Nuclear Power Reactors in the World - International Atomic Energy ... [PDF]

0 downloads 142 Views 775KB Size Report
DA Information Services, 648 Whitehorse Road, MITCHAM 3132. Telephone: +61 3 9210 7777 • Fax: +61 3 9210 7788. Email: [email protected] • Web ...
REFERENCE DATA SERIES No. 2 2012 Edition

Nuclear Power Reactors in the World

INTERNATIONAL ATOMIC ENERGY AGENCY VIENNA ISBN 978–92–0–132310–1 ISSN 1011–2642

@

REFERENCE DATA SERIES No. 2

NUCLEAR POWER REACTORS IN THE WORLD 2012 Edition

INTERNATIONAL ATOMIC ENERGY AGENCY VIENNA, 2012

NUCLEAR POWER REACTORS IN THE WORLD IAEA, VIENNA, 2012 IAEA-RDS-2/31 ISBN 978–92–0–132310–1 ISSN 1011–2642 Printed by the IAEA in Austria June 2012

CONTENTS Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Table 1. Reactors in operation, in long term shutdown and under construction, 31 Dec. 2011. . . . . 10 Table 2. Type and net electrical power of reactors connected to the grid, 31 Dec. 2011 . . . . . . 12 Table 3. Type and net electrical power of reactors under construction, 31 Dec. 2011 . . . . . . . . 13 Table 4. Reactor years of experience, up to 31 Dec. 2011 . . . . . . . . . . . . . . . . . . . . . . . . 14 Table 5. Operating reactors and net electrical power, 1980 to 2011 . . . . . . . . . . . . . . . . . . . . . . . . 16 Table 6. Nuclear electricity production and share, 1980 to 2011 . . . . . . . . . . . . . . . . . . . . . . . . 18 Table 7. Annual construction starts and connections to the grid, 1954 to 2011 . . . . 20 Table 8. Number of new reactors connected to the grid and median construction time in months . . . . . . . . . . . . . . . . . . . . . . . . . . 21 Table 9. Construction starts during 2011 . . . . . . . . . 22 Table 10. Connections to the grid during 2011 . . . . . 23 Table 11. Scheduled connections to the grid during 2012 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 Table 12. Reactors planned for construction as known on 31 Dec. 2011 . . . . . . . . . . . . . 24 Table 13. Reactors under construction, 31 Dec. 2011 . . . . . . . . . . . . . . . . . . . . . . . 28 Table 14. Reactors in operation, 31 Dec. 2011 . . . . . 31 Table 15. Reactors in long term shutdown, 31 Dec. 2011 . . . . . . . . . . . . . . . . . . . . . . . 47 Table 16. Reactors permanently shut down, 31 Dec. 2011 . . . . . . . . . . . . . . . . . . . . . . . . 48 Table 17. Reactors in decommissioning process or decommissioned, 31 Dec. 2011 . . . . . . . . . 53

Table 18. Performance factors by reactor category, 2009 to 2011 . . . . . . . . . . . . . . . . . . . . . . . . 58 Table 19. Full outage statistics during 2011 . . . . . . . 59 Table 20. Direct causes of full outages during 2011 . 60 Table 21. Direct causes of full outages, 2007 to 2011 . . . . . . . . . . . . . . . . . . . . . . . 61 Table 22. Countries: abbreviations and summary . . . 62 Table 23. Reactor types: abbreviations and summary . . . . . . . . . . . . . . . . . . . . . . . . . . 64 Table 24. Operators: abbreviations and summary . . 65 Table 25. NSSS suppliers: abbreviations and summary . . . . . . . . . . . . . . . . . . . . . . . . . . 71 Figure 1. Number of operational reactors by type and net electrical power (as of 31 Dec. 2011) . 74 Figure 2. Reactors under construction by type and net electrical power (as of 31 Dec. 2011) . 75 Figure 3. Nuclear share of electricity generation (as of 31 Dec. 2011) . . . . . . . . . . . . . . . . . 76 Figure 4. Worldwide median construction time in months (as of 31 Dec. 2011) . . . . . . . . . . . 77 Figure 5. Number of reactors in operation by age (as of 31 Dec. 2011) . . . . . . . . . . . . . . . . . 78 Figure 6. Annual construction starts and connections to the grid, 1954 to 2011 . . . . . . . . . . . . . . . 79

INTRODUCTION Nuclear Power Reactors in the World is an annual publication that presents the most recent data pertaining to nuclear power reactors in IAEA Member States. This thirty-second edition of Reference Data Series No. 2 provides a detailed comparison of various statistics through 31 December 2011. The tables and figures contain the following information: — General statistics on nuclear reactors in IAEA Member States; Technical data on specific reactors that are either — planned, under construction or operational, or that have been shut down or decommissioned. Performance data on reactors operating in IAEA — Member States, as reported to the IAEA. The data compiled in this publication is a product of the IAEA's Power Reactor Information System (PRIS). The PRIS database is a comprehensive source of data on all nuclear power reactors in the world. It includes specification and performance history data on operational reactors as well as on reactors under construction or in the decommissioning process. The IAEA collects this data through designated national correspondents in Member States. PRIS outputs are available in the IAEA’s annual publications and on the PRIS web page (http://www.iaea. org/pris). Detailed outputs are accessible to registered users through on-line applications. Enquiries should be addressed to: Director Division of Nuclear Power International Atomic Energy Agency Vienna International Centre PO Box 100 1400 Vienna, Austria Email: [email protected] 5

Definitions Performance factors (REG – PEL – UEL – XEL) × 100 EAF (%) = REG (REG – PEL – UEL) UCF (%) = × 100 REG UEL UCL (%) = × 100 REG PEL PCL (%) = × 100 REG EG LF (%) = × 100 REG On-line Hours OF (%) = × 100 Total Hours where EAF is the energy availability factor, expressed in per cent. UCF is the unit capability factor, expressed in per cent. UCL is the unplanned capability loss factor, expressed in per cent. PCL is the planned capability loss factor, expressed in per cent. LF is the load factor, expressed in per cent. OF is the operating factor, expressed in per cent. REG reference energy generation: The net electrical energy (MW·h) supplied by a unit continuously operated at the reference unit power during the entire reference period.

7

PEL planned energy loss: The energy (MW·h) that was not supplied during the period because of planned shutdowns or load reductions due to causes under plant management control. Energy losses are considered to be planned if they are scheduled at least four weeks in advance. UEL unplanned energy loss: The energy (MW·h) that was not supplied during the period because of unplanned shutdowns, outage extensions, or load reductions due to causes under plant management control. Energy losses are considered to be unplanned if they are not scheduled at least four weeks in advance. XEL external energy loss: The energy (MW·h) that was not supplied due to constraints beyond plant management control that reduced plant availability. EG the net electrical energy supplied during the reference period as measured at the unit outlet terminals after deducting the electrical energy taken by unit auxiliaries and the losses in transformers that are considered to be integral parts of the unit. Construction Start Date when first major placing of concrete, usually for the base mat of the reactor building, is done. First Criticality Date when the reactor is made critical for the first time. Grid Connection Date when the plant is first connected to the electrical grid for the supply of power. After this date, the plant is considered to be in operation. Commercial Operation Date when the plant is handed over by the contractors to the owner and declared to be officially in commercial operation. Permanent Shutdown Date when the plant is officially declared to be shut down by the owner and taken out of operation permanently. 8

Long Term Shutdown A unit is considered to be in long term shutdown status if it has been shut down for an extended period (usually several years) without any firm recovery schedule at the beginning, but there is the intention to restart the unit eventually. Units and Energy Conversion 1 terawatt-hour (TW·h) = 106 megawatt-hours (MW·h). For an average power plant, 1 TW·h = 0.39 megatonnes of coal equivalent (input) = 0.23 megatonnes of oil equivalent (input).

9

10

ARGENTINA ARMENIA BELGIUM BRAZIL BULGARIA CANADA CHINA CZECH REP. FINLAND FRANCE GERMANY HUNGARY INDIA IRAN, ISL.REP. JAPAN KOREA, REP. OF MEXICO NETHERLANDS PAKISTAN ROMANIA RUSSIA SLOVAKIA SLOVENIA SOUTH AFRICA SPAIN SWEDEN SWITZERLAND UK

Country

2 1 7 2 2 18 16 6 4 58 9 4 20 1 50 21 2 1 3 2 33 4 1 2 8 10 5 18

No. of Units

935 375 5927 1884 1906 12604 11816 3766 2736 63130 12068 1889 4391 915 44215 18751 1300 482 725 1300 23643 1816 688 1830 7567 9326 3263 9953

Total MW(e)

Reactors in operation Total MW(e)

2726

246

No. of Units

4

1

Reactors in long term shutdown

1600 1600 4824

1 1 7

630 8188 782

2 10 2

2650 5560

26620

26

2 5

1245 1906

1 2

692

Total MW(e)

1

No. of Units

Reactors under construction

5.9 2.4 45.9 14.8 15.3 88.3 82.6 26.7 22.3 423.5 102.3 14.7 29.0 0.1 156.2 147.8 9.3 3.9 3.8 10.8 162.0 14.3 5.9 12.9 55.1 58.1 25.7 62.7

TW(e)∙h 5.0 33.2 54.0 3.2 32.6 15.3 1.9 33.0 31.6 77.7 17.8 43.3 3.7 0.0 18.1 34.6 3.6 3.6 3.8 19.0 17.6 54.0 41.7 5.2 19.5 39.6 40.9 17.8

Nuclear electricity supplied in 2011 % of total

TABLE 1. REACTORS IN OPERATION, IN LONG TERM SHUTDOWN AND UNDER CONSTRUCTION, 31 DEC. 2011

11

435

Total

368791

13107 101465

Total MW(e)

5

No. of Units 2972

Total MW(e)

Reactors in long term shutdown

— 40.37 TW(e)∙h of nuclear electricity generation, representing 19.02% of the total electricity generated there.

— 6 units, 5018 MW in operation; 2 units, 2600 MW under construction;

Note: The total includes the following data from Taiwan, China:

15 104

No. of Units

Reactors in operation

UKRAINE USA

Country

65

2 1

No. of Units 61962

1900 1165

Total MW(e)

Reactors under construction

2518.0

84.9 790.4

TW(e)∙h

NA

47.2 19.3

Nuclear electricity supplied in 2011 % of total

TABLE 1. REACTORS IN OPERATION, IN LONG TERM SHUTDOWN AND UNDER CONSTRUCTION, 31 DEC. 2011 — continued

12

482 600

12864 1816 688 1830 6057 2811 1700 1191 13107 67368

1 2

17 4 1 2 6 3 3 1 15 69

248364

915 19284 15966

1 24 17

270

10496 3766 976 63130 9496 1889

13 6 2 58 7 4

MW(e)

375 5927 1884 1906

PWR

1 7 2 2

No.

During 2011, 7 reactors, 4004 MW were newly connected to the grid.

77726

34097

35

84

1510 6515 1563

1300

2

2 7 2

300

24931

2

26

2572

2

MW(e)

1760

BWR

2

No.

Note: The totals include 6 units, 5018 MW in Taiwan, China.

TOTAL

ARGENTINA ARMENIA BELGIUM BRAZIL BULGARIA CANADA CHINA CZECH REP. FINLAND FRANCE GERMANY HUNGARY INDIA IRAN, ISL. REP. JAPAN KOREA, REP. OF MEXICO NETHERLANDS PAKISTAN ROMANIA RUSSIA SLOVAKIA SLOVENIA SOUTH AFRICA SPAIN SWEDEN SWITZERLAND UK UKRAINE USA

Country

17

17

No.

GCR

8762

8762

MW(e)

47

1 2

4

23140

125 1300

2785

4091

12604 1300

18 2

18

935

2

PHWR No. MW(e)

15

15

10219

10219

LWGR No. MW(e)

2

1

1

No.

FBR

580

560

20

MW(e)

435

2 1 7 2 2 18 16 6 4 58 9 4 20 1 50 21 2 1 3 2 33 4 1 2 8 10 5 18 15 104

No.

TABLE 2. TYPE AND NET ELECTRICAL POWER Of REACTORS CONNECTED TO THE GRID, 31 DEC. 2011 Total

368791

935 375 5927 1884 1906 12604 11816 3766 2736 63130 12068 1889 4391 915 44215 18751 1300 482 725 1300 23643 1816 688 1830 7567 9326 3263 9953 13107 101465

MW(e)

13

53

51326

5560 630 6484 782 1900 1165

5 2 8 2 2 1

MW(e)

1245 1906 26620 1600 1600 1834

PWR

1 2 26 1 1 2

No.

During 2011, construction started on 4 reactors, 1890 MW.

Note: The totals include 2 units ( 2xBWR), 2600 MW in Taiwan, China.

TOTAL

ARGENTINA BRAZIL BULGARIA CHINA FINLAND FRANCE INDIA JAPAN KOREA, REP. OF PAKISTAN RUSSIA SLOVAKIA UKRAINE USA

Country

4

2

No.

BWR

5250

2650

MW(e)

5

4

1

No.

PHWR

3212

2520

692

MW(e)

1

1

No.

LWGR

915

915

MW(e)

2

1

1

No.

FBR

TABLE 3. TYPE AND NET ELECTRICAL POWER Of REACTORS UNDER CONSTRUCTION, 31 DEC. 2011

1259

789

470

MW(e)

65

1 1 2 26 1 1 7 2 5 2 10 2 2 1

No.

Total

61962

692 1245 1906 26620 1600 1600 4824 2650 5560 630 8188 782 1900 1165

MW(e)

14

ARGENTINA ARMENIA BELGIUM BRAZIL BULGARIA CANADA CHINA CZECH REP. FINLAND FRANCE GERMANY HUNGARY INDIA IRAN, ISL. REP. ITALY JAPAN KAZAKHSTAN KOREA, REP. OF LITHUANIA MEXICO NETHERLANDS PAKISTAN ROMANIA RUSSIA SLOVAKIA SLOVENIA SOUTH AFRICA SPAIN

Country

935 375 5927 1884 1906 12604 11816 3766 2736 63130 12068 1889 4391 915

44215

18751

1300 482 725 1300 23643 1816 688 1830 7567

2 1 7 2 2 18 16 6 4 58 9 4 20 1

50

21

2 1 3 2 33 4 1 2 8

Reactors connected to the grid Capacity No. MW(e) Net

1

4

246

2726

Reactors in long term shutdown Net capacity No. MW(e) 376 10 1632 478

3789 14301

1423 4337 52 2370 55 786 909 621

1 1 4 3

12 27

4 9 1 2 1 5 3 2

Permanently shutdown reactors Net capacity No. MW(e)

TABLE 4. REACTOR YEARS Of EXPERIENCE, UP TO 31 DEC. 2011

No. 2 2 8 2 6 25 16 6 4 70 36 4 20 1 4 60 1 21 2 2 2 3 2 38 7 1 2 10

935 751 5937 1884 3538 15808 11816 3766 2736 66919 26369 1889 4391 915 1423 48798 52 18751 2370 1300 537 725 1300 24429 2725 688 1830 8188

Total, Operating and Shutdown Net capacity MW(e)

81 1546 25 381 43 39 67 52 19 1058 140 30 54 285

66 37 247 41 151 618 125 122 131 1816 782 106 357

8 11 4 7 3 3 6

4 10 1 6 11

7 8 7 3 3 2 6 10 4 4 9 2 3 4

Experience Years Months

15

435

Total

368791

9326 3263 9953 13107 101465

5

2. Operating experience is counted from the grid connection excluding any long term shutdown period.

2972

Reactors in long term shutdown Net capacity No. MW(e)

— reactors connected to the grid: 6 units, 5018 MW; experience: 182 years, 1 month.

1. The total includes the following data from Taiwan, China:

Notes:

10 5 18 15 104

Reactors connected to the grid Net capacity No. MW(e)

SWEDEN SWITZERLAND UK UKRAINE USA

Country

138

3 1 27 4 28

1210 6 3518 3515 9764

49152

Permanently shutdown reactors Net capacity No. MW(e)

TABLE 4. REACTOR YEARS Of EXPERIENCE, UP TO 31 DEC. 2011 — continued

No.

578

13 6 45 19 132 420915

10536 3269 13471 16622 111229

Total, operating and shutdown Net capacity MW(e)

14792

392 184 1495 398 3707

3

6 11 2 6 11

Experience Years Months

16

ARGENTINA ARMENIA BELGIUM BRAZIL BULGARIA CANADA CHINA CZECH REP. FINLAND FRANCE GERMANY HUNGARY INDIA IRAN, ISL. REP. ITALY JAPAN KAZAKHSTAN KOREA, REP. OF LITHUANIA MEXICO NETHERLANDS PAKISTAN ROMANIA RUSSIA SLOVAKIA SLOVENIA SOUTH AFRICA SPAIN SWEDEN

Country

832

1112 14918 135 564

498 125

8596 780

1073 5510

4 23 1 1

2 1

20 2

3 8

2208 14388 10323

4 22 19

4

1224 5172

335 816 1670

MW(e)

3 10

1 2 4

No.

1980

28 4 1 2 8 12

2 1

3 33 1 5 1

1 4 43 24 2 6

2 2 8 1 4 16

No.

1985

15841 1632 632 1840 5608 9455

508 137

1273 23612 135 3692 1380

391 2300 37478 18110 825 1143

935 816 5464 626 1632 9741

29 4 1 2 9 12

41 1 9 2 1 2 1

18898 1632 620 1840 7099 9826

30867 135 7220 2760 640 539 125

1632 2310 55808 21250 1710 1324

5501 626 2585 13993

7 1 5 20

4 4 56 21 4 7

935

2

30 4 1 2 9 12

50 1 11 2 2 2 1

2 1 7 1 6 21 3 4 4 56 19 4 10

19848 1632 620 1840 7097 10043

39625 50 9115 2370 1256 510 125

935 376 5631 626 3538 14902 2188 1782 2310 58573 20972 1729 1746

978 376 5712 1976 3760 9998 2188 2611 2656 63080 21283 1729 2508

43245 12990 2370 1290 449 425 655 19848 2440 676 1840 7468 9412

52 16 2 2 1 2 1 30 6 1 2 9 11

2 1 7 2 6 14 3 5 4 59 19 4 14

2 1 7 2 4 18 9 6 4 59 17 4 15

935 376 5801 1901 2722 12584 6587 3373 2676 63260 20339 1755 2993

20 1 2 1 2 1 31 6 1 2 9 10

55 16810 1185 1360 450 425 655 21743 2442 656 1800 7591 8905

47593

Number of units and net capacity (MW(e)) connected to the grid at 31 Dec. of given year 1990 1995 2000 2005 MW(e) No. MW(e) No. MW(e) No. MW(e) No. MW(e)

TABLE 5. OPERATING REACTORS AND NET ELECTRICAL POWER,1980 TO 2011

1300 482 425 1300 22693 1816 666 1800 7514 9303

2 1 2 2 32 4 1 2 8 10

46821

935 375 5926 1884 1906 12604 10065 3678 2716 63130 20490 1889 4189

MW(e)

18698

2010

21

54

2 1 7 2 2 18 13 6 4 58 17 4 19

No.

2 1 3 2 33 4 1 2 8 10

21

50

2 1 7 2 2 18 16 6 4 58 9 4 20 1

No.

2011

1300 482 725 1300 23643 1816 688 1830 7567 9326

18751

44215

935 375 5927 1884 1906 12604 11816 3766 2736 63130 12068 1889 4391 915

MW(e)

17

245

4 33 3 69

No.

1980

133037

1940 6423 2306 50881

MW(e)

363

5 38 10 90

No.

1985

245779

2881 10077 8324 74401

318253

2942 11360 13020 96228

434

5 35 15 108

341402

3056 12910 13045 98068

435

5 33 13 103

349999

3170 12490 11195 96297

441

5 23 15 103

3220 11852 13107 98145

368125

441

5 19 15 104

No.

2010

375280

3238 10137 13107 101211

MW(e)

– 1980: 2 units, 1208 MW; 1985: 6 units, 4890 MW; 1990: 6 units, 4828 MW; 1995: 6 units, 4884 MW; 2000: 6 units, 4884 MW; 2005: 6 units, 4884 MW; 2010: 6 units, 4982 MW; 2011: 6 units, 5018 MW.

