Jul 8, 2016 - In design, build 2017. $1,021,701. $800,000. 5000 ... In design, build in 2016. $230,850. 8034 ... East of
Engineering Department Construction Project Status as of July 8, 2016 Road Task Name Flood - Big Thompson US 34 Bridges Reconstruction of CR 11C roadway
Area US 34 btwn Loveland & Estes Park from Boise to CR 28 (57th St)
CR 18 BR18-0.4-23E RAMP Hwy 14 & SH 14 Greenfields BR 3-0.2-50 CR 3 replacement CR 17 - CR 16 to Hwy CR 17 287 Reconst
Loveland
CR 70 Reconstuct Intersection improvements and CR 28 signal Trail Front Range Trail Carter Carter Lake Lake Improvements Lvld to FtC Trail Trail Longview Trail CR CR 68/CR 9 Intersect 68/CR9 Imp CR 3
CR3 2016 Overlay Project CR 15 2016 Overlay Project Flood - CR 15 Bridge CR 15 replacement CR 29, 22H, Flood - CR 29 & 22H & 31D 31D
Fort Collins Northeast Fort Collins Berthoud/Loveland Owl Canyon between CR15 & CR 19
Loveland
SH 392 to Boyd Lake
Description Permanent repairs to bridges Reconstruction of Roadway including spillway Replace box culvert on CR 18 west of Loveland
North Wellington area Hwy392 to CR 30 Various South Loveland
Construct Fall 2016 Open house July 20th, construction start in 2017
Grant
Project # 0
$2,700,000
305
$250,000
312
Realign frontage roads On CR 3 north of CR 50 over Larimer County Design 2016, construct 2017 Canal
$2,100,000
$1,680,000
314
$800,000
$640,000
315
Widen to 3 lane section with 6' shoulders
Design 2016 & Construct 2018
$5,000,000
$2,865,000
317
Reconstruction of chip seal road
Preliminary design 2016
$5,000,000
322
CR 28/ CR 13E (57th St / Monroe)
Final design, construct 2016
$350,000
323
Connect Front Range Trail between FC & Lvld
In design, build 2017
$1,021,701
In Design
$1,000,000
Carter Lake South Shore Campground improvement CR 17 (Shields/Taft)
Status Waiting on CDOT plans for US 34 In design, construct 2016 & 2017
Total Estimated Cost
Connect Longview Trail between FC & Lvld Design 2016. Construct 2017 Drainage improvements at intersection, storm sewer pipe drainage & gravel road improvements Annual overlay program Widen & Overlay - CR 14 to CR 16 Permanent repair - replace bridge over Little Thompson
South of Berthoud East of Dam Store, mouth of canyon near Sylvan Repair flood damaged sections Dale Ranch Redstone Canyon north of Replace damaged culverts in Red Stone CR 25E Flood - CR 25 E culverts Masonville Canyon & repair landslide area
In design, build in 2016 In design, construct 2016 & 2017. Construction starts August Construction starts August
$5,200,864
$800,000
5000 5022
$1,999,550
$230,850
5030 8034
$350,000 $3,000,000 part of overlay program
8316 9069 9069
In preliminary design
$4,205,000
$3,700,400
9310
In construction Construct in 2016 & 2017. Open House July 21st
$7,460,055
$6,564,848
9319
$1,277,500
$1,124,200
9321
Road Task Name CR 44H Flood - CR 44H
Area Description Upper Buckhorn Canyon, south of Stove Prairie Reconstruct 10.5 miles
CR 47 Flood - CR 47 US 36 to Big Elk Meadows Flood - Fish Creek Fish www.fishcreekcorridor Creek repair.com Estes Park Flood - CR 43 CFL CR 43 www.lcr43.com Glen Haven West Flood - West Creek Glen Haven Creek Structures
Reconstruct 2.5 miles
Lions Park Bank restoration
Bank restoration & armorment due to damage Roadway reconstruction & drainage improvements
Smithfield PID
Town of LaPorte Southwest corner I25/Mulberry
Estes Park - Utility and road repair CFL rebuilding roadway through design/build process Replace 3 structures on West Creek
Status Design is underway. Construction in 2017 & 2018 Design is underway. Construction in 2017 & 2018
Total Estimated Cost
Grant
Project #
$25,000,000
$22,000,000
9330
$9,871,000
$8,686,480
9332
$9,875,000
$8,690,000
9339
$38,000,000
$38,000,000
9386
Construction starts August In construction. 2 phases phase 1 complete phase 2 is planting & trail start in August. Parking lot is open
$2,670,000
$2,349,600
9429
$450,000
$393,750
9432
Design 2016 & Construct 2017
$2,200,000
Road construction starts 2016 & continue into 2017. Ribbon cutting 7/14/16
8500