and source data from a process perspective
Identify ADS
Determine access rules ,roles and permissions for assets and planned services
Develop Draft Ontology
Acquire Capability
Proceed to Step 5
Project Lead / Product Center Begin Step 4
Review Bounded User Requirements (Acquisition Strategy Package)
Identify Kickoff meeting attendees
Facilitate Kickoff Meeting
Identify the POC's that will support the Project Lead during the implementation of the Bounded User Requirements
Create Top Level IMS
Project Lead / Product Center Task POCs for IMS Input
Achitecture Team
Verify Requirements Satisfy all relevant LRP Constraints
Achitecture Team
Conduct Enterprise Architecture Analysis
Conduct Enterprise Architecture Analysis
BRM -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Close)
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
LRP Compliance Requirements Checklist -Clinger & Cohen. (Open) -PIA (Open) -FISMA (Open) -NDAA (Open) *CCA *BEA *EITDR Registration *Business Process Reengineering *Section 508 Compliance *Records Management *FISMA *ETP *Investment included in AF Budget -DIACAP (Open)
SWG review of Governance Package
LRP Compliance Requirements Checklist -Clinger & Cohen. (Close) -PIA (Close) -FISMA (Close) -NDAA (Close) *CCA *BEA *EITDR Registration *Business Process Reengineering *Section 508 Compliance *Records Management *FISMA *ETP *Investment included in AF Budget -DIACAP (Close)
Governance
Proceed To Sponsor Review of Package
Proceed To Sponsor Review of Package
No Approved
Approved?
Greater than $1M
COI Panel Review Vocabulary Package and provide Recommendations to Sponsor
Complete IMS
Task POCs to execute IMS
Identify Reuse Capability
Achitecture Team
Sponsor
M-Implementation Plan (From Step 3) -Work Break Structure/ RTM (Close) -Service Implementation Schedule (Close) -Cost Estimate (Close) -DOTLPF Change Management Plan (Close) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (Close) -Resourcing (Close)
Obtain DAA Approval for the ATO
Yes
Return to Sponsor Selected Point
No
Conduct Post Implementation Review (PIR)
Train Users Per Phasing Plan
PIR Successful?
Yes
End SDDP
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Close) -Operational Test & Evaluation Plans and Procedures (Close) -Post Implementation Review (PIR) Report (Open)
System Engineering
Execute Appropriate IMS Activities
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (Close) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (Close) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
ITLC
"Sandbox"
No
System Engineering
All Phases Complete?
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Close) -Operational Test & Evaluation Plans and Procedures (Close) -Post Implementation Review (PIR) Report (Open)
Yes
Update IMS with Fielding Activities
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Close) -Operational Test & Evaluation Plans and Procedures (Close) -Post Implementation Review (PIR) Report (Close)
Testing
Testing
OT&E and KPP evaluation of Prototype
Return to Step 5
Architecture Execute Appropriate IMS Activities
Proceed To Sponsor Review of Package
Revise Yes
CMO review of Governance Package
Approved Approved?
Revise IRB review of Governance Package
Approved?
Denied
Approved DBSMC review of Governance Package
Charter Approved by SWG?
Approved Approved?
Governance
Denied
Denied
All Stop
Denied
Governance All Stop
SWG Approval COI Vocabulary package
Yes
Governance
No
Proceed to Previous Sponsor Checkpoint
Yes
Stand Down COI
No
Participate in Kickoff Session
Platform Engineering
Task POCs for IMS Input Execute Appropriate IMS Activities
Platform Engineering
Proceed to Begin Vocabulary Work Participate in Kickoff Session
All Stop
All Stop
Register content in Business Reference Model
Proceed to Step 3
Validate BPR/process improvement effects at an enterprise level
Project Lead / Product Center
Project Lead / Product Center
Project Lead / Product Center
Project Lead / Product Center
Identify Project Lead
Project Lead / Product Center
Achitecture Team
Achitecture Team
Platform Engineering
Derive mission critical -Onboarding requirements
Define Platform Compliance Requirements
Conduct infrastructure topology analysis
Derive additional infrastructure service necessary to support COA
Platform Engineering
Platform Engineering
Platform Engineering
Determine Distributing Computing requirements
Develop service monitoring requirements
Project Lead / Product Center
Platform Engineering
Review Legacy System Requirements
Develop Service Levels Agreements (SLA's) for each layer of service
Platform Engineering
"Sandbox" Onboarding Requirements (Close) -Mission Critical Requirements (Close) -Topology Requirements (Close) -Additional Infrastructure Requirements (Close) -Distributing Components Requirements (Close) -Service Monitoring Requirements (Close) -SLAs (Close) -Onboarding Compliance Requirements (Close)
Onboarding Requirements (close) -Mission Critical Requirements (Close) -Topology Requirements (Close) -Additional Infrastructure Requirements (Close) -Distributing Components Requirements (Open) -Service Monitoring Requirements (Open) -SLAs (Open) -Onboarding Compliance Requirements (Close)
Ensure processes adequately define context for information assets
Participate in Kickoff Session
Onboarding
Capture DOTMLPF interdependencies (temporal, decisional, informational) to other processes
Ensure other processes that may be affected by modification of these processes have been identified and impacts addressed
Return to Step 5
Approved and Ready to Field?
Platform Engineering
Platform Engineering
No
Provision Prototype to operational environment
Install Prototype
Install Successful?
Yes
Provision Per Phasing Plan
BCL Compliance Governance
Proceed To Sponsor Review of Package
BRM -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Open)
BRM -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Open)
Conduct Enterprise Architecture analysis
Determine potential duplication/conflict with other enterprise requirements
"Sandbox"
Update DOT_LPF Implementation Plan
Task POCs for IMS Input
Architecture
COI / EVT Generate Vocabulary Package
Assessment of Prototype
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (Close) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
Complete Help Desk Training
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Open) -Operational Test & Evaluation Plans and Procedures (Open) -Post Implementation Review (PIR) Report (Open)
Achitecture Team Participate in Kickoff Session
COI Coordination Panel reviews charter and provides a recommendation to the Sponsor
User Evaluation of Prototype
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (WIP) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
ITLC Help Desk Prototype Training
Provide LRP compliance requirements checklist for each COA
Revise
Ensure alignment with AF Strategy
Sponsor
Perform User training for Prototype
Deployment Package (From Step 5) -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (WIP) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
Begin Step 6
"Sandbox"
Information Exchange Reuse?
COI / EVT
Functional / SME M-Implementation Plan (From Step 3) -Work Break Structure/ RTM (Close) -Service Implementation Schedule (Close) -Cost Estimate (Close) -DOTLPF Change Management Plan (Close) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (Close) -Resourcing (Close)
No
System Engineering
IMS (Close) Programmatic (Close) - Product Center Activities (Close) -Contracting Activities -Acquisition Activities - PEO Activities (Close) -Resourcing -Training -Equipment - Finance Activities (Close) -Allocate Funds -Assign Resources - Architecture Activities (Close) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Close) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Close) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Close) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Close) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activit
Operational Baseline
COI / EVT
User Evaluation of Prototype
Engage users for Prototype Training
Participate in Kickoff Session Execute Appropriate IMS Activities
Revise
Yes
Testing
Execute Appropriate IMS Activities Task POCs for IMS Input
Testing
"Sandbox"
Identify existing Key Performance Attributes to satisfy the Sub-Capability,
Functional / SME
Functional / SME
No
Sponsor Call Kickoff Meeting
Proceed to COA Evaluation Decision
No
Submit COI Charter to SWG
Match Compliance Requirements to individual information exchanges, services and function
Identify additional information exchanges requiring new implementation
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (WIP) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -Compliance Requirements (WIP) -On Boarding Requirements (Close)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Automated Information Assets (Open) -Detailed Design Requirements (Open) -Reuse components (WIP) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -Compliance Requirements (WIP) -On Boarding Requirements (Close)
BRM (From Step 2) -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Close)
Target CEIT Baseline
End Process Engineering
Draft a new COI charter or revise existing COI Charter
Prepare Bounded User Requirements for Implementation
Proceed to Begin Vocabulary Work
Sponsor Initiate COI Coordination
Identify reuse opportunities for Web Services, Point to Point Interfaces, Data Services, and Exposure Services
No
Achitecture Team
Characterize Information Assets needed for Information Flows
BRM -Mission Process Map (Close) -Auditable Process (WIP) - Business Rules (Close) -Dependencies (Open) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Open)
High Level Process describing expected outcomes
Identify information exchanges / assets
Denied
Revise
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
Functional / SME
Proceed Back to Beginning of Step 4
Bounded User Requirements - M Implementation Plan -SRM -DRM
Obtain DAA Approval for the ATT for the Prototype
Assemble Governance package
No
Define Initial Functional Requirements to implement information exchanges
Process Engineering Completion Criteria: A. Define process steps inputs and outputs. (Note: Put/Gets of Information Assets are process steps) B. Define business rules for each process step, including manipulations to information needed for process step, creation of record/store, workflow C. Define decisions taken in the step D. Define outputs from process steps, including information outputs to store or to next process step
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
Governance
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (WIP) - Performance attributes (Open) - Performance Measures (Open)
Participate in Kickoff Session
"Sandbox"
M-Implementation Plan -Work Break Structure/ RTM (Close) -Service Implementation Schedule (Close) -Cost Estimate (Close) -DOTLPF Change Management Plan (Close) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (Close) -Resourcing (Close)
M-Implementation Plan -Work Break Structure/ RTM (WIP) -Service Implementation Schedule (WIP) -Cost Estimate (WIP) -DOTLPF Change Management Plan (WIP) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (WIP) -Resourcing (WIP)
Information Analysis
Sponsor
Approve COI vocabulary package Corporate Approval?
No
No
ITLC
Architecture Team
SubCapability PRM Tree N.
SubCapability PRM Tree 2.
Project Lead / Product Center
SubCapability PRM Tree 1. Needs PRM
Platform Engineering
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Open) - Performance attributes (Open) - Performance Measures (Open)
Architecture Team
PRM - Needs (Close) - LRP (WIP) - Sub-capabilities (Open) - Performance attributes (Open) - Performance Measures (Open)
Functional / SME
M-Implementation Plan -Work Break Structure/ RTM (WIP) -Service Implementation Schedule (WIP) -Cost Estimate (WIP) -DOTLPF Change Management Plan (WIP) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (WIP) -Resourcing (WIP)
Sponsor Revise
Conduct Cost Estimates for each COA
Information Exchange Requirements
For each information flow describe the business rules and service levels requirements necessary to meet the process
"Sandbox" PRM - Needs (Close) - LRP (Open) - Sub-capabilities (Open) - Performance attributes (Open) - Performance Measures (Open)
Functional / SME
"Sandbox" M-Implementation Plan -Work Break Structure/ RTM (WIP) -Service Implementation Schedule (WIP) -Cost Estimate (WIP) -DOTLPF Change Management Plan (WIP) -Governance Package (WIP) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Open) -Approval Signatures (Open) -Compliance Completion Plan (Close) -Onboarding Plan (WIP) (from SRM) -Resourcing (WIP)
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (Close) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (Close) - Reusability (Close) - Dependencies (Close) - Constraints (Close) -COA Change Management Plan (Close) -COA Cost Estimates (Close)
Sponsor For each COA determine the scope, scalability and degree of difficultly of its associated DOTLPF change management requirements
Define impacts for each COA to DOTLPF necessary to support the material solution
Yes Define the information flow necessary to satisfy each put/get from the process
Contextual Model -Information Puts/Gets (WIP) -Business Rules (WIP) -Authorization and Access (WIP) -End User Design Guidelines (WIP)
No
All Stop
Functional / SME
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (Close) - Reusability (Close) - Dependencies (Close) - Constraints (Close) -COA Change Management Plan (Close) -COA Cost Estimates (Close)
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (WIP) - Reusability (Close) - Dependencies (Close) - Constraints (Close) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (Open) - Reusability (Open) - Dependencies (Open) - Constraints (Open) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
Develop COAs that align the best uses of the various sources (combination of sources may be the most efficient path) to satisfy the Contextual Model
Yes
Yes
All Stop
Conduct Process Engineering
AF Corporate Structure Review Needed?
Build evaluation criteria for COAs to satisfy the Contextual Model
All Stop
Lift information puts/gets for each process model
Yes
Approved
Denied Revise
Process Team
Sponsor
No Revise
Sponsor
Denied All Stop
Sponsor
Update DOTMLPF Implementation plan
Proceed to Sponsor Decision Point
Proceed Previous Sponsor Decision Point Approved
Approved Prioritized Sub-Capabilities Requirements?
Approved
Sponsor
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Open) -Onboarding Compliance Rqts (Open) -BEA Compliance Rqts (Open) -LRP Compliance Rqts (Open) -COA DOTLPF Impact Analysis (Open) - Reusability (Open) - Dependencies (Open) - Constraints (Open) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
Sponsor
Revise
SME Validation of Yes Contextual Model?
Design Contextual Model
Architecture Team
Sponsor All Stop
Get SME validation on contextual model
All Stop
Corporate Approval?
Yes Denied
Denied
Functional / SME
Functional / SME Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (WIP) -COA Components (Open) -COA Sequence (Open) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Open) -Onboarding Compliance Rqts (Open) -BEA Compliance Rqts (Open) -LRP Compliance Rqts (Open) -COA DOTLPF Impact Analysis (Open) - Reusability (Open) - Dependencies (Open) - Constraints (Open) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
Build Material Solution Implementation Plan
Start Material Solution Design
Denied
Approval Success Criteria A. Institutionalization of business processes through AFI/policy documentation (includes LRP) B. Prioritization of information assets by SRA D. Validation of adherence to EA standards by CIO F. Obtain approval to execute requirements to put the process into practice from appropriate authority (depending on scope) G. Capture auditable process models into Business Reference Model H. Contextual description of information assets clearly delineated from information flows within auditable business processes
No AF Corporate Structure Review Needed?
Build work plans
Revise
Provide to Sponsor recommended evaluation criteria for COAs to satisfy the Contextual Model
Work Plan to build the M-Implementation Plan - Tasks - Resources - Timelines - Milestones
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
Sponsor Scope Work Plan to build the M-Implementation
Obtain formal review Approved and approval to proceed
"Sandbox"
Review and Approve statement of need/problem statement and work plan with Sponsor.
Return to Material Solution Design
Validate Contextual Model content
No
Revise Execution Requirements Approved?
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
Begin 3.0
Proceed to Sponsor Decision Point
Denied Approved
Functional / SME
Functional / SME Proceed to Define Mission Processes to Deliver DOTMLPF Capability Requirements
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
All Stop Revise
Work plan approved?
Yes
Sponsor
Functional / SME Enterprise Architecture Assistance Needed?
ITLC
Complete Sub-Capability Requirement section of PRM Template
Architecture
Obtain formal Review and approval to proceed
Identify Key Performance Attributes
Report: Performance Requirements for the Capability
Capability Requirements Completion Criteria: 1. Prioritized by Sponsor 2. Satisfies all relevant LRP constraints 3. Does not duplicate other required capabilities 4. Reviewed and approved by AF Corporate Structure, as appropriate 5. Meets EA standards for representation 6. Registered in PRM 7. Performance Measures defined
Determine Sub-Capability requirements based on constraints
Yes
Sponsor
Conduct Enterprise Architecture analysis
. Determine, prioritize, and present DOTMLPF capability requirements to Sponsor
Enterprise Architecture No Assistance Needed?
Testing
Decompose Need/Problem Statement into Sub-Capabilities
Platform Engineering
Begin 1.3
Step 1
Step 2
Step 3
Identify DOTMLPF Capability Requirements
Define DOTMLPF executable actions
Define Material Solution and Implementation Plan
ITLC
Task POCs for IMS Input Execute Appropriate IMS Activities
ITLC
Provide Sponsor Cost Estimate Updates
Participate in Kickoff Session
AQ Authority
Participate in Kickoff Session
Participate in Kickoff Session
Participate in Kickoff Session
Participate in Kickoff Session
Finance PEO/PMO Governance (C&A)
Task POCs for IMS Input
Execute Appropriate IMS Activities
Task POCs for IMS Input
Execute Appropriate IMS Activities
Task POCs for IMS Input
Task POCs for IMS Input
Task POCs for IMS Input
Execute Appropriate IMS Activities
Execute Appropriate IMS Activities
Execute Appropriate IMS Activities
AQ Authority Finance PEO/PMO Governance (C&A)
Step 4 Plan / implement developmental components of the Material Solution
Certification Package (WIP) -Net-Worthiness (Close) -ATT (Close) -ATO (Open)
Network Op's
End 1.2
Project Lead / Product Center
Analyze for relevance (Down-select pertinent LRP.)
