attempt to develop an EGS beneath the city of Basel, Switzerland. Enhanced Geothermal Systems. EGS, also known as the âhot dry rockâ or. âhot fractured rockâ ...
Eos, Vol. 90, No. 32, 11 August 2009
Volume 90
number 32
11 AUGUST 2009 EOS, Transactions, American Geophysical Union
pages 273–280
Enhanced Geothermal Systems: Mitigating Risk in Urban Areas PAGES 273-274 With the global challenge to satisfy an increasing demand for energy while at the same time stabilizing or reducing carbon dioxide (CO2) concentrations in the atmosphere, geothermal energy from enhanced geothermal systems (EGSs) increasingly is being recognized as an attractive alternative energy source throughout the world. However, the risks associated with the seismicity necessarily induced during the development of an EGS constitute a significant challenge for the widespread implementation of this technology. This article provides a preliminary overview of lessons learned from an attempt to develop an EGS beneath the city of Basel, Switzerland.
Enhanced Geothermal Systems EGS, also known as the “hot dry rock” or “hot fractured rock” technique, refers to a technology that uses hydraulic stimulation of a hot (T > 100ºC) but comparably impermeable (κ 3 kilometers) to create an artificial geothermal reservoir. During hydraulic stimulation, fluids are pumped under high pressure into a target area in which pore pressure increases as the fluid propagates away from the injection well and fracturing of the host rock occurs. Research studies (see review by Tester et al. [2006]) at various sites around the world have confirmed that seismicity associated with EGSs is dominated by shear failure of favorably oriented natural joints as a response of normal stress reduction due to high-pressure fluid injection. The permeability inside the stimulated rock volume is thought to increase due to a selfpropping effect that inhibits the complete closure of the naturally rough fracture surfaces after they have experienced slip. The ruptures generate elastic waves detectable by sensitive seismic networks. Therefore, T. Kraft, P. M. Mai, S. Wiemer, N. Deichmann J. Ripperger, P. K ästli, C. Bachmann, D. Fäh, J. Wössner, and D. Giardini
seismic monitoring techniques are routinely applied at EGS sites to map the spatial and temporal development of the stimulated volume and to characterize the geothermal reservoir. Once a sufficiently large reservoir (volume > 1 cubic kilometer) has been developed, additional production wells are drilled into the stimulated volume to extract heat from the rock mass by circulating fluids through the enhanced fracture network.
The Basel Deep Heat Mining Project One of the first purely commercially oriented EGS projects, the Deep Heat Mining project, was initiated in Basel, Switzerland (Figure 1), in 1996 by an industry consortium (GeoPower Basel, or GPB). Basel, the industrial center of Europe’s chemical and pharmaceutical industry, borders France and Germany, and more than 700,000 people live in the trinational agglomeration area. In October 2006, the injection well that was drilled in an industrial zone in Basel reached its final depth of 5 kilometers in the granitic basement. Beginning on 2 December 2006, water was injected into the well with increasing flow rates [Häring et al., 2008] (Figure 2). Seismicity was monitored by six borehole seismometers near the injection well and by up to 30 seismic surface stations in the Basel area. Because of strongly increased seismic activity, which included a local magnitude (ML) 2.7 event, injection had already been stopped a few hours prior to a ML 3.4 event that occurred on 8 December 2006. This earthquake rattled the local population and received international media attention. Slight nonstructural damage, such as fine cracks in plaster, corresponding to an intensity of V on the European Macroseismic Scale (EMS-98), has been claimed by many homeowners, with a damage sum, already paid by GPB’s insurance, of US$7 million. In addition, one of the directors of the project is facing prosecution before the criminal court of Basel. About 1 hour after the ML 3.4 event, bleedoff to release pressure was initiated by opening the injection well, and hydrostatic down-
Fig. 1. Seismic network in Basel, Switzerland. An epicenter map of the fluid injection– induced seismicity recorded by the seismic network, indicating high event densities in hot colors, is shown in the inset.The limits of the epicenter map are given by the red rectangle in the station map. ole pressure was reached within 4 days. h Since then, the seismicity slowly decayed. Three additional earthquakes with ML > 3 were felt 1–2 months after bleed-off. More than 2 years later, sporadic seismicity inside the stimulated rock volume still was being detected by the down-hole instruments. At present, the EGS project is on hold and awaits the completion of an independent risk analysis study by a consortium of seismologists and engineers, selected by state authorities following an international bid. The study is expected to be completed by the end of 2009, and public authorities will decide then whether the project can continue.
