Facilities' Energy Challenges from an Intelligent. Perspective. Intelligent Facility
Management &. Energy Efficiency Systems. SATCHNET ELECTRONIC ...
Intelligent Facility Management & Energy Efficiency Systems Facilities’ Energy Challenges from an Intelligent Perspective SATCHNET ELECTRONIC SYSTEMS Local Systems’ Integration Experts
Who We Are?
A Leading Facility Automation Systems’ Integrators with A Major Vision to Step In & Change the Local Perception of Energy Management Solutions
Complete Facility Solutions For All Phases of your Facility Single Source Solutions throughout the Facility Life Cycle Power Monitoring & Management Metering and Monitoring Variable Speed Drives
Design
Operations
Evaluation
&
&
&
Installation
Maintenance
Retrofit
Power Quality (UPS)
Facility Automation HVAC Water & Pumping Energy Management
Security
Digital Video Management Access Control Intrusion Detection
Lighting Schedule Based Lighting Control
Fire and Life Safety Service & Maintenance (CMMS)
The Challenge
The life cycle cost of a Facility
A Peek at the Solution
Manage it Control It Measure it
Others ..
Security & Fire
Fuel Management
Water
Lighting
Power Management
HVAC Controls
High Performance Green
Facility
Integrated Facility Management System
Fault Detection and Diagnostics (FDD)
Automated Demand Response (ADR)
Automated Measurement & Verification (M&V)
Energy Information Systems (EIS) Facility Owners, Developers, Occupants, Consultants
Government Utilities, Policy Makers
Energy Information Systems Energy Efficiency Service Providers & Suppliers
Facility Managers, Operators, Financial Managers
Intelligent Energy Management Triangle
Visualization
Performance Indicators
Energy Saving Through BMS
10-20%
ECM # 1 : Occupancy Time Scheduling
Case Study: Packaging Industrial Company (PIC) Operations & Actual Energy Savings
Boiler Stop after 1000 second Pump Stop after 1800 second
Shut down timers are user adjustable
Chiller plant will start if only one film machine is working System start the most energy efficient chiller first
Only when it needed Hiross chiller (less efficient chiller ) start only Petra chiller can't keep cold enough water temperature
Petra chiller start when water temperature more than 16 (14+2) And stop when water temperature less than 12 (142)
All these value are user adjustable
The schedule weekly plan
This time schedule start at Saturday at 09:00 AM
And stop at Thursday 11:00 PM
Special event configured for next Thursday Since it will be labor day holiday
Weekly schedule remain as it is except May 2,2013 it will be stop
List of trend logs
One or more value can be display at once Depending on the purpose of the report There are several type of the output report
Set the report title
Se the period of the data
Exported data can be viewed and formatted in common program
The data can be saved
All data in one page Make it easy to monitor the operation
Energy Saving Report Electricity for PIC
SAVING = 32,555.6 = 27%
4.500,00 JOD 350.000,00
4.000,00
JOD 300.000,00
3.500,00
JOD 250.000,00
Simple Payback (ROI) = 6.2 Months Saving = 58,113.85 JOD = 18.4 %
3.000,00
JOD -
3.821,7
2.856,7
474,3
88,831.00 March Dec. 2011 2011 Actual Cost 2012 Expected 2012-Actual After Before(MWH) BMS Cost Before BMS 1.354,84 BMS Energy Production TON 2.856,72 .KWH/Ton 474,26
Saving
JOD 30.000,00
-
1.333,9
500,00
JOD 58.113,85
JOD 50.000,00
1.000,00
JOD 257.807,31
JOD 100.000,00
1.500,00
1.354,8
JOD 150.000,00
2.000,00
JOD 260.261,00
JOD 200.000,00
JOD 315.921,16
2.500,00 2011 Actual Cost Before BMS 2012 Expected Cost Before BMS 2012 Actual After BMS Saving
349,0
87,457.40 - Dec. 2012 BMSMarch Installation Cost1.333,89 3.821,73 349,03
Intelligence Out of the Data Variables Analysis 600000
35
500000
30 25
400000
20
300000
15
200000
10
100000
5
0
0 -367
1978
4521
1878
2052
3089
4428
3507
5691
5778
Mar-12
Apr-12
May-12
Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Nov-12
Dec-12
Sum of KWH
Sum of KG
Sum of Average Tempe (°C)
Thank You Firas Obeido Questions??