System Engineering
Functional / SME
Report: Sub-Capabilities for the Need
Complete LRP section of PRM Template
Project Lead / Product Center
Identify Public Laws, DOD No Directives, Manuals& Instructions, and OMB, GAO, BTA Findings
Yes
Architecture
Enterprise Architecture Assistance Needed?
Platform Engineering
Begin 1.2
Testing
Gather known LRP requirements End 1.1
AQ Authority
Scope the downstream efforts to complete steps 1 and 2 (define scope, charter, schedule of milestones and deliverables, resource requirements)
Contracting
Complete Needs section of PRM Template
Finance
No
Yes
Associated PEO/PMO
Enterprise Architecture Assistance Needed?
Governance (C&A)
Draft Initial Statement of Need/Problem Statement
Sponsor
Functional/ SME
Document: Laws, Regulations and Policy constrains/ mandates with findings for relevance
"Sandbox"
Begin 1.1
System Engineering / Design
Identify relevant legal, regulatory, and policy constraints List: Laws, Regulations, Policies
Functional / SME
Go to Step 2 Start SDDP 1.0
COI/EVT
Define statement of need/problem statement Document : Statement of Need / Problem Statement
Functional/ SME
Identified Top Level Need
Functional/SME
TRM
IMS (Close) Programmatic (Close) - Product Center Activities (Close) -Contracting Activities -Acquisition Activities - PEO Activities (Close) -Resourcing -Training -Equipment - Finance Activities (Close) -Allocate Funds -Assign Resources - Architecture Activities (Close) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Close) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Close) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Close) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Close) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (Close)
Step 5 Sustain Application Lifecycle
Certification Package (Close) -Net-Worthiness (Close) -ATT (Close) -ATO (Close)
Network Op's
Network Op's
Provision User Access for Prototype
Project Lead / Product Center
Project Lead / Product Center
Provision Access to trained users per phasing plan
IMS (Close) Programmatic (Close) - Product Center Activities (Close) -Contracting Activities -Acquisition Activities - PEO Activities (Close) -Resourcing -Training -Equipment - Finance Activities (Close) -Allocate Funds -Assign Resources - Architecture Activities (Close) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Close) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Close) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Close) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Close) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (Close)
Step 6 Deploy/Operate the Material Solution
The Service Development and Delivery Process Integrity - Service - Excellence
15
SDDP (3) Define Material Solution / Implementation Plan
Prioritization of Sub-Capability based on SME/Functional defined criteria
For the sub-capability, identify the Key Performance Attributes End 1.3
Begin 1.4
Complete performance measures and thresholds for each Key Performance Attributes of PRM Template
No
Process Information from SME
Start SDDP 2.0
Define Mission Processes to Deliver DOTMLPF Capability Requirements
Functional / SME
End 1.4
End 1.5 Engage the Enterprise Architecture Team Begin 1.5
Begin 1.6
Functional / SME
Provide basic process information to Process Team (I.E "Yellow Sticky's", "Napkins" etc)
Revisit work plan for additional resources required
Work Plan SDDP 1 & 2 - Tasks - Resources - Timelines - Milestones (from Step 1)
End 1.6
Submit Capabilities Requirements for approval
Functional / SME
No
Process Engineering Content Approved?
Yes
Ensure All expected outcomes from 1.0 are address/satisfied
Sponsor
Obtain SME Support for Process Engineering Activities
Inform/Adjudicate other processes that may be affected by modification of these processes (understand impacts)
Sponsor
Denied
All Stop
Characterize the DOTMLPF execution requirements to put the process into practice and be successful
Approved
Develop Implementation Plans
Revise
Define ROI and investment auditability
Yes
Review Capability Requirements with AF Corporate Structure
Determine Initial Scope with general cost estimate
Sponsor Approval?
All Stop
Review Approved Request SME support for and Approve, COA evaluation criteria Contextual Model development and Work Plan
Yes
Review Capability Requirements
Corporate Approval?
No
Define Start Points, Ends and Outcomes
Proceed to Sponsor Decision Point
Begin
Define Process Steps
Define required skill sets and proficiencies for each process step
Sequence Process Steps to create Discrete Process Steps including information dimension supporting process steps
Characterize Information Flows ( input, manipulation of information, output)
Process Team
Sponsor
Investigate potential solutions (COTS/GOTS/ Web Service Code / Systems) to satisfy all or part of the Contextual Model
Evaluate ability of source to satisfy part or all of Architecture No Contextual Model both from Support? a function and a feasibility of implementation
Architecture Support?
No
Generate BCA
Begin
Validation of appropriate BPR
Package BPR Assertion Documentation
BPR Assertion Complete?
No
Proceed to Process Engineering Activities
Sponsor
BRM from Step 2
Auditable Process model 1
Auditable Process model N
Yes
Capture how the user wants to use each put/get (ex. Presentation, Usability)
Capture the business rules, authorization and access rules, service requirements for each put/get within the process
Auditable Process model 2
Additional Process Flows?
Approve Review Package and Select COA?
Approved and COA Selected
Denied
AF Corporate Structure Review Needed?
Yes
Review Capability Requirements with AF Corporate Structure
Yes
Create Draft M- Implementation Plan
Receive Needs Data
Query 'As is' Repository for related LRP.
Complete Needs section of PRM Template
Achitecture Team
Identify Public Laws, DOD Directives, Manuals& Instructions, and OMB, GAO, BTA Findings
Complete LRP section of PRM Template
Query Architecture to look for similar Sub-Capabilities
Achitecture Team
Determine Sub-Capability requirements based on constraints (with user)
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Open) - Performance Measures (Open)
Report: Identified attributes to satisfy the capability
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
Based on the COA selected, commence the information analysis
Finish
System Engineering / Design Contextual model for Process 1 Contextual model for Process 2
Contextual model for Process N
System Engineering / Design
System Engineering / Design
BRM (From Step 2) -Mission Process Map (Close) -Auditable Process (Close) -Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Close)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (Open) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -Compliance Requirements (Open) -On Boarding Requirements (Open)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (Open) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -Compliance Requirements (Open) -On Boarding Requirements (Open)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (Open) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -Compliance Requirements (WIP) -On Boarding Requirements (WIP)
System Engineering / Design "Sandbox"
Process Team
Process Team
Functional/SME
Functional/SME
Task POCs for IMS Input Execute Appropriate IMS Activities
Discover existing potential solutions (COTS/GOTS / Web Service Code / Systems) to satisfy all or part of the Contextual Model
System Engineering / Design DRM -COI Charter (Open) -List of information assets (Open) -Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (WIP) -Roles and permissions (WIP) -Example Data Record (WIP) -Ontology (WIP) -Reusable COI Artifacts (WIP)
For the selected COA identify any information exchange reuse opportunities within the enterprise that will support the implementation of the contextual model
Assess capability coverage of solution options Search the Enterpise Architecture to identify additional compliance requirements
Achitecture Team
COI / EVT
COI / EVT
Governance
Governance
Identify Business / War Fighter Enterpise Architecture Compliance Requirements
For each COA, identify the inherited attributes that sufficiently satisfy the compliance requirements checklist
Identify evidence that can satisfy compliance requirements
For each COA, Identify the reuse opportunities across the enterprise to support the DOTLPF change management requirements
Approve IMS
Task POCs for IMS Input
Sponsor
Yes
SRM -Contextual Model (Close) -Web Service Code Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (WIP) -COTS/GOTS Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Open) -Reuse components (WIP) -System Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Open) -Reuse components (WIP) -Compliance Requirements (Close) -On Boarding Requirements (Close)
Update cost estimates to MImplementation Plan
Sponsor Champions ADS
Approved Update Implementation Plan
Package bounded user requirements for Product Center
Approve Bounded User Requirements? Go to SDDP Step 4
System Engineering / Design DRM -COI Charter (WIP) -List of information assets (Close) Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Open) -Reusable COI Artifacts (WIP)
DRM -COI Charter (WIP) -List of information assets (Open) Vocabulary Package (WIP) -Authoritative Data Source (ADS) Mapping (WIP) -Roles and permissions (WIP) -Example Data Record (WIP) -Ontology (WIP) -Reusable COI Artifacts (WIP)
DRM -COI Charter (WIP) -List of information assets (Close) Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Close) -Reusable COI Artifacts (WIP)
Achitecture Team
Achitecture Team
System Engineering
Participate in Kickoff Session
Execute Appropriate IMS Activities
Task POCs for IMS Input
Draft IMS (WIP) Programmatic (Open) - Product Center Activities (Open) -Contracting Activities -Acquisition Activities - PEO Activities (Open) -Resourcing -Training -Equipment - Finance Activities (Open) -Allocate Funds -Assign Resources - Architecture Activities (Open) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Open) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Open) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Open) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Open) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (Open)
DRM -COI Charter (Close) -List of information assets (Close) Vocabulary Package (Close) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Close) -Reusable COI Artifacts (Close)
DRM -COI Charter (Close) -List of information assets (Close) Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (WIP) -Roles and permissions (WIP) -Example Data Record (WIP) -Ontology (WIP) -Reusable COI Artifacts (WIP)
SRM -Contextual Model (Close) -Web Service Code Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close)
DRM -COI Charter (Close) -List of information assets (Close) Vocabulary Package (Close) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Close) -Reusable COI Artifacts (Close)
SRM -Contextual Model (Close) -Web Service Code Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close)
Draft IMS (WIP) Programmatic (WIP) - Product Center Activities (WIP) -Contracting Activities -Acquisition Activities - PEO Activities (WIP) -Resourcing -Training -Equipment - Finance Activities (WIP) -Allocate Funds -Assign Resources - Architecture Activities (WIP) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (WIP) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (WIP) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (WIP) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (WIP) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (WIP)
Draft IMS (WIP) Programmatic (WIP) - Product Center Activities (WIP) -Contracting Activities -Acquisition Activities - PEO Activities (WIP) -Resourcing -Training -Equipment - Finance Activities (WIP) -Allocate Funds -Assign Resources - Architecture Activities (WIP) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (WIP) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (WIP) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (WIP) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (WIP) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (WIP)
Complete Sub-Capability Requirements section of PRM Template
Complete performance measures and Key Performance Attributes section of PRM Template
Initiate Deployment
Yes
Extract Reusable Information Exchange Assets from previous DRMs
Ensure ontology reuse
Achitecture Team
COI / EVT
COI Coordination Panel will make a recommendation to the Sponsor to either re-charter an existing COI or establish a new COI to meet information sharing requirement.
Stand Up COI
Identify authoritative and source data from a process perspective
Identify ADS
Determine access rules ,roles and permissions for assets and planned services
Develop Draft Ontology
Acquire Capability
Proceed to Step 5
Project Lead / Product Center Begin Step 4
Review Bounded User Requirements (Acquisition Strategy Package)
Identify Kickoff meeting attendees
Facilitate Kickoff Meeting
Identify the POC's that will support the Project Lead during the implementation of the Bounded User Requirements
Create Top Level IMS
Project Lead / Product Center Task POCs for IMS Input
Achitecture Team
Verify Requirements Satisfy all relevant LRP Constraints
Achitecture Team
Conduct Enterprise Architecture Analysis
Conduct Enterprise Architecture Analysis
BRM -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Close)
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
LRP Compliance Requirements Checklist -Clinger & Cohen. (Open) -PIA (Open) -FISMA (Open) -NDAA (Open) *CCA *BEA *EITDR Registration *Business Process Reengineering *Section 508 Compliance *Records Management *FISMA *ETP *Investment included in AF Budget -DIACAP (Open)
SWG review of Governance Package
LRP Compliance Requirements Checklist -Clinger & Cohen. (Close) -PIA (Close) -FISMA (Close) -NDAA (Close) *CCA *BEA *EITDR Registration *Business Process Reengineering *Section 508 Compliance *Records Management *FISMA *ETP *Investment included in AF Budget -DIACAP (Close)
Governance
Proceed To Sponsor Review of Package
Proceed To Sponsor Review of Package
No Approved
Approved?
Greater than $1M
COI Panel Review Vocabulary Package and provide Recommendations to Sponsor
Complete IMS
Task POCs to execute IMS
Identify Reuse Capability
Achitecture Team
Sponsor
M-Implementation Plan (From Step 3) -Work Break Structure/ RTM (Close) -Service Implementation Schedule (Close) -Cost Estimate (Close) -DOTLPF Change Management Plan (Close) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (Close) -Resourcing (Close)
Obtain DAA Approval for the ATO
Yes
Return to Sponsor Selected Point
No
Conduct Post Implementation Review (PIR)
Train Users Per Phasing Plan
PIR Successful?
Yes
End SDDP
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Close) -Operational Test & Evaluation Plans and Procedures (Close) -Post Implementation Review (PIR) Report (Open)
System Engineering
Execute Appropriate IMS Activities
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (Close) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (Close) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
ITLC
"Sandbox"
No
System Engineering
All Phases Complete?
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Close) -Operational Test & Evaluation Plans and Procedures (Close) -Post Implementation Review (PIR) Report (Open)
Yes
Update IMS with Fielding Activities
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Close) -Operational Test & Evaluation Plans and Procedures (Close) -Post Implementation Review (PIR) Report (Close)
Testing
Testing
OT&E and KPP evaluation of Prototype
Return to Step 5
Architecture Execute Appropriate IMS Activities
Proceed To Sponsor Review of Package
Revise Yes
CMO review of Governance Package
Approved Approved?
Revise IRB review of Governance Package
Approved?
Denied
Approved DBSMC review of Governance Package
Charter Approved by SWG?
Approved Approved?
Governance
Denied
Denied
All Stop
Denied
Governance All Stop
SWG Approval COI Vocabulary package
Yes
No
Proceed to Previous Sponsor Checkpoint
Governance
Yes
Stand Down COI
No
Participate in Kickoff Session
Platform Engineering
Task POCs for IMS Input Execute Appropriate IMS Activities
Platform Engineering
Proceed to Begin Vocabulary Work Participate in Kickoff Session
All Stop
All Stop
Register content in Business Reference Model
Proceed to Step 3
Validate BPR/process improvement effects at an enterprise level
Project Lead / Product Center
Project Lead / Product Center
Project Lead / Product Center
Project Lead / Product Center
Identify Project Lead
Project Lead / Product Center
Achitecture Team
Achitecture Team
Platform Engineering
Derive mission critical -Onboarding requirements
Define Platform Compliance Requirements
Conduct infrastructure topology analysis
Derive additional infrastructure service necessary to support COA
Platform Engineering
Platform Engineering
Platform Engineering
Determine Distributing Computing requirements
Develop service monitoring requirements
Project Lead / Product Center
Platform Engineering
Review Legacy System Requirements
Develop Service Levels Agreements (SLA's) for each layer of service
Platform Engineering
"Sandbox" Onboarding Requirements (Close) -Mission Critical Requirements (Close) -Topology Requirements (Close) -Additional Infrastructure Requirements (Close) -Distributing Components Requirements (Close) -Service Monitoring Requirements (Close) -SLAs (Close) -Onboarding Compliance Requirements (Close)
Onboarding Requirements (close) -Mission Critical Requirements (Close) -Topology Requirements (Close) -Additional Infrastructure Requirements (Close) -Distributing Components Requirements (Open) -Service Monitoring Requirements (Open) -SLAs (Open) -Onboarding Compliance Requirements (Close)
Ensure processes adequately define context for information assets
Participate in Kickoff Session
Onboarding
Capture DOTMLPF interdependencies (temporal, decisional, informational) to other processes
Ensure other processes that may be affected by modification of these processes have been identified and impacts addressed
Return to Step 5
Approved and Ready to Field?
Platform Engineering
Platform Engineering
No
Provision Prototype to operational environment
Install Prototype
Install Successful?
Yes
Provision Per Phasing Plan
BCL Compliance Governance
Proceed To Sponsor Review of Package
BRM -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Open)
BRM -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Open)
Conduct Enterprise Architecture analysis
Determine potential duplication/conflict with other enterprise requirements
"Sandbox"
Update DOT_LPF Implementation Plan
Task POCs for IMS Input
Architecture
COI / EVT Generate Vocabulary Package
Assessment of Prototype
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (Close) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
Complete Help Desk Training
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Open) -Operational Test & Evaluation Plans and Procedures (Open) -Post Implementation Review (PIR) Report (Open)
Achitecture Team Participate in Kickoff Session
COI Coordination Panel reviews charter and provides a recommendation to the Sponsor
User Evaluation of Prototype
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (WIP) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
ITLC Help Desk Prototype Training
Provide LRP compliance requirements checklist for each COA
Revise
Ensure alignment with AF Strategy
Sponsor
Perform User training for Prototype
Deployment Package (From Step 5) -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (WIP) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
Begin Step 6
"Sandbox"
Information Exchange Reuse?