Seismological Aspects of EGS Although EGS technology has been applied and studied at various sites since the 1970s [e.g., Tester et al., 2006], the physical processes and parameters that control injection-induced seismicity—in terms of earthquake rate, size distribution, and maximum magnitude—are still poorly understood. Consequently, the seismic hazard and risk associated with the creation and operation of EGSs are difficult to estimate. The well-monitored Basel seismic sequence
Eos, Vol. 90, No. 32, 11 August 2009 provides an excellent opportunity to advance the understanding of the physics of EGS. The Swiss Seismological Service (SED) is investigating the Basel data set in the framework of the multidisciplinary research project GEOTHERM (http://w ww.geotherm .ethz.ch) and recently submitted first results for publication [e.g., Deichmann and Ernst, 2009; Deichmann and Giardini, 2009], with additional studies currently being conducted. Two aspects of EGS that are particularly relevant for the assessment of seismic hazard are highlighted below: ground motion scenarios and real-time forecasting of an ongoing earthquake sequence. To predict the expected peak ground motion and the corresponding intensities from scenario earthquakes, Ripperger et al. [2009] tested existing SED ground motion prediction models [Kästli and Fäh, 2006] against the observations of the largest event of the Basel sequence (Figure 3b). They then estimated potential consequences of even larger earthquakes at the same location. This assessment is based on scaling relations that allow converting measured ground motion to macroseismic intensities as well as on finite difference simulations that incorporate a detailed threedimensional geological model. A macroseismic intensity of VIII (EMS98) is predicted by Ripperger et al. [2009] for a ML 5.7 scenario earthquake in Basel. The probability of triggering such an event is considered extremely small in the case of the Basel EGS project; however, fluid injections into deep wells have triggered earthquakes of this size elsewhere in the past [Nicholson and Wesson, 1990]. Because there are currently no reliable and well-c alibrated physics-based models of seismic hazard due to induced seismicity, Bachmann et al. [2009] have implemented an approach that uses the statistical properties of injection-induced microearthquakes to provide input for developing probabilistic seismic hazard models. Their analysis shows that the postinjection seismicity at Basel can be well modeled by the Omori law for aftershock decay, highlighting that the physical processes during EGS stimulation are statistically not very different from other known seismicity clusters such as aftershock sequences or earthquake swarms. They estimate the background seismicity level for the reservoir volume by downscaling the corresponding source zone of the Swiss hazard model [Giardini et al., 2004], and they predict a continuation of the induced sequence for up to 20 years. Bachmann et al. [2009] then introduce a new mitigation strategy for largermagnitude earthquakes, based on the real-t ime short-term earthquake prediction (STEP) concept adopted in California since 2005 (Gerstenberger et al., [2005]; see also http://earthquake.usgs.gov/eqcenter/ step). This new implementation of STEP for the Basel area estimates the occurrence
Fig. 2. Fluid injection–induced seismicity recorded by the seismic network. Geothermal Explorers Ltd. (GEL) recorded earthquakes (gray bars, detected seismic events; red bars, located seismic events) that correlate with the temporal evolution of the well head pressure (blue line, recorded by GEL) over a period of 13 days, beginning on 2 December 2006 when water first was injected into the enhanced geothermal system (EGS) injection well. Earthquake magnitudes (red dots, ML, determined by Swiss Seismological Service) exhibit an increase over time, with highest magnitudes occurring shortly after the largest well head pressures were reached.
Fig 3. Comparison of simulated peak ground motions with observed and predicted macroseismic intensities for the induced ML 3.4 earthquake. (a) Peak ground velocity (PGV, in centimeters per second, shown as the maximum of the vector sum of the two horizontal components), computed with a three-dimensional (3-D) finite difference method using a detailed 3-D geological model, displays the expected lobes of the radiation pattern that are modulated by local amplifications due to a complicated 3-D structure.The epicenter is marked by the cross; the black line indicates the Rhine River, and red lines indicate the city limits of Basel.The dashed brown line indicates the eastern boundary of the Rhine graben structure. (b) The observed macroseismic intensities (shown in colored dots and triangles) agree well with the macroseismic intensities computed from scaling relations [Kästli and Fäh, 2006], displayed with background coloring.The dashed black lines outline the areas common to Figures 3a and 3b.
Eos, Vol. 90, No. 32, 11 August 2009 probability of a future earthquake with a chosen magnitude within a time period of the order of several hours, by statistical analysis of all induced earthquakes since the start of the injection. The goal of this approach is a real-t ime adjustment of injection parameters so as not to exceed an acceptable short-term hazard level agreed upon beforehand.
Lessons Learned The economic viability of EGSs generally is increased by cogeneration of electricity and heating, which necessitates short distances to the potential heat consumers. To optimize economic profit, commercial operators will therefore aim to develop EGS sites in urban areas. This, however, increases the seismic risk even at low hazard levels and requires developing advanced mitigation strategies as well as open and comprehensive information and education provided to the public and to authorities before, during, and after an EGS project. The difficulties and experiences of the Basel EGS project highlight a number of challenges for similar projects in the future. First, there are scientific challenges: How can the corresponding seismic hazard be assessed with confidence, and how can seismic risk be minimized during the creation and operation of EGSs? The Deep Heat Mining project in Basel was conceived from the outset as a commercial venture. Although it effectively was a pilot project with many unknowns, the project’s budget had little funding available for additional scientific efforts not directly related to the drilling, hydraulic stimulation, and exploitation of heat. Risks were perceived by the project promoters and public authorities to be mainly technological and financial. The hazard associated with induced seismicity was estimated largely on the basis of a comparison with the European Hot Dry Rock geothermal energy project in nearby Soultz-s ous-Forêts, France, where a magnitude of ML 2.9 was not exceeded. Earthquake risk scenarios for such an earthquake (ML 2.9) and for possible stronger events were not calculated in advance for the city of Basel.