416

5 37 15 108

Number of units and net capacity (MW(e)) connected to the grid at 31 Dec. of given year 1990 1995 2000 2005 MW(e) No. MW(e) No. MW(e) No. MW(e) No. MW(e)

Note: The world total includes the following data in Taiwan, China:

WORLD

SWITZERLAND UK UKRAINE USA

Country

TABLE 5. OPERATING REACTORS AND NET ELECTRICAL POWER,1980 TO 2011 — continued

435

5 18 15 104

No.

2011

368791

3263 9953 13107 101465

MW(e)

18

ARGENTINA ARMENIA BELGIUM BRAZIL BULGARIA CANADA CHINA CZECH REP. FINLAND FRANCE GERMANY HUNGARY INDIA IRAN, ISL. REP. ITALY JAPAN KAZAKHSTAN KOREA, REP. OF LITHUANIA MEXICO NETHERLANDS PAKISTAN ROMANIA RUSSIA SLOVAKIA SLOVENIA SOUTH AFRICA SPAIN SWEDEN

Country

NA

NA

NA NA

NA NA NA

NA

NA NA

NA

NA 0.5

NA NA

NA NA

2.18

11.86

5.71 38.02

6.68 57.31 41.44

2.77

2.11 79.11

3.26

3.97 0.07

43.78 4.52

4.98 25.42

88.26 8.70 3.85 5.39 26.83 55.89

3.69 0.26

12.36 8.75

NA NA NA 4.2 24.0 42.3

6.1 1.0

23.2 NA

3.8 22.7

NA 38.2 64.8 31.2 23.6 2.2

1.99 17.98 213.28 119.59 6.10 3.87

6.46 145.37

59.8 1.7 31.6 12.7

11.7

29.25 3.17 12.17 59.47

5.25

109.62 11.16 4.39 8.47 51.98 65.27

50.26 15.70 2.78 3.29 0.38

187.19

11.77 18.13 297.61 139.37 12.89 5.29

40.59 2.06 13.51 69.87

6.72

NA NA NA 5.6 35.9 45.9

49.1 NA 2.6 4.9 1.1

27.1

NA 35.1 74.5 33.1 51.4 2.2

60.1 1.0 35.7 14.8

19.8

91.59 11.35 4.57 11.29 53.49 67.17

275.51 0.08 60.21 10.64 7.53 3.78 0.46

39.30 2.33 16.22 93.98 12.13 12.23 18.13 358.71 146.13 13.20 6.99

6.57

11.8 44.1 39.5 6.5 34.1 46.6

33.4 0.1 36.1 86.1 6.0 4.9 0.9

55.5 1.0 46.4 17.3 1.2 20.0 29.9 76.1 29.6 42.3 1.9

11.8

103.54 7.42 7.92 3.70 0.90 5.05 120.10 15.17 4.55 13.00 59.49 51.88

306.24

5.74 1.84 45.81 5.59 16.79 69.12 16.02 12.71 21.58 395.39 160.66 13.35 14.23

7.3 33.0 56.8 1.9 45.0 11.8 1.2 18.7 32.2 76.4 30.6 40.6 3.1

6.37 2.50 45.34 9.20 17.38 86.83 50.33 23.25 22.36 431.18 154.61 13.02 15.73

6.9 42.7 55.6 2.5 44.1 14.5 2.0 30.5 32.9 78.5 26.6 37.2 2.8

6.69 2.29 45.73 13.77 14.24 85.50 70.96 26.44 21.89 410.09 133.01 14.66 20.48

5.9 39.4 51.2 3.1 33.1 15.1 1.8 33.3 28.4 74.1 22.6 42.1 2.9

5.89 2.36 45.94 14.79 15.26 88.32 82.57 26.70 22.27 423.51 102.31 14.71 28.95 0.10

5.0 33.2 54.0 3.2 32.6 15.3 1.9 33.0 31.6 77.7 17.8 43.3 3.7 0.0

40.7 73.9 3.9 4.3 1.7 10.9 15.0 53.4 37.4 6.6 27.6 39.0

33.8 137.59 9.54 10.32 3.77 2.41 5.11 137.64 16.34 5.61 12.24 54.99 69.58

280.50 44.7 70.3 5.0 3.9 2.8 8.6 15.8 56.1 42.4 5.5 19.6 44.9

29.3

32.2 3.6 3.4 2.6 19.5 17.1 51.8 37.3 5.2 20.1 38.1

5.59 3.75 2.56 10.70 159.41 13.54 5.38 12.90 59.26 55.73

29.2 141.89

280.25

9.31 3.92 3.84 10.81 162.02 14.34 5.90 12.94 55.12 58.10

147.76

156.18

3.6 3.6 3.8 19.0 17.6 54.0 41.7 5.2 19.5 39.6

34.6

18.1

Nuclear capacity (TW(e)∙h) of reactors connected to the grid at 31 Dec. of given year 1980 1985 1990 1995 2000 2005 2010 2011 TW(e)∙h % of total TW(e)·h % of total TW(e)·h % of total TW(e)·h % of total TW(e)·h % of total TW(e)·h % of total TW(e)·h % of total TW(e)·h % of total

TABLE 6. NUCLEAR ELECTRICITY PRODUCTION AND SHARE, 1980 TO 2011

19

635.36

WORLD

NA NA NA NA

1327.43

21.28 53.73 35.81 378.68

39.8 19.6 NA 15.5

1890.35

22.40 58.77 71.26 578.08

42.6 19.7 NA 20.6

2190.91

23.58 70.64 65.78 673.52

2011: 40.37 TW(e)∙h of nuclear electricity generation, representing 19.02% of the total electricity generated there.

2010: 39.89 TW(e)∙h of nuclear electricity generation, representing 19.3% of the total electricity generated there;

2005: 38.4 TW(e)∙h of nuclear electricity generation, representing 17.93% of the total electricity generated there;

2000: 37 TW(e)∙h of nuclear electricity generation, representing 21.19% of the total electricity generated there;

1995: 33.8 TW(e)∙h of nuclear electricity generation, representing 28.79% of the total electricity generated there;

1990: 31.54 TW(e)∙h of nuclear electricity generation, representing 38.32% of the total electricity generated there;

Note: The world total includes the following data from Taiwan, China:

13.63 32.32 6.38 249.84

39.9 25.4 37.8 22.5

2440.94

25.05 72.99 72.56 755.55

38.2 21.9 47.3 19.8

2626.34

22.11 75.34 83.40 783.35

38.0 20.0 48.5 19.3

25.34 56.85 83.95 807.08

38.0 15.5 48.1 19.6

25.69 62.66 84.89 790.44

40.9 17.8 47.2 19.3

2629.82

2517.97

Nuclear capacity (TW(e)·h) of reactors connected to the grid at 31 Dec. of given year 1980 1985 1990 1995 2000 2005 2010 2011 TW(e)·h % of total TW(e)·h % of total TW(e)·h % of total TW(e)·h % of total TW(e)·h % of total TW(e)·h % of total TW(e)·h % of total TW(e)·h % of total

SWITZERLAND UK UKRAINE USA

Country

TABLE 6. NUCLEAR ELECTRICITY PRODUCTION AND SHARE, 1980 TO 2011 — continued

TABLE 7. ANNUAL CONSTRUCTION STARTS AND CONNECTIONS TO THE GRID, 1954 TO 2011 Construction starts Year

20

Number of units

Connections to the grid

Design capacity (MW(e))

Number of units

Reactors in operation

Design capacity (MW(e))

Number of units

Updated capacity (MW(e))

1954 1955

1 8

60 260

1

5

1 1

5 5

1956 1957 1958 1959 1960

5 13 6 7 11

577 1836 476 976 1010

1 3 1 5 4

35 119 35 176 438

2 5 6 11 15

65 209 269 548 1087

1961 1962 1963 1964 1965

7 8 5 9 9

1531 1379 1722 2866 3291

1 9 9 8 8

15 955 500 1022 1879

16 25 33 40 48

1104 2223 2677 3686 5910

1966 1967 1968 1969 1970

15 25 37 13 37

7052 16287 26859 9277 25526

8 11 7 10 6

1530 2165 1020 3670 3410

55 64 69 78 84

7539 9595 10648 14121 17656

1971 1972 1973 1974 1975

18 29 29 38 38

12660 22335 23492 35222 36449

16 16 20 26 15

7711 8880 12727 17149 10236

99 113 132 154 169

24320 32797 43761 61021 70414

1976 1977 1978 1979 1980

42 24 23 28 20

40656 22691 21735 23909 19134

19 18 20 8 21

14269 13243 15782 6909 15088

186 200 219 225 245

83992 96385 111923 117814 133037

1981 1982 1983 1984 1985

16 19 16 10 20

15149 19765 12218 9528 16286

23 19 23 33 33

20389 15317 19253 31001 31042

267 284 306 336 363

153832 168317 187756 218452 245779

1986 1987 1988 1989 1990

8 13 7 6 5

7201 11019 7722 4018 3366

27 22 14 12 10

27212 22191 13621 10457 10543

389 407 416 420 416

272074 295812 305212 311942 318253

1991 1992 1993 1994 1995

2 3 4 2

2246 3105 3715 1330

4 6 9 5 5

3668 4809 9012 4176 3635

415 418 427 429 434

321924 325261 333914 336934 341402

1996 1997 1998 1999 2000

1 5 3 4 7

610 4386 2096 4583 5399

6 3 4 4 6

7080 3568 3152 2704 3063

438 434 430 432 435

347296 347895 344915 347368 349999

2001 2002 2003 2004 2005

1 6 1 2 3

1304 3440 202 1336 2900

3 6 2 5 4

2696 4998 1700 4785 3923

438 439 437 438 441

352730 357296 359842 364688 368125

2006 2007 2008 2009 2010

4 8 10 12 16

3400 6519 10499 13165 15846

2 3

1435 1785

2 5

1068 3763

435 439 438 437 441

369581 371645 371495 370705 375280

2011

4

1890

7

3997

435

368791

21

ARGENTINA ARMENIA BELGIUM BRAZIL BULGARIA CANADA CHINA CZECH REP. FINLAND FRANCE GERMANY HUNGARY INDIA IRAN, ISL. REP. ITALY JAPAN KOREA, REP. OF LITHUANIA MEXICO PAKISTAN ROMANIA RUSSIA SLOVAKIA SLOVENIA SOUTH AFRICA SPAIN SWEDEN

Country

73

87 69

63 66 68

152

101 61 63

74 89

85

2

1 4

4 13 9

1

1 11 1

6 2

3

1976 to 1980 No. Months

74

68 100 112 154

1

24 7 2 2

9 2 1 2 5 4

73 99 80 102 112 74

46 65 80

80 132 104 98

4 1 1 7

10 4 1

109

1

1981 to 1985 No. Months

72

96

2

49 62 116 151

86 103 90 152

93

89 101

4

8 4 1 1

15 6 2 1

3

1 5

1986 to 1990 No. Months

109

210

1 1

46 61

120

93

113 97 73

10 2

3

3

1 2 3

1991 to 1995 No. Months

83 169 118

2

42 59

122

124

167

175

1 1

3 5

4

4

1

1

1996 to 2000 No. Months

2

4 4

1

6 1

233

47 54

64

60 191

2001 to 2005 No. Months

1 1

1 1

4

4

160 323

53 51

81

68

2006 to 2010 No. Months

TABLE 8. NUMBER Of NEW REACTORS CONNECTED TO THE GRID AND MEDIAN CONSTRUCTION TIME IN MONTHS

1

1

1 1

3

107

64

105 221

60

No. Months

2011

22

86

TOTAL

74

63 106 89 100

131

1 6 7 25

99

125 186 64 126

1981 to 1985 No. Months

85

4 6 22

95

98 57 146

1986 to 1990 No. Months

29

1 1 1

PK -5 PK -4

PAKISTAN

Reactor

CHASNUPP 4 CHASNUPP 3

RAJASTHAN-7 RAJASTHAN-8

Name

Note: During 2011, construction was started on 4 reactors (1890 MW).

IN -21 IN -22

Code

INDIA

Country

Model

PWR PWR

CNP-300 CNP-300

PHWR Horizontal Pre PHWR Horizontal Pre

Type

TABLE 9. CONSTRUCTION STARTS DURING 2011

— 1981 to 1985: 4 units, 72 months.

— 1976 to 1980: 2 units, 64 months;

The totals include the following data from Taiwan, China:

999 999

2177 2177

Thermal

340 340

700 700

Gross

Capacity (MW)

103

80 113 221

1991 to 1995 No. Months

Note: Construction time is measured from the first pouring of concrete to the connection of the unit to the grid.

1 4 3 18

1976 to 1980 No. Months

SWITZERLAND UK UKRAINE USA

Country

315 315

630 630

Net

PAEC PAEC

NPCIL NPCIL

CZEC CZEC

NPCIL NPCIL

NSSS supplier

123

278

Operator

23

1

1996 to 2000 No. Months

20

2

2011-12 2011-5

2011-7 2011-9

Construction start

64

227

2001 to 2005 No. Months

2017-7 2016-9

2016-3 2016-9

Grid connection

12

75

2006 to 2010 No. Months

7

2017-10 2016-12

2016-6 2016-12

105

No. Months

2011

Commercial operation

TABLE 8. NUMBER Of NEW REACTORS CONNECTED TO THE GRID AND MEDIAN CONSTRUCTION TIME IN MONTHS — continued

23

RU -37

RUSSIA

BN-20 CPR-1000 CNP 600

Model

PWR

PWR

PWR

VVER V-320

PWR

VVER V-446

PHWR Horizontal Pre

FBR PWR PWR

Type

3200

999

3000

800

65 2905 1930

1000

325

1000

220

25 1080 650

Gross

Capacity (MW)

Thermal

IN -26

KR -22 KR -23

SK -10

US -391

KOREA, REP. OF

SLOVAKIA

USA

Reactor

WATTS BAR-2

MOCHOVCE-3

SHIN-KORI-2 SHIN-WOLSONG-1

KUDANKULAM-2

ATUCHA-2

Name

Model

PWR

PWR

PWR PWR

PWR

W (4-loop)

VVER V-213

OPR-1000 OPR-1000

VVER V-412

PHWR PHWR KWU

Type

Note: During 2012, 6 reactors (5085 MW) are expected to achieve connection to grid.

AR -3

INDIA

Code

ARGENTINA

Country

950

300

915

202

20 1000 610

Net

3425

1375

2825 2825

3000

2160

Thermal 745

1218

440

1000 1000

1000

Gross

Capacity (MW)

TABLE 11. SCHEDULED CONNECTIONS TO THE GRID DURING 2012

Note: During 2011, 7 reactors (3997 MW) were newly connected to the grid.

KALININ-4

CHASNUPP 2

PK -3

PAKISTAN

KAIGA-4

BUSHEHR 1

IN -16

INDIA

Reactor

CEFR LINGAO 4 QINSHAN 2-4

Name

IRAN, ISL. REP. IR -1

CN -84 CN -13 CN -15

Code

CHINA

Country

TABLE 10. CONNECTIONS TO THE GRID DURING 2011

1165

391

960 960

917

692

Net

REA

TVA

EMO

KHNP KHNP

NPCIL

WH

SKODA

DHICKOPC DHICKOPC

MAEP

SIEMENS

NSSS supplier

ROSATOM

CNNC

ASE

NPCIL

IZ DFEC CNNC

NSSS supplier

Operator NASA

PAEC

NPPDCO

NPCIL

CIAE LDNPC NPQJVC

Operator

1972-12

1987-1

2007-6 2007-11

2002-7

1981-7



2012-12

2011-12 2012-1

2012-6



First criticality

2011-11

2011-2

2011-5

2010-11

2010-7 2011-2 2011-11

First criticality

Construction start

1986-8

2005-12

1975-5

2002-5

2000-5 2006-6 2007-1

Construction start



2012-8

2012-12

2012-1 2012-1

2012-7

2012-7

Grid connection

2011-3

2011-9

2011-1

— 2011-5 2011-11

Grid connection

24

CHINA

Country

Code

CN -42 CN -53 CN -54 CN -57 CN -58 CN -59 CN -60 CN -48 CN -49 CN -50 CN -76 CN -77 CN -26 CN -27 CN -80 CN -81 CN -65 CN -66 CN -67 CN -68 CN -61 CN -62 CN -63 CN -64 CN -78 CN -79 CN -70 CN -71 CN -69

Name

BAMAOSHAN CHANGJIANG 3 CHANGJIANG 4 FANGCHENGGANG 3 FANGCHENGGANG 4 FANGCHENGGANG 5 FANGCHENGGANG 6 FUQING 4 FUQING 5 FUQING 6 HAIYANG 3 HAIYANG 4 HONGSHIDING 1 HONGSHIDING 2 HONGYANHE 5 HONGYANHE 6 JIYANG 1 JIYANG 2 JIYANG 3 JIYANG 4 PENGZE 1 PENGZE 2 PENGZE 3 PENGZE 4 SANMEN 3 SANMEN 4 SANMING-1 SANMING-2 SHIDAOWAN 1

Reactor

PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR FBR FBR HTGR

Type 2905 1930 1930

2905 2905 2905 3750 3750 2905 2905

3750 3750 2100 2100 500

CPR-1000 CPR-1000 CPR-1000 AP-1000 AP-1000

CPR-1000 CPR-1000

AP-1000 AP-1000 BN-800 BN-800 HTGR-PM

Thermal

1250 1250 860 860 200

1080 1080

1087 1087 1087 1250 1250

1080 650 650

Gross

Capacity (MW)

CPR-1000

Model

TABLE 12. REACTORS PLANNED fOR CONSTRUCTION AS KNOWN ON 31 DEC. 2011

900 610 610 1000 1000 1000 1000 1000 1000 1000 1000 1000 0 0 1000 1000 1000 1000 1000 1000 1250 1250 1250 1250 1000 1000 800 800 200

Net

WH/MHI WH/MHI

DFEC DFEC DFEC

HONGYANH LHNPC LHNPC

SMNPC SMNPC FSNPC FSNPC HSNPC

DFEC DFEC DFEC WH WH

NSSS supplier

FQNP FQNP FQNP SNPC SNPC

Operator — — — — — — — — — — — — — — — — — — — — — — — — — — — — —

Expected construction start

25

IR -2 IR -5 IR -9

JP -76 JP -69 JP -74 JP -72 JP -62 JP -63 JP -73 JP -75 JP -67 JP -68

KR -27

JAPAN

KOREA, REP. OF

Code

CN -32 CN -33 CN -72 CN -73 CN -74 CN -75 CN -40 CN -41 CN -82 CN -83 CN -44 CN -45 CN -46

IRAN, ISL. REP.