COI / EVT
Functional / SME M-Implementation Plan (From Step 3) -Work Break Structure/ RTM (Close) -Service Implementation Schedule (Close) -Cost Estimate (Close) -DOTLPF Change Management Plan (Close) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (Close) -Resourcing (Close)
No
System Engineering
IMS (Close) Programmatic (Close) - Product Center Activities (Close) -Contracting Activities -Acquisition Activities - PEO Activities (Close) -Resourcing -Training -Equipment - Finance Activities (Close) -Allocate Funds -Assign Resources - Architecture Activities (Close) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Close) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Close) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Close) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Close) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activit
Operational Baseline
COI / EVT
User Evaluation of Prototype
Engage users for Prototype Training
Participate in Kickoff Session Execute Appropriate IMS Activities
Revise
Yes
Testing
Execute Appropriate IMS Activities Task POCs for IMS Input
Testing
"Sandbox"
Identify existing Key Performance Attributes to satisfy the Sub-Capability,
Functional / SME
Functional / SME
No
Sponsor Call Kickoff Meeting
Proceed to COA Evaluation Decision
No
Submit COI Charter to SWG
Match Compliance Requirements to individual information exchanges, services and function
Identify additional information exchanges requiring new implementation
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (WIP) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -Compliance Requirements (WIP) -On Boarding Requirements (Close)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Automated Information Assets (Open) -Detailed Design Requirements (Open) -Reuse components (WIP) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -Compliance Requirements (WIP) -On Boarding Requirements (Close)
BRM (From Step 2) -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Close)
Target CEIT Baseline
End Process Engineering
Draft a new COI charter or revise existing COI Charter
Prepare Bounded User Requirements for Implementation
Proceed to Begin Vocabulary Work
Sponsor Initiate COI Coordination
Identify reuse opportunities for Web Services, Point to Point Interfaces, Data Services, and Exposure Services
No
Achitecture Team
Characterize Information Assets needed for Information Flows
BRM -Mission Process Map (Close) -Auditable Process (WIP) - Business Rules (Close) -Dependencies (Open) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Open)
High Level Process describing expected outcomes
Identify information exchanges / assets
Denied
Revise
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
Functional / SME
Proceed Back to Beginning of Step 4
Bounded User Requirements - M Implementation Plan -SRM -DRM
Obtain DAA Approval for the ATT for the Prototype
Assemble Governance package
No
Define Initial Functional Requirements to implement information exchanges
Process Engineering Completion Criteria: A. Define process steps inputs and outputs. (Note: Put/Gets of Information Assets are process steps) B. Define business rules for each process step, including manipulations to information needed for process step, creation of record/store, workflow C. Define decisions taken in the step D. Define outputs from process steps, including information outputs to store or to next process step
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
Governance
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (WIP) - Performance attributes (Open) - Performance Measures (Open)
Participate in Kickoff Session
"Sandbox"
M-Implementation Plan -Work Break Structure/ RTM (Close) -Service Implementation Schedule (Close) -Cost Estimate (Close) -DOTLPF Change Management Plan (Close) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (Close) -Resourcing (Close)
M-Implementation Plan -Work Break Structure/ RTM (WIP) -Service Implementation Schedule (WIP) -Cost Estimate (WIP) -DOTLPF Change Management Plan (WIP) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (WIP) -Resourcing (WIP)
Information Analysis
Sponsor
Approve COI vocabulary package Corporate Approval?
No
No
ITLC
Architecture Team
SubCapability PRM Tree N.
SubCapability PRM Tree 2.
Project Lead / Product Center
SubCapability PRM Tree 1. Needs PRM
Platform Engineering
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Open) - Performance attributes (Open) - Performance Measures (Open)
Architecture Team
PRM - Needs (Close) - LRP (WIP) - Sub-capabilities (Open) - Performance attributes (Open) - Performance Measures (Open)
Functional / SME
M-Implementation Plan -Work Break Structure/ RTM (WIP) -Service Implementation Schedule (WIP) -Cost Estimate (WIP) -DOTLPF Change Management Plan (WIP) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (WIP) -Resourcing (WIP)
Sponsor Revise
Conduct Cost Estimates for each COA
Information Exchange Requirements
For each information flow describe the business rules and service levels requirements necessary to meet the process
"Sandbox" PRM - Needs (Close) - LRP (Open) - Sub-capabilities (Open) - Performance attributes (Open) - Performance Measures (Open)
Functional / SME
"Sandbox" M-Implementation Plan -Work Break Structure/ RTM (WIP) -Service Implementation Schedule (WIP) -Cost Estimate (WIP) -DOTLPF Change Management Plan (WIP) -Governance Package (WIP) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Open) -Approval Signatures (Open) -Compliance Completion Plan (Close) -Onboarding Plan (WIP) (from SRM) -Resourcing (WIP)
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (Close) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (Close) - Reusability (Close) - Dependencies (Close) - Constraints (Close) -COA Change Management Plan (Close) -COA Cost Estimates (Close)
Sponsor For each COA determine the scope, scalability and degree of difficultly of its associated DOTLPF change management requirements
Define impacts for each COA to DOTLPF necessary to support the material solution
Yes Define the information flow necessary to satisfy each put/get from the process
Contextual Model -Information Puts/Gets (WIP) -Business Rules (WIP) -Authorization and Access (WIP) -End User Design Guidelines (WIP)
No
All Stop
Functional / SME
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (Close) - Reusability (Close) - Dependencies (Close) - Constraints (Close) -COA Change Management Plan (Close) -COA Cost Estimates (Close)
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (WIP) - Reusability (Close) - Dependencies (Close) - Constraints (Close) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (Open) - Reusability (Open) - Dependencies (Open) - Constraints (Open) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
Develop COAs that align the best uses of the various sources (combination of sources may be the most efficient path) to satisfy the Contextual Model
Yes
Yes
All Stop
Conduct Process Engineering
AF Corporate Structure Review Needed?
Build evaluation criteria for COAs to satisfy the Contextual Model
All Stop
Lift information puts/gets for each process model
Yes
Approved
Denied Revise
Process Team
Sponsor
No Revise
Sponsor
Denied All Stop
Sponsor
Update DOTMLPF Implementation plan
Proceed to Sponsor Decision Point
Proceed Previous Sponsor Decision Point Approved
Approved Prioritized Sub-Capabilities Requirements?
Approved
Sponsor
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Open) -Onboarding Compliance Rqts (Open) -BEA Compliance Rqts (Open) -LRP Compliance Rqts (Open) -COA DOTLPF Impact Analysis (Open) - Reusability (Open) - Dependencies (Open) - Constraints (Open) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
Sponsor
Revise
SME Validation of Yes Contextual Model?
Design Contextual Model
Architecture Team
Sponsor All Stop
Get SME validation on contextual model
All Stop
Corporate Approval?
Yes Denied
Denied
Functional / SME
Functional / SME Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (WIP) -COA Components (Open) -COA Sequence (Open) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Open) -Onboarding Compliance Rqts (Open) -BEA Compliance Rqts (Open) -LRP Compliance Rqts (Open) -COA DOTLPF Impact Analysis (Open) - Reusability (Open) - Dependencies (Open) - Constraints (Open) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
Build Material Solution Implementation Plan
Start Material Solution Design
Denied
Approval Success Criteria A. Institutionalization of business processes through AFI/policy documentation (includes LRP) B. Prioritization of information assets by SRA D. Validation of adherence to EA standards by CIO F. Obtain approval to execute requirements to put the process into practice from appropriate authority (depending on scope) G. Capture auditable process models into Business Reference Model H. Contextual description of information assets clearly delineated from information flows within auditable business processes
No AF Corporate Structure Review Needed?
Build work plans
Revise
Provide to Sponsor recommended evaluation criteria for COAs to satisfy the Contextual Model
Work Plan to build the M-Implementation Plan - Tasks - Resources - Timelines - Milestones
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
Sponsor Scope Work Plan to build the M-Implementation
Obtain formal review Approved and approval to proceed
"Sandbox"
Review and Approve statement of need/problem statement and work plan with Sponsor.
Return to Material Solution Design
Validate Contextual Model content
No
Revise Execution Requirements Approved?
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
Begin 3.0
Proceed to Sponsor Decision Point
Denied Approved
Functional / SME
Functional / SME Proceed to Define Mission Processes to Deliver DOTMLPF Capability Requirements
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
All Stop Revise
Work plan approved?
Yes
Sponsor
Functional / SME Enterprise Architecture Assistance Needed?
ITLC
Complete Sub-Capability Requirement section of PRM Template
Architecture
Obtain formal Review and approval to proceed
Identify Key Performance Attributes
Report: Performance Requirements for the Capability
Capability Requirements Completion Criteria: 1. Prioritized by Sponsor 2. Satisfies all relevant LRP constraints 3. Does not duplicate other required capabilities 4. Reviewed and approved by AF Corporate Structure, as appropriate 5. Meets EA standards for representation 6. Registered in PRM 7. Performance Measures defined
Determine Sub-Capability requirements based on constraints
Yes
Sponsor
Conduct Enterprise Architecture analysis
. Determine, prioritize, and present DOTMLPF capability requirements to Sponsor
Enterprise Architecture No Assistance Needed?
TRM
Testing
Decompose Need/Problem Statement into Sub-Capabilities
BRM
SRM DRM
Platform Engineering
Begin 1.3
PRM
Step 1
Step 2
Step 3
Identify DOTMLPF Capability Requirements
Define DOTMLPF executable actions
Define Material Solution and Implementation Plan
ITLC
Task POCs for IMS Input Execute Appropriate IMS Activities
ITLC
Provide Sponsor Cost Estimate Updates
Participate in Kickoff Session
AQ Authority
Participate in Kickoff Session
Participate in Kickoff Session
Participate in Kickoff Session
Participate in Kickoff Session
Finance PEO/PMO Governance (C&A)
Task POCs for IMS Input
Execute Appropriate IMS Activities
Task POCs for IMS Input
Execute Appropriate IMS Activities
Task POCs for IMS Input
Task POCs for IMS Input
Task POCs for IMS Input
Execute Appropriate IMS Activities
Execute Appropriate IMS Activities
Execute Appropriate IMS Activities
AQ Authority Finance PEO/PMO Governance (C&A)
Step 4 Plan / implement developmental components of the Material Solution
Certification Package (WIP) -Net-Worthiness (Close) -ATT (Close) -ATO (Open)
Network Op's
End 1.2
CAPTURED IN AND INFORMED BY ENTERPRISE ARCHITECTURE
Project Lead / Product Center
Analyze for relevance (Down-select pertinent LRP.)
System Engineering
Functional / SME
Report: Sub-Capabilities for the Need
Complete LRP section of PRM Template
Project Lead / Product Center
Identify Public Laws, DOD No Directives, Manuals& Instructions, and OMB, GAO, BTA Findings
Yes
Architecture
Enterprise Architecture Assistance Needed?
Platform Engineering
Begin 1.2
Testing
Gather known LRP requirements End 1.1
AQ Authority
Scope the downstream efforts to complete steps 1 and 2 (define scope, charter, schedule of milestones and deliverables, resource requirements)
Contracting
Complete Needs section of PRM Template
Finance
No
Yes
Associated PEO/PMO
Enterprise Architecture Assistance Needed?
Governance (C&A)
Draft Initial Statement of Need/Problem Statement
Sponsor
Functional/ SME
Document: Laws, Regulations and Policy constrains/ mandates with findings for relevance
"Sandbox"
Begin 1.1
System Engineering / Design
Identify relevant legal, regulatory, and policy constraints List: Laws, Regulations, Policies
Functional / SME
Go to Step 2 Start SDDP 1.0
COI/EVT
Define statement of need/problem statement Document : Statement of Need / Problem Statement
Functional/ SME
Identified Top Level Need
Functional/SME
STEP OUTCOMES • Sponsor commitment to implement selected Material Solution • Approval by Air Force corporate structure to fund / execute the implementation of Materiel Solution • Early involvement of platform engineering, network operations to align the infrastructure capabilities with the Material Solution requirements • Ensure reusability of existing Material Solution Capabilities PRODUCT OUTCOMES • The bounded user requirement that includes definition of the materiel solution, information and data sources, and implementation plan
IMS (Close) Programmatic (Close) - Product Center Activities (Close) -Contracting Activities -Acquisition Activities - PEO Activities (Close) -Resourcing -Training -Equipment - Finance Activities (Close) -Allocate Funds -Assign Resources - Architecture Activities (Close) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Close) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Close) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Close) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Close) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (Close)
Step 5 Sustain Application Lifecycle
Certification Package (Close) -Net-Worthiness (Close) -ATT (Close) -ATO (Close)
Network Op's
Network Op's
Provision User Access for Prototype
Project Lead / Product Center
Project Lead / Product Center
Provision Access to trained users per phasing plan
IMS (Close) Programmatic (Close) - Product Center Activities (Close) -Contracting Activities -Acquisition Activities - PEO Activities (Close) -Resourcing -Training -Equipment - Finance Activities (Close) -Allocate Funds -Assign Resources - Architecture Activities (Close) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Close) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Close) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Close) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Close) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (Close)
Step 6 Deploy/Operate the Material Solution
The Service Development and Delivery Process Integrity - Service - Excellence
16
SDDP (4) Plan/implement Dev Components of Material Solution
Prioritization of Sub-Capability based on SME/Functional defined criteria
For the sub-capability, identify the Key Performance Attributes End 1.3
Begin 1.4
Complete performance measures and thresholds for each Key Performance Attributes of PRM Template
No
Process Information from SME
Start SDDP 2.0
Define Mission Processes to Deliver DOTMLPF Capability Requirements
Functional / SME
End 1.4
End 1.5 Engage the Enterprise Architecture Team Begin 1.5
Begin 1.6
Functional / SME
Provide basic process information to Process Team (I.E "Yellow Sticky's", "Napkins" etc)
Revisit work plan for additional resources required
Work Plan SDDP 1 & 2 - Tasks - Resources - Timelines - Milestones (from Step 1)
End 1.6
Submit Capabilities Requirements for approval
Functional / SME
No
Process Engineering Content Approved?
Yes
Ensure All expected outcomes from 1.0 are address/satisfied
Sponsor
Obtain SME Support for Process Engineering Activities
Inform/Adjudicate other processes that may be affected by modification of these processes (understand impacts)
Sponsor
Denied
All Stop
Characterize the DOTMLPF execution requirements to put the process into practice and be successful
Approved
Develop Implementation Plans
Revise
Define ROI and investment auditability
Yes
Review Capability Requirements with AF Corporate Structure
Determine Initial Scope with general cost estimate
Sponsor Approval?
All Stop
Review Approved Request SME support for and Approve, COA evaluation criteria Contextual Model development and Work Plan
Yes
Review Capability Requirements
Corporate Approval?
No
Define Start Points, Ends and Outcomes
Proceed to Sponsor Decision Point
Begin
Define Process Steps
Define required skill sets and proficiencies for each process step
Sequence Process Steps to create Discrete Process Steps including information dimension supporting process steps
Characterize Information Flows ( input, manipulation of information, output)
Process Team
Sponsor
Investigate potential solutions (COTS/GOTS/ Web Service Code / Systems) to satisfy all or part of the Contextual Model
Evaluate ability of source to satisfy part or all of Architecture No Contextual Model both from Support? a function and a feasibility of implementation
Architecture Support?
No
Begin
Generate BCA
Validation of appropriate BPR
Package BPR Assertion Documentation
BPR Assertion Complete?
No
Proceed to Process Engineering Activities
Sponsor
BRM from Step 2
Auditable Process model 1
Auditable Process model N
Yes
Capture how the user wants to use each put/get (ex. Presentation, Usability)
Capture the business rules, authorization and access rules, service requirements for each put/get within the process
Auditable Process model 2
Additional Process Flows?
Approve Review Package and Select COA?
Approved and COA Selected
Denied
AF Corporate Structure Review Needed?
Yes
Review Capability Requirements with AF Corporate Structure
Yes
Create Draft M- Implementation Plan
Receive Needs Data
Query 'As is' Repository for related LRP.
