Environmental Assessment Report Sri Lanka ...

35 downloads 181 Views 6MB Size Report
Environmental Assessment (REA) checklist, ADB's Safeguard Policy Statement (2009). Therefore upon ...... oxides (SOx), nitrogen oxide (NOx), Carbon dioxide (CO2) and particulates. Asphalt ...... maintenance & frequent audits. Adequate ...
Environmental Assessment Report

Initial Environmental Examination – National Roads Component: Anuradhapura-Rambewa (A020) Project Number: 42254 May 2010

Sri Lanka: Northern Road Connectivity Project

Prepared by [Author(s)] [Firm] [City, Country] Prepared by the Ministry of Local Government and Provincial Councils for the Asian Development Bank (ADB). Prepared for [Executing Agency] [Implementing Agency] The initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary The views expressed herein are those of the consultant and do not necessarily represent those of ADB’s inmembers, nature. Board of Directors, Management, or staff, and may be preliminary in nature.

Table of Contents Table of Contents ................................................................................................................................ i Abbreviations ................................................................................................................................... iii Executive Summary ...................................................................................................................... v 1

INTRODUCTION........................................................................................................................... 1

1.1 Background and justification of the proposed project............................................................. 1 1.2 Extent and Scope of the study ............................................................................................... 1 1.3 Objectives of the IEE report ................................................................................................... 1 1.4 Methodologies adopted in IEE preparation ............................................................................ 1 2 DESCRIPTION OF THE PROJECT .............................................................................................. 2 2.1 Location of the project ........................................................................................................... 2 2.2 Category of the project .......................................................................................................... 3 2.3 Necessity for the project ........................................................................................................ 4 2.4 Magnitude of the project ........................................................................................................ 4 2.5 Materials to be used and sources .......................................................................................... 4 2.6 Labour Force ......................................................................................................................... 7 2.7 Investment and Funding Sources .......................................................................................... 7 2.8 Schedule of implementation ........................................................................................................ 7 2.9 Main beneficiaries of the project.................................................................................................. 8 3 DESCRIPTION OF THE ENVIRONMENT..................................................................................... 8 3.2 Physical Environment ............................................................................................................ 8 3.3 Hydrology ............................................................................................................................ 11 3.4 Ecological Resources .......................................................................................................... 12 3.5 Socio economic structure..................................................................................................... 15 3.6 Description of Traffic............................................................................................................ 16 4 ANTICIPATED ENVIRONMENTAL IMPACTS AND PROPOSED MITIGATION MEASURES .... 18 4.1 Pre- construction & Construction period .............................................................................. 18 4.2 Anticipated impacts during operation period ........................................................................ 29 5. Public consultation & Information Disclosure............................................................................... 30 6.

Grievance redress mechanisms .................................................................................................. 32

7.

INSTITUTIONAL ARRANGEMENT & ENVIRONMENTAL MANAGEMENT PLAN (EMP) ... 32

7.1 Environmental management Plan (EMP)............................................................................. 33 7.2 Environmental Mnitoring Plan (EMoP) .............................................................................. 33 8. FINDINGS AND RECOMMENDATIONS................................................................................. 33 9.

CONCLUSION ............................................................................................................................ 34

10. REFERENCES............................................................................................................................ 34 Sources of Data and Information..................................................................................................... 35 Contributors/authors........................................................................................................................ 35

ii List of Tables: Table 01: Location of borrow pits Table 02: Locations of Quarries and Crushers Table 03: Air quality at Anuradhapura Meteorological Department May 1999 (NBRO) Table 04: Physical and chemical properties of ground water in Nachchaduwa tank Table 05: Description of Traffic Table 06: Socio- economic structure in DS divisions Table 07: Public utilities to be removed Table 08: Details of trees to be cut List of Figures Figure 01: Map showing the location of the project site Figure 02: Borrow Pit Locations Figure 03: Geological Map of the project area Figure04: Average rainfall variation in Anuradhapura Figure 05: Map showing drainage pattern of the project area Figure 06: Reservoir near the road Figure 07: Secondary forest patch in “Rama Kele” Archaeological reserve Figure 08: Paddy fields Figure 09: Home gardens Figure 10: Railway crossing and signal room beside the road Figure 11: Encroachment of the RoW Annexes: Annex 01: Annex 02: Annex 03: Annex 04 Annex 05: Annex 06: Annex 07: Annex 08: Annex 09:

1:60,000 Location Diagram REA checklist Typical cross section Strip Plan Flora of the Project Area Fauna of the Project Area Environmental Management Plan (EMP) Environmental Monitoring Plan (EMOP) Environmental Clearance from the Central Environmental Authority (CEA)

iii

Abbreviations and Definitions 3R

Reduce, Reuse, Recycle

AADT

Annual Average Daily Traffic

AC

Asphalt Concrete

ADB

Asian Development Bank

ADT

Average Daily Traffic

BOQ

Bill of Quantities

CEA

Central Environmental Authority

CEB

Ceylon Electricity Board.

CO

carbon monoxide

DBST

Double Bituminous Surface Treatment

DoAS

Department of Agriculture services

DoF

Department of Forestry

DoI

Department of Irrigation

DS

Divisional Secretary

EA

Executing Agency

EE

Executive Engineer (Divisions)

EIA

Environmental Impact Assessment

EMoC

Environmental Monitoring committee

EMP

Environmental Management Plan

EPL

Environmental Protection License

GND

Gram Niladhari Division

GoSL

Government of Sri Lanka

GSMB

Geological Survey and Mining Bureau

HC

Hydrocarbons

IA

Implementing Agency

IEE

Initial Environmental Examination

IML

Industrial Mining License

LA

Local Authority

LGV

Light Goods Vehicle

LPG

Liquid petroleum Gas

iv

MAV

Multi Axle Vehicle

MOH

Medical Officer of Health

MOHRD

Ministry of Highways and Road Development

NAAS

National Ambient Air Quality Standards

NBD

National Budget Department

NCP

North Central Province

NCPA

National Child Protection Authority

NEA

National Environmental Act

Nox

Oxides of nitrogen

NP

Northern Province

NRCP

Northern Roads Connectivity Project

NWP

North Western Province

NWS&DB

National Water Supply & Drainage Board

PHI

Public Health Inspector

PIU

Project implementation Unit

PM10

particulate matter