PRODUKSI DAN KONSUMSI MINYAK BUMI. • PRODUKSI .... 2022. 2024. S. B.
M. /hari. Minyak Bumi. Batubara. Gas. Tenaga Air. Panas Bumi. EBT Lainnya ...
KONDISI ENERGI PRIMER (MINYAK DAN GAS) INDONESIA Oleh: Eko Widianto VP EP Technology Center PT PERTAMINA (Persero)
Disampaikan pada: Pertemuan Nasional Forum Komunikasi Pendidikan Tinggi Teknik Elektro Indonesia 2007 Yogyakarta, 5 – 6 Desember 2007
CURRICULUM VITAE Name Place of Birth Marital Status Address
: Ir. Eko Widianto, MT : Semarang, 3 September 1955 : Married : Rancho Indah, Jl. Tanjung 19 / Blok G-21 Tanjung Barat, Jakarta Selatan 12530 Email :
[email protected]
Academic Record : 1982 : S1 Geologi UGM 1999 : S2 Applied Geophysic ITB Work History 1982 – 1985 1986 – 1993 1993 – 1994 1994 – 1997 1998 – 2000 2000 – 2002 2002 – 2006 2006 – 2006 2006 – now
: : Pertamina Exploration Division Jakarta : Pertamina Exploration Department Plaju : Pertamina BPPKA Jakarta : Head of Exploration Planning Jakarta : Exploration Manager JOB Pertamina – Greka Energy : Chief Geophysic Pertamina Upstream Chairman of HAGI : GM JOB Pertamina-ConocoPhillips (Sakakemang) Ltd. : Head of New Venture Division Pertamina : VP EP Technology Center Pertamina
PT PERTAMINA (PERSERO) PERTAMINA
Page 2
AGENDA • • • • •
PENDAHULUAN PRODUKSI DAN KONSUMSI MINYAK BUMI PRODUKSI DAN KONSUMSI GAS BUMI CADANGAN MIGAS NASIONAL KESIMPULAN
3
History of Oil & Gas Exploration in Indonesia Dutch Colonial – Law 8/1971 Era The history of Indonesia’s petroleum industry goes back to the Dutch colonialism era and was marked by the beginning of systematic oil exploration in 1865. The first well was drilled in 1871, and the first oil field discovery was made in 1885. Since the independence of Indonesia in 1945 and up to 1950, most oil fields had been discovered in East Java, South and Central Sumatra, and East Kalimantan. In 1966, Pertamina was established as a merger of several upstream and downstream Dutch oil companies. The new contract system (PSC) was first introduced in the same year. In 1971, a new law no 8 clarified Pertamina’s roles as an upstream and downstream operator, as well as contractors’ regulator. A 2001 law specified the deregulation of the country’s oil and gas industry PT PERTAMINA (PERSERO) PERTAMINA
Page 4
REFORM PHILOSOPHY PREVIOUS
NEW REGULATOR
PERTAMINA (GOVERNMENT)
• REGULATOR • PLAYER 1971 - 2001 (LAW NO. 8/1971)
DOWNSTREAM
GOVERNMENT POLICY’S BOUNDARY
PLAYER SUPERVISOR
PERTAMINA & OTHERS
UPSTREAM
2001-RECENT (LAW NO. 22/2001) Heri Purnomo, 2006
PT PERTAMINA (PERSERO) PERTAMINA
Page 5
INDONESIA TOP 10 OIL and GAS PRODUCERS Ref PetroEnergy
Magazine No. 6 Year II Oct
– November 2005
Note : * PERTAMINA Production = PERTAMINA EP + Joint Company
CALTEX PACIFIC INDONESIA
452.63
TOTAL
2,679.00
PERTAMINA*
136.12
PERTAMINA*
1,107.00
CONOCOPHILLIPS LTD
92.80
EXXONMOBIL OIL INDONESIA
986.00
TOTAL
69
CONOCOPHILLIPS LTD
839.00
CNOOC(SES) BV
65.93
VICO
613.00
PETROCHINA INT’L IND.LTD
53.8
UNOCAL INDONESIA
191.00
MEDCO E&P INDONESIA
52.95
PREMIER OIL
151.00
UNOCAL
45.24
MEDCO E&P INDONESIA
115.64
25.70
KODECO
VICO BPINDONESIA
Oil, MBOPD
23.12
113.70
Gas, MMSCFD
PETROCHINA INT’L IND LTD
GEOTHERMAL WORLD INSTALLED CAPACITY 2.228 1.909 855 852 785 546 437 172.1 161.1 142.5
MW USA PHILLIPINE MEXICO INDONESIA ITALY JAPAN NEW ZEALAND ICELAND EL SALVADOR COSTA RICA