Complete Needs section of PRM Template
Achitecture Team
Identify Public Laws, DOD Directives, Manuals& Instructions, and OMB, GAO, BTA Findings
Complete LRP section of PRM Template
Query Architecture to look for similar Sub-Capabilities
Achitecture Team
Determine Sub-Capability requirements based on constraints (with user)
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Open) - Performance Measures (Open)
Report: Identified attributes to satisfy the capability
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
Based on the COA selected, commence the information analysis
Finish
System Engineering / Design Contextual model for Process 1 Contextual model for Process 2
Contextual model for Process N
System Engineering / Design
System Engineering / Design
BRM (From Step 2) -Mission Process Map (Close) -Auditable Process (Close) -Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Close)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (Open) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -Compliance Requirements (Open) -On Boarding Requirements (Open)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (Open) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -Compliance Requirements (Open) -On Boarding Requirements (Open)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (Open) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -Compliance Requirements (WIP) -On Boarding Requirements (WIP)
System Engineering / Design "Sandbox"
Process Team
Process Team
Functional/SME
Functional/SME
Task POCs for IMS Input Execute Appropriate IMS Activities
Discover existing potential solutions (COTS/GOTS / Web Service Code / Systems) to satisfy all or part of the Contextual Model
System Engineering / Design DRM -COI Charter (Open) -List of information assets (Open) -Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (WIP) -Roles and permissions (WIP) -Example Data Record (WIP) -Ontology (WIP) -Reusable COI Artifacts (WIP)
For the selected COA identify any information exchange reuse opportunities within the enterprise that will support the implementation of the contextual model
Assess capability coverage of solution options Search the Enterpise Architecture to identify additional compliance requirements
Achitecture Team
COI / EVT
COI / EVT
Governance
Governance
Identify Business / War Fighter Enterpise Architecture Compliance Requirements
For each COA, identify the inherited attributes that sufficiently satisfy the compliance requirements checklist
Identify evidence that can satisfy compliance requirements
For each COA, Identify the reuse opportunities across the enterprise to support the DOTLPF change management requirements
Approve IMS
Task POCs for IMS Input
Sponsor
Yes
SRM -Contextual Model (Close) -Web Service Code Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (WIP) -COTS/GOTS Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Open) -Reuse components (WIP) -System Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Open) -Reuse components (WIP) -Compliance Requirements (Close) -On Boarding Requirements (Close)
Update cost estimates to MImplementation Plan
Sponsor Champions ADS
Approved Update Implementation Plan
Package bounded user requirements for Product Center
Approve Bounded User Requirements? Go to SDDP Step 4
System Engineering / Design DRM -COI Charter (WIP) -List of information assets (Close) Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Open) -Reusable COI Artifacts (WIP)
DRM -COI Charter (WIP) -List of information assets (Open) Vocabulary Package (WIP) -Authoritative Data Source (ADS) Mapping (WIP) -Roles and permissions (WIP) -Example Data Record (WIP) -Ontology (WIP) -Reusable COI Artifacts (WIP)
DRM -COI Charter (WIP) -List of information assets (Close) Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Close) -Reusable COI Artifacts (WIP)
Achitecture Team
Achitecture Team
System Engineering
Participate in Kickoff Session
Execute Appropriate IMS Activities
Task POCs for IMS Input
Draft IMS (WIP) Programmatic (Open) - Product Center Activities (Open) -Contracting Activities -Acquisition Activities - PEO Activities (Open) -Resourcing -Training -Equipment - Finance Activities (Open) -Allocate Funds -Assign Resources - Architecture Activities (Open) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Open) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Open) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Open) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Open) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (Open)
DRM -COI Charter (Close) -List of information assets (Close) Vocabulary Package (Close) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Close) -Reusable COI Artifacts (Close)
DRM -COI Charter (Close) -List of information assets (Close) Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (WIP) -Roles and permissions (WIP) -Example Data Record (WIP) -Ontology (WIP) -Reusable COI Artifacts (WIP)
SRM -Contextual Model (Close) -Web Service Code Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close)
DRM -COI Charter (Close) -List of information assets (Close) Vocabulary Package (Close) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Close) -Reusable COI Artifacts (Close)
SRM -Contextual Model (Close) -Web Service Code Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close)
Draft IMS (WIP) Programmatic (WIP) - Product Center Activities (WIP) -Contracting Activities -Acquisition Activities - PEO Activities (WIP) -Resourcing -Training -Equipment - Finance Activities (WIP) -Allocate Funds -Assign Resources - Architecture Activities (WIP) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (WIP) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (WIP) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (WIP) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (WIP) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (WIP)
Draft IMS (WIP) Programmatic (WIP) - Product Center Activities (WIP) -Contracting Activities -Acquisition Activities - PEO Activities (WIP) -Resourcing -Training -Equipment - Finance Activities (WIP) -Allocate Funds -Assign Resources - Architecture Activities (WIP) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (WIP) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (WIP) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (WIP) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (WIP) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (WIP)
Complete Sub-Capability Requirements section of PRM Template
Complete performance measures and Key Performance Attributes section of PRM Template
Initiate Deployment
Yes
Extract Reusable Information Exchange Assets from previous DRMs
Ensure ontology reuse
Achitecture Team
COI / EVT
COI Coordination Panel will make a recommendation to the Sponsor to either re-charter an existing COI or establish a new COI to meet information sharing requirement.
Stand Up COI
Identify authoritative and source data from a process perspective
Identify ADS
Determine access rules ,roles and permissions for assets and planned services
Develop Draft Ontology
Acquire Capability
Proceed to Step 5
Project Lead / Product Center Begin Step 4
Review Bounded User Requirements (Acquisition Strategy Package)
Identify Kickoff meeting attendees
Facilitate Kickoff Meeting
Identify the POC's that will support the Project Lead during the implementation of the Bounded User Requirements
Create Top Level IMS
Project Lead / Product Center Task POCs for IMS Input
Achitecture Team
Verify Requirements Satisfy all relevant LRP Constraints
Achitecture Team
Conduct Enterprise Architecture Analysis
Conduct Enterprise Architecture Analysis
BRM -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Close)
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
LRP Compliance Requirements Checklist -Clinger & Cohen. (Open) -PIA (Open) -FISMA (Open) -NDAA (Open) *CCA *BEA *EITDR Registration *Business Process Reengineering *Section 508 Compliance *Records Management *FISMA *ETP *Investment included in AF Budget -DIACAP (Open)
SWG review of Governance Package
LRP Compliance Requirements Checklist -Clinger & Cohen. (Close) -PIA (Close) -FISMA (Close) -NDAA (Close) *CCA *BEA *EITDR Registration *Business Process Reengineering *Section 508 Compliance *Records Management *FISMA *ETP *Investment included in AF Budget -DIACAP (Close)
Governance
Proceed To Sponsor Review of Package
Proceed To Sponsor Review of Package
No Approved
Approved?
Greater than $1M
COI Panel Review Vocabulary Package and provide Recommendations to Sponsor
Complete IMS
Task POCs to execute IMS
Identify Reuse Capability
Achitecture Team
Sponsor
M-Implementation Plan (From Step 3) -Work Break Structure/ RTM (Close) -Service Implementation Schedule (Close) -Cost Estimate (Close) -DOTLPF Change Management Plan (Close) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (Close) -Resourcing (Close)
Obtain DAA Approval for the ATO
Yes
Return to Sponsor Selected Point
No
Conduct Post Implementation Review (PIR)
Train Users Per Phasing Plan
PIR Successful?
Yes
End SDDP
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Close) -Operational Test & Evaluation Plans and Procedures (Close) -Post Implementation Review (PIR) Report (Open)
System Engineering
Execute Appropriate IMS Activities
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (Close) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (Close) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
ITLC
"Sandbox"
No
System Engineering
All Phases Complete?
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Close) -Operational Test & Evaluation Plans and Procedures (Close) -Post Implementation Review (PIR) Report (Open)
Yes
Update IMS with Fielding Activities
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Close) -Operational Test & Evaluation Plans and Procedures (Close) -Post Implementation Review (PIR) Report (Close)
Testing
Testing
OT&E and KPP evaluation of Prototype
Return to Step 5
Architecture Execute Appropriate IMS Activities
Proceed To Sponsor Review of Package
Revise Yes
CMO review of Governance Package
Approved Approved?
Revise IRB review of Governance Package
Approved?
Denied
Approved DBSMC review of Governance Package
Charter Approved by SWG?
Approved Approved?
Governance
Denied
Denied
All Stop
Denied
Governance All Stop
SWG Approval COI Vocabulary package
Yes
No
Proceed to Previous Sponsor Checkpoint
Governance
Yes
Stand Down COI
No
Participate in Kickoff Session
Platform Engineering
Task POCs for IMS Input Execute Appropriate IMS Activities
Platform Engineering
Proceed to Begin Vocabulary Work Participate in Kickoff Session
All Stop
All Stop
Register content in Business Reference Model
Proceed to Step 3
Validate BPR/process improvement effects at an enterprise level
Project Lead / Product Center
Project Lead / Product Center
Project Lead / Product Center
Project Lead / Product Center
Identify Project Lead
Project Lead / Product Center
Achitecture Team
Achitecture Team
Platform Engineering
Derive mission critical -Onboarding requirements
Define Platform Compliance Requirements
Conduct infrastructure topology analysis
Derive additional infrastructure service necessary to support COA
Platform Engineering
Platform Engineering
Platform Engineering
Determine Distributing Computing requirements
Develop service monitoring requirements
Project Lead / Product Center
Platform Engineering
Review Legacy System Requirements
Develop Service Levels Agreements (SLA's) for each layer of service
Platform Engineering
"Sandbox" Onboarding Requirements (Close) -Mission Critical Requirements (Close) -Topology Requirements (Close) -Additional Infrastructure Requirements (Close) -Distributing Components Requirements (Close) -Service Monitoring Requirements (Close) -SLAs (Close) -Onboarding Compliance Requirements (Close)
Onboarding Requirements (close) -Mission Critical Requirements (Close) -Topology Requirements (Close) -Additional Infrastructure Requirements (Close) -Distributing Components Requirements (Open) -Service Monitoring Requirements (Open) -SLAs (Open) -Onboarding Compliance Requirements (Close)
Ensure processes adequately define context for information assets
Participate in Kickoff Session
Onboarding
Capture DOTMLPF interdependencies (temporal, decisional, informational) to other processes
Ensure other processes that may be affected by modification of these processes have been identified and impacts addressed
Return to Step 5
Approved and Ready to Field?
Platform Engineering
Platform Engineering
No
Provision Prototype to operational environment
Install Prototype
Install Successful?
Yes
Provision Per Phasing Plan
BCL Compliance Governance
Proceed To Sponsor Review of Package
BRM -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Open)
BRM -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Open)
Conduct Enterprise Architecture analysis
Determine potential duplication/conflict with other enterprise requirements
"Sandbox"
Update DOT_LPF Implementation Plan
Task POCs for IMS Input
Architecture
COI / EVT Generate Vocabulary Package
Assessment of Prototype
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (Close) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
Complete Help Desk Training
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Open) -Operational Test & Evaluation Plans and Procedures (Open) -Post Implementation Review (PIR) Report (Open)
Achitecture Team Participate in Kickoff Session
COI Coordination Panel reviews charter and provides a recommendation to the Sponsor
User Evaluation of Prototype
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (WIP) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
ITLC Help Desk Prototype Training
Provide LRP compliance requirements checklist for each COA
Revise
Ensure alignment with AF Strategy
Sponsor
Perform User training for Prototype
Deployment Package (From Step 5) -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (WIP) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
Begin Step 6
"Sandbox"
Information Exchange Reuse?
COI / EVT
Functional / SME M-Implementation Plan (From Step 3) -Work Break Structure/ RTM (Close) -Service Implementation Schedule (Close) -Cost Estimate (Close) -DOTLPF Change Management Plan (Close) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (Close) -Resourcing (Close)
No
System Engineering
IMS (Close) Programmatic (Close) - Product Center Activities (Close) -Contracting Activities -Acquisition Activities - PEO Activities (Close) -Resourcing -Training -Equipment - Finance Activities (Close) -Allocate Funds -Assign Resources - Architecture Activities (Close) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Close) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Close) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Close) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Close) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activit
Operational Baseline
COI / EVT
User Evaluation of Prototype
Engage users for Prototype Training
Participate in Kickoff Session Execute Appropriate IMS Activities
Revise
Yes
Testing
Execute Appropriate IMS Activities Task POCs for IMS Input
Testing
"Sandbox"
Identify existing Key Performance Attributes to satisfy the Sub-Capability,
Functional / SME
Functional / SME
No
Sponsor Call Kickoff Meeting
Proceed to COA Evaluation Decision
No
Submit COI Charter to SWG
Match Compliance Requirements to individual information exchanges, services and function
Identify additional information exchanges requiring new implementation
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (WIP) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -Compliance Requirements (WIP) -On Boarding Requirements (Close)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Automated Information Assets (Open) -Detailed Design Requirements (Open) -Reuse components (WIP) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -Compliance Requirements (WIP) -On Boarding Requirements (Close)
BRM (From Step 2) -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Close)
Target CEIT Baseline
End Process Engineering
Draft a new COI charter or revise existing COI Charter
Prepare Bounded User Requirements for Implementation
Proceed to Begin Vocabulary Work
Sponsor Initiate COI Coordination
Identify reuse opportunities for Web Services, Point to Point Interfaces, Data Services, and Exposure Services
No
Achitecture Team
Characterize Information Assets needed for Information Flows
BRM -Mission Process Map (Close) -Auditable Process (WIP) - Business Rules (Close) -Dependencies (Open) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Open)
High Level Process describing expected outcomes
Identify information exchanges / assets
Denied
Revise
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
Functional / SME
Proceed Back to Beginning of Step 4
Bounded User Requirements - M Implementation Plan -SRM -DRM
Obtain DAA Approval for the ATT for the Prototype
Assemble Governance package
No
Define Initial Functional Requirements to implement information exchanges
Process Engineering Completion Criteria: A. Define process steps inputs and outputs. (Note: Put/Gets of Information Assets are process steps) B. Define business rules for each process step, including manipulations to information needed for process step, creation of record/store, workflow C. Define decisions taken in the step D. Define outputs from process steps, including information outputs to store or to next process step
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
Governance
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (WIP) - Performance attributes (Open) - Performance Measures (Open)
Participate in Kickoff Session
"Sandbox"
M-Implementation Plan -Work Break Structure/ RTM (Close) -Service Implementation Schedule (Close) -Cost Estimate (Close) -DOTLPF Change Management Plan (Close) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (Close) -Resourcing (Close)
M-Implementation Plan -Work Break Structure/ RTM (WIP) -Service Implementation Schedule (WIP) -Cost Estimate (WIP) -DOTLPF Change Management Plan (WIP) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (WIP) -Resourcing (WIP)
Information Analysis
Sponsor
Approve COI vocabulary package Corporate Approval?
No
No
ITLC
Architecture Team
SubCapability PRM Tree N.
SubCapability PRM Tree 2.
Project Lead / Product Center
SubCapability PRM Tree 1. Needs PRM
Platform Engineering
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Open) - Performance attributes (Open) - Performance Measures (Open)
Architecture Team
PRM - Needs (Close) - LRP (WIP) - Sub-capabilities (Open) - Performance attributes (Open) - Performance Measures (Open)
Functional / SME
M-Implementation Plan -Work Break Structure/ RTM (WIP) -Service Implementation Schedule (WIP) -Cost Estimate (WIP) -DOTLPF Change Management Plan (WIP) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (WIP) -Resourcing (WIP)
Sponsor Revise
Conduct Cost Estimates for each COA
Information Exchange Requirements
For each information flow describe the business rules and service levels requirements necessary to meet the process
"Sandbox" PRM - Needs (Close) - LRP (Open) - Sub-capabilities (Open) - Performance attributes (Open) - Performance Measures (Open)
Functional / SME
"Sandbox" M-Implementation Plan -Work Break Structure/ RTM (WIP) -Service Implementation Schedule (WIP) -Cost Estimate (WIP) -DOTLPF Change Management Plan (WIP) -Governance Package (WIP) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Open) -Approval Signatures (Open) -Compliance Completion Plan (Close) -Onboarding Plan (WIP) (from SRM) -Resourcing (WIP)
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (Close) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (Close) - Reusability (Close) - Dependencies (Close) - Constraints (Close) -COA Change Management Plan (Close) -COA Cost Estimates (Close)
Sponsor For each COA determine the scope, scalability and degree of difficultly of its associated DOTLPF change management requirements
Define impacts for each COA to DOTLPF necessary to support the material solution
Yes Define the information flow necessary to satisfy each put/get from the process
Contextual Model -Information Puts/Gets (WIP) -Business Rules (WIP) -Authorization and Access (WIP) -End User Design Guidelines (WIP)
No
All Stop
Functional / SME
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (Close) - Reusability (Close) - Dependencies (Close) - Constraints (Close) -COA Change Management Plan (Close) -COA Cost Estimates (Close)
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (WIP) - Reusability (Close) - Dependencies (Close) - Constraints (Close) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (Open) - Reusability (Open) - Dependencies (Open) - Constraints (Open) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
Develop COAs that align the best uses of the various sources (combination of sources may be the most efficient path) to satisfy the Contextual Model
Yes
Yes
All Stop
Conduct Process Engineering
AF Corporate Structure Review Needed?
Build evaluation criteria for COAs to satisfy the Contextual Model
All Stop
Lift information puts/gets for each process model
Yes
Approved
Denied Revise
Process Team
Sponsor
No Revise
Sponsor
Denied All Stop
Sponsor
Update DOTMLPF Implementation plan
Proceed to Sponsor Decision Point
Proceed Previous Sponsor Decision Point Approved
Approved Prioritized Sub-Capabilities Requirements?