A second challenge is related to regulatory and insurance aspects: What are the standards in terms of risk studies and seismic monitoring that should be imposed on future projects, keeping in mind that projects need to remain economically viable? A preliminary comparison with past earthquakes of similar magnitude and focal depth in Switzerland, which also considered the locally measured ground motion data, indicates that the damage claims of approximately US$7 million after the ML 3.4 event in Basel are out of proportion and may be partially unjustified. Although the project promoters and the insurance company gave an independent engineering firm the task of evaluating the individual claims, it appears that the insurance company did little to question possibly unjustified claims, and it seems to have been more expedient for the insurance company to pay lumpsum compensations rather than fight such claims. As a consequence, given that the occurrence of stronger events can never be entirely excluded, the Basel case could have a significant impact on the insurance cost of future projects. The third challenge, and possibly the biggest obstacle for future projects, is related to the communication of risk and its acceptance by society and decision makers. It is clear to many scientists that EGS systems carry a small but nonzero risk—as do most technologies, especially in the energy sector. Dams can break, nuclear power plants may fail, CO2 released from oil and gas contributes to global warming, and EGSs can create damage through induced earthquakes. The open question is whether or not society is able to find ways to balance and accept the risks associated with EGSs.
Acknowledgments This article compiles the work of the many people who contributed to this study. We are grateful for contributions by F. Bethmann, J. Ernst, and S. Wöhlbier. Special thanks for continued discussion and fruitful collaborations to Markus O. Häring of Geothermal Explorers Ltd., Basel, Switzerland, and Keith Evans, Department of Earth Sciences, ETH Zurich. Further, we thank
Geothermal Explorers Ltd. for providing injection and seismicity data.
References Bachmann, C., J. Wössner, and S. Wiemer (2009), A new probability-based monitoring system for induced seismicity: Insights from the 2006–2007 Basel earthquake sequence, Seismol. Res. Lett., 80(2), 327. Deichmann, N., and D. Giardini (2009), Earthquakes induced by the stimulation of an enhanced geothermal system below Basel (Switzerland), Seismol. Res. Lett., in press. Deichmann, N., and J. Ernst (2009), Earthquake focal mechanisms of the induced seismicity in 2006 and 2007 below Basel (Switzerland), Swiss J. Geosci., in press. Gerstenberger, M., S. Wiemer, L. M. Jones, and P. A. Reasenberg (2005), Real-time forecasts of tomorrow’s earthquakes in California, Nature, 435, 328–331. Giardini, D., S. Wiemer, D. Fäh, and N. Deichmann (2004), Seismic hazard assessment of Switzerland, 2004, 95 pp., Swiss Seismol. Serv., Zurich, Switzerland. (Available at http://w ww.earthquake.ethz .ch/docs/reports/report_ giardini2004) Häring, M. O., U. Schanz, F. Ladner, and B. C. Dyer (2008), Characterisation of the Basel 1 enhanced geothermal system, Geothermics, 37, 469–495. Kästli, P., and D. Fäh (2006), Rapid estimation of macroseismic effects and shake maps combining macroseismic and instrumental data, paper presented at the First European Conference on Earthquake Engineering and Seismology (ECEES), Swiss Fed. Dep. of Foreign Affairs, Geneva, Switzerland, 3–8 Sept. Nicolson, C., and R. L. Wesson (1990), Earthquake hazard associated with deep well injection, U.S. Geol. Surv. Bull., 1951, 74 pp. Ripperger, J., P. Kästli, D. Fäh, and D. Giardini (2009), Ground motion and macroseismic intensities of a seismic event related to geothermal reservoir stimulation below the city of Basel: Observations and modeling, Geophys. J. Int., in press. Tester, J. W., et al. (Eds.) (2006), The future of geothermal energy: Impact of enhanced geothermal systems (EGS) on the United States in the 21st century, 358 pp., Mass. Inst. of Technol., Boston.
Author Information Toni Kraft, Paul Martin Mai, Stefan Wiemer, Nicholas Deichmann, Johannes Ripperger, Philipp Kästli, Corinne Bachmann, Donat Fäh, Jochen Wössner, and Domenico Giardini, Swiss Seismological Service, Swiss Federal Institute of Technology Zurich (ETH Zurich), Zurich, Switzerland; E-mail: kraft@sed.ethz.ch