Dec 3, 2015 - ... temperature components identified. â¢. Prototype designed, circuit board ordered. Dewar. â¢. Subcont
Mar 28, 2017 - Simulation of Power Generation. ⢠Cost Estimations ... Understanding the state of supercritical geother
Mar 28, 2017 - Final Conference. DESCRAMBLE Project. Conclusive Remarks. Ruggero Bertani â head of geothermal innovati
decades. 2D and 3D seismic survey data highlighted an important deep seismic marker named âK-horizonâ culminating be
Sep 8, 2016 - DESCRAMBLE's scope is the development of new drilling technologies and concepts for geothermal energy expl
unconventional well controll (Well Head,. BOP, MPDS, cementing strategy, mud logging, cooling system) by monitoring micr
Oct 27, 2016 - GEOTHERMAL ENERGY. Project acronym: DESCRAMBLE. Drilling in dEep, Super-CRitical AMBient of. continentaL
Oct 27, 2016 - Coordinating entity: ENEL GREEN POWER (EGP). Via Andrea Pisano 120 â 56122 Pisa - Italy. Coordinator: D
Geothermal Energy. Ref n.ber 640573. Replicability. Actual technologies for geothermal power production are not directly
Sep 12, 2017 - and demonstrate novel drilling techniques to control gas emissions, the aggressive environment and the hi
Sep 18, 2008 - be treated adequately in order to achieve the aim of therapy: cure or ..... Juxta-visceral nodes: pre-laryngeal, pre-thyroid, pre-tracheal and latero ...
Dr. Ruggero Bertani, Enel GP. This is to certify that the DESCRABLE Project website is online and can be reached at the
emphasis is placed on considering project definition as an adaptive process that .... the problem required re-formulation and analysis after each phase gate.
Oct 28, 2015 - Edited by: Marek McGann,. Mary Immaculate College, Ireland. Reviewed by: Martin Lages,. University of Glasgow, UK. Amanda Jane Barnier,.
centrally managed system of hardware, software, and data resources. It started its ... DEEPEGS), Nobukazu Soma (JBBP, te
Apr 11, 2012 ... Project Context Definition Method. Sergio F. Ochoa, Alcides Quispe, Julio Ariel
Hurtado, Cecilia Bastarrica. Computer Science Department ...
Apr 11, 2012 - In software development it is clear that the projects' context determines ... a software company to tailor its organizational software process.
most authoritative definition is that given in BS 6079 'Guide to Project
Management'. This states ... 2 The project must be accomplished within the
budgeted cost;.
Failure to meet protection and associated participation goals in the County will trigger the traditional regulatory appr
The activation of automatic alert system for seismic event with magnitude > 1.5 occurring near the ... In general, th
Apr 4, 2011 - 2003-2011 Business Performance Pty Ltd www.businessperform.com .... Training Project Plan Template/Guide.
provides a formal definition for 'project governance' based on a Delphi study. ... legislation in the form of the Sarbanes Oxley Act (The United States of America, ...
Glenn Ballard. 2 .... research (Whelton and Ballard 2001a, 2001b & 2001c). .... the client decides on the facility purpose which demands high functional performance ..... Dissertation, School of Civil Engineering, University of Leeds, Leeds, UK.
Mar 28, 2018 - Introduction: the seismic K horizon. ⢠The VSP (zero and offset) survey: - Indication on target depth.
DESCRAMBLE Project VSP and target definition S. Ciuffi – M. Casini
28/03/2018
Final meeting – PISA
28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
Agenda • Introduction: the seismic K horizon •
The VSP (zero and offset) survey: - Indication on target depth
• The 3D seismic volume interpretation - Mining target definition - Well project •
Final remarks based on drilling outcomes
28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
Introduction The K horizon
• The K horizon is a seismic reflector present in the whole Larderello-Travale geothermal area • Its 3D reconstruction was done through the interpretation of 2D/3D seismic data in time
Larderello Lago
Travale
Venelle_2 well
• In the Lago area, where the Venelle_2 well is located, the K horizon reaches its shallowest elevation (about 3000 - 3500m depth) • Depth estimation from velocity information coming from VSP and logs data
28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
K horizon interpretation 3D seismic in time – Random line from the 3D Val di Cornia seismic volume in time
28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
•
Presence of reflections associated to the H and K horizons
•
Lateral variation of the K horizon signal characteristics
•
Uncertainty in the interpretation of the reflections belonging to the two seismic horizons
•
Critical conditions have been encountered during drilling of the S.Pompeo_2 well
•
The critical conditions, potentially associated to the K horizon, require a particular effort for the determination of its depth
VSP survey Acquisition layout
•
Zero offset VSP: source air-gun
•
Offset VSPs: vibroseis
•
3 component geophone
•
Investigated depth interval: 0 – 1600m
•
Acquired levels: - every 100m between 0 and 900m - every 20m between 900 and 1600m
80 m3/h of water were injected to cool the well Water level at about 700m
28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
Zero and offset VSP Acquisition
Dual G-Gun Array 2x 250 cubic inch
Pit location 53,7 m in south-west direction
28/03/2018
Pit dimension: 4X4 m at the base Pit depth: 5m
DESCRAMBLE Project final meeting – VSP and target definition
Offset VSP source: 4 vibroseis Sweep: 5 x 16sec Frequency range: 8 -100 Hz
Zero-offset VSP P raw stacked data Acquisition layout
Processed levels Processed interval between 900 and 1600m
28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
Velocity function
P wave upgoing field (time)
K horizon Comparison between surface and VSP seismic data
Good correlation between the VSP and surface seismic data in time
28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
Offset 1 Acquisition layout
Stack of Z correlated component
VSP-CDP transform of P upgoing wavefield
H
Source point
28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
Offset 2 Acquisition layout
Stack of Z correlated component
VSP-CDP transform of P upgoing wavefield
K? Source point
28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
Offset 3 Acquisition layout
Stack of Z correlated component
VSP-CDP transform of P upgoing wavefield
H K
Source point
28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
11
Offset - VSPs VENELLE_2 OFFSET- 2
OFFSET - 1
VENELLE_2
OFFSET- 3 OFFSET - 2
The VSP surveys at the Venelle_2 well identified the top of the K horizon at 3200/3300 m TVD OFFSET - 1 OFFSET- 3
H K
28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
K?