Approved
Sponsor
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Open) -Onboarding Compliance Rqts (Open) -BEA Compliance Rqts (Open) -LRP Compliance Rqts (Open) -COA DOTLPF Impact Analysis (Open) - Reusability (Open) - Dependencies (Open) - Constraints (Open) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
Sponsor
Revise
SME Validation of Yes Contextual Model?
Design Contextual Model
Architecture Team
Sponsor All Stop
Get SME validation on contextual model
All Stop
Corporate Approval?
Yes Denied
Denied
Functional / SME
Functional / SME Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (WIP) -COA Components (Open) -COA Sequence (Open) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Open) -Onboarding Compliance Rqts (Open) -BEA Compliance Rqts (Open) -LRP Compliance Rqts (Open) -COA DOTLPF Impact Analysis (Open) - Reusability (Open) - Dependencies (Open) - Constraints (Open) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
Build Material Solution Implementation Plan
Start Material Solution Design
Denied
Approval Success Criteria A. Institutionalization of business processes through AFI/policy documentation (includes LRP) B. Prioritization of information assets by SRA D. Validation of adherence to EA standards by CIO F. Obtain approval to execute requirements to put the process into practice from appropriate authority (depending on scope) G. Capture auditable process models into Business Reference Model H. Contextual description of information assets clearly delineated from information flows within auditable business processes
No AF Corporate Structure Review Needed?
Build work plans
Revise
Provide to Sponsor recommended evaluation criteria for COAs to satisfy the Contextual Model
Work Plan to build the M-Implementation Plan - Tasks - Resources - Timelines - Milestones
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
Sponsor Scope Work Plan to build the M-Implementation
Obtain formal review Approved and approval to proceed
"Sandbox"
Review and Approve statement of need/problem statement and work plan with Sponsor.
Return to Material Solution Design
Validate Contextual Model content
No
Revise Execution Requirements Approved?
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
Begin 3.0
Proceed to Sponsor Decision Point
Denied Approved
Functional / SME
Functional / SME Proceed to Define Mission Processes to Deliver DOTMLPF Capability Requirements
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
All Stop Revise
Work plan approved?
Yes
Sponsor
Functional / SME Enterprise Architecture Assistance Needed?
ITLC
Complete Sub-Capability Requirement section of PRM Template
Architecture
Obtain formal Review and approval to proceed
Identify Key Performance Attributes
Report: Performance Requirements for the Capability
Capability Requirements Completion Criteria: 1. Prioritized by Sponsor 2. Satisfies all relevant LRP constraints 3. Does not duplicate other required capabilities 4. Reviewed and approved by AF Corporate Structure, as appropriate 5. Meets EA standards for representation 6. Registered in PRM 7. Performance Measures defined
Determine Sub-Capability requirements based on constraints
Yes
Sponsor
Conduct Enterprise Architecture analysis
. Determine, prioritize, and present DOTMLPF capability requirements to Sponsor
Enterprise Architecture No Assistance Needed?
TRM
Testing
Decompose Need/Problem Statement into Sub-Capabilities
BRM
SRM DRM
Platform Engineering
Begin 1.3
PRM
ITLC
Task POCs for IMS Input Execute Appropriate IMS Activities
ITLC
Provide Sponsor Cost Estimate Updates
Participate in Kickoff Session
AQ Authority
Participate in Kickoff Session
Participate in Kickoff Session
Participate in Kickoff Session
Participate in Kickoff Session
Finance PEO/PMO Governance (C&A)
Task POCs for IMS Input
Execute Appropriate IMS Activities
Task POCs for IMS Input
Execute Appropriate IMS Activities
Task POCs for IMS Input
Task POCs for IMS Input
Task POCs for IMS Input
Execute Appropriate IMS Activities
Execute Appropriate IMS Activities
Execute Appropriate IMS Activities
Certification Package (WIP) -Net-Worthiness (Close) -ATT (Close) -ATO (Open)
Network Op's
End 1.2
DEVELOPED AGAINST CONFIGURATION MANAGED TECHNICAL STANDARDS
Project Lead / Product Center
Analyze for relevance (Down-select pertinent LRP.)
System Engineering
Functional / SME
Report: Sub-Capabilities for the Need
Complete LRP section of PRM Template
Project Lead / Product Center
Identify Public Laws, DOD No Directives, Manuals& Instructions, and OMB, GAO, BTA Findings
Yes
Architecture
Enterprise Architecture Assistance Needed?
Platform Engineering
Begin 1.2
Testing
Gather known LRP requirements End 1.1
AQ Authority
Scope the downstream efforts to complete steps 1 and 2 (define scope, charter, schedule of milestones and deliverables, resource requirements)
Contracting
Complete Needs section of PRM Template
Finance
No
Yes
Associated PEO/PMO
Enterprise Architecture Assistance Needed?
Governance (C&A)
Draft Initial Statement of Need/Problem Statement
Sponsor
Functional/ SME
Document: Laws, Regulations and Policy constrains/ mandates with findings for relevance
"Sandbox"
Begin 1.1
System Engineering / Design
Identify relevant legal, regulatory, and policy constraints List: Laws, Regulations, Policies
Functional / SME
Go to Step 2 Start SDDP 1.0
COI/EVT
Define statement of need/problem statement Document : Statement of Need / Problem Statement
Functional/ SME
Identified Top Level Need
Functional/SME
STEP OUTCOMES • Designation of Project Lead • Formation of a project team with a wide range of skillsets from multiple Air Force functions, including engineering, architecture, acquisition, testing, platform engineering, network operations • Inherit engineering and project artifacts from Step 3 to streamline implementation processes, e.g. C&A inheritance • Enterprise standards for development processes & environments PRODUCT OUTCOMES • Integrated master schedule to deliver the Materiel Solution • Developed components of the Materiel Solution • Supporting engineering content including test plans, onboarding requirements
AQ Authority Finance PEO/PMO Governance (C&A)
Step 1
Step 2
Step 3
Step 4
Step 5
Identify DOTMLPF Capability Requirements
Define DOTMLPF executable actions
Define Material Solution and Implementation Plan
Plan / implement developmental components of the Material Solution
Sustain Application Lifecycle
IMS (Close) Programmatic (Close) - Product Center Activities (Close) -Contracting Activities -Acquisition Activities - PEO Activities (Close) -Resourcing -Training -Equipment - Finance Activities (Close) -Allocate Funds -Assign Resources - Architecture Activities (Close) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Close) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Close) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Close) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Close) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (Close)
Certification Package (Close) -Net-Worthiness (Close) -ATT (Close) -ATO (Close)
Network Op's
Network Op's
Provision User Access for Prototype
Project Lead / Product Center
Project Lead / Product Center
Provision Access to trained users per phasing plan
IMS (Close) Programmatic (Close) - Product Center Activities (Close) -Contracting Activities -Acquisition Activities - PEO Activities (Close) -Resourcing -Training -Equipment - Finance Activities (Close) -Allocate Funds -Assign Resources - Architecture Activities (Close) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Close) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Close) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Close) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Close) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (Close)
Step 6 Deploy/Operate the Material Solution
The Service Development and Delivery Process Integrity - Service - Excellence
17
SDDP (5) Sustain Application Lifecycle TESTED / ACCREDITED TO CONFIGURATION MANAGED TECHNICAL STANDARDS
STEP OUTCOMES • Enterprise standards for test processes and environments • Enterprise standards for development and code sustainment • Management and control of testing and sustainment at the Air Force enterprise level PRODUCT OUTCOMES • Fully Integrated Material Solution • Deployment Package /Tech Order
PRM
BRM
SRM DRM
Prioritization of Sub-Capability based on SME/Functional defined criteria
For the sub-capability, identify the Key Performance Attributes End 1.3
Begin 1.4
Complete performance measures and thresholds for each Key Performance Attributes of PRM Template
No
Process Information from SME
Start SDDP 2.0
Define Mission Processes to Deliver DOTMLPF Capability Requirements
Functional / SME
End 1.4
End 1.5 Engage the Enterprise Architecture Team Begin 1.5
Begin 1.6
Functional / SME
Provide basic process information to Process Team (I.E "Yellow Sticky's", "Napkins" etc)
Revisit work plan for additional resources required
Work Plan SDDP 1 & 2 - Tasks - Resources - Timelines - Milestones (from Step 1)
End 1.6
Submit Capabilities Requirements for approval
Functional / SME
No
Process Engineering Content Approved?
Yes
Ensure All expected outcomes from 1.0 are address/satisfied
Sponsor
Obtain SME Support for Process Engineering Activities
Inform/Adjudicate other processes that may be affected by modification of these processes (understand impacts)
Sponsor
Denied
All Stop
Characterize the DOTMLPF execution requirements to put the process into practice and be successful
Approved
Develop Implementation Plans
Revise
Define ROI and investment auditability
Yes
Review Capability Requirements with AF Corporate Structure
Determine Initial Scope with general cost estimate
Sponsor Approval?
All Stop
Review Approved Request SME support for and Approve, COA evaluation criteria Contextual Model development and Work Plan
Yes
Review Capability Requirements
Corporate Approval?
No
Define Start Points, Ends and Outcomes
Proceed to Sponsor Decision Point
Begin
Define Process Steps
Define required skill sets and proficiencies for each process step
Sequence Process Steps to create Discrete Process Steps including information dimension supporting process steps
Characterize Information Flows ( input, manipulation of information, output)
Process Team
Sponsor
Investigate potential solutions (COTS/GOTS/ Web Service Code / Systems) to satisfy all or part of the Contextual Model
Evaluate ability of source to satisfy part or all of Architecture No Contextual Model both from Support? a function and a feasibility of implementation
Architecture Support?
No
Generate BCA
Begin
Validation of appropriate BPR
Package BPR Assertion Documentation
BPR Assertion Complete?
No
Proceed to Process Engineering Activities
Sponsor
BRM from Step 2
Auditable Process model 1
Auditable Process model N
Yes
Capture how the user wants to use each put/get (ex. Presentation, Usability)
Capture the business rules, authorization and access rules, service requirements for each put/get within the process
Auditable Process model 2
Additional Process Flows?
Approve Review Package and Select COA?
Approved and COA Selected
Denied
AF Corporate Structure Review Needed?
Yes
Review Capability Requirements with AF Corporate Structure
Yes
Create Draft M- Implementation Plan
Receive Needs Data
Query 'As is' Repository for related LRP.
Complete Needs section of PRM Template
Achitecture Team
Identify Public Laws, DOD Directives, Manuals& Instructions, and OMB, GAO, BTA Findings
Complete LRP section of PRM Template
Query Architecture to look for similar Sub-Capabilities
Achitecture Team
Determine Sub-Capability requirements based on constraints (with user)
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Open) - Performance Measures (Open)
Report: Identified attributes to satisfy the capability
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
Based on the COA selected, commence the information analysis
Finish
System Engineering / Design Contextual model for Process 1 Contextual model for Process 2
Contextual model for Process N
System Engineering / Design
System Engineering / Design
BRM (From Step 2) -Mission Process Map (Close) -Auditable Process (Close) -Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Close)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (Open) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -Compliance Requirements (Open) -On Boarding Requirements (Open)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (Open) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -Compliance Requirements (Open) -On Boarding Requirements (Open)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (Open) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -Compliance Requirements (WIP) -On Boarding Requirements (WIP)
System Engineering / Design "Sandbox"
Process Team
Process Team
Functional/SME
Functional/SME
Task POCs for IMS Input Execute Appropriate IMS Activities
Discover existing potential solutions (COTS/GOTS / Web Service Code / Systems) to satisfy all or part of the Contextual Model
System Engineering / Design DRM -COI Charter (Open) -List of information assets (Open) -Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (WIP) -Roles and permissions (WIP) -Example Data Record (WIP) -Ontology (WIP) -Reusable COI Artifacts (WIP)
For the selected COA identify any information exchange reuse opportunities within the enterprise that will support the implementation of the contextual model
Assess capability coverage of solution options Search the Enterpise Architecture to identify additional compliance requirements
Achitecture Team
COI / EVT
COI / EVT
Governance
Governance
Identify Business / War Fighter Enterpise Architecture Compliance Requirements
For each COA, identify the inherited attributes that sufficiently satisfy the compliance requirements checklist
Identify evidence that can satisfy compliance requirements
For each COA, Identify the reuse opportunities across the enterprise to support the DOTLPF change management requirements
Approve IMS
Task POCs for IMS Input
Sponsor
Yes
SRM -Contextual Model (Close) -Web Service Code Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (WIP) -COTS/GOTS Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Open) -Reuse components (WIP) -System Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Open) -Reuse components (WIP) -Compliance Requirements (Close) -On Boarding Requirements (Close)
Update cost estimates to MImplementation Plan
Sponsor Champions ADS
Approved Update Implementation Plan
Package bounded user requirements for Product Center
Approve Bounded User Requirements? Go to SDDP Step 4
System Engineering / Design DRM -COI Charter (WIP) -List of information assets (Close) Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Open) -Reusable COI Artifacts (WIP)
DRM -COI Charter (WIP) -List of information assets (Open) Vocabulary Package (WIP) -Authoritative Data Source (ADS) Mapping (WIP) -Roles and permissions (WIP) -Example Data Record (WIP) -Ontology (WIP) -Reusable COI Artifacts (WIP)
DRM -COI Charter (WIP) -List of information assets (Close) Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Close) -Reusable COI Artifacts (WIP)
Achitecture Team
Achitecture Team
System Engineering
Participate in Kickoff Session
Execute Appropriate IMS Activities
Task POCs for IMS Input
Draft IMS (WIP) Programmatic (Open) - Product Center Activities (Open) -Contracting Activities -Acquisition Activities - PEO Activities (Open) -Resourcing -Training -Equipment - Finance Activities (Open) -Allocate Funds -Assign Resources - Architecture Activities (Open) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Open) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Open) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Open) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Open) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (Open)
DRM -COI Charter (Close) -List of information assets (Close) Vocabulary Package (Close) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Close) -Reusable COI Artifacts (Close)
DRM -COI Charter (Close) -List of information assets (Close) Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (WIP) -Roles and permissions (WIP) -Example Data Record (WIP) -Ontology (WIP) -Reusable COI Artifacts (WIP)
SRM -Contextual Model (Close) -Web Service Code Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close)
DRM -COI Charter (Close) -List of information assets (Close) Vocabulary Package (Close) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Close) -Reusable COI Artifacts (Close)
SRM -Contextual Model (Close) -Web Service Code Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close)
Draft IMS (WIP) Programmatic (WIP) - Product Center Activities (WIP) -Contracting Activities -Acquisition Activities - PEO Activities (WIP) -Resourcing -Training -Equipment - Finance Activities (WIP) -Allocate Funds -Assign Resources - Architecture Activities (WIP) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (WIP) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (WIP) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (WIP) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (WIP) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (WIP)
Draft IMS (WIP) Programmatic (WIP) - Product Center Activities (WIP) -Contracting Activities -Acquisition Activities - PEO Activities (WIP) -Resourcing -Training -Equipment - Finance Activities (WIP) -Allocate Funds -Assign Resources - Architecture Activities (WIP) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (WIP) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (WIP) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (WIP) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (WIP) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (WIP)
Complete Sub-Capability Requirements section of PRM Template
Complete performance measures and Key Performance Attributes section of PRM Template
Initiate Deployment
Yes
Extract Reusable Information Exchange Assets from previous DRMs
Ensure ontology reuse
Achitecture Team
COI / EVT
COI Coordination Panel will make a recommendation to the Sponsor to either re-charter an existing COI or establish a new COI to meet information sharing requirement.
Stand Up COI
Identify authoritative and source data from a process perspective
Identify ADS
Determine access rules ,roles and permissions for assets and planned services
Develop Draft Ontology
Acquire Capability
Proceed to Step 5
Project Lead / Product Center Begin Step 4
Review Bounded User Requirements (Acquisition Strategy Package)
Identify Kickoff meeting attendees
Facilitate Kickoff Meeting
Identify the POC's that will support the Project Lead during the implementation of the Bounded User Requirements
Create Top Level IMS
Project Lead / Product Center Task POCs for IMS Input
Achitecture Team
Verify Requirements Satisfy all relevant LRP Constraints
Achitecture Team
Conduct Enterprise Architecture Analysis
Conduct Enterprise Architecture Analysis
BRM -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Close)
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
LRP Compliance Requirements Checklist -Clinger & Cohen. (Open) -PIA (Open) -FISMA (Open) -NDAA (Open) *CCA *BEA *EITDR Registration *Business Process Reengineering *Section 508 Compliance *Records Management *FISMA *ETP *Investment included in AF Budget -DIACAP (Open)
SWG review of Governance Package
LRP Compliance Requirements Checklist -Clinger & Cohen. (Close) -PIA (Close) -FISMA (Close) -NDAA (Close) *CCA *BEA *EITDR Registration *Business Process Reengineering *Section 508 Compliance *Records Management *FISMA *ETP *Investment included in AF Budget -DIACAP (Close)
Governance
Proceed To Sponsor Review of Package
Proceed To Sponsor Review of Package
No Approved
Approved?
