HIGH SCHOOL STUDENT STEM (22 March). UNIVERSITY R&D SHOWCASE AND .... CHINA NATIONAL PAVILION. 3.0. Hall 3, 4 &
Overview
SPECIAL SESSIONS
LEVEL 4 3 40 4 40 5 40
2 40 1 40
TECHNICAL SESSIONS
OPENING CEREMONY / EXECUTIVE PLENARY SESSION
CONFERENCE REGISTRATION
PLENARY HALL
LEVEL 3
CLOSING SESSION
CONFERENCE HEADQUARTERS & AUTHOR CHECK-IN
COUNTRY SESSIONS (21-23 March)
CONFERENCE HALL 2 THE NEXT WAVE (19 March) HIGH SCHOOL STUDENT STEM (22 March) UNIVERSITY R&D SHOWCASE AND CHALLENGE (23 March)
BANQUET HALL CONFERENCE LUNCHEON (21-23 March)
SELF CHECK-IN KIOSK
30 302 3
GRAND BALLROOM
CONFERENCE HALL 3
304 3 30 05 5 306 1 2
3 4 5 6 7
PANEL SESSIONS
8 9 10 11
3 3 10 3 09 3008 7 12
301
AUTHOR PREPARATION ROOM
MEDIA REGISTRATION AND MEDIA CENTRE
13 14
15 16
17
18 19
20 21
PLENARY THEATRE
22
KNOWLEDGE SHARING ePOSTER STATIONS
OPENING CEREMONY / EXECUTIVE PLENARY SESSION
PLENARY HALL
LEVEL 1
MAIN ENTRANCE
GRAND HYATT KUALA LUMPUR
GROUND LEVEL ALL 2
SELF CHECK-IN KIOSK
LL
HAL
1
SELF CHECK-IN KIOSK
SELF CHECK-IN KIOSK
6
L4
H HALL
HA
HALL 3
HAL
L5
PARK ENTRANCE EXHIBITOR SERVICE COUNTER AND EXHIBITOR REGISTRATION
TRADERS HOTEL KLCC
VISITOR REGISTRATION MANDARIN ORIENTAL KL
LEGEND: SELF CHECK-IN KIOSK
Conference Self Check-In Kiosk
Prayer Room
Medical Room
SELF CHECK-IN KIOSK
Visitor Self Check-In Kiosk
Cafeteria
UPDATED AS OF 8 MARCH 2018
Hall 1 & 2 (Ground Level) LP20 LIFT
LP19 LIFT
CORE 8
KIOSK 1
FEMALE
EXIT EMERGENCY
DISABLED
ROLLER SHUTTER
IT/TEL
(SB)
9
6.25
12
B101 9SITCO 2.5 INDUSTRIES 6.25 MODEC
FRANK’S 3.0 INTERNATIONAL
2.5 6.25
1.1
WEATHERFORD
2.5
2.5
D101
6
(SB)
12
G101
2.5
21
HALLIBURTON
BUMI ARMADA
12.5
SCHLUMBERGER
12.5
16
7.25
HR
12
12
2.5
B201
TECHNIPFMC
12.5
(DC)
(FB/FA)
HR
HR
REGISTRATION
(SB)
GLASS
EXIT TO TRADERS HOTEL
PLASMA
FR
FIRE EXTINGUISHER
HR
HOSE REEL
DC
FA
FIRE ALARM
SB
FB
FIRE BREAK GLASS
NON BUILD UP AREA DOOR CONTROLLER SUIS BOARD MAX HIGH STRUCTURE 3.0m & THE SET BACK 1.0m FROM THE WALL
WALL STORAGE
MALE
(FB/FA)
(SB)
0.50
LEGEND :
2.5
15
(DC)
6
OTC 12
13
5.0
0.50
FEMALE
CEILING HEIGHT LIMIT = 3000mm HR
(FB/FA)
(SB)
FD
(FB/FA)
ASME MTS SPE AAPG IEEE-OES SEG 3
S201 S202 S203 S204 S205 S206 1.5 0.50
HR
ENTRANCE/ EXIT
0.50
HALL 2
LIFT
LIFT
REGISTRATION
PLASMA
GLASS
CORE 4
UTILITY
HR
STORE
SERVICE DESK EXHIBITOR REGISTRATION
(SB) PLASMA GLASS
(FB/FA)
3.55
13
MMHE
12.5
INFORMATION
DISABLED
ENTRANCE/ EXIT
HALL 1
E201
BAKER HUGHES, A GE COMPANY
12
CONOCOPHILLIPS
6
2.5
2.5
FR
(FB/FA)
S
INFORMATION
LIFT
12
HR
FR
2.5
12
C201
12.5
3.0
E211
SUBSEA 7
6
15
2.5
DELEUM
HR
3.0
D211
MCDERMOTT
6
2.5
12 5.0
HR
(FB/FA)
LIFT
12
5.0
CEILING HEIGHT LIMIT = 3000mmFR
ROLLER SHUTTER TO
C211
UZMA
6
12
2.5
ROOM ELECTRICAL
UTILITY 2
FR
B211
A201
2.5
12.5
HR
3.0
2.5
LOADING BAY 2
(FB/FA)
A211 6
EXIT EMERGENCY
(SB)
FR
WESTSTAR
12
F101 2.5
SAPURA ENERGY
MALE
DISABLE
LLOYD’S REGISTER
7.25
5.0
12.5
C101
OPENING LIFT DOOR
HR
6
6.25
OPENING LIFT DOOR
G111
F111
E101
DIALOG
10
C102
SWAGELOK
3
CHINA PETROLEUM2.5 6 PIPELINE BUREAU
FEMALE
EXIT EMERGENCY
(SB)
3.0
FR
D111
6
2.5
B102
3 3.0
A101
2.5
PTTEP
3.0
C111
(SB)
LIFT
IT
B111
AIR9 DRILLING6 ASSOCIATES
1.1
HR
3.0
FR
A111
LH 10 LIFT
ROLLER SHUTTER
(FB/FA)
(SB)
LIFT
ELECT / TEL
ROOM ELEC.