Country

Name

SHIN-ULCHIN-1

HAMAOKA-6 HIGASHI DORI 1 (TEPCO) HIGASHI DORI 2 (TEPCO) HIGASHI DORI 2 (TOHOKU) KAMINOSEKI 1 KAMINOSEKI 2 NAMIE-ODAKA SENDAI-3 TSURUGA-3 TSURUGA-4

BUSHEHR 2 BUSHEHR 3 DARKHOVAIN

TAOHUAJIANG 1 TAOHUAJIANG 2 TIANWAN 3 TIANWAN 4 TIANWAN 5 TIANWAN 6 XIANNING 1 XIANNING 2 XUDABU 1 XUDABU 2 YANGJIANG 4 YANGJIANG 5 YANGJIANG 6

Reactor

PWR

BWR BWR BWR BWR BWR BWR BWR PWR PWR PWR

PWR PWR PWR

PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR

Type

APR-1400

ABWR ABWR ABWR ABWR ABWR ABWR BWR APWR APWR APWR 1590 1590 1590

4466 4466 4466 1400

1373 1373

3926 3926

3938

1400 1385 1385

1000 1000 360

1080 1080 1087 1087 1087

1000 1000 1080 1080

Gross

3926 3926 3926

3000 3000 1113

2905 2905 2905 2905 2905

CPR-1000 CPR-1000 CPR-1000 CPR-1000 CPR-1000

VVER V-446 IR-360

3000 3000 2905 2905

Thermal

Capacity (MW)

VVER V-428 VVER V-428 CNP-1000 CNP-1000

Model

1340

1350 1343 1343 1067 1325 1325 825 1538 1538 1538

915 915 330

0 0 933 933 1000 1000 0 0 1000 1000 1000 1000 1000

Net

KHNP

CHUBU TEPCO TEPCO TOHOKU CHUGOKU CHUGOKU TOHOKU KYUSHU JAPCO JAPCO

NPPDCO NPPDCO NPPDCO

LNPC LNPC YJNPC YJNPC YJNPC

JNPC JNPC JNPC JNPC

Operator

TABLE 12. REACTORS PLANNED fOR CONSTRUCTION AS KNOWN ON 31 DEC. 2011 — continued

DHICKOPC

MHI MHI

TBD ASE

DFEC DFEC DFEC DFEC DFEC

IZ IZ DFEC DFEC

NSSS supplier



— — — — — — — — — —

2013-7 2013-7 2015-6

— — — — — — — — — — — — —

Expected construction start

26

RUSSIA

Country

RU -170 RU -171 RU -202 RU -203 RU -177 RU -178 RU -185 RU -186 RU -175 RU -176 RU -166 RU -189 RU -190 RU -191 RU -165 RU -167 RU -181 RU -182 RU -179 RU -180 RU -196 RU -197 RU -187 RU -188 RU -198 RU -199 RU -204 RU -205

Code

KR -28

Name

BALTIISK-1 BALTIISK-2 BASHKIR-1 BASHKIR-2 CENTRAL-1 CENTRAL-2 CENTRAL-3 CENTRAL-4 KOLA 2-1 KOLA 2-2 KURSK 2-1 KURSK 2-2 KURSK 2-3 KURSK 2-4 LENINGRAD 2-3 LENINGRAD 2-4 NIZHEGORODSK-1 NIZHEGORODSK-2 PEVEK-1 PEVEK-2 PRIMORSK-1 PRIMORSK-2 SEVERSK-1 SEVERSK-2 SMOLENSK 2-1 SMOLENSK 2-2 SOUTH URALS 1 SOUTH URALS 2

SHIN-ULCHIN-2

Reactor

PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR

PWR

Type

KLT-40S KLT-40S

VVER V-491 VVER V-491

-

-

VVER V-491 VVER V-491

APR-1400

Model

3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 3200 150 150 3200 3200 3200 3200 3200 3200 3000 3000

3983

Thermal 1194 1194 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1170 1170 1200 1200 35 35 1200 1200 1200 1200 1200 1200 1200 1200

1400

Gross

Capacity (MW)

1109 1109 1115 1115 1115 1115 1115 1115 1115 1115 1115 1115 1115 1115 1085 1085 1115 1115 32 32 1115 1115 1115 1115 1115 1115 1115 1115

Net

1340 REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA

KHNP

Operator

TABLE 12. REACTORS PLANNED fOR CONSTRUCTION AS KNOWN ON 31 DEC. 2011 — continued

ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM

DHICKOPC

NSSS supplier

2012-2 — — — — — — — — — — — — — — — — — — — — — — — — — — —



Expected construction start

27

VN -1 VN -2

VIETNAM

Name

PHUOC DINH 1 PHUOC DINH 2

BELL BEND CALVERT CLIFFS-3 COMANCHE PEAK-3 COMANCHE PEAK-4 ENRICO FERMI-3 LEVY COUNTY-1 LEVY COUNTY-2 NORTH ANNA-3 SHEARON HARRIS-2 SHEARON HARRIS-3 SOUTH TEXAS-3 SOUTH TEXAS-4 TURKEY POINT-6 TURKEY POINT-7 VIRGIL C. SUMMER-2 VIRGIL C. SUMMER-3 VOGTLE-3 VOGTLE-4 WILLIAM STATES LEE III -1 WILLIAM STATES LEE III -2

SOUTH URALS 3 TATAR-1 TATAR-2 TVERSK-1 TVERSK-2 TVERSK-3 TVERSK-4

Reactor

PWR PWR

PWR PWR PWR PWR BWR PWR PWR PWR PWR PWR BWR BWR PWR PWR PWR PWR PWR PWR PWR PWR

PWR PWR PWR PWR PWR PWR PWR

Type

Note: Status as of 31 December 2011, 114 reactors (117329 MW) were known as being planned.

US -5039 US -5016 US -5034 US -5035 US -5033 US -5029 US -5030 US -5017 US -5022 US -5023 US -5012 US -5013 US -5040 US -5041 US -5027 US -5028 US -5025 US -5026 US -5018 US -5019

Code

RU -206 RU -200 RU -201 RU -192 RU -193 RU -194 RU -195

USA

Country

EPR US-EPR US-APWR US-APWR ESBWR AP-1000 AP-1000 US-APWR AP-1000 AP-1000 ABWR ABWR AP-1000 AP-1000 AP-1000 AP-1000 AP-1000 AP-1000 AP-1000 AP-1000

Model

1720 1720 1600 1250 1250 1250 1250 1400 1400 1250 1250 1250 1250 1250 1250 1250 1250

4500 3750 3750 3750 3750 3926 3926 3750 3750 3750 3750 3750 3750 3750 3750

1200 1200 1200 1200 1200 1200 1200

Gross

4300 4300

3000 3200 3200 3200 3200 3200 3200

Thermal

Capacity (MW)

1000 1000

1600 1600 1700 1700 1520 1117 1117 1500 1117 1117 1350 1350 1117 1117 1117 1117 1117 1117 1117 1117

Net

1115 1115 1115 1115 1115 1115 1115

EVN EVN

PROGRESS

REA REA REA REA REA REA REA

Operator

TABLE 12. REACTORS PLANNED fOR CONSTRUCTION AS KNOWN ON 31 DEC. 2011 — continued

ROSATOM ROSATOM

WH WH

AREVA

ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM

NSSS supplier

— —

— — — — — — — — — — — — — — — — — — — —

— — — — — — —

Expected construction start

28

BG -7 BG -8

BR -3

CN -51 CN -52 CN -55 CN -56 CN -28 CN -29 CN -30 CN -31 CN -47 CN -24 CN -25 CN -20 CN -21 CN -22 CN -23 CN -36 CN -37 CN -38 CN -39 CN -16 CN -17 CN -34

BULGARIA

BRAZIL

CHINA

Code

AR -3

ARGENTINA

Country

CHANGJIANG 1 CHANGJIANG 2 FANGCHENGGANG 1 FANGCHENGGANG 2 FANGJIASHAN 1 FANGJIASHAN 2 FUQING 1 FUQING 2 FUQING 3 HAIYANG 1 HAIYANG 2 HONGYANHE 1 HONGYANHE 2 HONGYANHE 3 HONGYANHE 4 NINGDE 1 NINGDE 2 NINGDE 3 NINGDE 4 SANMEN 1 SANMEN 2 TAISHAN 1

ANGRA-3

BELENE-1 BELENE-2

Name

ATUCHA-2

Reactor

Model

PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR

PWR

PWR PWR

CNP-600 CNP-600 CPR-1000 CPR-1000 CNP-1000 CNP-1000 CPR-1000 CPR-1000 CPR-1000 AP-1000 AP-1000 CPR-1000 CPR-1000 CPR-1000 CPR-1000 CPR-1000 CPR-1000 CPR-1000 CPR-1000 AP-1000 AP-1000 EPR-1700

PRE KONVOI

VVER V-466 VVER V-466

PHWR PHWR KWU

Type

1930 1930 2905 2905 2905 2905 2905 2905 2905 3750 3750 2905 2905 2905 2905 2905 2905 2905 2905 3750 3750 4500

3765

3000 3000

2160

Thermal

650 650 1087 1087 1087 1087 1087 1087 1087 1250 1250 1080 1080 1080 1080 1087 1080 1080 1080 1250 1250 1750

1350

1000 1000

745

Gross

Capacity (MW)

TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2011

610 610 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1700

1245

953 953

692

Net ASE ASE

SIEMENS

NSSS supplier

HNPC HNPC GFNPC GFNPC QNPC QNPC FQNP FQNP FQNP SNPC SNPC LHNPC LHNPC LHNPC LHNPC NDNPC NDNPC NDNPC NDNPC SMNPC SMNPC TNPC

DFEC DFEC DFEC DFEC DFEC DFEC DFEC DFEC DFEC WH WH DFEC DFEC DFEC DFEC DFEC DFEC DFEC DFEC WH/MHI WH/MHI AREVA

ELETRONU KWU

KOZNPP KOZNPP

NASA

Operator

2010-4 2010-11 2010-7 2010-12 2008-12 2009-7 2008-11 2009-6 2010-12 2009-9 2010-6 2007-8 2008-3 2009-3 2009-8 2008-2 2008-11 2010-1 2010-9 2009-4 2009-12 2009-10

2010-6

1987-1 1987-3

1981-7

— — — — — — — — — — — — — — — — — — — — — —



— —



Construction First start criticality

— — — — — — — — — — — — — — — — — — — — — —



— —

2012-7

Grid connection

— 2015-12 — — — — — — 2015-7 — — — — — — — — — — — — —

2016-1

— —



Commercial operation

29

FI -5

FR -74

IN -30 IN -31 IN -25 IN -26 IN -29 IN -21 IN -22

JP -66 JP -65

KR -22 KR -25 KR -26 KR -23 KR -24

PK -4 PK -5

RU -151

FRANCE

INDIA

JAPAN

KOREA, REP. OF

PAKISTAN

RUSSIA

Code

CN -35 CN -18 CN -19 CN -43

FINLAND

Country

AKADEMIK LOMONOSOV 1

CHASNUPP 3 CHASNUPP 4

SHIN-KORI-2 SHIN-KORI-3 SHIN-KORI-4 SHIN-WOLSONG-1 SHIN-WOLSONG-2

OHMA SHIMANE-3

KAKRAPAR-3 KAKRAPAR-4 KUDANKULAM-1 KUDANKULAM-2 PFBR RAJASTHAN-7 RAJASTHAN-8

FLAMANVILLE-3

OLKILUOTO-3

Name

TAISHAN 2 YANGJIANG 1 YANGJIANG 2 YANGJIANG 3

Reactor

PWR

PWR PWR

PWR PWR PWR PWR PWR

BWR BWR

PHWR PHWR PWR PWR FBR PHWR PHWR

PWR

PWR

PWR PWR PWR PWR

Type

KLT-40S 'Float

CNP-300 CNP-300

OPR-1000 APR-1400 APR-1400 OPR-1000 OPR-1000

ABWR ABWR

Horizontal Pre Horizontal Pre

PHWR-700 PHWR-700 VVER V-412 VVER V-412

EPR

EPR

EPR-1700 CPR-1000 CPR-1000 CPR-1000

Model

150

999 999

2825 3983 3938 2825 2825

3926 3926

2166 2166 3000 3000 1253 2177 2177

4300

4300

4500 2905 2905 2905

Thermal

35

340 340

1000 1400 1400 1000 1000

1383 1373

700 700 1000 1000 500 700 700

1650

1720

1750 1087 1087 1087

Gross

Capacity (MW)

32

315 315

960 1340 1340 960 960

1325 1325

630 630 917 917 470 630 630

1600

1600

Net

1700 1000 1000 1000

NPCIL NPCIL

NPCIL NPCIL MAEP MAEP

AREVA

AREVA

AREVA DFEC DFEC DFEC

NSSS supplier

REA

PAEC PAEC

KHNP KHNP KHNP KHNP KHNP

ROSATOM

CZEC CZEC

DHICKOPC DHICKOPC DHICKOPC DHICKOPC DHICKOPC

EPDC H/G CHUGOKU HITACHI

NPCIL NPCIL NPCIL NPCIL BHAVINI NPCIL NPCIL

EDF

TVO

TNPC YJNPC YJNPC YJNPC

Operator

TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2011 — continued

2007-4

2011-5 2011-12

2007-6 2008-10 2009-8 2007-11 2008-9

2010-5 2007-10

2010-11 2010-11 2002-3 2002-7 2004-10 2011-7 2011-9

2007-12

2005-8

2010-4 2008-12 2009-6 2010-11



2016-8 2017-6

2011-12 — — 2012-1 —

— —

2014-12 2015-6 — 2012-6 — 2015-12 2016-6

2016-12



— — — —

Construction First start criticality



2016-9 2017-7

2012-1 — — 2012-1 —

— —

2015-3 2015-9 — 2012-7 — 2016-3 2016-9

2016-12



— — — —

Grid connection

2013-12

2016-12 2017-10

— 2013-9 2014-9 — —

2014-11 —

2015-6 2015-12 — 2012-8 — 2016-6 2016-12



2013-8

— — — —

Commercial operation

30

PWR

W (4-loop) (IC

VVER V-392B VVER V-392B 3425

3200 3200

1375 1375

150 2100 3200 3200 3200 3200 3200 3000 3000

1218

1000 1000

440 440

35 864 1000 1170 1170 1200 1200 1070 1070

Gross

Capacity (MW)

Thermal

1165

950 950

391 391

32 789 915 1085 1085 1114 1114 1011 1011

Net

NNEGC NNEGC

EMO EMO

REA REA REA REA REA REA REA REA REA

Operator

ASE ASE

SKODA SKODA

ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM

NSSS supplier

GE GE

WATTS BAR-2

PWR PWR

VVER V-213 VVER V-213

KLT-40S 'Float BN-800 RBMK-1000 VVER V-491 VVER V-491 VVER V-392M VVER V-392M VVER V-320 VVER V-320

Model

Note: Status as of 31 December 2011, 65 reactors (61962 MW) were under construction, including 2 units (2600 MW) in Taiwan, China: TAIWAN, CN TW -7 LUNGMEN 1 BWR ABWR 3926 1350 1300 TPC TAIWAN, CN TW -8 LUNGMEN 2 BWR ABWR 3926 1350 1300 TPC

US -391

USA

KHMELNITSKI-3 KHMELNITSKI-4

PWR PWR

PWR FBR LWGR PWR PWR PWR PWR PWR PWR

Type

WH

UA -51 UA -52

UKRAINE

MOCHOVCE-3 MOCHOVCE-4

AKADEMIK LOMONOSOV 2 BELOYARSKY-4 (BN-800) KURSK-5 LENINGRAD 2-1 LENINGRAD 2-2 NOVOVORONEZH 2-1 NOVOVORONEZH 2-2 ROSTOV-3 ROSTOV-4

Reactor

Name

TVA

SK -10 SK -11

RU -152 RU -116 RU -120 RU -163 RU -164 RU -161 RU -162 RU -63 RU -64

Code

SLOVAKIA

Country

TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2011 — continued

1999-3 1999-8

1972-12

1986-3 1987-2

1987-1 1987-1

2007-4 2006-7 1985-12 2008-10 2010-4 2008-6 2009-7 2009-9 2010-6

— —



— —

2012-12 2013-8

— — — — — — — — —

Construction First start criticality

— —

2012-8

2015-1 2016-1

2012-12 2013-9

— — — — — — — — —

Grid connection

— —



— —

2013-2 2013-10

2013-12 — — — — 2013-12 — — —

Commercial operation

31

Reactor

BE -2 BE -4 BE -5 BE -7 BE -3 BE -6 BE -8

BR -1 BR -2

BG -5 BG -6

CA -10 CA -11 CA -18 CA -19 CA -20 CA -21 CA -22 CA -23 CA -24 CA -25

BELGIUM

BRAZIL

BULGARIA

CANADA

Model

PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR

PWR PWR

PWR PWR

PWR PWR PWR PWR PWR PWR PWR

PWR

CANDU 750A CANDU 750A CANDU 750B CANDU 750B CANDU 750B CANDU 750B CANDU 850 CANDU 850 CANDU 850 CANDU 850

VVER V-320 VVER V-320

2-loop WE PRE KONVOI

WE (2 loops) WE (2 loops) WE 3-loops WE 3-loops Framatome 3 lo WE 3-loops WE 3-loops

VVER V-270

PHWR PHWR KWU PHWR CANDU 6

Type

2832 2832 2832 2690 2832 2690 2776 2776 2776 2776

3000 3000

1882 3764

1311 1311 3054 2988 2873 3064 3000

1375

1179 2015

805 805 872 891 872 845 934 934 934 934

1000 1000

640 1350

454 454 1056 1090 1009 1055 1094

408

357 648

Gross

Capacity (MW)

Thermal

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DH district heating.

BRUCE-3 BRUCE-4 BRUCE-5 BRUCE-6 BRUCE-7 BRUCE-8 DARLINGTON-1 DARLINGTON-2 DARLINGTON-3 DARLINGTON-4

KOZLODUY-5 KOZLODUY-6

ANGRA-1 ANGRA-2

DOEL-1 DOEL-2 DOEL-3 DOEL-4 TIHANGE-1 TIHANGE-2 TIHANGE-3

AM -19 ARMENIA-2

ARMENIA

ATUCHA-1 EMBALSE

Name

AR -1 AR -2

Code

ARGENTINA

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011

730 730 817 817 817 817 878 878 878 878

953 953

609 1275

433 433 1006 1039 962 1008 1046

375

335 600

Net

BRUCEPOW BRUCEPOW BRUCEPOW BRUCEPOW BRUCEPOW BRUCEPOW OPG OPG OPG OPG

KOZNPP KOZNPP

ELETRONU ELETRONU

ELECTRAB ELECTRAB ELECTRAB ELECTRAB ELECTRAB ELECTRAB ELECTRAB

ANPPJSC

NASA NASA

Operator

OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL

AEE AEE

WH KWU

ACECOWEN ACECOWEN FRAMACEC ACECOWEN ACLF FRAMACEC ACECOWEN

FAEA

SIEMENS AECL

NSSS supplier

1972-7 1972-9 1978-6 1978-1 1979-5 1979-8 1982-4 1981-9 1984-9 1985-7

1980-7 1982-4

1971-5 1976-1

1969-7 1971-9 1975-1 1978-12 1970-6 1976-4 1978-11

1975-7

1968-6 1974-4

1977-12 1978-12 1984-12 1984-6 1986-2 1987-3 1990-12 1990-1 1992-12 1993-4

1987-11 1991-8

1982-4 2000-7

1974-8 1975-8 1982-6 1985-4 1975-3 1982-10 1985-6

1980-1

1974-3 1983-4

Construction Grid Start connection

1978-2 1979-1 1985-3 1984-9 1986-4 1987-5 1992-11 1990-10 1993-2 1993-6

1988-12 1993-12

1985-1 2001-2

1975-2 1975-12 1982-10 1985-7 1975-10 1983-6 1985-9

1980-5

1974-6 1984-1

Commercial operation

76.6 86.9 90.7 85.8 89.9 91.7 88.5 89.5 92.5 87.8

86.3 86.1

73.0 90.3

84.9 90.7 86.8 86.4 87.1 89.8 88.3

71.2

87.4 80.1

77.2 87.4 91.0 85.9 90.0 91.9 89.6 90.4 93.4 88.6

86.7 86.7

73.1 90.9

84.9 90.7 87.1 86.4 88.1 90.1 88.9

72.3

87.6 80.2

-

DH DH

-

-

-

-

EAF % UCF % Non2007– 2007– electrical 2011 2011 applics

32

CN -84 CN -2 CN -3 CN -6 CN -7 CN -12 CN -13 CN -1 CN -4 CN -5 CN -14 CN -15 CN -8 CN -9 CN -10 CN -11

CZ -4 CZ -5 CZ -8 CZ -9

CZECH REP.