Ref International Geothermal Association, Nov 2005
PT PERTAMINA (PERSERO) PERTAMINA
Note : PERTAMINA EP Geothermal Electric Power Capacity : 162 MW
Page 6
82.68
Produksi dan Konsumsi Minyak bumi
7
REALISASI DAN PROYEKSI ENERGI PRIMER 9000
8000
7000
SBM/hari
6000
5000
4000
3000
2000
1000
Minyak Bumi
PT PERTAMINA (PERSERO) PERTAMINA
Batubara
Gas
Tenaga Air
Panas Bumi Page 8
EBT Lainnya
24 20
22 20
20 20
18 20
16 20
14 20
12 20
10 20
08 20
06 20
04 20
02 20
00 20
98 19
96 19
94 19
92 19
19
90
0
INDONESIA: Oil production (bars) & consumption (dots) Thousands of barrels of oil per day
2000 1800 1600 1400 1200 1000 800 600 400 200 0 1955
1960
1965
© Energyfiles Ltd
PT PERTAMINA (PERSERO)
1970
1975
1980 Year
1985
1990
1995
2000
INDONESIA: Oil production forecast to 2050
Thousands of barrels of oil per day
2000 1800 1600 1400 1200 1000 800 600 400 200 0 1930
1940
1950
© Energyfiles Ltd
PT PERTAMINA (PERSERO)
1960
1970
1980
1990 Year
2000
2010
2020
2030
2040
2050
REALISASI DAN PROYEKSI MINYAK BUMI (SKENARIO PESIMIS) 1800
1500
Ribu Barrel/hari
1200
900
600
300
0 1990
1993
1996
1999
2002
2005
Produksi Skenario Pesimis
PT PERTAMINA (PERSERO) PERTAMINA
2008
2011
2014
2017
Kebutuhan Domestik Page 11
2020
2023
Produksi dan Konsumsi Gas bumi
12
PT PERTAMINA (PERSERO)
INDONESIAN DAN PROVENGAS OIL AND GAS RESERVESINDONESIA 1980 -2006 CADANGAN MINYAK TERBUKTI 3,500
12,000
3,000
10,000
2,500
8,000
2,000
6,000
1,500
4,000
1,000
TCF
MMBO
14,000
2,000
500 OIL (mmbo) GAS (TCF)
YEAR
Annual report OPEC 2006
PT PERTAMINA (PERSERO)
06
05
20
04
20
03
20
02
20
01
20
00
20
99
20
98
19
97
19
96
19
95
19
94
19
93
19
92
19
91
19
90
19
89
19
88
19
87
19
86
19
85
19
84
19
83
19
82
19
19
19
19
81
0
80
0
PT PERTAMINA (PERSERO)
PRODUKSI GAS ALAM INDONESIA NATURAL GAS OF INDONESIA (1980-2006 in MMSCF) (1980-2006) dalam MMSCFD 100,000
90,000
80,000
70,000
60,000
Gross Production mmscf Marketed Production Flaring Reinjection Shrinkage
50,000
40,000
30,000
20,000
10,000
0 1980
1985
Annual report OPEC 2006
PT PERTAMINA (PERSERO)
1990
1995
2000
2005
PEMANFAATAN VS PRODUKSI GAS BUMI (REALISASI DAN PRODUKSI) 14000
12000
M M S CFD
10000
8000
6000
4000
2000
0 1990
1993
1996 Kontrak Ekspor Impor LNG
1999
2002
2005
Kontrak Domestik Produksi
2008
2011
2014
Tambahan Domestik Kemampuan Produksi
Catatan: Berdasarkan cadangan P1 dan P2 status saat ini PT PERTAMINA (PERSERO) PERTAMINA
Page 17
2017
2020
Produksi CBM
2023
PT PERTAMINA (PERSERO)
PT PERTAMINA (PERSERO)
PT PERTAMINA (PERSERO)
Cadangan dan Sumberdaya Migas Nasional
PT PERTAMINA (PERSERO) PERTAMINA
Page 21
INDONESIA TERTIARY SEDIMENTARY BASINS
SOUTH CHINA SEA PA CIF IC
SULAWESI SEA
eastern
400 KM
OC EA N
D IN N IA AN CE
O
BANDA SEA
western
UNDRILLED 22
TOTAL OF 60 BASINS DRILLED 38
OIL & GAS RESOURCES & RESERVES PRODUCING 15 NON PRODUCING 23
DISCOVERY 8 NON DISCOVERY 15
OIL
RESOURCES
GAS
(BBO)
(TCF)
84.47
384.27
8.88
133.37
RESERVES
Status : Jan 01, 1999
PT PERTAMINA (PERSERO) PERTAMINA
Page 22
INDONESIA OIL RESERVE NATUNA
ACEH 148.6
0.2
East Kalimantan
North Sumatra 111.0 Central Sumatra
39.5 2,398.1
IRIAN JAYA
582.3
92.1 10.2 682.7 500.4
West Java
162.9 East Java
OIL RESERVE 1P (MMSTB)
PT PERTAMINA (PERSERO) PERTAMINA
PROVEN : 4,728 MMSTB POTENTIAL : 5,024.6 MMSTB TOTAL : 9,746.4 MMSTB Page 23
DINAS STUDI EKS.& EVAL JIAN-BANG.