KIOSK 2
CEILING HEIGHT LIMIT= 2750 mm
KEEPING HOUSE
EXIT EMERGENCY
UTILITY 1
(FB/FA)
LH 9 LIFT
CEILING HEIGHT LIMIT= 2750 mm
MALE
LOADING BAY 1
LH 8 LIFT
TO / FROM HALL 3, 4 & 5
UPDATED AS OF 8 MARCH 2018
Hall 3, 4 & 5 (Ground Level)
LP3 LIFT
LP4 LIFT
HR
HOSE REEL
DC
DOOR CONTROLLER
FA
FIRE ALARM
SB
SUIS BOARD
FB
FIRE BREAK GLASS
FEMALE
NON BUILD UP AREA
(SB)
3.0
MAX HIGH STRUCTURE 3.0m & THE SET BACK 1.0m FROM THE WALL
(FB/FA)
2.5
0.75
A) B/F
)
B303
(F
(DC
3
6
FR
SHAWCOR
2.9
9
TO / FROM HALL 1, 2 & 3 3
B302
6
HEMPEL
0.50
B301
12
6
6
3.0
B408
RED WING SHOE
3.0 3 B405
B406
DAIDO STEEL A) B/F
(F
B/F A)
(F
3
FR
9
BARDOT
6.52
6
9
LP
A302
RUBBERATKINS
A301
F YO BB LL 3 O L HA
2.5
0.50
UP
6
3.0
3 B423
B424
4
B402 3
3 B421
B422
12
B401 B402 B403 B404 B405 B406 B407 B408 B421 B422 B423 B424 B425
12
UTILITY
PLASMA
HR
2.5
STRESS
6
LP8 LIFT
E401 E402 3
3.0
G403
FA
PLASMA
ENTRANCE/ EXIT
6
A507
G404
HOLLAND LOUNGE 3 A501
HR
B502
2.5
OCEANEERING 12
B504
6
STORAGE WALL
MALE
DISABLED
(SB)
S401 S402 S403 S404 S405 S406 0.50
ROOM PARENTING
(SB)
APITEQ ARCHERWELL DNV GL FISHBONES AS HYDRAWELL INTERVENTION INTERWELL RESMAN AS RUSTIBUS OIL & GAS RYSTAD ENERGY SALCON PETROLEUM SERVICES SDN BHD T.D. WILLIAMSON, INC. TAMROTOR MARINE COMPRESSORS AS TELENOR MARITIME WELLBARRIER
E401 E402 E403 E404 E405 E406
USA NATIONAL PAVILION
NIPPON TITANIUM METAL CORPORATION COLUMBIA SOUTHERN EDUCATION GROUP INDUSTRIAL INFO RESOURCES SAFEGUARD TECHNOLOGY, INC. DERRICK SOLUTIONS INTERNATIONAL PTE LTD DRAWWORKS, L.P.