Code

CA -12 CA -4 CA -7 CA -13 CA -14 CA -15 CA -16 CA -17

CHINA

Country

Name

DUKOVANY-1 DUKOVANY-2 DUKOVANY-3 DUKOVANY-4

CEFR GUANGDONG-1 GUANGDONG-2 LINGAO 1 LINGAO 2 LINGAO 3 LINGAO 4 QINSHAN 1 QINSHAN 2-1 QINSHAN 2-2 QINSHAN 2-3 QINSHAN 2-4 QINSHAN 3-1 QINSHAN 3-2 TIANWAN 1 TIANWAN 2

GENTILLY-2 PICKERING-1 PICKERING-4 PICKERING-5 PICKERING-6 PICKERING-7 PICKERING-8 POINT LEPREAU

Reactor

PWR PWR PWR PWR

FBR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PHWR PHWR PWR PWR

PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR

Type

VVER V-213 VVER V-213 VVER V-213 VVER V-213

BN-20 M310 M310 M310 M310 CPR-1000 CPR-1000 CNP-300 CNP-600 CNP-600 CNP-600 CNP 600 CANDU 6 CANDU 6 VVER V-428 VVER V-428

CANDU 6 CANDU 500A CANDU 500A CANDU 500B CANDU 500B CANDU 500B CANDU 500B CANDU 6

Model

1375 1375 1444 1375

65 2905 2905 2905 2905 2905 2905 966 1930 1930 1930 1930 2064 2064 3000 3000

2156 1744 1744 1744 1744 1744 1744 2180

Thermal

498 456 498 498

25 984 984 990 990 1080 1080 310 650 650 650 650 700 700 1060 1060

675 542 542 540 540 540 540 680

Gross

Capacity (MW) 635 515 515 516 516 516 516 635

471 427 471 471

20 944 944 938 938 1007 1007 298 610 610 610 610 650 650 990 990

Net

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued

CEZ CEZ CEZ CEZ

CIAE GNPJVC GNPJVC LANPC LANPC LDNPC LDNPC QNPC NPQJVC NPQJVC NPQJVC NPQJVC TQNPC TQNPC JNPC JNPC

HQ OPG OPG OPG OPG OPG OPG NBEPC

Operator

SKODA SKODA SKODA SKODA

IZ FRAM FRAM FRAM FRAM DFEC DFEC CNNC CNNC CNNC CNNC CNNC AECL AECL IZ IZ

AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL AECL

NSSS supplier

1979-1 1979-1 1979-3 1979-3

2000-5 1987-8 1988-4 1997-5 1997-11 2005-12 2006-6 1985-3 1996-6 1997-4 2006-3 2007-1 1998-6 1998-9 1999-10 2000-10

1974-4 1966-6 1968-5 1974-11 1975-10 1976-3 1976-9 1975-5

1985-2 1986-1 1986-11 1987-6

2011-7 1993-8 1994-2 2002-2 2002-12 2010-7 2011-5 1991-12 2002-2 2004-3 2010-8 2011-11 2002-11 2003-6 2006-5 2007-5

1982-12 1971-4 1973-5 1982-12 1983-11 1984-11 1986-1 1982-9

Construction Grid start connection

1985-5 1986-3 1986-12 1987-7

— 1994-2 1994-5 2002-5 2003-1 2010-9 2011-8 1994-4 2002-4 2004-5 2010-10 2011-12 2002-12 2003-7 2007-5 2007-8

1983-10 1971-7 1973-6 1983-5 1984-2 1985-1 1986-2 1983-2

Commercial operation

87.4 89.3 86.0 85.8

90.4 92.7 80.1 84.2

90.3 92.5 80.1 84.2 87.2 88.8 85.3 85.2

94.2 90.8 90.1 89.7 73.2 99.5 87.3 79.5 87.9 83.1

69.6 65.4 57.1 69.3 80.5 74.5 80.5 22.0 94.2 90.8 89.9 89.7 73.2 99.5 87.2 79.5 87.8 83.1

66.7 65.2 56.9 68.6 80.2 74.2 79.7 22.0

-

-

-

EAF % UCF % Non2007– 2007– electrical 2011 2011 applics

33

FR -54 FR -55 FR -32 FR -33 FR -34 FR -35 FR -13 FR -14 FR -15 FR -16 FR -50 FR -53 FR -60 FR -65 FR -40 FR -41 FR -56 FR -57 FR -62 FR -70 FR -72 FR -73

FRANCE

Name

BELLEVILLE-1 BELLEVILLE-2 BLAYAIS-1 BLAYAIS-2 BLAYAIS-3 BLAYAIS-4 BUGEY-2 BUGEY-3 BUGEY-4 BUGEY-5 CATTENOM-1 CATTENOM-2 CATTENOM-3 CATTENOM-4 CHINON-B-1 CHINON-B-2 CHINON-B-3 CHINON-B-4 CHOOZ-B-1 CHOOZ-B-2 CIVAUX-1 CIVAUX-2

LOVIISA-1 LOVIISA-2 OLKILUOTO-1 OLKILUOTO-2

TEMELIN-1 TEMELIN-2

Reactor

PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR

PWR PWR BWR BWR

PWR PWR

Type

P4 REP 1300 P4 REP 1300 CP1 CP1 CP1 CP1 CP0 CP0 CP0 CP0 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 CP2 CP2 CP2 CP2 N4 REP 1450 N4 REP 1450 N4 REP 1450 N4 REP 1450

VVER V-213 VVER V-213 BWR-2500 BWR-2500

VVER V-320 VVER V-320

Model

3817 3817 2785 2785 2785 2785 2785 2785 2785 2785 3817 3817 3817 3817 2785 2785 2785 2785 4270 4270 4270 4270

1500 1500 2500 2500

3000 3000

Thermal

1363 1363 951 951 951 951 945 945 917 917 1362 1362 1362 1362 954 954 954 954 1560 1560 1561 1561

510 510 910 910

1013 1013

Gross

Capacity (MW)

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DH district heating.

FI -1 FI -2 FI -3 FI -4

Code

CZ -23 CZ -24

FINLAND

Country 963 963

1310 1310 910 910 910 910 910 910 880 880 1300 1300 1300 1300 905 905 905 905 1500 1500 1495 1495

488 488 880 880

Net

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued

EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF

FORTUMPH FORTUMPH TVO TVO

CEZ CEZ

Operator

FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM

AEE AEE ASEASTAL ASEASTAL

SKODA SKODA

NSSS supplier

1980-5 1980-8 1977-1 1977-1 1978-4 1978-4 1972-11 1973-9 1974-6 1974-7 1979-10 1980-7 1982-6 1983-9 1977-3 1977-3 1980-10 1981-2 1984-1 1985-12 1988-10 1991-4

1971-5 1972-8 1974-2 1975-11

1987-2 1987-2

1987-10 1988-7 1981-6 1982-7 1983-8 1983-5 1978-5 1978-9 1979-3 1979-7 1986-11 1987-9 1990-7 1991-5 1982-11 1983-11 1986-10 1987-11 1996-8 1997-4 1997-12 1999-12

1977-2 1980-11 1978-9 1980-2

2000-12 2002-12

Construction Grid start connection

1988-6 1989-1 1981-12 1983-2 1983-11 1983-10 1979-3 1979-3 1979-7 1980-1 1987-4 1988-2 1991-2 1992-1 1984-2 1984-8 1987-3 1988-4 2000-5 2000-9 2002-1 2002-4

1977-5 1981-1 1979-10 1982-7

2002-6 2003-4

Commercial operation

70.6 80.5 79.4 79.6 84.3 78.8 73.8 56.3 71.8 73.9 84.9 78.8 77.4 83.7 65.2 75.8 72.7 73.7 77.5 81.4 73.5 84.4

91.7 92.7 94.6 93.7

68.8 78.7

71.6 83.3 83.3 82.0 87.3 81.8 76.1 61.5 73.8 77.8 87.4 81.8 78.8 85.8 70.9 77.6 75.2 78.2 78.8 84.1 74.6 87.2

92.1 93.4 95.1 94.4

68.9 79.2

-

-

DH DH

EAF % UCF % Non2007– 2007– electrical 2011 2011 applics

34

Country

Code

FR -42 FR -43 FR -44 FR -45 FR -22 FR -29 FR -30 FR -31 FR -11 FR -12 FR -46 FR -47 FR -61 FR -68 FR -20 FR -21 FR -27 FR -28 FR -51 FR -52 FR -58 FR -59 FR -36 FR -37 FR -38 FR -39 FR -63 FR -64 FR -48 FR -49

Name

CRUAS-1 CRUAS-2 CRUAS-3 CRUAS-4 DAMPIERRE-1 DAMPIERRE-2 DAMPIERRE-3 DAMPIERRE-4 FESSENHEIM-1 FESSENHEIM-2 FLAMANVILLE-1 FLAMANVILLE-2 GOLFECH-1 GOLFECH-2 GRAVELINES-1 GRAVELINES-2 GRAVELINES-3 GRAVELINES-4 GRAVELINES-5 GRAVELINES-6 NOGENT-1 NOGENT-2 PALUEL-1 PALUEL-2 PALUEL-3 PALUEL-4 PENLY-1 PENLY-2 ST. ALBAN-1 ST. ALBAN-2

Reactor

PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR

Type

CP2 CP2 CP2 CP2 CP1 CP1 CP1 CP1 CP0 CP0 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 CP1 CP1 CP1 CP1 CP1 CP1 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300

Model

2785 2785 2785 2785 2785 2785 2785 2785 2660 2660 3817 3817 3817 3817 2785 2785 2785 2785 2785 2785 3817 3817 3817 3817 3817 3817 3817 3817 3817 3817

Thermal 956 956 956 956 937 937 937 937 920 920 1382 1382 1363 1363 951 951 951 951 951 951 1363 1363 1382 1382 1382 1382 1382 1382 1381 1381

Gross

Capacity (MW) 915 915 915 915 890 890 890 890 880 880 1330 1330 1310 1310 910 910 910 910 910 910 1310 1310 1330 1330 1330 1330 1330 1330 1335 1335

Net

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued

EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF

Operator FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM

NSSS supplier 1978-8 1978-11 1979-4 1979-10 1975-2 1975-4 1975-9 1975-12 1971-9 1972-2 1979-12 1980-5 1982-11 1984-10 1975-2 1975-3 1975-12 1976-4 1979-10 1979-10 1981-5 1982-1 1977-8 1978-1 1979-2 1980-2 1982-9 1984-8 1979-1 1979-7

1983-4 1984-9 1984-5 1984-10 1980-3 1980-12 1981-1 1981-8 1977-4 1977-10 1985-12 1986-7 1990-6 1993-6 1980-3 1980-8 1980-12 1981-6 1984-8 1985-8 1987-10 1988-12 1984-6 1984-9 1985-9 1986-4 1990-5 1992-2 1985-8 1986-7

Construction Grid start connection 1984-4 1985-4 1984-9 1985-2 1980-9 1981-2 1981-5 1981-11 1978-1 1978-4 1986-12 1987-3 1991-2 1994-3 1980-11 1980-12 1981-6 1981-10 1985-1 1985-10 1988-2 1989-5 1985-12 1985-12 1986-2 1986-6 1990-12 1992-11 1986-5 1987-3

Commercial operation 70.7 68.2 74.4 74.3 78.3 83.5 80.4 79.4 66.8 57.3 71.5 74.3 88.5 85.5 75.1 80.7 74.6 83.3 83.3 79.6 83.1 75.6 79.8 81.3 62.5 77.5 77.7 85.1 65.0 79.0

74.9 72.0 76.4 76.8 81.4 85.5 82.3 82.0 67.8 59.5 73.5 77.2 90.1 87.3 76.8 82.3 76.5 84.6 84.9 80.0 86.5 76.8 84.9 83.4 64.6 79.3 78.4 87.0 66.4 81.4

-

EAF % UCF % Non2007– 2007– electrical 2011 2011 applics

35

HU -1 HU -2 HU -3 HU -4

IN -13 IN -14 IN -15 IN -16 IN -9 IN -10 IN -5 IN -6

HUNGARY

INDIA

Name

KAIGA-1 KAIGA-2 KAIGA-3 KAIGA-4 KAKRAPAR-1 KAKRAPAR-2 MADRAS-1 MADRAS-2

PAKS-1 PAKS-2 PAKS-3 PAKS-4

BROKDORF (KBR) EMSLAND (KKE) GRAFENRHEINFELD (KKG) GROHNDE (KWG) GUNDREMMINGEN-B (GUN-B) GUNDREMMINGEN-C (GUN-C) ISAR-2 (KKI 2) NECKARWESTHEIM-2 (GKN 2) PHILIPPSBURG-2 (KKP 2)

ST. LAURENT-B-1 ST. LAURENT-B-2 TRICASTIN-1 TRICASTIN-2 TRICASTIN-3 TRICASTIN-4

Reactor

PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR

PWR PWR PWR PWR

PWR PWR PWR PWR BWR BWR PWR PWR PWR

PWR PWR PWR PWR PWR PWR

Type

Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre

VVER V-213 VVER V-213 VVER V-213 VVER V-213

PWR Konvoi PWR PWR BWR-72 BWR-72 Konvoi Konvoi PWR

CP2 CP2 CP1 CP1 CP1 CP1

Model

801 801 800 800 801 801 801 801

1485 1485 1485 1485

3900 3850 3765 3900 3840 3840 3950 3850 3950

2785 2785 2785 2785 2785 2785

Thermal

220 220 220 220 220 220 220 220

500 500 500 500

1480 1400 1345 1430 1344 1344 1485 1400 1468

956 956 955 955 955 955

Gross

Capacity (MW) 915 915 915 915 915 915

202 202 202 202 202 202 205 205

470 473 473 473

1410 1329 1275 1360 1284 1288 1410 1310 1402

Net

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DH district heating, DS desalination.

DE -32 DE -33 DE -23 DE -27 DE -26 DE -28 DE -31 DE -44 DE -24

Code

FR -17 FR -23 FR -18 FR -19 FR -25 FR -26

GERMANY

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued

NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL

PAKS Zrt PAKS Zrt PAKS Zrt PAKS Zrt

E.ON KLE E.ON KWG KGG KGG E.ON EnKK EnKK

EDF EDF EDF EDF EDF EDF

Operator

NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL

AEE AEE AEE AEE

KWU KWU KWU KWU KWU KWU KWU KWU KWU

FRAM FRAM FRAM FRAM FRAM FRAM

NSSS supplier

1989-9 1989-12 2002-3 2002-5 1984-12 1985-4 1971-1 1972-10

1974-8 1974-8 1979-10 1979-10

1976-1 1982-8 1975-1 1976-6 1976-7 1976-7 1982-9 1982-11 1977-7

1976-5 1976-7 1974-11 1974-12 1975-4 1975-5

2000-10 1999-12 2007-4 2011-1 1992-11 1995-3 1983-7 1985-9

1982-12 1984-9 1986-9 1987-8

1986-10 1988-4 1981-12 1984-9 1984-3 1984-11 1988-1 1989-1 1984-12

1981-1 1981-6 1980-5 1980-8 1981-2 1981-6

Construction Grid start connection

2000-11 2000-3 2007-5 2011-1 1993-5 1995-9 1984-1 1986-3

1983-8 1984-11 1986-12 1987-11

1986-12 1988-6 1982-6 1985-2 1984-7 1985-1 1988-4 1989-4 1985-4

1983-8 1983-8 1980-12 1980-12 1981-5 1981-11

Commercial operation

57.6 56.4 45.1 71.7 35.9 62.5 47.5 50.9

86.7 87.6 88.2 88.3

91.0 94.1 84.2 90.1 88.9 88.3 93.8 92.5 90.7

81.3 77.6 78.5 74.9 78.3 83.2

90.0 92.6 72.9 93.5 45.3 94.3 80.7 91.2

86.7 87.6 88.2 88.3

91.2 94.2 84.3 91.4 89.1 88.4 93.9 92.8 91.9

85.1 80.7 80.6 77.0 79.6 84.9

DS DS

DH DH DH

-

-

EAF % UCF % Non2007– 2007– electrical 2011 2011 applics

36

JP -17 JP -18 JP -25 JP -26 JP -35 JP -38 JP -12 JP -27 JP -45 JP -46 JP -36 JP -49 JP -60 JP -58 JP -23

Name

FUKUSHIMA-DAIICHI-5 FUKUSHIMA-DAIICHI-6 FUKUSHIMA-DAINI-1 FUKUSHIMA-DAINI-2 FUKUSHIMA-DAINI-3 FUKUSHIMA-DAINI-4 GENKAI-1 GENKAI-2 GENKAI-3 GENKAI-4 HAMAOKA-3 HAMAOKA-4 HAMAOKA-5 HIGASHI DORI 1 (TOHOKU) IKATA-1

BUSHEHR 1

NARORA-1 NARORA-2 RAJASTHAN-1 RAJASTHAN-2 RAJASTHAN-3 RAJASTHAN-4 RAJASTHAN-5 RAJASTHAN-6 TARAPUR-1 TARAPUR-2 TARAPUR-3 TARAPUR-4

Reactor

BWR BWR BWR BWR BWR BWR PWR PWR PWR PWR BWR BWR BWR BWR PWR

PWR

PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR BWR BWR PHWR PHWR

Type

BWR-4 BWR-5 BWR-5 BWR-5 BWR-5 BWR-5 M (2-loop) M (2-loop) M (4-loop) M (4-loop) BWR-5 BWR-5 ABWR BWR-5 M (2-loop)

VVER V-446

Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre BWR-1, Mark 2 BWR-1, Mark 2 Horizontal Pre Horizontal Pre

Model

2381 3293 3293 3293 3293 3293 1650 1650 3423 3423 3293 3293 3926 3293 1650

3000

801 801 346 693 801 801 801 801 530 530 1730 1730

Thermal

784 1100 1100 1100 1100 1100 559 559 1180 1180 1100 1137 1380 1100 566

1000

220 220 100 200 220 220 220 220 160 160 540 540

Gross

Capacity (MW) 202 202 90 187 202 202 202 202 150 150 490 490

760 1067 1067 1067 1067 1067 529 529 1127 1127 1056 1092 1325 1067 538

915

Net

TEPCO TEPCO TEPCO TEPCO TEPCO TEPCO KYUSHU KYUSHU KYUSHU KYUSHU CHUBU CHUBU CHUBU TOHOKU SHIKOKU

NPPDCO

NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL

Operator

Note: The column "Non-electrical applications" indicates the use of the facility to provide: PH process heating, DS desalination.

IR -1

JAPAN

Code

IN -7 IN -8 IN -3 IN -4 IN -11 IN -12 IN -19 IN -20 IN -1 IN -2 IN -23 IN -24

IRAN, ISL. REP.