Greater than $1M
COI Panel Review Vocabulary Package and provide Recommendations to Sponsor
Complete IMS
Task POCs to execute IMS
Identify Reuse Capability
Achitecture Team
Sponsor
M-Implementation Plan (From Step 3) -Work Break Structure/ RTM (Close) -Service Implementation Schedule (Close) -Cost Estimate (Close) -DOTLPF Change Management Plan (Close) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (Close) -Resourcing (Close)
Obtain DAA Approval for the ATO
Yes
Return to Sponsor Selected Point
No
Conduct Post Implementation Review (PIR)
Train Users Per Phasing Plan
PIR Successful?
Yes
End SDDP
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Close) -Operational Test & Evaluation Plans and Procedures (Close) -Post Implementation Review (PIR) Report (Open)
System Engineering
Execute Appropriate IMS Activities
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (Close) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (Close) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
ITLC
"Sandbox"
No
System Engineering
All Phases Complete?
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Close) -Operational Test & Evaluation Plans and Procedures (Close) -Post Implementation Review (PIR) Report (Open)
Yes
Update IMS with Fielding Activities
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Close) -Operational Test & Evaluation Plans and Procedures (Close) -Post Implementation Review (PIR) Report (Close)
Testing
Testing
OT&E and KPP evaluation of Prototype
Return to Step 5
Architecture Execute Appropriate IMS Activities
Proceed To Sponsor Review of Package
Revise Yes
CMO review of Governance Package
Approved Approved?
Revise IRB review of Governance Package
Approved?
Denied
Approved DBSMC review of Governance Package
Charter Approved by SWG?
Approved Approved?
Governance
Denied
Denied
All Stop
Denied
Governance All Stop
SWG Approval COI Vocabulary package
Yes
Governance
No
Proceed to Previous Sponsor Checkpoint
Yes
Stand Down COI
No
Participate in Kickoff Session
Platform Engineering
Task POCs for IMS Input Execute Appropriate IMS Activities
Platform Engineering
Proceed to Begin Vocabulary Work Participate in Kickoff Session
All Stop
All Stop
Register content in Business Reference Model
Proceed to Step 3
Validate BPR/process improvement effects at an enterprise level
Project Lead / Product Center
Project Lead / Product Center
Project Lead / Product Center
Project Lead / Product Center
Identify Project Lead
Project Lead / Product Center
Achitecture Team
Achitecture Team
Platform Engineering
Derive mission critical -Onboarding requirements
Define Platform Compliance Requirements
Conduct infrastructure topology analysis
Derive additional infrastructure service necessary to support COA
Platform Engineering
Platform Engineering
Platform Engineering
Determine Distributing Computing requirements
Develop service monitoring requirements
Project Lead / Product Center
Platform Engineering
Review Legacy System Requirements
Develop Service Levels Agreements (SLA's) for each layer of service
Platform Engineering
"Sandbox" Onboarding Requirements (Close) -Mission Critical Requirements (Close) -Topology Requirements (Close) -Additional Infrastructure Requirements (Close) -Distributing Components Requirements (Close) -Service Monitoring Requirements (Close) -SLAs (Close) -Onboarding Compliance Requirements (Close)
Onboarding Requirements (close) -Mission Critical Requirements (Close) -Topology Requirements (Close) -Additional Infrastructure Requirements (Close) -Distributing Components Requirements (Open) -Service Monitoring Requirements (Open) -SLAs (Open) -Onboarding Compliance Requirements (Close)
Ensure processes adequately define context for information assets
Participate in Kickoff Session
Onboarding
Capture DOTMLPF interdependencies (temporal, decisional, informational) to other processes
Ensure other processes that may be affected by modification of these processes have been identified and impacts addressed
Return to Step 5
Approved and Ready to Field?
Platform Engineering
Platform Engineering
No
Provision Prototype to operational environment
Install Prototype
Install Successful?
Yes
Provision Per Phasing Plan
BCL Compliance Governance
Proceed To Sponsor Review of Package
BRM -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Open)
BRM -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Open)
Conduct Enterprise Architecture analysis
Determine potential duplication/conflict with other enterprise requirements
"Sandbox"
Update DOT_LPF Implementation Plan
Task POCs for IMS Input
Architecture
COI / EVT Generate Vocabulary Package
Assessment of Prototype
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (Close) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
Complete Help Desk Training
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Open) -Operational Test & Evaluation Plans and Procedures (Open) -Post Implementation Review (PIR) Report (Open)
Achitecture Team Participate in Kickoff Session
COI Coordination Panel reviews charter and provides a recommendation to the Sponsor
User Evaluation of Prototype
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (WIP) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
ITLC Help Desk Prototype Training
Provide LRP compliance requirements checklist for each COA
Revise
Ensure alignment with AF Strategy
Sponsor
Perform User training for Prototype
Deployment Package (From Step 5) -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (WIP) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
Begin Step 6
"Sandbox"
Information Exchange Reuse?
COI / EVT
Functional / SME M-Implementation Plan (From Step 3) -Work Break Structure/ RTM (Close) -Service Implementation Schedule (Close) -Cost Estimate (Close) -DOTLPF Change Management Plan (Close) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (Close) -Resourcing (Close)
No
System Engineering
IMS (Close) Programmatic (Close) - Product Center Activities (Close) -Contracting Activities -Acquisition Activities - PEO Activities (Close) -Resourcing -Training -Equipment - Finance Activities (Close) -Allocate Funds -Assign Resources - Architecture Activities (Close) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Close) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Close) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Close) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Close) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activit
Operational Baseline
COI / EVT
User Evaluation of Prototype
Engage users for Prototype Training
Participate in Kickoff Session Execute Appropriate IMS Activities
Revise
Yes
Testing
Execute Appropriate IMS Activities Task POCs for IMS Input
Testing
"Sandbox"
Identify existing Key Performance Attributes to satisfy the Sub-Capability,
Functional / SME
Functional / SME
No
Sponsor Call Kickoff Meeting
Proceed to COA Evaluation Decision
No
Submit COI Charter to SWG
Match Compliance Requirements to individual information exchanges, services and function
Identify additional information exchanges requiring new implementation
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (WIP) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -Compliance Requirements (WIP) -On Boarding Requirements (Close)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Automated Information Assets (Open) -Detailed Design Requirements (Open) -Reuse components (WIP) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -Compliance Requirements (WIP) -On Boarding Requirements (Close)
BRM (From Step 2) -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Close)
Target CEIT Baseline
End Process Engineering
Draft a new COI charter or revise existing COI Charter
Prepare Bounded User Requirements for Implementation
Proceed to Begin Vocabulary Work
Sponsor Initiate COI Coordination
Identify reuse opportunities for Web Services, Point to Point Interfaces, Data Services, and Exposure Services
No
Achitecture Team
Characterize Information Assets needed for Information Flows
BRM -Mission Process Map (Close) -Auditable Process (WIP) - Business Rules (Close) -Dependencies (Open) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Open)
High Level Process describing expected outcomes
Identify information exchanges / assets
Denied
Revise
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
Functional / SME
Proceed Back to Beginning of Step 4
Bounded User Requirements - M Implementation Plan -SRM -DRM
Obtain DAA Approval for the ATT for the Prototype
Assemble Governance package
No
Define Initial Functional Requirements to implement information exchanges
Process Engineering Completion Criteria: A. Define process steps inputs and outputs. (Note: Put/Gets of Information Assets are process steps) B. Define business rules for each process step, including manipulations to information needed for process step, creation of record/store, workflow C. Define decisions taken in the step D. Define outputs from process steps, including information outputs to store or to next process step
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
Governance
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (WIP) - Performance attributes (Open) - Performance Measures (Open)
Participate in Kickoff Session
"Sandbox"
M-Implementation Plan -Work Break Structure/ RTM (Close) -Service Implementation Schedule (Close) -Cost Estimate (Close) -DOTLPF Change Management Plan (Close) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (Close) -Resourcing (Close)
M-Implementation Plan -Work Break Structure/ RTM (WIP) -Service Implementation Schedule (WIP) -Cost Estimate (WIP) -DOTLPF Change Management Plan (WIP) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (WIP) -Resourcing (WIP)
Information Analysis
Sponsor
Approve COI vocabulary package Corporate Approval?
No
No
ITLC
Architecture Team
SubCapability PRM Tree N.
SubCapability PRM Tree 2.
Project Lead / Product Center
SubCapability PRM Tree 1. Needs PRM
Platform Engineering
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Open) - Performance attributes (Open) - Performance Measures (Open)
Architecture Team
PRM - Needs (Close) - LRP (WIP) - Sub-capabilities (Open) - Performance attributes (Open) - Performance Measures (Open)
Functional / SME
M-Implementation Plan -Work Break Structure/ RTM (WIP) -Service Implementation Schedule (WIP) -Cost Estimate (WIP) -DOTLPF Change Management Plan (WIP) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (WIP) -Resourcing (WIP)
Sponsor Revise
Conduct Cost Estimates for each COA
Information Exchange Requirements
For each information flow describe the business rules and service levels requirements necessary to meet the process
"Sandbox" PRM - Needs (Close) - LRP (Open) - Sub-capabilities (Open) - Performance attributes (Open) - Performance Measures (Open)
Functional / SME
"Sandbox" M-Implementation Plan -Work Break Structure/ RTM (WIP) -Service Implementation Schedule (WIP) -Cost Estimate (WIP) -DOTLPF Change Management Plan (WIP) -Governance Package (WIP) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Open) -Approval Signatures (Open) -Compliance Completion Plan (Close) -Onboarding Plan (WIP) (from SRM) -Resourcing (WIP)
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (Close) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (Close) - Reusability (Close) - Dependencies (Close) - Constraints (Close) -COA Change Management Plan (Close) -COA Cost Estimates (Close)
Sponsor For each COA determine the scope, scalability and degree of difficultly of its associated DOTLPF change management requirements
Define impacts for each COA to DOTLPF necessary to support the material solution
Yes Define the information flow necessary to satisfy each put/get from the process
Contextual Model -Information Puts/Gets (WIP) -Business Rules (WIP) -Authorization and Access (WIP) -End User Design Guidelines (WIP)
No
All Stop
Functional / SME
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (Close) - Reusability (Close) - Dependencies (Close) - Constraints (Close) -COA Change Management Plan (Close) -COA Cost Estimates (Close)
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (WIP) - Reusability (Close) - Dependencies (Close) - Constraints (Close) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (Open) - Reusability (Open) - Dependencies (Open) - Constraints (Open) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
Develop COAs that align the best uses of the various sources (combination of sources may be the most efficient path) to satisfy the Contextual Model
Yes
Yes
All Stop
Conduct Process Engineering
AF Corporate Structure Review Needed?
Build evaluation criteria for COAs to satisfy the Contextual Model
All Stop
Lift information puts/gets for each process model
Yes
Approved
Denied Revise
Process Team
Sponsor
No Revise
Sponsor
Denied All Stop
Sponsor
Update DOTMLPF Implementation plan
Proceed to Sponsor Decision Point
Proceed Previous Sponsor Decision Point Approved
Approved Prioritized Sub-Capabilities Requirements?
Approved
Sponsor
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Open) -Onboarding Compliance Rqts (Open) -BEA Compliance Rqts (Open) -LRP Compliance Rqts (Open) -COA DOTLPF Impact Analysis (Open) - Reusability (Open) - Dependencies (Open) - Constraints (Open) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
Sponsor
Revise
SME Validation of Yes Contextual Model?
Design Contextual Model
Architecture Team
Sponsor All Stop
Get SME validation on contextual model
All Stop
Corporate Approval?
Yes Denied
Denied
Functional / SME
Functional / SME Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (WIP) -COA Components (Open) -COA Sequence (Open) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Open) -Onboarding Compliance Rqts (Open) -BEA Compliance Rqts (Open) -LRP Compliance Rqts (Open) -COA DOTLPF Impact Analysis (Open) - Reusability (Open) - Dependencies (Open) - Constraints (Open) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
Build Material Solution Implementation Plan
Start Material Solution Design
Denied
Approval Success Criteria A. Institutionalization of business processes through AFI/policy documentation (includes LRP) B. Prioritization of information assets by SRA D. Validation of adherence to EA standards by CIO F. Obtain approval to execute requirements to put the process into practice from appropriate authority (depending on scope) G. Capture auditable process models into Business Reference Model H. Contextual description of information assets clearly delineated from information flows within auditable business processes
No AF Corporate Structure Review Needed?
Build work plans
Revise
Provide to Sponsor recommended evaluation criteria for COAs to satisfy the Contextual Model
Work Plan to build the M-Implementation Plan - Tasks - Resources - Timelines - Milestones
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
Sponsor Scope Work Plan to build the M-Implementation
Obtain formal review Approved and approval to proceed
"Sandbox"
Review and Approve statement of need/problem statement and work plan with Sponsor.
Return to Material Solution Design
Validate Contextual Model content
No
Revise Execution Requirements Approved?
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
Begin 3.0
Proceed to Sponsor Decision Point
Denied Approved
Functional / SME
Functional / SME Proceed to Define Mission Processes to Deliver DOTMLPF Capability Requirements
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
All Stop Revise
Work plan approved?
Yes
Sponsor
Functional / SME Enterprise Architecture Assistance Needed?
ITLC
Complete Sub-Capability Requirement section of PRM Template
Architecture
Obtain formal Review and approval to proceed
Identify Key Performance Attributes
Report: Performance Requirements for the Capability
Capability Requirements Completion Criteria: 1. Prioritized by Sponsor 2. Satisfies all relevant LRP constraints 3. Does not duplicate other required capabilities 4. Reviewed and approved by AF Corporate Structure, as appropriate 5. Meets EA standards for representation 6. Registered in PRM 7. Performance Measures defined
Determine Sub-Capability requirements based on constraints
Yes
Sponsor
Conduct Enterprise Architecture analysis
. Determine, prioritize, and present DOTMLPF capability requirements to Sponsor
Enterprise Architecture No Assistance Needed?
Testing
Decompose Need/Problem Statement into Sub-Capabilities
Platform Engineering
Begin 1.3
ITLC
Task POCs for IMS Input Execute Appropriate IMS Activities
ITLC
Provide Sponsor Cost Estimate Updates
Participate in Kickoff Session
AQ Authority
Participate in Kickoff Session
Participate in Kickoff Session
Participate in Kickoff Session
Participate in Kickoff Session
Finance PEO/PMO Governance (C&A)
Task POCs for IMS Input
Execute Appropriate IMS Activities
Task POCs for IMS Input
Execute Appropriate IMS Activities
Task POCs for IMS Input
Task POCs for IMS Input
Task POCs for IMS Input
Execute Appropriate IMS Activities
Execute Appropriate IMS Activities
Execute Appropriate IMS Activities
Certification Package (WIP) -Net-Worthiness (Close) -ATT (Close) -ATO (Open)
Network Op's
End 1.2
Project Lead / Product Center
Analyze for relevance (Down-select pertinent LRP.)
System Engineering
Functional / SME
Report: Sub-Capabilities for the Need
Complete LRP section of PRM Template
Project Lead / Product Center
Identify Public Laws, DOD No Directives, Manuals& Instructions, and OMB, GAO, BTA Findings
Yes
Architecture
Enterprise Architecture Assistance Needed?
Platform Engineering
Begin 1.2
Testing
Gather known LRP requirements End 1.1
AQ Authority
Scope the downstream efforts to complete steps 1 and 2 (define scope, charter, schedule of milestones and deliverables, resource requirements)
Contracting
Complete Needs section of PRM Template
Finance
No
Yes
Associated PEO/PMO
Enterprise Architecture Assistance Needed?