NETHERLANDS NATIONAL PAVILION
G401 G402 G403 G404 G406 G407 G408 A501 A503 A506 A507
VAN LEUSDEN B.V. SOLUFORCE AMPELMANN OPERATIONS HMSA DCN DIVING AIRBORNE OIL & GAS HUISMAN EQUIPMENT B.V. GUSTOMSC HOLLAND LOUNGE PARADIGM TECHNOLOGY SERVICES IHC IQIP SINGAPORE PTE LTD
6
C526
3
C521
INTECSEA
3.0
6
6
DRAEGER
3
3
C506 C508 C521 C522 C523 C525 C526 C528
CHINA NATIONAL PAVILION
WENZHOU ZHIJU PIPE CO., LTD ZTT INTERNATIONAL LIMITED SAILUOKE FLUID EQUIPMENT INC. M.GELDBACK (SHANXI) FLANGE&FITTINGS CO., LTD LUOYANG SENDE PETROCHEMICAL ENGINEERING CO., LTD WUHAN LINMEI HEAD PLATE CO., LTD CANGZHOU LONGTAIDI PIPING TECHNOLOGY CO., LTD HEBEI HENG AN TAI PIPELINE CO., LTD TIANJIN LILIN PETROLEUM MACHINERY CO., LTD NINGBO ORIENT WIRED & CABLES CO., LTD HEBEI LEAGOO INSTRUMENT CO., LTD CM SEALED PARTS FACTORY
2.5
6 PANAH HUNTING JAYA ENERGY
G505
6
3.0
6
2.5
KOREA NATIONAL PAVILION
6
6
LOUNGE
2.5
SHPI
PALFINGER 6 CANADA NATIONAL PAVILION 9
6
3
5.0
HR
CEILING HEIGHT LIMIT = 3000mm
FD
VOID
INFORMATION
1ST FLR UP TO
(FB/FA)
(FB/FA)
UTILITY
HR
LIFT
LIFT
REGISTRATION
LOBBY
(SB)
ENTRANCE/ EXIT
VOID
0.50
KOREA NATIONAL PAVILION
BMT CO.,LTD DONGHAW PNEUTEC ECOWAVE CO., LTD HOSEUNG ENT.CO.,LTD JEONJIN ENTECH,.LTD NAVUTEC CO.,LTD YNV CO.,LTD
0.50
G501
3.0
F501
FR
(DC)
HALL 5 C501 C502 C503 C505
6
E501 12
D501
G511
F511
GOFORTH 6
D505
C523 C522 6
HALL 4 NORWAY NATIONAL PAVILION
2.5
6
6
C525 C528
C506
C501
(FB/FA)
HR
E511
AFGLOBAL
CHINA5.0NATIONAL PAVILION
HR
FR
(SB)(SB)
(FB/FA)
3
6
3.0
C503 C502
6
5.0
MATRADE IMAREST MOGSC MPRC IMM GD 3
6
B503
6 KROHNE WILD WELL EMAS CONTROL
6
MTQ
C505 C508 3.0
D511
C513
YINSON 6
BUREAU HUBER + VERITAS SUHNER B501
6
FEMALE
FD
(SB)
3.0
C511 6
12
3.0
6
3
ROOM ELECTRICAL
UTILITY 4
OIL STATES
6
A510 A506
2.5
EXIT EMERGENCY
3.0
B511
2.5
SANDVIK 12 3.0
NETHERLANDS NATIONAL PAVILION
0.50
SENSITRON SINGAPORE (SENSING) PTE LTD HOERBIGER KT ASIA SERVICES PTE LTD MARSHALL CAVENDISH BUSINESS INFORMATION PTE LTD ASSOCIATION OF SINGAPORE MARINE INDUSTRIES (ASMI) ONE OFFSHORE PTE LTD YONG FAH INTERNATIONAL PTE LTD GLOBAL MARINE SAFETY (S) PTE LTD TECHNOLOGY CENTRE FOR OFFSHORE AND MARINE, SINGAPORE LTD (TCOMS) KM KINLEY MARKETING PTE LTD HYDROGROUP ASIA PTE LTD SPECTEC ASIA PACIFIC PTE LTD NRGEDGE PTE LTD KEPPEL OFFSHORE & MARINE LTD
G406
MALE
(FB/FA)
A511
6
DISABLED
HR
FR
1.5
3.0
SINGAPORE NATIONAL PAVILION
2.5
FUGRO
G401 G402
S
REGISTRATION
GLASS
KEEPING HOUSE
(FB/FA)
ELEC
(SB)
FEMALE
EXIT EMERGENCY
(SB)
6
4
INFORMATION
LP7 LIFT
G411
G407 G408
SERBA DINAMIK
USA NATIONAL PAVILION5.0 HR (DC)
KIOSK 5
3.0
FR
6
IT
(SB)
F411
6
2.5
E403 E404
CEILING HEIGHT LIMIT = 3000mm
CAFE WEST
6
F401
3.0
3
INTERTEK 6 TO / FROM HALL 3, 4 & 5
2.5
E405 E406
NORWAY NATIONAL PAVILION
12
3
3
10
LP
E411
3.0
(SB)
FR
6
B404
HR/WR
(SB)
6 TRELLEBORG
6
C401
SINGAPORE NATIONAL 5.0 PAVILION HR
UP
3
A303 0.75
6
3.01
B425
2.5
LP5 LIFT
HOSPITALITY LOUNGE 4 UP TO 1ST FLR
3.0
ABS
6
CEILING HEIGHT LIMIT= 2750 mm
LP6 LIFT
ELEC.