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued

TOSHIBA GE/T TOSHIBA HITACHI TOSHIBA HITACHI MHI MHI MHI MHI TOSHIBA TOSHIBA TOSHIBA TOSHIBA MHI

ASE

NPCIL NPCIL AECL AECL/DAE NPCIL NPCIL NPCIL NPCIL GE GE NPCIL NPCIL

NSSS supplier

1972-5 1973-10 1976-3 1979-5 1981-3 1981-5 1971-9 1977-2 1988-6 1992-7 1983-4 1989-10 2000-7 2000-11 1973-9

1975-5

1976-12 1977-11 1965-8 1968-4 1990-2 1990-10 2002-9 2003-1 1964-10 1964-10 2000-5 2000-3

1977-9 1979-5 1981-7 1983-6 1984-12 1986-12 1975-2 1980-6 1993-6 1996-11 1987-1 1993-1 2004-4 2005-3 1977-2

2011-9

1989-7 1992-1 1972-11 1980-11 2000-3 2000-11 2009-12 2010-3 1969-4 1969-5 2006-6 2005-6

Construction Grid start connection

1978-4 1979-10 1982-4 1984-2 1985-6 1987-8 1975-10 1981-3 1994-3 1997-7 1987-8 1993-9 2005-1 2005-12 1977-9

2012-7

1991-1 1992-7 1973-12 1981-4 2000-6 2000-12 2010-2 2010-3 1969-10 1969-10 2006-8 2005-9

Commercial operation

61.6 59.0 69.1 65.4 68.5 62.3 85.0 64.4 67.0 86.6 66.7 79.1 49.2 63.9 76.4

36.8 18.7 0.0 50.3 71.5 70.1 90.7 65.3 85.8 91.4 66.3 56.1

61.6 60.4 70.2 66.6 69.7 63.5 85.0 64.4 67.0 86.6 67.0 81.2 61.0 63.9 76.5

68.0 34.8 0.0 53.4 91.4 89.6 91.7 66.1 86.4 91.9 92.1 84.9

DS DS DS

-

PH PH PH PH -

EAF % UCF % Non2007– 2007– electrical 2011 2011 applics

37

Code

JP -32 JP -47 JP -33 JP -39 JP -52 JP -53 JP -40 JP -55 JP -56 JP -4 JP -6 JP -14 JP -15 JP -19 JP -50 JP -51 JP -22 JP -54 JP -57 JP -28 JP -37 JP -48 JP -59 JP -7 JP -41 JP -8 JP -13 JP -29 JP -30 JP -21

Name

IKATA-2 IKATA-3 KASHIWAZAKI KARIWA-1 KASHIWAZAKI KARIWA-2 KASHIWAZAKI KARIWA-3 KASHIWAZAKI KARIWA-4 KASHIWAZAKI KARIWA-5 KASHIWAZAKI KARIWA-6 KASHIWAZAKI KARIWA-7 MIHAMA-1 MIHAMA-2 MIHAMA-3 OHI-1 OHI-2 OHI-3 OHI-4 ONAGAWA-1 ONAGAWA-2 ONAGAWA-3 SENDAI-1 SENDAI-2 SHIKA-1 SHIKA-2 SHIMANE-1 SHIMANE-2 TAKAHAMA-1 TAKAHAMA-2 TAKAHAMA-3 TAKAHAMA-4 TOKAI-2

Reactor

PWR PWR BWR BWR BWR BWR BWR BWR BWR PWR PWR PWR PWR PWR PWR PWR BWR BWR BWR PWR PWR BWR BWR BWR BWR PWR PWR PWR PWR BWR

Type

M (2-loop) M (3-loop) BWR-5 BWR-5 BWR-5 BWR-5 BWR-5 ABWR ABWR W (2-loop) M (2-loop) M (3-loop) W (4-loop) W (4-loop) M (4-loop) M (4-loop) BWR-4 BWR-5 BWR-5 M (3-loop) M (3-loop) BWR-5 ABWR BWR-3 BWR-5 M (3-loop) M (3-loop) M (3-loop) M (3-loop) BWR-5

Model

1650 2660 3293 3293 3293 3293 3293 3926 3926 1031 1456 2440 3423 3423 3423 3423 1593 2436 2436 2660 2660 1593 3926 1380 2436 2440 2440 2660 2660 3293

Thermal 566 890 1100 1100 1100 1100 1100 1356 1356 340 500 826 1175 1175 1180 1180 524 825 825 890 890 540 1206 460 820 826 826 870 870 1100

Gross

Capacity (MW)

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DS desalination.

Country 538 846 1067 1067 1067 1067 1067 1315 1315 320 470 780 1120 1120 1127 1127 498 796 796 846 846 505 1108 439 789 780 780 830 830 1060

Net

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued

SHIKOKU SHIKOKU TEPCO TEPCO TEPCO TEPCO TEPCO TEPCO TEPCO KEPCO KEPCO KEPCO KEPCO KEPCO KEPCO KEPCO TOHOKU TOHOKU TOHOKU KYUSHU KYUSHU HOKURIKU HOKURIKU CHUGOKU CHUGOKU KEPCO KEPCO KEPCO KEPCO JAPCO

Operator MHI MHI TOSHIBA TOSHIBA TOSHIBA HITACHI HITACHI TOSHIBA HITACHI WH MHI MHI WH WH MHI MHI TOSHIBA TOSHIBA TOSHIBA MHI MHI HITACHI HITACHI HITACHI HITACHI WH/MHI MHI MHI MHI GE

NSSS supplier 1978-8 1990-10 1980-6 1985-11 1989-3 1990-3 1985-6 1992-11 1993-7 1967-2 1968-5 1972-8 1972-10 1972-12 1987-10 1988-6 1980-7 1991-4 1998-1 1979-12 1981-10 1989-7 2001-8 1970-7 1985-2 1970-4 1971-3 1980-12 1981-3 1973-10

1981-8 1994-3 1985-2 1990-2 1992-12 1993-12 1989-9 1996-1 1996-12 1970-8 1972-4 1976-2 1977-12 1978-10 1991-6 1992-6 1983-11 1994-12 2001-5 1983-9 1985-4 1993-1 2005-7 1973-12 1988-7 1974-3 1975-1 1984-5 1984-11 1978-3

Construction Grid start connection 1982-3 1994-12 1985-9 1990-9 1993-8 1994-8 1990-4 1996-11 1997-7 1970-11 1972-7 1976-12 1979-3 1979-12 1991-12 1993-2 1984-6 1995-7 2002-1 1984-7 1985-11 1993-7 2006-3 1974-3 1989-2 1974-11 1975-11 1985-1 1985-6 1978-11

Commercial operation 85.1 77.7 29.9 4.0 10.7 10.8 21.7 47.2 47.9 53.1 64.2 71.6 63.5 77.0 62.0 75.8 42.4 59.8 52.4 69.0 78.7 35.9 42.7 46.4 70.6 67.4 71.2 76.8 73.2 56.1

85.2 77.7 35.5 4.0 14.3 20.0 31.9 55.4 54.6 53.4 64.4 71.6 63.5 77.0 62.0 75.8 52.3 69.2 62.4 69.0 78.7 35.9 42.7 46.4 70.6 67.4 71.2 76.8 73.2 59.9

DS DS DS DS DS DS -

EAF % UCF % Non2007– 2007– electrical 2011 2011 applics

38

KR -1 KR -2 KR -5 KR -6 KR -21 KR -9 KR -10 KR -13 KR -14 KR -19 KR -20 KR -3 KR -4 KR -15 KR -16 KR -7 KR -8 KR -11 KR -12 KR -17 KR -18

MX -1 MX -2

MEXICO

Code

JP -43 JP -44 JP -64 JP -3 JP -34

KOREA, REP. OF

Country

Name

LAGUNA VERDE-1 LAGUNA VERDE-2

KORI-1 KORI-2 KORI-3 KORI-4 SHIN-KORI-1 ULCHIN-1 ULCHIN-2 ULCHIN-3 ULCHIN-4 ULCHIN-5 ULCHIN-6 WOLSONG-1 WOLSONG-2 WOLSONG-3 WOLSONG-4 YONGGWANG-1 YONGGWANG-2 YONGGWANG-3 YONGGWANG-4 YONGGWANG-5 YONGGWANG-6

TOMARI-1 TOMARI-2 TOMARI-3 TSURUGA-1 TSURUGA-2

Reactor

BWR BWR

PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PHWR PHWR PHWR PHWR PWR PWR PWR PWR PWR PWR

PWR PWR PWR BWR PWR

Type

BWR-5 BWR-5

WH △60 WH F WH F WH F OPR-1000 France CPI France CPI OPR-1000 OPR-1000 OPR-1000 OPR-1000 CANDU 6 CANDU 6 CANDU 6 CANDU 6 WH F WH F OPR-1000 OPR-1000 OPR-1000 OPR-1000

M (2-loop) M (2-loop) M (3-loop) BWR-2 M (4-loop)

Model

2027 2027

1729 1882 2912 2912 2825 2785 2775 2825 2825 2815 2825 2061 2061 2061 2061 2787 2787 2825 2825 2825 2825

1650 1650 2660 1070 3411

Thermal

682 682

603 675 1042 1042 1038 985 984 1047 1045 1048 1048 689 740 729 730 985 978 1039 1039 1046 1050

579 579 912 357 1160

Gross

Capacity (MW)

650 650

576 637 1011 1009 985 945 942 994 998 997 997 660 710 707 708 953 947 997 994 988 996

550 550 866 340 1108

Net

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued

CFE CFE

KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP

HEPCO HEPCO HEPCO JAPCO JAPCO

Operator

GE GE

WH WH WH WH DHICKOPC FRAM FRAM DHICKOPC DHICKOPC DHICKOPC DHICKOPC AECL AECL/DHI AECL/DHI AECL/DHI WH WH DHICKAEC DHICKAEC DHICKOPC DHICKOPC

MHI MHI MHI GE MHI

NSSS supplier

1976-10 1977-6

1972-4 1977-12 1979-10 1980-4 2006-6 1983-1 1983-7 1993-7 1993-11 1999-10 2000-9 1977-10 1992-6 1994-3 1994-7 1981-6 1981-12 1989-12 1990-5 1997-6 1997-11

1985-4 1985-6 2004-11 1966-11 1982-11

1989-4 1994-11

1977-6 1983-4 1985-1 1985-11 2010-8 1988-4 1989-4 1998-1 1998-12 2003-12 2005-1 1982-12 1997-4 1998-3 1999-5 1986-3 1986-11 1994-10 1995-7 2001-12 2002-9

1988-12 1990-8 2009-3 1969-11 1986-6

Construction Grid start connection

1990-7 1995-4

1978-4 1983-7 1985-9 1986-4 2011-2 1988-9 1989-9 1998-8 1999-12 2004-7 2005-4 1983-4 1997-7 1998-7 1999-10 1986-8 1987-6 1995-3 1996-1 2002-5 2002-12

1989-6 1991-4 2009-12 1970-3 1987-2

Commercial operation

75.8 82.3

94.4 91.4 92.9 92.2 99.6 93.4 89.6 93.0 88.5 93.6 93.4 50.1 93.5 94.7 93.3 91.6 90.5 92.3 91.5 94.2 92.5

71.1 74.6 91.4 42.8 50.9

76.1 82.8

95.0 91.4 92.9 92.4 100.0 93.6 89.6 93.1 88.6 93.7 93.6 50.1 93.7 94.8 93.4 91.9 90.8 92.5 91.8 94.2 92.8

71.1 74.6 91.4 43.0 51.7

-

-

-

EAF % UCF % Non2007– 2007– electrical 2011 2011 applics

39

PK -2 PK -3 PK -1

RO -1 RO -2

RU -96 RU -97 RU -98 RU -99 RU -21 RU -141 RU -142 RU -143 RU -144 RU -30 RU -31 RU -36 RU -37 RU -12 RU -13 RU -32 RU -33 RU -17 RU -22 RU -38 RU -39

ROMANIA

RUSSIA

Reactor

BALAKOVO-1 BALAKOVO-2 BALAKOVO-3 BALAKOVO-4 BELOYARSKY-3 (BN-600) BILIBINO-1 BILIBINO-2 BILIBINO-3 BILIBINO-4 KALININ-1 KALININ-2 KALININ-3 KALININ-4 KOLA-1 KOLA-2 KOLA-3 KOLA-4 KURSK-1 KURSK-2 KURSK-3 KURSK-4

CERNAVODA-1 CERNAVODA-2

CHASNUPP 1 CHASNUPP 2 KANUPP

BORSSELE

Name

LWR - PWR

Model

PWR PWR PWR PWR FBR LWGR LWGR LWGR LWGR PWR PWR PWR PWR PWR PWR PWR PWR LWGR LWGR LWGR LWGR

VVER V-320 VVER V-320 VVER V-320 VVER V-320 BN-600 EGP-6 EGP-6 EGP-6 EGP-6 VVER V-338 VVER V-338 VVER V-320 VVER V-320 VVER V-230 VVER V-230 VVER V-213 VVER V-213 RBMK-1000 RBMK-1000 RBMK-1000 RBMK-1000

PHWR CANDU 6 PHWR CANDU 6

3000 3000 3000 3200 1470 62 62 62 62 3000 3000 3200 3200 1375 1375 1375 1375 3200 3200 3200 3200

2180 2180

999 999 433

1366

1000 1000 1000 1000 600 12 12 12 12 1000 1000 1000 1000 440 440 440 440 1000 1000 1000 1000

706 706

325 325 137

515

Gross

Capacity (MW)

Thermal

PWR CNP-300 PWR PWR PHWR CANDU-137 MW

PWR

Type 482

950 950 950 950 560 11 11 11 11 950 950 950 950 411 411 411 411 925 925 925 925

650 650

300 300 125

Net

REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA

SNN SNN

PAEC PAEC PAEC

EPZ

Operator

ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM

AECL AECL

CNNC CNNC CGE

S/KWU

NSSS supplier

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DS desalination, DH district heating, PH process heating.

NL -2

PAKISTAN

Code

NETHERLANDS

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued

1980-12 1981-8 1982-11 1984-4 1969-1 1970-1 1970-1 1970-1 1970-1 1977-2 1982-2 1985-10 1986-8 1970-5 1970-5 1977-4 1976-8 1972-6 1973-1 1978-4 1981-5

1982-7 1983-7

1993-8 2005-12 1966-8

1969-7

1985-12 1987-10 1988-12 1993-4 1980-4 1974-1 1974-12 1975-12 1976-12 1984-5 1986-12 2004-12 2011-11 1973-6 1974-12 1981-3 1984-10 1976-12 1979-1 1983-10 1985-12

1996-7 2007-8

2000-6 2011-3 1971-10

1973-7

Construction Grid start connection

1986-5 1988-1 1989-4 1993-12 1981-11 1974-4 1975-2 1976-2 1977-1 1985-6 1987-3 2005-11 — 1973-12 1975-2 1982-12 1984-12 1977-10 1979-8 1984-3 1986-2

1996-12 2007-10

2000-9 2011-5 1972-12

1973-10

Commercial operation

87.4 89.2 89.5 88.8 76.6 53.3 84.8 85.7 83.4 84.9 86.2 85.3 85.7 86.0 78.7 84.6 84.8 78.6 71.4 75.6

82.4 82.4 72.2 80.9 82.8 78.4 70.7 74.7

94.1 94.6

74.1 88.3 45.7

93.0

86.9 88.1 88.5 88.0 76.5 44.3 75.5 76.3 74.2 84.7 85.9 85.1

93.6 93.8

74.0 88.3 45.7

92.7

DH, PH DH, PH DH, PH DH, PH DH, PH DH DH DH DH DH, PH DH, PH PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH

DH DH

DS

-

EAF % UCF % Non2007– 2007– electrical 2011 2011 applics

40

SI -1

ZA -1 ZA -2

ES -6 ES -7 ES -8 ES -9 ES -10 ES -2 ES -11

SLOVENIA

SOUTH AFRICA

SPAIN

Name

ALMARAZ-1 ALMARAZ-2 ASCO-1 ASCO-2 COFRENTES SANTA MARIA DE GARONA TRILLO-1

KOEBERG-1 KOEBERG-2

KRSKO

BOHUNICE-3 BOHUNICE-4 MOCHOVCE-1 MOCHOVCE-2

LENINGRAD-1 LENINGRAD-2 LENINGRAD-3 LENINGRAD-4 NOVOVORONEZH-3 NOVOVORONEZH-4 NOVOVORONEZH-5 ROSTOV-1 ROSTOV-2 SMOLENSK-1 SMOLENSK-2 SMOLENSK-3

Reactor

PWR PWR PWR PWR BWR BWR PWR

PWR PWR

PWR

PWR PWR PWR PWR

LWGR LWGR LWGR LWGR PWR PWR PWR PWR PWR LWGR LWGR LWGR

Type

WE 3-loops WE 3-loops WE 3-loops WE 3-loops BWR-6 BWR-3 PWR 3 loops

CP1 CP1

Westinghouse 2

VVER V-213 VVER V-213 VVER V-213 VVER V-213

RBMK-1000 RBMK-1000 RBMK-1000 RBMK-1000 VVER V-179 VVER V-179 VVER V-187 VVER V-320I VVER V-320I RBMK-1000 RBMK-1000 RBMK-1000

Model

2947 2947 2941 2941 3237 1381 3010

2775 2775

1994

1471 1471 1471 1471

3200 3200 3200 3200 1375 1375 3000 3200 3200 3200 3200 3200

Thermal

1045 1044 1033 1027 1092 466 1066

970 940

727

505 505 470 470

1000 1000 1000 1000 417 417 1000 1000 1000 1000 1000 1000

Gross

Capacity (MW) 925 925 925 925 385 385 950 950 950 925 925 925

1011 1006 995 997 1064 446 1003

930 900

688

472 472 436 436

Net

CNAT CNAT ANAV ANAV ID NUCLENOR CNAT

ESKOM ESKOM

NEK

SE,plc SE,plc SE,plc SE,plc

REA REA REA REA REA REA REA REA REA REA REA REA

Operator

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DH district heating, PH process heating.

SK -13 SK -14 SK -6 SK -7

Code

RU -15 RU -16 RU -34 RU -35 RU -9 RU -11 RU -20 RU -59 RU -62 RU -23 RU -24 RU -67

SLOVAKIA

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued

WH WH WH WH GE GE KWU

FRAM FRAM

WH

SKODA SKODA SKODA SKODA

ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM

NSSS supplier

1973-7 1973-7 1974-5 1975-3 1975-9 1966-9 1979-8

1976-7 1976-7

1975-3

1976-12 1976-12 1983-10 1983-10

1970-3 1970-6 1973-12 1975-2 1967-7 1967-7 1974-3 1981-9 1983-5 1975-10 1976-6 1984-5

1981-5 1983-10 1983-8 1985-10 1984-10 1971-3 1988-5

1984-4 1985-7

1981-10

1984-8 1985-8 1998-7 1999-12

1973-12 1975-7 1979-12 1981-2 1971-12 1972-12 1980-5 2001-3 2010-3 1982-12 1985-5 1990-1

Construction Grid start connection

1983-9 1984-7 1984-12 1986-3 1985-3 1971-5 1988-8

1984-7 1985-11

1983-1

1985-2 1985-12 1998-10 2000-4

1974-11 1976-2 1980-6 1981-8 1972-6 1973-3 1981-2 2001-12 2010-12 1983-9 1985-7 1990-10

Commercial operation

88.6 87.8 80.8 83.8 82.4 91.1 87.9

80.9 79.1

93.7

83.5 84.7 89.2 89.1

79.2 86.9 71.3 70.5 65.2 80.6 67.0 88.2 89.4 75.9 79.7 79.1

89.6 88.8 82.0 85.6 83.9 91.5 88.3

81.4 81.8

93.8

85.8 86.7 89.6 89.8

80.2 87.3 72.8 71.7 66.0 81.8 67.8 88.3 90.2 76.3 80.2 79.3

-

-

-

DH, PH DH, PH -

DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH

EAF % UCF % Non2007– 2007– electrical 2011 2011 applics

41

CH -1 CH -3 CH -4 CH -5 CH -2

GB -18A GB -18B GB -19A GB -19B GB -20A GB -20B GB -22A GB -22B GB -16A GB -16B GB -17A

SWITZERLAND

UK

Reactor

DUNGENESS-B1 DUNGENESS-B2 HARTLEPOOL-A1 HARTLEPOOL-A2 HEYSHAM-A1 HEYSHAM-A2 HEYSHAM-B1 HEYSHAM-B2 HINKLEY POINT-B1 HINKLEY POINT-B2 HUNTERSTON-B1

BEZNAU-1 BEZNAU-2 GOESGEN LEIBSTADT MUEHLEBERG

FORSMARK-1 FORSMARK-2 FORSMARK-3 OSKARSHAMN-1 OSKARSHAMN-2 OSKARSHAMN-3 RINGHALS-1 RINGHALS-2 RINGHALS-3 RINGHALS-4

VANDELLOS-2

Name

GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR

PWR PWR PWR BWR BWR

BWR BWR BWR BWR BWR BWR BWR PWR PWR PWR

PWR

Type

AGR AGR AGR AGR AGR AGR AGR AGR AGR AGR AGR

WH - 2 loops WH - 2 loops PWR 3 Loop BWR-6 BWR-4

BWR-75 BWR-75 BWR-3000 ABB BWR ABB BWR BWR-75 BWR WE (3 loops) WE (3 loops) WE (3 loops)

WE 3-loops

Model

1500 1500 1500 1500 1500 1500 1550 1550 1494 1494 1496

1130 1130 3002 3600 1097

2928 2928 3300 1375 1800 3900 2540 2660 3135 2775

2941

615 615 655 655 625 625 680 680 655 655 644

380 380 1035 1245 390

1022 1034 1212 492 661 1450 893 917 1102 981

1087

Gross

Capacity (MW)

Thermal

520 520 595 595 585 575 605 605 435 435 460

365 365 970 1190 373

984 996 1170 473 638 1400 854 809 1057 945

1045

Net

BE BE BE BE BE BE BE BE BE BE BE

Axpo AG Axpo AG KKG KKL BKW

FKA FKA FKA OKG OKG OKG RAB RAB RAB RAB

ANAV

Operator

Note: The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating, PH process heating,