Seismic interpretation Venelle_2 well
VENELLE_2 (2232m)
KOP (1030m)
Why we have decided to point the well path in the south - west direction? VENELLE_2 DEEPENIG (2909m)
VENELLE_2 PRJ (3400m)
28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
Seismic interpretation 3D seismic layout
Available data for the target interpretation:
VENELLE_2
K horizon
N
28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
•
VSP
•
Piggy Back
•
Well data
•
2D seismic lines
•
3D seismic volume
Seismic interpretation The mining target
VENELLE_2
K horizon
N
28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
Seismic interpretation The mining target
The interpretation of seismic target (K horizon) in the area of the Venelle_2 well.
VENELLE_2
K horizon
N
28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
Seismic interpretation The mining target
The interpretation of seismic target (K horizon) on the whole seismic volume.
VENELLE_2
K horizon
N
28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
Seismic interpretation The K horizon
The top of the K horizon and lack of seismic signal below the Venelle_2 well.
VENELLE_2
K horizon
N
28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
Seismic interpretation The K horizon
The K horizon as a continuous surface interpolating the 2D and 3D seismic data.
VENELLE_2
K horizon
N
28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
Seismic interpretation The lack of the K horizon
The K horizon seems to lose its lateral continuity.
VENELLE_2
The areas that are marked by absence or weakness of seismic reflections, have been excluded from the potential target.
K horizon in time 28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
VENELLE_2
K horizon RMS amplitude
Seismic interpretation The Venelle_2 deepening project
The area characterized by better seismic signal is considered more reliable. 21 VENELLE_2
Deepening project towards southwest, to cross the strong seismic reflections.
VENELLE_2 PRJ
K horizon
N
28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
Seismic interpretation The Venelle_2 deepening project
VENELLE_2 VENELLE_2 PRJ
K horizon
N
28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
Presence and weakness of the seismic reflections VENELLE_2
VENELLE_2
K horizon
K horizon 28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
Mining target Venelle_2 deepening project W-NW
E-SE
MAIN PARAMETERS OF THE DRILLING PROJECT
KOP
• • • • VENELLE_2
Kick off point (KOP): 1030 m MD Direction: N200°E Build up rate: 1°/100 m Off-set from well head: 100m
The inferred H and K horizons are very close to each other.
VENELLE_2 PRJ
H horizon
VENELLE_2
K horizon VENELLE_2 PRJ
K horizon 28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
H and K horizons seem to be separated by the presence of a transition zone characterized by a decrease in the amplitude of the seismic signal. H and K have been interpreted as two separate horizons.
Mining target H and K horizons
Based on velocity values coming from the integration between the VSP data and available check-shots in the area, the estimated depths are as follows:
VENELLE_2
VENELLE_2 PRJ
H horizon
Top H horizon: 2750-2800m TVD Top K horizon: 3150-3200m TVD
K horizon
28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
N
Mining target Velocity model
VENELLE_2
VENELLE_2
VENELLE_2 PRJ
In terms of the depth of the seismic reflections (H and K), the same results were obtained by the conversion of the seismic data using an integrated velocity model. 28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
VENELLE_2 PRJ
The velocity model allowed to reconstruct the surfaces of the H and K horizons in depth.
Seismic interpretation Results W-NW
E-SE
The Venelle_2 deepening has been drilled up to 2909 m MD.
KOP
From the analysis of the data acquired during the drilling (LOT, cores, PLC, temperature, ROP), one can safely assert that the shallower reflections related to the H horizon have been reached and crossed entirely.
VENELLE_2 VENELLE_2 DEEPENING
H horizon
VENELLE_2
The depths relevant to the K horizon do not seem to have been reached.
K horizon VENELLE_2 PRJ VENELLE_2 PRJ
K horizon 28/03/2018
DESCRAMBLE Project final meeting – VSP and target definition
The research leading to these results has received funding from the European Union’s Horizon2020 Research and Innovation Program under grant agreement No 640573 (Project DESCRAMBLE)