Intelligent Facility Management & Energy Efficiency Systems

46 downloads 641 Views 2MB Size Report
Facilities' Energy Challenges from an Intelligent. Perspective. Intelligent Facility Management &. Energy Efficiency Systems. SATCHNET ELECTRONIC ...
Intelligent Facility Management & Energy Efficiency Systems Facilities’ Energy Challenges from an Intelligent Perspective SATCHNET ELECTRONIC SYSTEMS Local Systems’ Integration Experts

Who We Are?

A Leading Facility Automation Systems’ Integrators with A Major Vision to Step In & Change the Local Perception of Energy Management Solutions

Complete Facility Solutions For All Phases of your Facility Single Source Solutions throughout the Facility Life Cycle Power Monitoring & Management Metering and Monitoring Variable Speed Drives

Design

Operations

Evaluation

&

&

&

Installation

Maintenance

Retrofit

Power Quality (UPS)

Facility Automation HVAC Water & Pumping Energy Management

Security

Digital Video Management Access Control Intrusion Detection

Lighting Schedule Based Lighting Control

Fire and Life Safety Service & Maintenance (CMMS)

The Challenge

The life cycle cost of a Facility

A Peek at the Solution

Manage it Control It Measure it

Others ..

Security & Fire

Fuel Management

Water

Lighting

Power Management

HVAC Controls

High Performance Green

Facility

Integrated Facility Management System

Fault Detection and Diagnostics (FDD)

Automated Demand Response (ADR)

Automated Measurement & Verification (M&V)

Energy Information Systems (EIS) Facility Owners, Developers, Occupants, Consultants

Government Utilities, Policy Makers

Energy Information Systems Energy Efficiency Service Providers & Suppliers

Facility Managers, Operators, Financial Managers

Intelligent Energy Management Triangle

Visualization

Performance Indicators

Energy Saving Through BMS

10-20%

ECM # 1 : Occupancy Time Scheduling

Case Study: Packaging Industrial Company (PIC) Operations & Actual Energy Savings

Boiler Stop after 1000 second Pump Stop after 1800 second

Shut down timers are user adjustable

Chiller plant will start if only one film machine is working System start the most energy efficient chiller first

Only when it needed Hiross chiller (less efficient chiller ) start only Petra chiller can't keep cold enough water temperature

Petra chiller start when water temperature more than 16 (14+2) And stop when water temperature less than 12 (142)

All these value are user adjustable

The schedule weekly plan

This time schedule start at Saturday at 09:00 AM

And stop at Thursday 11:00 PM

Special event configured for next Thursday Since it will be labor day holiday

Weekly schedule remain as it is except May 2,2013 it will be stop

List of trend logs

One or more value can be display at once Depending on the purpose of the report There are several type of the output report

Set the report title

Se the period of the data

Exported data can be viewed and formatted in common program

The data can be saved

All data in one page Make it easy to monitor the operation

Energy Saving Report Electricity for PIC

SAVING = 32,555.6 = 27%

4.500,00 JOD 350.000,00

4.000,00

JOD 300.000,00

3.500,00

JOD 250.000,00

Simple Payback (ROI) = 6.2 Months Saving = 58,113.85 JOD = 18.4 %

3.000,00

JOD -

3.821,7

2.856,7

474,3

88,831.00 March Dec. 2011 2011 Actual Cost 2012 Expected 2012-Actual After Before(MWH) BMS Cost Before BMS 1.354,84 BMS Energy Production TON 2.856,72 .KWH/Ton 474,26

Saving

JOD 30.000,00

-

1.333,9

500,00

JOD 58.113,85

JOD 50.000,00

1.000,00

JOD 257.807,31

JOD 100.000,00

1.500,00

1.354,8

JOD 150.000,00

2.000,00

JOD 260.261,00

JOD 200.000,00

JOD 315.921,16

2.500,00 2011 Actual Cost Before BMS 2012 Expected Cost Before BMS 2012 Actual After BMS Saving

349,0

87,457.40 - Dec. 2012 BMSMarch Installation Cost1.333,89 3.821,73 349,03

Intelligence Out of the Data Variables Analysis 600000

35

500000

30 25

400000

20

300000

15

200000

10

100000

5

0

0 -367

1978

4521

1878

2052

3089

4428

3507

5691

5778

Mar-12

Apr-12

May-12

Jun-12

Jul-12

Aug-12

Sep-12

Oct-12

Nov-12

Dec-12

Sum of KWH

Sum of KG

Sum of Average Tempe (°C)

Thank You Firas Obeido Questions??