SE -9 SE -11 SE -14 SE -2 SE -3 SE -12 SE -4 SE -5 SE -7 SE -10

ES -16

Code

SWEDEN

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued

APC APC NPC NPC NPC NPC NPC NPC TNPG TNPG TNPG

WH WH KWU GETSCO GETSCO

ABBATOM ABBATOM ABBATOM ABBATOM ABBATOM ABBATOM ABBATOM WH WH WH

WH

NSSS supplier

1965-10 1965-10 1968-10 1968-10 1970-12 1970-12 1980-8 1980-8 1967-9 1967-9 1967-11

1965-9 1968-1 1973-12 1974-1 1967-3

1973-6 1975-1 1979-1 1966-8 1969-9 1980-5 1969-2 1970-10 1972-9 1973-11

1980-12

1983-4 1985-12 1983-8 1984-10 1983-7 1984-10 1988-7 1988-11 1976-10 1976-2 1976-2

1969-7 1971-10 1979-2 1984-5 1971-7

1980-6 1981-1 1985-3 1971-8 1974-10 1985-3 1974-10 1974-8 1980-9 1982-6

1987-12

Construction Grid start connection

1985-4 1989-4 1989-4 1989-4 1989-4 1989-4 1989-4 1989-4 1978-10 1976-9 1976-2

1969-9 1971-12 1979-11 1984-12 1972-11

1980-12 1981-7 1985-8 1972-2 1975-1 1985-8 1976-1 1975-5 1981-9 1983-11

1988-3

Commercial operation

36.3 45.1 56.6 55.7 52.6 48.6 82.4 69.5 67.6 70.4 67.9

93.1 90.0 93.2 90.3 87.9

84.1 71.9 81.3 73.8 81.4 54.7 56.9 61.2 80.1 81.1

72.2

36.3 45.1 56.6 55.7 52.6 48.6 82.7 70.0 67.9 70.4 67.9

93.1 90.0 93.4 91.2 88.0

84.7 72.4 82.1 75.1 82.8 55.6 58.1 62.5 82.1 82.9

73.2

-

DH DH PH -

-

-

EAF % UCF % Non2007– 2007– electrical 2011 2011 applics

42

US -313 US -368 US -334 US -412 US -456 US -457

USA

Name

ARKANSAS ONE-1 ARKANSAS ONE-2 BEAVER VALLEY-1 BEAVER VALLEY-2 BRAIDWOOD-1 BRAIDWOOD-2

KHMELNITSKI-1 KHMELNITSKI-2 ROVNO-1 ROVNO-2 ROVNO-3 ROVNO-4 SOUTH UKRAINE-1 SOUTH UKRAINE-2 SOUTH UKRAINE-3 ZAPOROZHE-1 ZAPOROZHE-2 ZAPOROZHE-3 ZAPOROZHE-4 ZAPOROZHE-5 ZAPOROZHE-6

HUNTERSTON-B2 OLDBURY-A1 SIZEWELL-B TORNESS 1 TORNESS 2 WYLFA 1 WYLFA 2

Reactor

PWR PWR PWR PWR PWR PWR

PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR

GCR GCR PWR GCR GCR GCR GCR

Type

B&W (L-loop) D CE (2-loop) DR W (3-loop) W (3-loop) W (4-loop) W (4-loop) DRY

VVER V-320 VVER V-320 VVER V-213 VVER V-213 VVER V-320 VVER V-320 VVER V-302 VVER V-338 VVER V-320 VVER V-320 VVER V-320 VVER V-320 VVER V-320 VVER V-320 VVER V-320

AGR MAGNOX SNUPPS AGR AGR MAGNOX MAGNOX

Model

2568 3026 2689 2689 3587 3587

3000 3000 1375 1375 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000

1496 730 3425 1623 1623 1920 1920

Thermal

880 1040 923 923 1240 1213

1000 1000 420 415 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000

644 230 1250 682 682 540 540

Gross

Capacity (MW)

Note: The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating,

UA -40 UA -41 UA -27 UA -28 UA -29 UA -69 UA -44 UA -45 UA -48 UA -54 UA -56 UA -78 UA -79 UA -126 UA -127

Code

GB -17B GB -11A GB -24 GB -23A GB -23B GB -13A GB -13B

UKRAINE

Country

842 993 892 885 1178 1152

950 950 381 376 950 950 950 950 950 950 950 950 950 950 950

430 217 1191 600 605 490 490

Net

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued

ENTERGY ENTERGY FENOC FENOC EXELON EXELON

NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC

BE MEL BE BE BE MEL MEL

Operator

B&W CE WH WH WH WH

PAIP PAIP PAIP PAIP PAIP PAA PAA PAA PAA PAIP PAIP PAIP PAIP PAIP PAIP

TNPG TNPG PPC NNC NNC EE/B&W/T EE/B&W/T

NSSS supplier

1968-10 1968-12 1970-6 1974-5 1975-8 1975-8

1981-11 1985-2 1973-8 1973-10 1980-2 1986-8 1977-3 1979-10 1985-2 1980-4 1981-1 1982-4 1983-4 1985-11 1986-6

1967-11 1962-5 1988-7 1980-8 1980-8 1963-9 1963-9

1974-8 1978-12 1976-6 1987-8 1987-7 1988-5

1987-12 2004-8 1980-12 1981-12 1986-12 2004-10 1982-12 1985-1 1989-9 1984-12 1985-7 1986-12 1987-12 1989-8 1995-10

1977-3 1967-11 1995-2 1988-5 1989-2 1971-1 1971-7

Construction Grid start connection

1974-12 1980-3 1976-10 1987-11 1988-7 1988-10

1988-8 2005-12 1981-9 1982-7 1987-5 2006-4 1983-10 1985-4 1989-12 1985-12 1986-2 1987-3 1988-4 1989-10 1996-9

1977-3 1967-12 1995-9 1988-5 1989-2 1971-11 1972-1

Commercial operation

91.4 93.9 94.6 93.0 95.2 95.2

80.7 74.0 58.0 70.7 67.1 70.0 73.1 77.7 65.5 80.4 81.0 82.8 82.1 81.7 82.4

70.0 41.1 80.7 75.5 84.8 63.4 59.4

91.4 93.9 94.6 93.0 95.3 95.3

81.4 74.8 58.4 71.4 69.1 72.6 77.7 79.5 71.4 81.4 82.1 85.5 83.6 83.0 82.8

70.1 41.1 80.7 76.1 85.8 63.7 59.6

-

DH DH DH DH DH DH DH DH DH DH DH DH DH DH DH

-

EAF % UCF % Non2007– 2007– electrical 2011 2011 applics

43

Country

US -259 US -260 US -296 US -325 US -324 US -454 US -455 US -483 US -317 US -318 US -413 US -414 US -461 US -397 US -445 US -446 US -298 US -302 US -346 US -275 US -323 US -315 US -316 US -237 US -249 US -331 US -341 US -348 US -364 US -333

Code

Reactor

BROWNS FERRY-1 BROWNS FERRY-2 BROWNS FERRY-3 BRUNSWICK-1 BRUNSWICK-2 BYRON-1 BYRON-2 CALLAWAY-1 CALVERT CLIFFS-1 CALVERT CLIFFS-2 CATAWBA-1 CATAWBA-2 CLINTON-1 COLUMBIA COMANCHE PEAK-1 COMANCHE PEAK-2 COOPER CRYSTAL RIVER-3 DAVIS BESSE-1 DIABLO CANYON-1 DIABLO CANYON-2 DONALD COOK-1 DONALD COOK-2 DRESDEN-2 DRESDEN-3 DUANE ARNOLD-1 ENRICO FERMI-2 FARLEY-1 FARLEY-2 FITZPATRICK

Name

BWR BWR BWR BWR BWR PWR PWR PWR PWR PWR PWR PWR BWR BWR PWR PWR BWR PWR PWR PWR PWR PWR PWR BWR BWR BWR BWR PWR PWR BWR

Type

BWR-4 (Mark 1 BWR-4 (Mark 1 BWR-4 (Mark 1 BWR-4 (Mark 1 BWR-4 (Mark 1 W (4-loop) (DR W (4-Loop) (DR W (4-loop) DRY CE (2-loop) (D CE (2-loop) (D W (4-loop) (IC W (4-loop) (IC BWR-6 (Mark 3 BWR-5 (Mark 2 W (4-loop) DRY W (4-loop) DRY BWR-4 (Mark 1 B&W (L-loop) B&W (R-loop) W (4-loop) W (4-loop) W (4-loop) ICE W (4-loop) ICE BWR-3 (Mark 1 BWR-3 (Mark 1 BWR-4 (Mark 1 BWR-4 (Mark 1 W (3-loop) W (3-loop) DRY BWR-4 (Mark 1

Model

3458 3458 3458 2923 2923 3587 3587 3565 2700 2700 3411 3411 3473 3486 3612 3458 2381 2568 2772 3338 3411 3304 3468 2527 2527 1912 3430 2775 2775 2536

Thermal 1152 1155 1400 990 989 1225 1196 1236 918 911 1188 1188 1098 1200 1259 1250 801 890 925 1136 1164 1077 1133 913 913 614 1154 895 905 882

Gross

Capacity (MW) 1101 1104 1105 938 920 1164 1136 1190 855 850 1129 1129 1065 1131 1209 1197 774 860 894 1122 1118 1009 1077 867 867 601 1085 874 860 855

Net

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued

TVA TVA TVA PROGRESS PROGRESS EXELON EXELON AmerenUE CONSTELL CONSTELL DUKEENER DUKEENER EXELON ENERGYNW LUMINANT LUMINANT ENTERGY PROGRESS FENOC PG&E PG&E AEP AEP EXELON EXELON NEXTERA DTEDISON SOUTHERN SOUTHERN ENTERGY

Operator GE GE GE GE GE WH WH WH CE CE WH WH GE GE WH WH GE B&W B&W WH WH WH WH GE GE GE GE WH WH GE

NSSS supplier 1967-5 1967-5 1968-7 1970-2 1970-2 1975-4 1975-4 1975-9 1968-6 1968-6 1974-5 1974-5 1975-10 1972-8 1974-12 1974-12 1968-6 1968-9 1970-9 1968-4 1970-12 1969-3 1969-3 1966-1 1966-10 1970-6 1972-9 1970-10 1970-10 1968-9

1973-10 1974-8 1976-9 1976-12 1975-4 1985-3 1987-2 1984-10 1975-1 1976-12 1985-1 1986-5 1987-4 1984-5 1990-4 1993-4 1974-5 1977-1 1977-8 1984-11 1985-10 1975-2 1978-3 1970-4 1971-7 1974-5 1986-9 1977-8 1981-5 1975-2

Construction Grid start connection 1974-8 1975-3 1977-3 1977-3 1975-11 1985-9 1987-8 1984-12 1975-5 1977-4 1985-6 1986-8 1987-11 1984-12 1990-8 1993-8 1974-7 1977-3 1978-7 1985-5 1986-3 1975-8 1978-7 1970-6 1971-11 1975-2 1988-1 1977-12 1981-7 1975-7

Commercial operation 90.3 87.6 88.6 91.6 88.5 94.6 94.1 89.4 96.1 94.6 92.3 92.2 94.8 81.4 92.7 95.9 91.6 50.8 85.7 92.3 90.0 68.5 90.4 95.2 96.4 92.2 89.1 93.0 90.2 95.5

91.7 89.1 90.5 91.6 88.5 94.6 94.1 89.4 96.3 94.6 92.3 92.2 94.8 81.6 92.7 95.9 91.6 50.8 85.7 92.3 90.2 68.5 90.4 95.2 96.4 92.2 89.1 93.0 90.2 96.1

-

EAF % UCF % Non2007– 2007– electrical 2011 2011 applics

44

Country

Code

US -285 US -416 US -261 US -321 US -366 US -354 US -247 US -286 US -305 US -373 US -374 US -352 US -353 US -369 US -370 US -336 US -423 US -263 US -220 US -410 US -338 US -339 US -269 US -270 US -287 US -219 US -255 US -528 US -529 US -530

Name

FORT CALHOUN-1 GRAND GULF-1 H.B. ROBINSON-2 HATCH-1 HATCH-2 HOPE CREEK-1 INDIAN POINT-2 INDIAN POINT-3 KEWAUNEE LASALLE-1 LASALLE-2 LIMERICK-1 LIMERICK-2 MCGUIRE-1 MCGUIRE-2 MILLSTONE-2 MILLSTONE-3 MONTICELLO NINE MILE POINT-1 NINE MILE POINT-2 NORTH ANNA-1 NORTH ANNA-2 OCONEE-1 OCONEE-2 OCONEE-3 OYSTER CREEK PALISADES PALO VERDE-1 PALO VERDE-2 PALO VERDE-3

Reactor

PWR BWR PWR BWR BWR BWR PWR PWR PWR BWR BWR BWR BWR PWR PWR PWR PWR BWR BWR BWR PWR PWR PWR PWR PWR BWR PWR PWR PWR PWR

Type

CE (2-loop) BWR-6 (Mark 3 W (3-loop) DRY BWR-4 (Mark 1 BWR-4 (Mark 1 BWR-4 (Mark 1 W (4-loop) DRY W (4-loop) DRY W (2-loop) DRY BWR-5 (Mark 2 BWR-5 (Mark 2 BWR-4 (Mark 2 BWR-4 (Mark 2 W (4-loop) ICE W (4-loop) (IC COMB CE DRY W (4-loop) DRY BWR-3 BWR-2 (Mark 1 BWR-5 (Mark 2 W (3-loop) W (3-loop) B&W (L-loop) B&W (L-loop) B&W (L-loop) BWR-2 (Mark 1 CE (2-loop) DR CE (2-loop) DR COMB CE80 DR COMB CE80 DR

Model

1500 3833 2339 2804 2804 3339 3216 3216 1772 3489 3489 3458 3458 3411 3411 2700 3411 1775 1850 3467 2893 2940 2568 2568 2568 1930 2565 3990 3990 3990

Thermal 512 1333 745 898 921 1376 1062 1065 581 1177 1179 1194 1194 1158 1158 910 1253 600 642 1205 973 994 891 891 891 652 842 1414 1414 1346

Gross

Capacity (MW) Net

482 1251 724 876 883 1191 1022 1040 566 1118 1120 1130 1134 1100 1100 869 1233 572 621 1119 920 943 846 846 846 619 793 1311 1314 1312

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued

OPPD ENTERGY PROGRESS SOUTHERN SOUTHERN PSEG ENTERGY ENTERGY DOMINION EXELON EXELON EXELON EXELON DUKEENER DUKEENER DOMINION DOMINION NSP CONSTELL CONSTELL DOMINION DOMINION DUKEENER DUKEENER DUKEENER EXELON ENTERGY APS APS APS

Operator CE GE WH GE GE GE WH WH WH GE GE GE GE WH WH CE WH GE GE GE WH WH B&W B&W B&W GE CE CE CE CE

NSSS supplier 1968-6 1974-5 1967-4 1968-9 1972-2 1976-3 1966-10 1968-11 1968-8 1973-9 1973-9 1974-6 1974-6 1971-4 1971-4 1969-11 1974-8 1967-6 1965-4 1975-8 1971-2 1971-2 1967-11 1967-11 1967-11 1964-12 1967-3 1976-5 1976-6 1976-6

1973-8 1984-10 1970-9 1974-11 1978-9 1986-8 1973-6 1976-4 1974-4 1982-9 1984-4 1985-4 1989-9 1981-9 1983-5 1975-11 1986-2 1971-3 1969-11 1987-8 1978-4 1980-8 1973-5 1973-12 1974-9 1969-9 1971-12 1985-6 1986-5 1987-11

Construction Grid start connection 1973-9 1985-7 1971-3 1975-12 1979-9 1986-12 1974-8 1976-8 1974-6 1984-1 1984-10 1986-2 1990-1 1981-12 1984-3 1975-12 1986-4 1971-6 1969-12 1988-3 1978-6 1980-12 1973-7 1974-9 1974-12 1969-12 1971-12 1986-1 1986-9 1988-1

Commercial operation 78.9 92.9 85.6 93.2 87.3 94.4 94.4 92.8 93.3 96.1 96.1 96.6 94.5 88.5 93.1 90.7 89.6 86.0 94.0 94.7 88.8 84.4 89.3 91.4 93.3 93.3 91.4 86.2 88.8 86.6

78.9 92.9 85.6 93.2 87.3 94.4 94.4 92.8 93.3 96.1 96.1 96.6 94.5 88.5 93.1 91.1 89.6 86.0 94.0 94.7 93.3 89.6 89.3 91.4 93.3 93.4 91.4 86.2 88.8 86.6

-

EAF % UCF % Non2007– 2007– electrical 2011 2011 applics

45

Country

US -277 US -278 US -440 US -293 US -266 US -301 US -282 US -306 US -254 US -265 US -244 US -458 US -272 US -311 US -361 US -362 US -443 US -327 US -328 US -400 US -498 US -499 US -335 US -389 US -280 US -281 US -387 US -388 US -289 US -250

Code

Reactor

PEACH BOTTOM-2 PEACH BOTTOM-3 PERRY-1 PILGRIM-1 POINT BEACH-1 POINT BEACH-2 PRAIRIE ISLAND-1 PRAIRIE ISLAND-2 QUAD CITIES-1 QUAD CITIES-2 R.E. GINNA RIVER BEND-1 SALEM-1 SALEM-2 SAN ONOFRE-2 SAN ONOFRE-3 SEABROOK-1 SEQUOYAH-1 SEQUOYAH-2 SHEARON HARRIS-1 SOUTH TEXAS-1 SOUTH TEXAS-2 ST. LUCIE-1 ST. LUCIE-2 SURRY-1 SURRY-2 SUSQUEHANNA-1 SUSQUEHANNA-2 THREE MILE ISLAND-1 TURKEY POINT-3

Name

BWR BWR BWR BWR PWR PWR PWR PWR BWR BWR PWR BWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR BWR BWR PWR PWR

Type

BWR-4 (Mark 1 BWR-4 (Mark 1 BWR-6 (Mark 3 BWR-3 (Mark 1 W (2-loop) DRY W (2-loop) DRY W (2-loop) DRY W (2-loop) DRY BWR-3 (Mark 1 BWR-3 (Mark 1 W (2-loop) BWR-6 (Mark 3 W (4-loop) DRY W (4-loop) DRY CE (2-loop) DR CE (2-loop) DR W (4-loop) DRY W (4-loop) ICE W (4-loop) (IC W (3-loop) DRY W (4-loop) W (4-loop) DRY COMB CE DRY COMB CE DRY W (3-loop) DRY W (3-loop) DRY BWR-4 (Mark 2 BWR-4 (Mark 2 B&W (L-loop) W (3-loop) DRY

Model

3514 3514 3758 2028 1540 1800 1650 1650 2957 2511 1775 3091 3459 3459 3438 3438 3587 3411 3411 2900 3853 3853 2700 2700 2546 2546 3952 3489 2568 2300

Thermal 1171 1171 1303 711 543 645 566 640 913 913 608 1036 1228 1170 1127 1127 1296 1221 1221 960 1354 1354 883 883 848 848 1298 1300 837 729

Gross

Capacity (MW) 1122 1122 1240 685 512 586 521 519 882 892 580 967 1174 1158 1070 1080 1247 1152 1126 900 1280 1280 839 839 839 839 1260 1260 805 693

Net

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued

EXELON EXELON FENOC ENTERGY NEXTERA NEXTERA NSP NSP EXELON EXELON CONSTELL ENTERGY PSEG PSEG SCE SCE NEXTERA TVA TVA PROGRESS STP STP FPL FPL DOMINION DOMINION PPL SUSQ PPL SUSQ EXELON FPL

Operator GE GE GE GE WH WH WH WH GE GE WH GE WH WH CE CE WH WH WH WH WH WH CE CE WH WH GE GE B&W WH

NSSS supplier 1968-1 1968-1 1974-10 1968-8 1967-7 1968-7 1968-6 1969-6 1967-2 1967-2 1966-4 1977-3 1968-9 1968-9 1974-3 1974-3 1976-7 1970-5 1970-5 1978-1 1975-12 1975-12 1970-7 1977-6 1968-6 1968-6 1973-11 1973-11 1968-5 1967-4

