Jul 27, 2016 - Operation & Monitoring are the 6 critical steps of Landfill. ... An environmental monitoring system.
27-Jul-16
GARWARE-WALL ROPES LTD.
Presentation on Design and Development of LANDFILL ENGINEERING SYSTEM CORPORATE PRESENTATION
Ranjit Dash AVP-Geosynthetics
Dumping Waste WHY WE NEED SCIENTIFIC DISPOSAL ?
uncontrolled
controlled
What solution do YOU prefer?
1
27-Jul-16
WHY WE NEED SCIENTIFIC DISPOSAL ? Pollutant Migration
Landfill LANDFILL • The term ‘landfill’ is the final disposal point of ‘Waste’ on land, designed and constructed with the objective of minimum impact to the environment • We call them: Secured Landfill, Engineered Landfill, Sanitary Landfill. They are engineered for • Hazardous Waste, Non Hazardous Waste & Municipal Waste • Landfill Legislation, Siting, Design, Construction, Operation & Monitoring are the 6 critical steps of Landfill.
2
27-Jul-16
Elements ofOFLandfill COMPONENTS LANDFILL 1. A liner system at the base and sides of the landfill 2. A leachate collection and control facility which collects and extracts leachate 3. A gas collection and control facility which collects and extracts gas 4. A final cover system at the top of the landfill 5. A surface water drainage system for surface runoff 6. An environmental monitoring system 7. A closure and post-closure plan
DEVELOPMENT OF A FACILITY
3
27-Jul-16
BOTTOM & SIDE SYSTEM LINING SYSTEM FOR LINER DEVELOPMENT