Governance (C&A)
Draft Initial Statement of Need/Problem Statement
Sponsor
Functional/ SME
Document: Laws, Regulations and Policy constrains/ mandates with findings for relevance
"Sandbox"
Begin 1.1
System Engineering / Design
Identify relevant legal, regulatory, and policy constraints List: Laws, Regulations, Policies
Functional / SME
Go to Step 2 Start SDDP 1.0
COI/EVT
Define statement of need/problem statement Document : Statement of Need / Problem Statement
Functional/ SME
Identified Top Level Need
Functional/SME
TRM
AQ Authority Finance PEO/PMO Governance (C&A)
Step 1
Step 2
Step 3
Step 4
Step 5
Identify DOTMLPF Capability Requirements
Define DOTMLPF executable actions
Define Material Solution and Implementation Plan
Plan / implement developmental components of the Material Solution
Sustain Application Lifecycle
IMS (Close) Programmatic (Close) - Product Center Activities (Close) -Contracting Activities -Acquisition Activities - PEO Activities (Close) -Resourcing -Training -Equipment - Finance Activities (Close) -Allocate Funds -Assign Resources - Architecture Activities (Close) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Close) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Close) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Close) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Close) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (Close)
Certification Package (Close) -Net-Worthiness (Close) -ATT (Close) -ATO (Close)
Network Op's
Network Op's
Provision User Access for Prototype
Project Lead / Product Center
Project Lead / Product Center
Provision Access to trained users per phasing plan
IMS (Close) Programmatic (Close) - Product Center Activities (Close) -Contracting Activities -Acquisition Activities - PEO Activities (Close) -Resourcing -Training -Equipment - Finance Activities (Close) -Allocate Funds -Assign Resources - Architecture Activities (Close) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Close) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Close) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Close) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Close) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (Close)
Step 6 Deploy/Operate the Material Solution
The Service Development and Delivery Process Integrity - Service - Excellence
18
SDDP (6) Deploy/Operate the Material Solution STEP OUTCOMES • Ensure effectiveness of Material Solution in meeting users’ needs prior to commitment of resources to fully deploy Material Solution and DOTLPF capabilities • Ensure ongoing effectiveness of DOTMLPF solution, with fully deployed Material Solution, in meeting users’ needs PRODUCT OUTCOMES • Fully operational, deployed Material Solution within the context of the larger DOTMLPF Implementation
DEPLOYED TO PLATFORM CONFIGURED TO TECHNICAL STANDARDS
PRM
BRM
SRM DRM
Prioritization of Sub-Capability based on SME/Functional defined criteria
For the sub-capability, identify the Key Performance Attributes End 1.3
Begin 1.4
Complete performance measures and thresholds for each Key Performance Attributes of PRM Template
No
Process Information from SME
Start SDDP 2.0
Define Mission Processes to Deliver DOTMLPF Capability Requirements
Functional / SME
End 1.4
End 1.5 Engage the Enterprise Architecture Team Begin 1.5
Begin 1.6
Functional / SME
Provide basic process information to Process Team (I.E "Yellow Sticky's", "Napkins" etc)
Revisit work plan for additional resources required
Work Plan SDDP 1 & 2 - Tasks - Resources - Timelines - Milestones (from Step 1)
End 1.6
Submit Capabilities Requirements for approval
Functional / SME
No
Process Engineering Content Approved?
Yes
Ensure All expected outcomes from 1.0 are address/satisfied
Sponsor
Obtain SME Support for Process Engineering Activities
Inform/Adjudicate other processes that may be affected by modification of these processes (understand impacts)
Sponsor
Denied
All Stop
Characterize the DOTMLPF execution requirements to put the process into practice and be successful
Approved
Develop Implementation Plans
Revise
Define ROI and investment auditability
Yes
Review Capability Requirements with AF Corporate Structure
Determine Initial Scope with general cost estimate
Sponsor Approval?
All Stop
Review Approved Request SME support for and Approve, COA evaluation criteria Contextual Model development and Work Plan
Yes
Review Capability Requirements
Corporate Approval?
No
Define Start Points, Ends and Outcomes
Proceed to Sponsor Decision Point
Begin
Define Process Steps
Define required skill sets and proficiencies for each process step
Sequence Process Steps to create Discrete Process Steps including information dimension supporting process steps
Characterize Information Flows ( input, manipulation of information, output)
Process Team
Sponsor
Investigate potential solutions (COTS/GOTS/ Web Service Code / Systems) to satisfy all or part of the Contextual Model
Evaluate ability of source to satisfy part or all of Architecture No Contextual Model both from Support? a function and a feasibility of implementation
Architecture Support?
No
Generate BCA
Begin
Validation of appropriate BPR
Package BPR Assertion Documentation
BPR Assertion Complete?
No
Proceed to Process Engineering Activities
Sponsor
BRM from Step 2
Auditable Process model 1
Auditable Process model N
Yes
Capture how the user wants to use each put/get (ex. Presentation, Usability)
Capture the business rules, authorization and access rules, service requirements for each put/get within the process
Auditable Process model 2
Additional Process Flows?
Approve Review Package and Select COA?
Approved and COA Selected
Denied
AF Corporate Structure Review Needed?
Yes
Review Capability Requirements with AF Corporate Structure
Yes
Create Draft M- Implementation Plan
Receive Needs Data
Query 'As is' Repository for related LRP.
Complete Needs section of PRM Template
Achitecture Team
Identify Public Laws, DOD Directives, Manuals& Instructions, and OMB, GAO, BTA Findings
Complete LRP section of PRM Template
Query Architecture to look for similar Sub-Capabilities
Achitecture Team
Determine Sub-Capability requirements based on constraints (with user)
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Open) - Performance Measures (Open)
Report: Identified attributes to satisfy the capability
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
Based on the COA selected, commence the information analysis
Finish
System Engineering / Design Contextual model for Process 1 Contextual model for Process 2
Contextual model for Process N
System Engineering / Design
System Engineering / Design
BRM (From Step 2) -Mission Process Map (Close) -Auditable Process (Close) -Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Close)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (Open) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -Compliance Requirements (Open) -On Boarding Requirements (Open)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (Open) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -Compliance Requirements (Open) -On Boarding Requirements (Open)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (Open) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (Open) -Compliance Requirements (WIP) -On Boarding Requirements (WIP)
System Engineering / Design "Sandbox"
Process Team
Process Team
Functional/SME
Functional/SME
Task POCs for IMS Input Execute Appropriate IMS Activities
Discover existing potential solutions (COTS/GOTS / Web Service Code / Systems) to satisfy all or part of the Contextual Model
System Engineering / Design DRM -COI Charter (Open) -List of information assets (Open) -Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (WIP) -Roles and permissions (WIP) -Example Data Record (WIP) -Ontology (WIP) -Reusable COI Artifacts (WIP)
For the selected COA identify any information exchange reuse opportunities within the enterprise that will support the implementation of the contextual model
Assess capability coverage of solution options Search the Enterpise Architecture to identify additional compliance requirements
Achitecture Team
COI / EVT
COI / EVT
Governance
Governance
Identify Business / War Fighter Enterpise Architecture Compliance Requirements
For each COA, identify the inherited attributes that sufficiently satisfy the compliance requirements checklist
Identify evidence that can satisfy compliance requirements
For each COA, Identify the reuse opportunities across the enterprise to support the DOTLPF change management requirements
Approve IMS
Task POCs for IMS Input
Sponsor
Yes
SRM -Contextual Model (Close) -Web Service Code Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (WIP) -COTS/GOTS Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Open) -Reuse components (WIP) -System Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Open) -Reuse components (WIP) -Compliance Requirements (Close) -On Boarding Requirements (Close)
Update cost estimates to MImplementation Plan
Sponsor Champions ADS
Approved Update Implementation Plan
Package bounded user requirements for Product Center
Approve Bounded User Requirements? Go to SDDP Step 4
System Engineering / Design DRM -COI Charter (WIP) -List of information assets (Close) Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Open) -Reusable COI Artifacts (WIP)
DRM -COI Charter (WIP) -List of information assets (Open) Vocabulary Package (WIP) -Authoritative Data Source (ADS) Mapping (WIP) -Roles and permissions (WIP) -Example Data Record (WIP) -Ontology (WIP) -Reusable COI Artifacts (WIP)
DRM -COI Charter (WIP) -List of information assets (Close) Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Close) -Reusable COI Artifacts (WIP)
Achitecture Team
Achitecture Team
System Engineering
Participate in Kickoff Session
Execute Appropriate IMS Activities
Task POCs for IMS Input
Draft IMS (WIP) Programmatic (Open) - Product Center Activities (Open) -Contracting Activities -Acquisition Activities - PEO Activities (Open) -Resourcing -Training -Equipment - Finance Activities (Open) -Allocate Funds -Assign Resources - Architecture Activities (Open) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Open) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Open) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Open) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Open) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (Open)
DRM -COI Charter (Close) -List of information assets (Close) Vocabulary Package (Close) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Close) -Reusable COI Artifacts (Close)
DRM -COI Charter (Close) -List of information assets (Close) Vocabulary Package (WIP) -Authoritative data Source (ADS) Mapping (WIP) -Roles and permissions (WIP) -Example Data Record (WIP) -Ontology (WIP) -Reusable COI Artifacts (WIP)
SRM -Contextual Model (Close) -Web Service Code Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close)
DRM -COI Charter (Close) -List of information assets (Close) Vocabulary Package (Close) -Authoritative data Source (ADS) Mapping (Close) -Roles and permissions (Close) -Example Data Record (Close) -Ontology (Close) -Reusable COI Artifacts (Close)
SRM -Contextual Model (Close) -Web Service Code Requirements (WIP) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close)
Draft IMS (WIP) Programmatic (WIP) - Product Center Activities (WIP) -Contracting Activities -Acquisition Activities - PEO Activities (WIP) -Resourcing -Training -Equipment - Finance Activities (WIP) -Allocate Funds -Assign Resources - Architecture Activities (WIP) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (WIP) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (WIP) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (WIP) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (WIP) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (WIP)
Draft IMS (WIP) Programmatic (WIP) - Product Center Activities (WIP) -Contracting Activities -Acquisition Activities - PEO Activities (WIP) -Resourcing -Training -Equipment - Finance Activities (WIP) -Allocate Funds -Assign Resources - Architecture Activities (WIP) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (WIP) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (WIP) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (WIP) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (WIP) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (WIP)
Complete Sub-Capability Requirements section of PRM Template
Complete performance measures and Key Performance Attributes section of PRM Template
Initiate Deployment
Yes
Extract Reusable Information Exchange Assets from previous DRMs
Ensure ontology reuse
Achitecture Team
COI / EVT
COI Coordination Panel will make a recommendation to the Sponsor to either re-charter an existing COI or establish a new COI to meet information sharing requirement.
Stand Up COI
Identify authoritative and source data from a process perspective
Identify ADS
Determine access rules ,roles and permissions for assets and planned services
Develop Draft Ontology
Acquire Capability
Proceed to Step 5
Project Lead / Product Center Begin Step 4
Review Bounded User Requirements (Acquisition Strategy Package)
Identify Kickoff meeting attendees
Facilitate Kickoff Meeting
Identify the POC's that will support the Project Lead during the implementation of the Bounded User Requirements
Create Top Level IMS
Project Lead / Product Center Task POCs for IMS Input
Achitecture Team
Verify Requirements Satisfy all relevant LRP Constraints
Achitecture Team
Conduct Enterprise Architecture Analysis
Conduct Enterprise Architecture Analysis
BRM -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Close)
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
LRP Compliance Requirements Checklist -Clinger & Cohen. (Open) -PIA (Open) -FISMA (Open) -NDAA (Open) *CCA *BEA *EITDR Registration *Business Process Reengineering *Section 508 Compliance *Records Management *FISMA *ETP *Investment included in AF Budget -DIACAP (Open)
SWG review of Governance Package
LRP Compliance Requirements Checklist -Clinger & Cohen. (Close) -PIA (Close) -FISMA (Close) -NDAA (Close) *CCA *BEA *EITDR Registration *Business Process Reengineering *Section 508 Compliance *Records Management *FISMA *ETP *Investment included in AF Budget -DIACAP (Close)
Governance
Proceed To Sponsor Review of Package
Proceed To Sponsor Review of Package
No Approved
Approved?
Greater than $1M
COI Panel Review Vocabulary Package and provide Recommendations to Sponsor
Complete IMS
Task POCs to execute IMS
Identify Reuse Capability
Achitecture Team
Sponsor
M-Implementation Plan (From Step 3) -Work Break Structure/ RTM (Close) -Service Implementation Schedule (Close) -Cost Estimate (Close) -DOTLPF Change Management Plan (Close) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (Close) -Resourcing (Close)
Obtain DAA Approval for the ATO
Yes
Return to Sponsor Selected Point
No
Conduct Post Implementation Review (PIR)
Train Users Per Phasing Plan
PIR Successful?
Yes
End SDDP
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Close) -Operational Test & Evaluation Plans and Procedures (Close) -Post Implementation Review (PIR) Report (Open)
System Engineering
Execute Appropriate IMS Activities
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (Close) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (Close) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
ITLC
"Sandbox"
No
System Engineering
All Phases Complete?
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Close) -Operational Test & Evaluation Plans and Procedures (Close) -Post Implementation Review (PIR) Report (Open)
Yes
Update IMS with Fielding Activities
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Close) -Operational Test & Evaluation Plans and Procedures (Close) -Post Implementation Review (PIR) Report (Close)
Testing
Testing
OT&E and KPP evaluation of Prototype
Return to Step 5
Architecture Execute Appropriate IMS Activities
Proceed To Sponsor Review of Package
Revise Yes
CMO review of Governance Package
Approved Approved?
Revise IRB review of Governance Package
Approved?
Denied
Approved DBSMC review of Governance Package
Charter Approved by SWG?
Approved Approved?
Governance
Denied
Denied
All Stop
Denied
Governance All Stop
SWG Approval COI Vocabulary package
Yes
No
Proceed to Previous Sponsor Checkpoint
Governance
Yes
Stand Down COI
No
Participate in Kickoff Session
Platform Engineering
Task POCs for IMS Input Execute Appropriate IMS Activities
Platform Engineering
Proceed to Begin Vocabulary Work Participate in Kickoff Session
All Stop
All Stop
Register content in Business Reference Model
Proceed to Step 3
Validate BPR/process improvement effects at an enterprise level
Project Lead / Product Center
Project Lead / Product Center
Project Lead / Product Center
Project Lead / Product Center
Identify Project Lead
Project Lead / Product Center
Achitecture Team
Achitecture Team
Platform Engineering
Derive mission critical -Onboarding requirements
Define Platform Compliance Requirements
Conduct infrastructure topology analysis
Derive additional infrastructure service necessary to support COA
Platform Engineering
Platform Engineering
Platform Engineering
Determine Distributing Computing requirements
Develop service monitoring requirements
Project Lead / Product Center
Platform Engineering
Review Legacy System Requirements
Develop Service Levels Agreements (SLA's) for each layer of service
Platform Engineering
"Sandbox" Onboarding Requirements (Close) -Mission Critical Requirements (Close) -Topology Requirements (Close) -Additional Infrastructure Requirements (Close) -Distributing Components Requirements (Close) -Service Monitoring Requirements (Close) -SLAs (Close) -Onboarding Compliance Requirements (Close)
Onboarding Requirements (close) -Mission Critical Requirements (Close) -Topology Requirements (Close) -Additional Infrastructure Requirements (Close) -Distributing Components Requirements (Open) -Service Monitoring Requirements (Open) -SLAs (Open) -Onboarding Compliance Requirements (Close)
Ensure processes adequately define context for information assets
Participate in Kickoff Session
Onboarding
Capture DOTMLPF interdependencies (temporal, decisional, informational) to other processes
Ensure other processes that may be affected by modification of these processes have been identified and impacts addressed
Return to Step 5
Approved and Ready to Field?
Platform Engineering
Platform Engineering
No
Provision Prototype to operational environment
Install Prototype
Install Successful?
Yes
Provision Per Phasing Plan
BCL Compliance Governance
Proceed To Sponsor Review of Package
BRM -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Open)
BRM -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Open)
Conduct Enterprise Architecture analysis
Determine potential duplication/conflict with other enterprise requirements
"Sandbox"
Update DOT_LPF Implementation Plan
Task POCs for IMS Input
Architecture
COI / EVT Generate Vocabulary Package
Assessment of Prototype
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (Close) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
Complete Help Desk Training
SRM -Contextual Model (Close) -Web Service Code Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Detailed Design Requirements (Open) -Automated Information Assets (Close) -Reuse components (Close) -COTS/GOTS Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -System Requirements (Close) -Information Exchange Requirements (Close) -Functional Requirements( Close) -Service Levels (Close) -Automated Information Assets (Close) -Reuse components (Close) -Compliance Requirements (Close) -On Boarding Requirements (Close) __________AS Deployed_____________ Version Reference to Deployed Software Repository (Close) - Source Code Reference (Close) - Training Material (Close) - Test Results (Close) -Operational Test & Evaluation Report (Open) -Operational Test & Evaluation Plans and Procedures (Open) -Post Implementation Review (PIR) Report (Open)
Achitecture Team Participate in Kickoff Session
COI Coordination Panel reviews charter and provides a recommendation to the Sponsor
User Evaluation of Prototype
Deployment Package -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (WIP) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
ITLC Help Desk Prototype Training
Provide LRP compliance requirements checklist for each COA
Revise
Ensure alignment with AF Strategy
Sponsor
Perform User training for Prototype
Deployment Package (From Step 5) -Deployment Tech Order (Close) - Executable Code (Close) - Help Desk Guidance (Close) - Training Materials (Close) - Configuration Instructions (Close) - Installation Instructions (Close) -SysAd Instructions (Close) -Monitoring Instructions (Close) -Deployment Readiness Assertion (Close) -C&A Certification package (Close) -iTRM Application Alignment Assertion (Close) -User's Evaluation Assertion (WIP) -Functional & Performance Assertion (Close) -Net-Worthiness (Close)
Begin Step 6
"Sandbox"
Information Exchange Reuse?