South Sumatra
INDONESIA NATURAL GAS RESERVE ACEH
NATUNA
3,896
52,080
East Kalimantan
North Sumatera 728
South Sumatera
IRIAN JAYA
31,814
3,22
14,782 3,654 14,260 5,190
DINAS STUDI EKS.& EVAL JIAN-BANG.
Central Sumatera
4,395
West Java East Java
NATURAL GAS 2P (BSCF) PT PERTAMINA (PERSERO) PERTAMINA
1P : 91,170.2 BSCF 2P : 134,015.5 BSCF 3P : 178,128.8 BSCF Page 24
WILAYAH KERJA PT PERTAMINA (EP) OIL & GAS POTENTIAL Total: 4 BB0 & 35.5 TCFG
9672 535
349
6253
109 1476
8515
46
233
42
33
60
24
22
64
330 2141
72 108
958 2330 PT PERTAMINA (PERSERO)
Total Luas WK : 142.510 km2
65
: oil bubble-graph
1681
: gas bubble-graph
2466
2466 9314 65
: oil in MMbbls : gas in Bcu.ft : number of closure
Newton (2004) Awang H. Satyana - BPMIGAS
PT PERTAMINA (PERSERO)
INDONESIAN ENERGY POTENTIAL 2007 RESOURCES
RESERVES
PRODUCTION
RESERVE/ PRODUCTION (YEAR)
86.9 billion barrel
9.1 billion barrel*)
365 million barrel
25
Gas
384.7 TSCF
187 TSCF
2.77 TSCF
68
Coal
90.5 billion ton
18.7 billion ton
170 million ton
110
CBM
453 TSCF
-
-
-
FOSSIL ENERGY
Oil
PT PERTAMINA (PERSERO)
Kesimpulan
Secara nasional pemenuhan kebutuhan gas hingga 2011 akan terpenuhi. Reserve to Production Ratio untuk minyak adalah 25 tahun sedang untuk gas adalah 68 tahun. Dengan asumsi commercial success dari resources menjadi reserve adalah 46%, akan didapatkan tambahan reserve minyak sebesar 40 Billion Barrel dan gas sebesar 177 TCF. Tetap perlunya upaya peningkatan eksplorasi migas Indonesia untuk memenuhi kebutuhan energi primer sesuai target mix energy Option pengalihan sebagian gas alam untuk ekspor menjadi untuk kebutuhan dalam negri layak dipertimbangkan. Perlunya pembangunan infrastruktur penyaluran gas bumi dari lapangan penghasil ke pasar. Proyek gas yang akan onstream sebaiknya tidak mengalami kelambatan
PT PERTAMINA (PERSERO)
Terima kasih 29
TARGET OF ENERGY MIX (PRESIDENTIAL DECREE NO. 5 YEAR 2006)
Target of Energy Mix 2025 (3 million BOE)
CURRENT ENERGI MIX (1 million BOE) Hydro Power, 3.11%
National (Primary) Energy Mix Oil,
Geothermal, 1.32%
20%
Natural Gas, 28.57%
Biofuel, 5%
Gas, 30%
RE,17%
Geothermal, 5% Biomass, Nuclear, Hydro Solar Energy, Wind Power, 5%
Oil 51.66% Coal, 15.34%
Coal Liquefaction
Coal , 33%
PT PERTAMINA (PERSERO)
2%
PT PERTAMINA (PERSERO)
PT PERTAMINA (PERSERO)