1974-2 1974-9 1986-12 1972-7 1970-11 1972-8 1973-12 1974-12 1972-4 1972-5 1969-12 1985-12 1976-12 1981-6 1982-9 1983-9 1990-5 1980-7 1981-12 1987-1 1988-3 1989-4 1976-5 1983-6 1972-7 1973-3 1982-11 1984-7 1974-6 1972-11

Construction Grid start connection 1974-7 1974-12 1987-11 1972-12 1970-12 1972-10 1973-12 1974-12 1973-2 1973-3 1970-7 1986-6 1977-6 1981-10 1983-8 1984-4 1990-8 1981-7 1982-6 1987-5 1988-8 1989-6 1976-12 1983-8 1972-12 1973-5 1983-6 1985-2 1974-9 1972-12

Commercial operation 96.6 94.5 85.1 93.4 87.9 88.6 90.4 93.9 94.6 95.7 94.5 90.0 92.0 92.0 81.9 85.1 89.7 92.2 93.3 94.3 93.5 89.6 88.0 81.2 93.2 92.3 89.9 90.3 91.4 89.6

96.6 94.5 85.1 93.6 87.9 88.6 90.4 93.9 94.6 95.7 94.5 91.1 92.3 92.0 82.0 85.3 89.7 92.2 93.3 94.3 93.5 89.6 88.0 81.2 93.6 92.3 89.9 90.3 91.4 90.0

-

EAF % UCF % Non2007– 2007– electrical 2011 2011 applics

46

Name

W (3-loop) DRY BWR-4 (Mark 1 W (3-loop) DRY W (4-loop) DRY W (4-loop) DRY CE (2-loop) W (4-loop) (IC W (4-loop)

2300 1912 2900 3565 3565 3716 3459 3565

Thermal 729 650 1003 1203 1202 1200 1202 1213

Gross

Capacity (MW) 693 620 966 1150 1152 1168 1123 1195

Net FPL ENTERGY SCE&G SOUTHERN SOUTHERN ENTERGY TVA WCNOC

Operator

NSSS supplier

1977-11 1978-12 1981-5 1982-6 1984-5 1985-2

1973-6 1972-9 1982-11 1987-3 1989-4 1985-3 1996-2 1985-6

Construction Grid start connection

1972-6 1973-12 1975-11 1976-3 1978-8 1979-2

PWR BWR PWR PWR PWR PWR PWR PWR

Model

Note: Status as of 31 December 2011, 435 reactors (368791 MW) were connected to the grid, including 6 units (5018 MW) in Taiwan, China: TAIWAN, CN TW -1 CHIN SHAN-1 BWR BWR-4 1804 636 604 TPC GE TAIWAN, CN TW -2 CHIN SHAN-2 BWR BWR-4 1804 636 604 TPC GE TAIWAN, CN TW -3 KUOSHENG-1 BWR BWR-6 2943 1019 985 TPC GE TAIWAN, CN TW -4 KUOSHENG-2 BWR BWR-6 2943 1020 985 TPC GE TAIWAN, CN TW -5 MAANSHAN-1 PWR WE 312 (3 loop 2822 956 918 TPC WH TAIWAN, CN TW -6 MAANSHAN-2 PWR WE 312 (3 loop 2822 958 922 TPC WH

TURKEY POINT-4 VERMONT YANKEE VIRGIL C. SUMMER-1 VOGTLE-1 VOGTLE-2 WATERFORD-3 WATTS BAR-1 WOLF CREEK

Type 1967-4 1967-12 1973-3 1976-8 1976-8 1974-11 1973-1 1977-5

Code

US -251 US -271 US -395 US -424 US -425 US -382 US -390 US -482

Reactor WH GE WH WH WH CE WH WH

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 — continued

1978-12 1979-7 1981-12 1983-3 1984-7 1985-5

1973-9 1972-11 1984-1 1987-6 1989-5 1985-9 1996-5 1985-9

Commercial operation

87.0 90.6 91.6 88.8 94.3 93.3

89.9 94.1 90.3 94.0 91.2 92.3 91.3 86.9

87.2 90.9 92.4 90.3 94.4 93.3

90.0 94.1 90.3 94.0 91.2 92.8 91.3 86.9

-

-

EAF % UCF % Non2007– 2007– electrical 2011 2011 applics

47

JP -31

Name

MONJU

BRUCE-1 BRUCE-2 PICKERING-2 PICKERING-3

Reactor

FBR

PHWR PHWR PHWR PHWR

Type

-

CANDU 791 CANDU 791 CANDU 500A CANDU 500A

Model

Note: Status as of 31 December 2011, 5 reactors (2972 MW) were in long term shutdown.

JAPAN

Code

CA -8 CA -9 CA -5 CA -6

CANADA

Country 824 824 542 542 280

714

Gross

2832 2832 1744 1744

Thermal

Capacity (MW)

TABLE 15. REACTORS IN LONG TERM SHUTDOWN, 31 DEC. 2011

246

848 848 515 515

Net

JAEA

BRUCEPOW BRUCEPOW OPG OPG

Operator

T/H/F/M

OH/AECL OH/AECL OH/AECL OH/AECL

NSSS supplier

1986-5

1971-6 1970-12 1966-9 1967-12

Construction start

1995-8

1977-1 1976-9 1971-10 1972-5

Grid connection



1977-9 1977-9 1971-12 1972-6

Commercial operation

1995-12

1997-10 1995-10 1997-12 1997-12

Long term shutdown date

48

AM -18

BE -1

BG -1 BG -2 BG -3 BG -4

CA -2 CA -3 CA -1

FR -9 FR -2 FR -3 FR -4 FR -5 FR -6 FR -1B FR -1 FR -10 FR -7 FR -8 FR -24

DE -4 DE -12 DE -18 DE -13 DE -502

BELGIUM

BULGARIA

CANADA

FRANCE

GERMANY

Code

ARMENIA

Country

Reactor

AVR JUELICH (AVR) BIBLIS-A (KWB A) BIBLIS-B (KWB B) BRUNSBUETTEL (KKB) GREIFSWALD-1 (KGR 1)

BUGEY-1 CHINON-A1 CHINON-A2 CHINON-A3 CHOOZ-A (ARDENNES) EL-4 (MONTS D'ARREE) G-2 (MARCOULE) G-3 (MARCOULE) PHENIX ST. LAURENT-A1 ST. LAURENT-A2 SUPER-PHENIX

DOUGLAS POINT GENTILLY-1 ROLPHTON NPD

KOZLODUY-1 KOZLODUY-2 KOZLODUY-3 KOZLODUY-4

BR-3

ARMENIA-1

Name

HTGR PWR PWR BWR PWR

GCR GCR GCR GCR PWR HWGCR GCR GCR FBR GCR GCR FBR

PHWR HWLWR PHWR

PWR PWR PWR PWR

PWR

PWR

Type

46 3517 3733 2292 1375

1954 300 800 1170 1040 250 260 260 345 1650 1475 3000

704 792 92

1375 1375 1375 1375

41

1375

Thermal

15 1225 1300 806 440

555 80 230 480 320 75 43 43 142 500 530 1242

218 266 25

440 440 440 440

12

408

Gross

Capacity (MW)

13 1167 1240 771 408

540 70 180 360 305 70 39 40 130 390 465 1200

206 250 22

408 408 408 408

10

376

Net

TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2011

AVR RWE RWE KKB EWN

EDF EDF EDF EDF SENA EDF COGEMA COGEMA CEA/EDF EDF EDF EDF

OH HQ OH

KOZNPP KOZNPP KOZNPP KOZNPP

CEN/SCK

ANPPJSC

Operator

BBK KWU KWU KWU AtEE

FRAM LEVIVIER LEVIVIER GTM A/F/W GAAA SACM SACM CNCLNEY FRAM FRAM ASPALDO

AECL AECL CGE

AEE AEE AEE AEE

WH

FAEA

NSSS supplier

1961-8 1970-1 1972-2 1970-4 1970-3

1965-12 1957-2 1959-8 1961-3 1962-1 1962-7 1955-3 1956-3 1968-11 1963-10 1966-1 1976-12

1960-2 1966-9 1958-1

1970-4 1970-4 1973-10 1973-10

1957-11

1969-7

Construction start

1967-12 1974-8 1976-4 1976-7 1973-12

1972-4 1963-6 1965-2 1966-8 1967-4 1967-7 1959-4 1960-4 1973-12 1969-3 1971-8 1986-1

1967-1 1971-4 1962-6

1974-7 1975-8 1980-12 1982-5

1962-10

1976-12

Grid connection

1969-5 1975-2 1977-1 1977-2 1974-7

1972-7 1964-2 1965-2 1966-8 1967-4 1968-6 1959-4 1960-4 1974-7 1969-6 1971-11 1986-12

1968-9 1972-5 1962-10

1974-10 1975-11 1981-1 1982-6

1962-10

1977-10

Commercial operation

1988-12 2011-8 2011-8 2011-8 1990-2

1994-5 1973-4 1985-6 1990-6 1991-10 1985-7 1980-2 1984-6 2010-2 1990-4 1992-5 1998-12

1984-5 1977-6 1987-8

2002-12 2002-12 2006-12 2006-12

1987-6

1989-2

Shut down

49

DE -503 DE -504 DE -505 DE -506 DE -3 DE -7 DE -16 DE -8 DE -20 DE -6 DE -22 DE -2 DE -15 DE -11 DE -5 DE -14 DE -501 DE -10 DE -19 DE -17 DE -1 DE -9

IT -4 IT -3 IT -2 IT -1

JP -20 JP -5 JP -9 JP -10

ITALY

JAPAN

Code

GERMANY

Country

Reactor

FUGEN ATR FUKUSHIMA-DAIICHI-1 FUKUSHIMA-DAIICHI-2 FUKUSHIMA-DAIICHI-3

CAORSO ENRICO FERMI (TRINO) GARIGLIANO LATINA

GREIFSWALD-2 (KGR 2) GREIFSWALD-3 (KGR 3) GREIFSWALD-4 (KGR 4) GREIFSWALD-5 (KGR 5) GUNDREMMINGEN-A (KRB A) HDR GROSSWELZHEIM ISAR-1 (KKI 1) KNK II KRUEMMEL (KKK) LINGEN (KWL) MUELHEIM-KAERLICH (KMK) MZFR NECKARWESTHEIM-1 (GKN 1) NIEDERAICHBACH (KKN) OBRIGHEIM (KWO) PHILIPPSBURG-1 (KKP 1) RHEINSBERG (KKR) STADE (KKS) THTR-300 UNTERWESER (KKU) VAK KAHL WUERGASSEN (KWW)

Name

HWLWR BWR BWR BWR

BWR PWR BWR GCR

PWR PWR PWR PWR BWR BWR BWR FBR BWR BWR PWR PHWR PWR HWGCR PWR BWR PWR PWR HTGR PWR BWR BWR

Type

557 1380 2381 2381

2651 870 506 660

1375 1375 1375 1375 801 100 2575 58 3690 520 3760 200 2497 321 1050 2575 265 1900 750 3900 60 1912

Thermal

165 460 784 784

882 270 160 160

440 440 440 440 250 25 912 21 1402 268 1302 57 840 106 357 926 70 672 308 1410 16 670

Gross

Capacity (MW)

148 439 760 760

860 260 150 153

408 408 408 408 237 25 878 17 1346 183 1219 52 785 100 340 890 62 640 296 1345 15 640

Net

JAEA TEPCO TEPCO TEPCO

SOGIN SOGIN SOGIN SOGIN

EWN EWN EWN EWN KGB HDR E.ON KBG KKK KWL KGG KBG EnKK KKN EnBW EnKK EWN E.ON HKG E.ON VAK PE

Operator

HITACHI GE/GETSC GE/T TOSHIBA

AMN/GETS EL/WEST GE TNPG

AtEE AtEE AtEE AtEE AEG,GE AEG,KWU KWU IA KWU AEG BBR SIEMENS KWU SIEM,KWU SIEM,KWU KWU AtEE KWU HRB KWU GE,AEG AEG,KWU

NSSS supplier

TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2011 — continued

1972-5 1967-7 1969-6 1970-12

1970-1 1961-7 1959-11 1958-11

1970-3 1972-4 1972-4 1976-12 1962-12 1965-1 1972-5 1974-9 1974-4 1964-10 1975-1 1961-12 1972-2 1966-6 1965-3 1970-10 1960-1 1967-12 1971-5 1972-7 1958-7 1968-1

Construction start

1978-7 1970-11 1973-12 1974-10

1978-5 1964-10 1964-1 1963-5

1974-12 1977-10 1979-9 1989-4 1966-12 1969-10 1977-12 1978-4 1983-9 1968-7 1986-3 1966-3 1976-6 1973-1 1968-10 1979-5 1966-5 1972-1 1985-11 1978-9 1961-6 1971-12

Grid connection

1979-3 1971-3 1974-7 1976-3

1981-12 1965-1 1964-6 1964-1

1975-4 1978-5 1979-11 1989-11 1967-4 1970-8 1979-3 1979-3 1984-3 1968-10 1987-8 1966-12 1976-12 1973-1 1969-3 1980-3 1966-10 1972-5 1987-6 1979-9 1962-2 1975-11

Commercial operation Shut down

2003-3 2011-5 2011-5 2011-5

1990-7 1990-7 1982-3 1987-12

1990-2 1990-2 1990-7 1989-11 1977-1 1971-4 2011-8 1991-8 2011-8 1979-1 1988-9 1984-5 2011-8 1974-7 2005-5 2011-8 1990-6 2003-11 1988-4 2011-8 1985-11 1994-8

50

JP -16 JP -11 JP -24 JP -1 JP -2

KZ -10

LT -46 LT -47

NL -1

RU -1 RU -3 RU -6 RU -4 RU -8

SK -1 SK -2 SK -3

ES -1 ES -3

SE -1 SE -6 SE -8

CH -8

GB -3A

KAZAKHSTAN

LITHUANIA

NETHERLANDS

RUSSIA

SLOVAKIA

SPAIN

SWEDEN

SWITZERLAND

UK

Code

JAPAN

Country

BERKELEY 1

LUCENS

AGESTA BARSEBACK-1 BARSEBACK-2

JOSE CABRERA-1 (ZORITA) VANDELLOS-1

BOHUNICE A1 BOHUNICE-1 BOHUNICE-2

APS-1 OBNINSK BELOYARSKY-1 BELOYARSKY-2 NOVOVORONEZH-1 NOVOVORONEZH-2

DODEWAARD

IGNALINA-1 IGNALINA-2

BN-350

FUKUSHIMA-DAIICHI-4 HAMAOKA-1 HAMAOKA-2 JPDR TOKAI-1

Name

Reactor

GCR

HWGCR

PHWR BWR BWR

PWR GCR

HWGCR PWR PWR

LWGR LWGR LWGR PWR PWR

BWR

LWGR LWGR

FBR

BWR BWR BWR BWR GCR

Type

620

28

80 1800 1800

510 1670

560 1375 1375

30 286 530 760 1320

183

4800 4800

1000

2381 1593 2436 90 587

Thermal

166

6

12 615 615

150 500

143 440 440

6 108 160 210 365

60

1300 1300

90

784 540 840 13 166

Gross

Capacity (MW)

138

6

10 600 600

141 480

93 408 408

5 102 146 197 336

55

1185 1185

52

760 515 806 12 137

Net

MEL

EOS

BKAB BKAB BKAB

UFG HIFRENSA

JAVYS JAVYS JAVYS

REA REA REA REA REA

BV GKN

INPP INPP

MAEC-KAZ

TEPCO CHUBU CHUBU JAEA JAPCO

Operator

TNPG

NGA

ABBATOM ASEASTAL ABBATOM

WH CEA

SKODA AEE AEE

MSM MSM MSM MSM MSM

RDM

MAEP MAEP

MAEC-KAZ

HITACHI TOSHIBA TOSHIBA GE GEC

NSSS supplier

TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2011 — continued

1957-1

1962-4

1957-12 1971-2 1973-1

1964-6 1968-6

1958-8 1972-4 1972-4

1951-1 1958-6 1962-1 1957-7 1964-6

1965-5

1977-5 1978-1

1964-10

1973-2 1971-6 1974-6 1960-12 1961-3

Construction start

1962-6

1968-1

1964-5 1975-5 1977-3

1968-7 1972-5

1972-12 1978-12 1980-3

1954-6 1964-4 1967-12 1964-9 1969-12

1968-10

1983-12 1987-8

1973-7

1978-2 1974-8 1978-5 1963-10 1965-11

Grid connection

1962-6

NA

1964-5 1975-7 1977-7

1969-8 1972-8

1972-12 1980-4 1981-1

1954-12 1964-4 1969-12 1964-12 1970-4

1969-3

1984-5 1987-8

1973-7

1978-10 1976-3 1978-11 1965-3 1966-7

Commercial operation

1989-3

1969-1

1974-6 1999-11 2005-5

2006-4 1990-7

1977-2 2006-12 2008-12

2002-4 1983-1 1990-1 1988-2 1990-8

1997-3

2004-12 2009-12

1999-4

2011-5 2009-1 2009-1 1976-3 1998-3

Shut down

51

GB -3B GB -4A GB -4B GB -1A GB -1B GB -1C GB -1D GB -2A GB -2B GB -2C GB -2D GB -14 GB -15 GB -9A GB -9B GB -7A GB -7B GB -6A GB -6B GB -11B GB -10A GB -10B GB -8A GB -8B GB -5 GB -12

UA -25 UA -26 UA -42 UA -43

US -155

UKRAINE

USA

Code

UK

Country

Reactor

BIG ROCK POINT

CHERNOBYL-1 CHERNOBYL-2 CHERNOBYL-3 CHERNOBYL-4

BERKELEY 2 BRADWELL 1 BRADWELL 2 CALDER HALL 1 CALDER HALL 2 CALDER HALL 3 CALDER HALL 4 CHAPELCROSS 1 CHAPELCROSS 2 CHAPELCROSS 3 CHAPELCROSS 4 DOUNREAY DFR DOUNREAY PFR DUNGENESS-A1 DUNGENESS-A2 HINKLEY POINT-A1 HINKLEY POINT-A2 HUNTERSTON-A1 HUNTERSTON-A2 OLDBURY-A2 SIZEWELL-A1 SIZEWELL-A2 TRAWSFYNYDD 1 TRAWSFYNYDD 2 WINDSCALE AGR WINFRITH SGHWR

Name

BWR

LWGR LWGR LWGR LWGR

GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR FBR FBR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR SGHWR

Type

240

3200 3200 3200 3200

620 481 481 268 268 268 268 260 260 260 260 60 600 840 840 900 900 595 595 660 1010 1010 850 850 120 318

Thermal

71

800 1000 1000 1000

166 146 146 60 60 60 60 60 60 60 60 15 250 230 230 267 267 173 173 230 245 245 235 235 36 100

Gross

Capacity (MW)

67

740 925 925 925

138 123 123 49 49 49 49 48 48 48 48 11 234 225 225 235 235 150 150 217 210 210 195 195 24 92

Net

CPC

MTE MTE MTE MTE

MEL MEL MEL MEL MEL MEL MEL MEL MEL MEL MEL UKAEA UKAEA MEL MEL MEL MEL MEL MEL MEL MEL MEL MEL MEL UKAEA UKAEA

Operator

GE

FAEA FAEA FAEA FAEA

TNPG TNPG TNPG UKAEA UKAEA UKAEA UKAEA UKAEA UKAEA UKAEA UKAEA UKAEA TNPG TNPG TNPG EE/B&W/T EE/B&W/T GEC GEC TNPG EE/B&W/T EE/B&W/T APC APC UKAEA ICL/FE

NSSS supplier

TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2011 — continued

1960-5

1970-3 1973-2 1976-3 1979-4

1957-1 1957-1 1957-1 1953-8 1953-8 1955-8 1955-8 1955-10 1955-10 1955-10 1955-10 1955-3 1966-1 1960-7 1960-7 1957-11 1957-11 1957-10 1957-10 1962-5 1961-4 1961-4 1959-7 1959-7 1958-11 1963-5

Construction start

1962-12

1977-9 1978-12 1981-12 1983-12

1962-6 1962-7 1962-7 1956-8 1957-2 1958-3 1959-4 1959-2 1959-7 1959-11 1960-1 1962-10 1975-1 1965-9 1965-11 1965-2 1965-3 1964-2 1964-6 1968-4 1966-1 1966-4 1965-1 1965-2 1963-2 1967-12

Grid connection

1963-3

1978-5 1979-5 1982-6 1984-3

1962-10 1962-7 1962-11 1956-10 1957-2 1958-5 1959-4 1959-3 1959-8 1959-12 1960-3 1962-10 1976-7 1965-10 1965-12 1965-3 1965-5 1964-2 1964-7 1968-9 1966-3 1966-9 1965-3 1965-3 1963-3 1968-1

Commercial operation Shut down

1997-8

1996-11 1991-10 2000-12 1986-4

1988-10 2002-3 2002-3 2003-3 2003-3 2003-3 2003-3 2004-6 2004-6 2004-6 2004-6 1977-3 1994-3 2006-12 2006-12 2000-5 2000-5 1990-3 1989-12 2011-6 2006-12 2006-12 1991-2 1991-2 1981-4 1990-9

52

US -014 US -144 US -10 US -011 US -16 US -267 US -018 US -213 US -077 US -133 US -013 US -409 US -309 US -245 US -130 US -171 US -012 US -312 US -206 US -146 US -001 US -322 US -320 US -344 US -29 US -295 US -304

Code

BONUS CVTR DRESDEN-1 ELK RIVER ENRICO FERMI-1 FORT ST. VRAIN GE VALLECITOS HADDAM NECK HALLAM HUMBOLDT BAY INDIAN POINT-1 LACROSSE MAINE YANKEE MILLSTONE-1 PATHFINDER PEACH BOTTOM-1 PIQUA RANCHO SECO-1 SAN ONOFRE-1 SAXTON SHIPPINGPORT SHOREHAM THREE MILE ISLAND-2 TROJAN YANKEE NPS ZION-1 ZION-2

Name

Reactor

BWR PHWR BWR BWR FBR HTGR BWR PWR X BWR PWR BWR PWR BWR BWR HTGR X PWR PWR PWR PWR BWR PWR PWR PWR PWR PWR

Type

50 65 700 58 200 842 50 1825 256 220 615 165 2630 2011 220 115 46 2772 1347 24 236 2436 2772 3411 600 3250 3250

Thermal 18 19 207 24 65 342 24 603 84 65 277 55 900 684 63 42 12 917 456 3 68 849 959 1155 180 1085 1085

Gross

Capacity (MW)

Note: Status as of 31 December 2011, 138 reactors (49152 MW) have been permanently shut down.