(SB)
12
2 B403
B401
EXIT EMERGENCY
D411
AKER SOLUTIONS
12
3 B407
A401
C411 6
CEILING HEIGHT LIMIT= 2750 mm
MALE
HR
HR
GULF MARINE SERVICES
6 2.5
KIOSK 4
DISABLED
(FB/FA)
(SB)
B411
A411
PANTECH
KEEPING HOUSE
EXIT EMERGENCY
UTILITY 3
CHW
FIRE EXTINGUISHER
SANITARY SHAFT
FR
CHW
LEGEND :
SANITARY SHAFT
HR
dp
CANADA NATIONAL PAVILION
LIFT
BITCAN GEOSCIENCES & ENGINEERING INC. CANADIAN GLOBAL EXPLORATION FORUM (CGEF) / SONORO ENERGY COUGAR DRILLING SOLUTIONS INNOVATION CENTRIC GROUP KMG INDUSTRIAL LUBRICANTS CANADA, INC DBA SEALWELD NATIONAL COMPRESSED AIR (NCA) SSI ARTIFICIAL LIFT, A TUNDRA PROCESS SOLUTIONS COMPANY TECHNO CANADA TELETICS & GUARDIAN TRANS CANADA TURBINES XRF SOLUTIONS
0.50
UPDATED AS OF 8 MARCH 2018
Hall 6 (Ground Level) ROLLER SHUTTER
3
A613
2.5
DPI GROUP 6
B615 B616 C619 MASER & IO SETIA ATLAS 3 MERGER QUARTZELEC B613 C617 CRESCENT 3 DROPSAFE ENGINEERING
P603 A-HAK
3
3
C618 ZERLUX3 3
6
A609 6
6
6
D609
FR
SUB-BOARD 1
6
P601
MIDA
CITECH
6
D607 D608 TS PSS MARITIME D605 GLOAZURE
6
IN-SITU 6 9
3
FR
3 6 3.0
A601
2.5
6
B601
3.0
NGL TECH
FR
6
6
6
C603 C604 D603 D604 2.5 WIRECO RADEXPROBOCCARD SENKO
3
3.0
3
FR
P631 A*STAR
C601 C602 D601 D602 P632 0.50 CERAM-KOTE OMEGA 3CHANGZHOU WUXI 3 LUX ASSURE HUALI QIANHAN WELL 3
3.0
AIR RETURN
14.6
HR
6
3
3.0
WASCO
UNIVERSITY R&D SHOWCASE
3
B606 2.5
NOV 6
6
A605
HR
3
D619 D620 TROLEX TOOLS &3 MACHINERY 3.0 D617 D618 3 KOC OTP TIANJING HUILITONG
D615 PIETRO FIORENTINI
B609
2.6
FR
2.5
3.0
3.73
FR
C620 3 REMITITE
3.0
REDTECH
3
2.6
PASSAGE WAY EXISTING
FR
D6
6
3
3
3
P604 EUREKA6 EFEKTIF
SUB-BOARD 2
3
3
FR
D4
P606 3 TURCOMP
ENTRANCE / EXIT FROM / TO HALL 5
0.50
B617
D3
A618
HR
D5
3.0
1.5
D1
13 3.0
2.6
0.50
0.50
D2 FR
B620 C621 C624 P622 ZILICORR UPSTREAM SQA 6 LEAK BARAKAH BIZWORTH 6 CLASSNK C622 P624 B618 P623 3 PETROSEAL 3 SERIMATIK JFD 3 INFLATABLE RIGZONE PACKERS
HR
ACCESS TO RAMP
8.6
EMERGENCY EXIT
OTCafé
11.6
FR
EMERGENCY EXIT
EMERGENCY EXIT
SUB-BOARD 3
3
IT SERVER / PA SYSTEM
EXIT
5
3.0
A617
3
6
2.6 P609 3 MALAYSIA NATIONAL PAVILION FR ICEP A621 A622 3 2.5 B621 B622 3 3.0 3 KEJURUTERAAN INNOCORR AWALTEK TNB REPAIR & TRILLENNIUM OFFSHORE MAINTENANCE
FR
18
1.5
LAMAN ASIA
1.0
F& B DISTRIBUTION AREA
1.15
18
EMERGENCY EXIT
1.15
3
3.0
AIR RETURN
AIR RETURN
AIR RETURN
MANDARIN ORIENTAL HOTEL LEGEND :
FR
FIRE EXTINGUISHER
RS
ROLLER SHUTTER (5m W x 6m H) NON BUILD UP AREA MAX BOOTH HEIGHT FOR PERIMETER BOOTH = 2500mm MAX BOOTH HEIGHT FOR CENTER BOOTH = 4000mm FAN HEIGHT = 3000mm