COI / EVT
Functional / SME M-Implementation Plan (From Step 3) -Work Break Structure/ RTM (Close) -Service Implementation Schedule (Close) -Cost Estimate (Close) -DOTLPF Change Management Plan (Close) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (Close) -Resourcing (Close)
No
System Engineering
IMS (Close) Programmatic (Close) - Product Center Activities (Close) -Contracting Activities -Acquisition Activities - PEO Activities (Close) -Resourcing -Training -Equipment - Finance Activities (Close) -Allocate Funds -Assign Resources - Architecture Activities (Close) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Close) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Close) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Close) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Close) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activit
Operational Baseline
COI / EVT
User Evaluation of Prototype
Engage users for Prototype Training
Participate in Kickoff Session Execute Appropriate IMS Activities
Revise
Yes
Testing
Execute Appropriate IMS Activities Task POCs for IMS Input
Testing
"Sandbox"
Identify existing Key Performance Attributes to satisfy the Sub-Capability,
Functional / SME
Functional / SME
No
Sponsor Call Kickoff Meeting
Proceed to COA Evaluation Decision
No
Submit COI Charter to SWG
Match Compliance Requirements to individual information exchanges, services and function
Identify additional information exchanges requiring new implementation
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Detailed Design Requirements (Open) -Automated Information Assets (Open) -Reuse components (WIP) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -Compliance Requirements (WIP) -On Boarding Requirements (Close)
SRM -Contextual Model (Close) -Web Service Code Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements( Open) -Service Levels (Open) -Automated Information Assets (Open) -Detailed Design Requirements (Open) -Reuse components (WIP) -COTS/GOTS Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -System Requirements (Open) -Information Exchange Requirements (Open) -Functional Requirements (Open) -Service Levels (Open) -Automated Information Assets (Open) -Reuse components (WIP) -Compliance Requirements (WIP) -On Boarding Requirements (Close)
BRM (From Step 2) -Mission Process Map (Close) -Auditable Process (Close) - Business Rules (Close) -Dependencies (Close) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Close)
Target CEIT Baseline
End Process Engineering
Draft a new COI charter or revise existing COI Charter
Prepare Bounded User Requirements for Implementation
Proceed to Begin Vocabulary Work
Sponsor Initiate COI Coordination
Identify reuse opportunities for Web Services, Point to Point Interfaces, Data Services, and Exposure Services
No
Achitecture Team
Characterize Information Assets needed for Information Flows
BRM -Mission Process Map (Close) -Auditable Process (WIP) - Business Rules (Close) -Dependencies (Open) Information Assets (Close) -Information Flows (Close) -BPR Assertion Documentation (Open)
High Level Process describing expected outcomes
Identify information exchanges / assets
Denied
Revise
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
Functional / SME
Proceed Back to Beginning of Step 4
Bounded User Requirements - M Implementation Plan -SRM -DRM
Obtain DAA Approval for the ATT for the Prototype
Assemble Governance package
No
Define Initial Functional Requirements to implement information exchanges
Process Engineering Completion Criteria: A. Define process steps inputs and outputs. (Note: Put/Gets of Information Assets are process steps) B. Define business rules for each process step, including manipulations to information needed for process step, creation of record/store, workflow C. Define decisions taken in the step D. Define outputs from process steps, including information outputs to store or to next process step
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Close) - Performance attributes (Close) - Performance Measures (Close)
Governance
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (WIP) - Performance attributes (Open) - Performance Measures (Open)
Participate in Kickoff Session
"Sandbox"
M-Implementation Plan -Work Break Structure/ RTM (Close) -Service Implementation Schedule (Close) -Cost Estimate (Close) -DOTLPF Change Management Plan (Close) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (Close) -Resourcing (Close)
M-Implementation Plan -Work Break Structure/ RTM (WIP) -Service Implementation Schedule (WIP) -Cost Estimate (WIP) -DOTLPF Change Management Plan (WIP) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (WIP) -Resourcing (WIP)
Information Analysis
Sponsor
Approve COI vocabulary package Corporate Approval?
No
No
ITLC
Architecture Team
SubCapability PRM Tree N.
SubCapability PRM Tree 2.
Project Lead / Product Center
SubCapability PRM Tree 1. Needs PRM
Platform Engineering
PRM - Needs (Close) - LRP (Close) - Sub-capabilities (Open) - Performance attributes (Open) - Performance Measures (Open)
Architecture Team
PRM - Needs (Close) - LRP (WIP) - Sub-capabilities (Open) - Performance attributes (Open) - Performance Measures (Open)
Functional / SME
M-Implementation Plan -Work Break Structure/ RTM (WIP) -Service Implementation Schedule (WIP) -Cost Estimate (WIP) -DOTLPF Change Management Plan (WIP) -Governance Package (Close) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Close) -Approval Signatures (Close) -Compliance Completion Plan (Close) -Onboarding Plan (WIP) -Resourcing (WIP)
Sponsor Revise
Conduct Cost Estimates for each COA
Information Exchange Requirements
For each information flow describe the business rules and service levels requirements necessary to meet the process
"Sandbox" PRM - Needs (Close) - LRP (Open) - Sub-capabilities (Open) - Performance attributes (Open) - Performance Measures (Open)
Functional / SME
"Sandbox" M-Implementation Plan -Work Break Structure/ RTM (WIP) -Service Implementation Schedule (WIP) -Cost Estimate (WIP) -DOTLPF Change Management Plan (WIP) -Governance Package (WIP) -IT Dashboards (Close) -BPR Assertion (Close) -Funding Profile (Close) -CMO Determination Memo - If Greater than $1M (Open) -Approval Signatures (Open) -Compliance Completion Plan (Close) -Onboarding Plan (WIP) (from SRM) -Resourcing (WIP)
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (Close) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (Close) - Reusability (Close) - Dependencies (Close) - Constraints (Close) -COA Change Management Plan (Close) -COA Cost Estimates (Close)
Sponsor For each COA determine the scope, scalability and degree of difficultly of its associated DOTLPF change management requirements
Define impacts for each COA to DOTLPF necessary to support the material solution
Yes Define the information flow necessary to satisfy each put/get from the process
Contextual Model -Information Puts/Gets (WIP) -Business Rules (WIP) -Authorization and Access (WIP) -End User Design Guidelines (WIP)
No
All Stop
Functional / SME
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (Close) - Reusability (Close) - Dependencies (Close) - Constraints (Close) -COA Change Management Plan (Close) -COA Cost Estimates (Close)
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (WIP) - Reusability (Close) - Dependencies (Close) - Constraints (Close) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Close) -Onboarding Compliance Rqts (Close) -BEA Compliance Rqts (Close) -LRP Compliance Rqts (Close) -COA DOTLPF Impact Analysis (Open) - Reusability (Open) - Dependencies (Open) - Constraints (Open) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
Develop COAs that align the best uses of the various sources (combination of sources may be the most efficient path) to satisfy the Contextual Model
Yes
Yes
All Stop
Conduct Process Engineering
AF Corporate Structure Review Needed?
Build evaluation criteria for COAs to satisfy the Contextual Model
All Stop
Lift information puts/gets for each process model
Yes
Approved
Denied Revise
Process Team
Sponsor
No Revise
Sponsor
Denied All Stop
Sponsor
Update DOTMLPF Implementation plan
Proceed to Sponsor Decision Point
Proceed Previous Sponsor Decision Point Approved
Approved Prioritized Sub-Capabilities Requirements?
Approved
Sponsor
Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (Close) -COA Components (Close) -COA Sequence (Close) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Open) -Onboarding Compliance Rqts (Open) -BEA Compliance Rqts (Open) -LRP Compliance Rqts (Open) -COA DOTLPF Impact Analysis (Open) - Reusability (Open) - Dependencies (Open) - Constraints (Open) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
Sponsor
Revise
SME Validation of Yes Contextual Model?
Design Contextual Model
Architecture Team
Sponsor All Stop
Get SME validation on contextual model
All Stop
Corporate Approval?
Yes Denied
Denied
Functional / SME
Functional / SME Sponsor Review Package -PRM (Close) -BRM (Close) -SRM (WIP) -COA Package (WIP) -COAs (WIP) -COA Components (Open) -COA Sequence (Open) -COA Evaluation Criteria (Close) -COA Compliance Requirements (Open) -Onboarding Compliance Rqts (Open) -BEA Compliance Rqts (Open) -LRP Compliance Rqts (Open) -COA DOTLPF Impact Analysis (Open) - Reusability (Open) - Dependencies (Open) - Constraints (Open) -COA Change Management Plan (Open) -COA Cost Estimates (Open)
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
Build Material Solution Implementation Plan
Start Material Solution Design
Denied
Approval Success Criteria A. Institutionalization of business processes through AFI/policy documentation (includes LRP) B. Prioritization of information assets by SRA D. Validation of adherence to EA standards by CIO F. Obtain approval to execute requirements to put the process into practice from appropriate authority (depending on scope) G. Capture auditable process models into Business Reference Model H. Contextual description of information assets clearly delineated from information flows within auditable business processes
No AF Corporate Structure Review Needed?
Build work plans
Revise
Provide to Sponsor recommended evaluation criteria for COAs to satisfy the Contextual Model
Work Plan to build the M-Implementation Plan - Tasks - Resources - Timelines - Milestones
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
Sponsor Scope Work Plan to build the M-Implementation
Obtain formal review Approved and approval to proceed
"Sandbox"
Review and Approve statement of need/problem statement and work plan with Sponsor.
Return to Material Solution Design
Validate Contextual Model content
No
Revise Execution Requirements Approved?
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
Begin 3.0
Proceed to Sponsor Decision Point
Denied Approved
Functional / SME
Functional / SME Proceed to Define Mission Processes to Deliver DOTMLPF Capability Requirements
DOTMLPF Implementation Plan -Characterized execution requirements -ROI and investment auditability -Work plans -BCA
All Stop Revise
Work plan approved?
Yes
Sponsor
Functional / SME Enterprise Architecture Assistance Needed?
ITLC
Complete Sub-Capability Requirement section of PRM Template
Architecture
Obtain formal Review and approval to proceed
Identify Key Performance Attributes
Report: Performance Requirements for the Capability
Capability Requirements Completion Criteria: 1. Prioritized by Sponsor 2. Satisfies all relevant LRP constraints 3. Does not duplicate other required capabilities 4. Reviewed and approved by AF Corporate Structure, as appropriate 5. Meets EA standards for representation 6. Registered in PRM 7. Performance Measures defined
Determine Sub-Capability requirements based on constraints
Yes
Sponsor
Conduct Enterprise Architecture analysis
. Determine, prioritize, and present DOTMLPF capability requirements to Sponsor
Enterprise Architecture No Assistance Needed?
Testing
Decompose Need/Problem Statement into Sub-Capabilities
Platform Engineering
Begin 1.3
ITLC
Task POCs for IMS Input Execute Appropriate IMS Activities
ITLC
Provide Sponsor Cost Estimate Updates
Participate in Kickoff Session
AQ Authority
Participate in Kickoff Session
Participate in Kickoff Session
Participate in Kickoff Session
Participate in Kickoff Session
Finance PEO/PMO Governance (C&A)
Task POCs for IMS Input
Execute Appropriate IMS Activities
Task POCs for IMS Input
Execute Appropriate IMS Activities
Task POCs for IMS Input
Task POCs for IMS Input
Task POCs for IMS Input
Execute Appropriate IMS Activities
Execute Appropriate IMS Activities
Execute Appropriate IMS Activities
Certification Package (WIP) -Net-Worthiness (Close) -ATT (Close) -ATO (Open)
Network Op's
End 1.2
Project Lead / Product Center
Analyze for relevance (Down-select pertinent LRP.)
System Engineering
Functional / SME
Report: Sub-Capabilities for the Need
Complete LRP section of PRM Template
Project Lead / Product Center
Identify Public Laws, DOD No Directives, Manuals& Instructions, and OMB, GAO, BTA Findings
Yes
Architecture
Enterprise Architecture Assistance Needed?
Platform Engineering
Begin 1.2
Testing
Gather known LRP requirements End 1.1
AQ Authority
Scope the downstream efforts to complete steps 1 and 2 (define scope, charter, schedule of milestones and deliverables, resource requirements)
Contracting
Complete Needs section of PRM Template
Finance
No
Yes
Associated PEO/PMO
Enterprise Architecture Assistance Needed?
Governance (C&A)
Draft Initial Statement of Need/Problem Statement
Sponsor
Functional/ SME
Document: Laws, Regulations and Policy constrains/ mandates with findings for relevance
"Sandbox"
Begin 1.1
System Engineering / Design
Identify relevant legal, regulatory, and policy constraints List: Laws, Regulations, Policies
Functional / SME
Go to Step 2 Start SDDP 1.0
COI/EVT
Define statement of need/problem statement Document : Statement of Need / Problem Statement
Functional/ SME
Identified Top Level Need
Functional/SME
TRM
AQ Authority Finance PEO/PMO Governance (C&A)
Step 1
Step 2
Step 3
Step 4
Step 5
Identify DOTMLPF Capability Requirements
Define DOTMLPF executable actions
Define Material Solution and Implementation Plan
Plan / implement developmental components of the Material Solution
Sustain Application Lifecycle
IMS (Close) Programmatic (Close) - Product Center Activities (Close) -Contracting Activities -Acquisition Activities - PEO Activities (Close) -Resourcing -Training -Equipment - Finance Activities (Close) -Allocate Funds -Assign Resources - Architecture Activities (Close) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Close) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Close) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Close) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Close) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (Close)
Certification Package (Close) -Net-Worthiness (Close) -ATT (Close) -ATO (Close)
Network Op's
Network Op's
Provision User Access for Prototype
Project Lead / Product Center
Project Lead / Product Center
Provision Access to trained users per phasing plan
IMS (Close) Programmatic (Close) - Product Center Activities (Close) -Contracting Activities -Acquisition Activities - PEO Activities (Close) -Resourcing -Training -Equipment - Finance Activities (Close) -Allocate Funds -Assign Resources - Architecture Activities (Close) -Air Force EA Compliance -Air Force EA artifact generation -FEA, DOD EA, BEA Compliance Engineering - System Engineering Activities (Close) -SEMP/TEMP Update Activities -Requirement traceability activities -Compliance/Certification Activities -Help Desk Activities -Versioning and CM activities -Data Deployment Strategy Service -Development (Close) -Component Designs -Blue Printing -COTS Product Configuration -Code Generation -Developer Testing -Pre-Deployment Activities (Close) -Platform Engineering Activities -Test environment definition -Test environment provisioning -Platform Adjustment and Tuning Activities -Platform provisioning -Security Activities -Data Deployment Strategy -Service Deployment Strategy -Legacy System Interface Engineering Activities -Testing Activities -Government Unit acceptance Testing -Platform Integration Testing -Performance Measurement Testing -Deployment Activities (Close) -Monitoring Activities -Maintenance Support Activities -COOP -Failover and Recovery activities -Product Deployment Activities -Deployment Strategy -Operations & Sustainment (Close)
Step 6 Deploy/Operate the Material Solution
The Service Development and Delivery Process Integrity - Service - Excellence
19
The Way Ahead Together CONTENT DELIVERY
PITP
APPLICATION
DOTMLPF INFORMATION ASSET MANAGEMENT COI SUPPORT SERVICE DEVELOPMENT AGGREGATION
DATA SOURCING SERVICE DEVELOPMENT
BEHAVIORAL TOOLS
LIFECYCLE INTEGRATION
SERVICE DEVELOPMENT PRESENTATION/ DASHBOARDS/MASHUPS PRESENTATION SECURITY DESIGN
LIFECYCLE MGMT DESIGN
CAPABILITY DESIGN
Service Lifecycle Management
PROCESS DESIGN SERVICES
METADATA ENGINES
SESSION TOOLS / MIDDLEWARE VIRTUALIZATION
TRANSPORT NETWORK CONNECTIVITY
DATA LINK
SVC LEVEL MANAGEMENT DESIGN SERVICE LEVEL INTEGRATION
Service Level Management
CONTENT GENERATION
TECH R&D
ARCHI TECT URE
TRANSPORT EXPOSURE HW PHYSICAL
Integrity - Service - Excellence
20
QUESTIONS Integrity - Service - Excellence
21