USA

Country 17 17 197 22 61 330 24 560 75 63 257 48 860 641 59 40 12 873 436 3 60 820 880 1095 167 1040 1040

Net DOE/PRWR CVPA EXELON RCPA DTEDISON PSCC GE CYAPC AEC/NPPD PG&E ENTERGY DPC MYAPC DOMINION NMC EXELON CofPiqua SMUD SCE SNEC DOE DUQU LIPA GPU PORTGE YAEC EXELON EXELON

Operator GNEPRWRA WH GE AC UEC GA GE WH GE GE B&W AC CE GE AC GA GE B&W WH GE WH GE B&W WH WH WH WH

NSSS supplier

TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2011 — continued

1960-1 1960-1 1956-5 1959-1 1956-8 1968-9 1956-1 1964-5 1959-1 1960-11 1956-5 1963-3 1968-10 1966-5 1959-1 1962-2 1960-1 1969-4 1964-5 1960-1 1954-1 1972-11 1969-11 1970-2 1957-11 1968-12 1968-12

Construction start 1964-8 1963-12 1960-4 1963-8 1966-8 1976-12 1957-10 1967-8 1963-9 1963-4 1962-9 1968-4 1972-11 1970-11 1966-7 1967-1 1963-7 1974-10 1967-7 1967-3 1957-12 1986-8 1978-4 1975-12 1960-11 1973-6 1973-12

Grid connection 1965-9 NA 1960-7 1964-7 NA 1979-7 1957-10 1968-1 1963-11 1963-8 1962-10 1969-11 1972-12 1971-3 NA 1967-6 1963-11 1975-4 1968-1 1967-3 1958-5 NA 1978-12 1976-5 1961-7 1973-12 1974-9

Commercial operation 1968-6 1967-1 1978-10 1968-2 1972-11 1989-8 1963-12 1996-12 1964-9 1976-7 1974-10 1987-4 1997-8 1998-7 1967-10 1974-11 1966-1 1989-6 1992-11 1972-5 1982-10 1989-5 1979-3 1992-11 1991-10 1998-2 1998-2

Shut down

53

ITALY

GERMANY

FRANCE

CANADA

ARMENIA BELGIUM BULGARIA

Country

AM -18 BE -1 BG -1 BG -2 BG -3 BG -4 CA -1 CA -2 CA -3 FR -10 FR -2 FR -24 FR -3 FR -4 FR -5 FR -6 FR -7 FR -8 FR -9 DE -10 DE -3 DE -4 DE -501 DE -502 DE -503 DE -504 DE -505 DE -506 DE -6 DE -9 IT -1

Code

Reactor

ARMENIA-1 BR-3 KOZLODUY-1 KOZLODUY-2 KOZLODUY-3 KOZLODUY-4 ROLPHTON NPD DOUGLAS POINT GENTILLY-1 PHENIX CHINON-A1 SUPER-PHENIX CHINON-A2 CHINON-A3 CHOOZ-A (ARDENNES) EL-4 (MONTS D'ARREE) ST. LAURENT-A1 ST. LAURENT-A2 BUGEY-1 STADE (KKS) GUNDREMMINGEN-A (KRB A) AVR JUELICH (AVR) RHEINSBERG (KKR) GREIFSWALD-1 (KGR 1) GREIFSWALD-2 (KGR 2) GREIFSWALD-3 (KGR 3) GREIFSWALD-4 (KGR 4) GREIFSWALD-5 (KGR 5) LINGEN (KWL) WUERGASSEN (KWW) LATINA

Name

1989-2 1987-6 2002-12 2002-12 2006-12 2006-12 1987-8 1984-5 1977-6 2010-2 1973-4 1998-12 1985-6 1990-6 1991-10 1985-7 1990-4 1992-5 1994-5 2003-11 1977-1 1988-12 1990-6 1990-2 1990-2 1990-2 1990-7 1989-11 1979-1 1994-8 1987-12

Shut down Other 2,5 7,Other 7,Other 7,Other 7,Other 2 2 2 Other 1,2 Other 1,2 1,2 Other 1,2 1,2 1,2 1,2 2 6,8 7 1 3,6,7 3,6,7 3,6 3,5,7 3,6,7 2 2 7,Other

Shutdown reason Other Imdte.dism. Dd+PD+SE Dd+PD+SE Dd+PD+SE Dd+PD+SE Dd+PD+SE Dd+SE Dd+PD+SE Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Dd+PD+SE Imdte.dism. Imdte.dism.

Decom. strategy

3,9 3 3 3 1,3 8 3,4,6 3,4,9

3,4,9

9 3,4,6

3 3 3

4 4

3,6

6 4,9 9

7 7

4 3,6,7 3,6,7 2,6,7 2,7

Current fuel management phase

4,9 6,7 6,7 7 7 8 8 8

Current decom. phase

TABLE 17. REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED, 31 Dec. 2011

ANPPJSC CEN/SCK E-03492 E-03493 E-00174 E-0008 AECL AECL AECL EDF NERSA EDF EDF SENA EDF EDF EDF EDF E.ON KGG xxxx G 01 KKR G 01 G 01 G 01 G 01 G 01 KWL GmbH E.ON SOGIN

Decom. licensee

2014 2018

2019 2015 2027 2025 2020 2014

2025

2036 2036 2036 2036

Licence terminated

54

SWITZERLAND UK

SWEDEN

SPAIN

SLOVAKIA

NETHERLANDS RUSSIA

KAZAKHSTAN LITHUANIA

JAPAN

ITALY

Country

IT -2 IT -3 IT -4 JP -1 JP -11 JP -2 JP -20 JP -24 KZ -10 LT -46 LT -47 NL -1 RU -3 RU -4 RU -6 RU -8 SK -1 SK -2 SK -3 ES -1 ES -3 SE -1 SE -6 SE -8 CH -8 GB -10A GB -10B GB -12 GB -14 GB -15 GB -1A GB -1B

Code

Reactor

GARIGLIANO ENRICO FERMI (TRINO) CAORSO JPDR HAMAOKA-1 TOKAI-1 FUGEN ATR HAMAOKA-2 BN-350 IGNALINA-1 IGNALINA-2 DODEWAARD BELOYARSKY-1 NOVOVORONEZH-1 BELOYARSKY-2 NOVOVORONEZH-2 BOHUNICE A1 BOHUNICE-1 BOHUNICE-2 JOSE CABRERA-1 (ZORITA) VANDELLOS-1 AGESTA BARSEBACK-1 BARSEBACK-2 LUCENS SIZEWELL-A1 SIZEWELL-A2 WINFRITH SGHWR DOUNREAY DFR DOUNREAY PFR CALDER HALL 1 CALDER HALL 2

Name

1982-3 1990-7 1990-7 1976-3 2009-1 1998-3 2003-3 2009-1 1999-4 2004-12 2009-12 1997-3 1983-1 1988-2 1990-1 1990-8 1977-2 2006-12 2008-12 2006-4 1990-7 1974-6 1999-11 2005-5 1969-1 2006-12 2006-12 1990-9 1977-3 1994-3 2003-3 2003-3

Shut down 3,4,Other 7,Other 7,Other Other 6 2 2 6 2,5 7,Other 7,Other 2,Other Other Other Other Other 4 7 7 Other 4 2,3 Other Other 4 2,8 2,8 Other Other Other 2,8 2,8

Shutdown reason Imdte.dism. Imdte.dism. Imdte.dism. Imdte.dism. Dd+SE Dd+PD+SE Dd+SE Dd+SE Dd+PD+SE Imdte.dism. Imdte.dism. Dd+SE Other Other Other Other Dd+PD+SE Imdte.dism. Imdte.dism. Imdte.dism. Dd+PD+SE Dd+SE Other Other Dd+SE Dd+SE Dd+SE Imdte.dism. Dd+PD+SE Dd+PD+SE Dd+PD+SE Dd+PD+SE

Decom. strategy

1 2,3,5,6 2,3,5,6 3,4,9,10 2,5 5 3,5,6,8 3,5,6,8

3,6 3,4,9 3,4,9 3,4,9 8 7

3,4 3,4,9 3,4 3 1,6,7 3,4,6,7,9 1,3,5 1,6,7 1,5,6 3 2,3 7

Current decom. phase

5

4 4

3,6 2,3,6 3,7

1

2,5 2 2,4,7

2

3,5

Current fuel management phase SOGIN SOGIN SOGIN JAERI CHUBU DL JAPCO JAEA CHUBU DL MAEC-KAZ INPP INPP BV GKN EA EA EA EA JAVYS JAVYS JAVYS UFG ENRESA BKAB BKAB BKAB EOS Magnox S Magnox S UKAEA DSR Magnox N SL SL

Decom. licensee

2025 2025 2004 2110 2110 2019 2333 2333 2117 2117

2015 2032

2030 2030 2055

2019 2013 2019 2002 2037 2018 2029 2037

Licence terminated

TABLE 17. REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED, 31 Dec. 2011 — continued

55

USA

UK

Country

GB -1C GB -1D GB -2A GB -2B GB -2C GB -2D GB -3A GB -3B GB -4A GB -4B GB -5 GB -6A GB -6B GB -7A GB -7B GB -8A GB -8B GB -9A GB -9B US -001 US -011 US -012 US -013 US -014 US -018 US -077 US -10 US -130 US -133 US -144 US -146 US -155

Code

Reactor

CALDER HALL 3 CALDER HALL 4 CHAPELCROSS 1 CHAPELCROSS 2 CHAPELCROSS 3 CHAPELCROSS 4 BERKELEY 1 BERKELEY 2 BRADWELL 1 BRADWELL 2 WINDSCALE AGR HUNTERSTON-A1 HUNTERSTON-A2 HINKLEY POINT-A1 HINKLEY POINT-A2 TRAWSFYNYDD 1 TRAWSFYNYDD 2 DUNGENESS-A1 DUNGENESS-A2 SHIPPINGPORT ELK RIVER PIQUA INDIAN POINT-1 BONUS GE VALLECITOS HALLAM DRESDEN-1 PATHFINDER HUMBOLDT BAY CVTR SAXTON BIG ROCK POINT

Name

2003-3 2003-3 2004-6 2004-6 2004-6 2004-6 1989-3 1988-10 2002-3 2002-3 1981-4 1990-3 1989-12 2000-5 2000-5 1991-2 1991-2 2006-12 2006-12 1982-10 1968-2 1966-1 1974-10 1968-6 1963-12 1964-9 1978-10 1967-10 1976-7 1967-1 1972-5 1997-8

Shut down 2,8 2,8 2,8 2,8 2,8 2,8 2,8 2,8 2,8 2,8 Other 2,8 2,8 2,8 2,8 2,8 2,8 2,8 2,8 3 1,Other 4,5 5 5,6 1 5 6 5 5 7,Other Other 2,Other

Shutdown reason Dd+PD+SE Dd+PD+SE Dd+PD+SE Dd+PD+SE Dd+PD+SE Dd+PD+SE Dd+SE Dd+SE Dd+SE Dd+SE Dd+PD+SE Dd+PD+SE Dd+PD+SE Dd+PD+SE Dd+PD+SE Dd+PD+SE Dd+PD+SE Dd+PD+SE Dd+PD+SE Imdte.dism. Imdte.dism. in situ disp. Dd+PD+SE in situ disp. Dd+SE Dd+SE Dd+SE Dd+SE Dd+PD+SE Dd+SE Imdte.dism. Imdte.dism.

Decom. strategy

11 11 3,4,6,9

11

3,5,6,8 3,5,6,8 3,5,6 3,5,6 3,5,6 3,5,6 3,8 3,8 3,5,6 3,5,6 2,3,5,6 3,5,6 3,5,6 3,5,6 3,5,6 3,5,6 3,5,6 3,5,6 3,5,6

Current decom. phase

7

7

Current fuel management phase

GE&PGEC AEC&NPPD EXELON NMC PG&E CVPA GPUNC CPC

SL SL Magnox N Magnox N Magnox N Magnox N Magnox S Magnox S Magnox S Magnox S SL Magnox N Magnox N Magnox S Magnox S Magnox N Magnox N Magnox S Magnox S DOE DUQU RCPA CofPiqua ENTERGY

Decom. licensee

2013 2009 2005 2007

1971

1970

2117 2117 2128 2128 2128 2128 2083 2083 2104 2104 2065 2090 2090 2104 2104 2098 2098 2111 2111 1989 1974

Licence terminated

TABLE 17. REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED, 31 Dec. 2011 — continued

56

USA

Country

US -16 US -171 US -206 US -213 US -245 US -267 US -29 US -295 US -304 US -309 US -312 US -320 US -322 US -344 US -409

Code

Reactor

ENRICO FERMI-1 PEACH BOTTOM-1 SAN ONOFRE-1 HADDAM NECK MILLSTONE-1 FORT ST. VRAIN YANKEE NPS ZION-1 ZION-2 MAINE YANKEE RANCHO SECO-1 THREE MILE ISLAND-2 SHOREHAM TROJAN LACROSSE

Name

1972-11 1974-11 1992-11 1996-12 1998-7 1989-8 1991-10 1998-2 1998-2 1997-8 1989-6 1979-3 1989-5 1992-11 1987-4

Shut down 4,5 1 Other 6 6 1,Other 5,7 5,6 5,6 6 5,6 4,5 7,Other 6 2

Shutdown reason Dd+SE Dd+SE Dd+PD+SE Imdte.dism. Dd+PD+SE Imdte.dism. Imdte.dism. Dd+PD+SE Dd+PD+SE Imdte.dism. Dd+PD+SE Other Imdte.dism. Dd+PD+SE Dd+PD+SE

Decom. strategy

4,6 1 1 4 9 11

9,11 1 4 4,6

Current decom. phase

7

4

7

Current fuel management phase

DTEDISON EXELON SCE CYAPC DOMINRES PSCC YAEC CommonEd COMMED MYAPC SMUD GPU LIPA PORTGE DPC

Decom. licensee

1995 2005

2005 2009

1996 2005

2008 2007

2025

Licence terminated

TABLE 17. REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED, 31 Dec. 2011 — continued

57

Drawing up the final decommissioning plan Reactor core defuelling Waste conditioning on-site (only for decommissioning waste) Waste shipment off-site (only for decommissioning waste) Safe enclosure preparation Partial dismantling Active safe enclosure period Passive safe enclosure period

1 2 3 4 5 6 7 8 9 10 11

Description

Transfer to a reactor facility Transfer away from reactor facility Storage in an on-site facility Storage in an off-site facility

Shipment to a reprocessing plant Underwater storage Dry storage Encapsulation

Fuel Management

1 2 3 4

5 6 7 8

undefined

Final dismantling Final survey Licence terminated (legal act at the end of the decommissioning process)

Description

Current decommissioning phase

Other technological reasons Other economical reasons Public acceptance reasons Other

5 6 7 undefd

in situ disp.

Immediate dismantling and removal of all radioactive materials Deferred dismantling, placing all radiological areas into safe enclosure Deferred dismantling, including partial dismantling and placing remanining radiological areas into safe enclosure In situ disposal, involving encapsulation of radioactive materials and subsequent restriction of access Other

Imdte.dism. Dd+SE Dd+PD+SE

The technology or process being used became obsolete The process was no longer profitable There were changes in licensing requirements After an operating incident

1 2 3 4

Description

Decommissioning strategy

Description

Shutdown reason

TABLE 17. DEFINITIONS FOR REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED

58

79.7

71.8

68.1

79.6

82.5

65.9

77.1

— Reactors permanently shut down during 2009 to 2011 (17 units) are considered.

14.0

27.7

11.7

16.9

26.7

16.9

14.2

15.0

14.5

18.5

22.9

18.9

11.9

15.1

12.2

81.2

71.8

68.3

79.9

73.0

79.9

83.0

77.2

81.1

75.0

67.4

74.5

83.8

83.5

83.8

Capability factor (%)

5.9

2.8

1.3

2.7

3.7

0.7

14.6

2.7

0.4

2.7

2.0

7.9

3.9

5.7

10.7

Forced loss rate (%)

Reactors reporting to IAEA PRIS (see note) Planned cap.loss factor (%)

Note: 2011 is the latest year for which operating experience data is currently available to the IAEA.

448

2

FBR

TOTAL

18

GCR

73.0

4

16

LWGR

12

21

PHWR >= 600 MW(e)

LWGR < 600 MW(e)

26

PHWR < 600 MW(e)

LWGR >= 600 MW(e)

79.6

47

PHWR

64.7

73.6

12

82

BWR < 600 MW(e)

BWR >= 600 MW(e)

73.0

82.7

83.2

82.7

Availability factor (%)

94

224

PWR >= 600 MW(e)

BWR

47

271

PWR < 600 Mw(e)

PWR

Reactor category

Number of units

TABLE 18. PERfORMANCE fACTORS BY REACTOR CATEGORY, 2009 to 2011 Operating factor (%)

80.4

62.6

76.0

81.3

64.3

76.8

82.4

76.0

78.9

74.4

68.1

73.7

83.5

83.8

83.6

Load factor (%)

78.9

72.8

68.2

80.2

32.1

80.0

82.2

64.9

76.6

72.2

64.6

71.8

81.8

82.0

81.8

59

435

Full outage hours per operating experience year

— Reactors shut down during 2011 (13 units) are considered.

Note: 2011 is the latest year for which outage information is currently available to the IAEA.

ALL REACTORS

2

FBR

15

LWGR

17

21

PHWR >= 600 MW(e)

GCR

26

PHWR < 600 MW(e)

4

47

PHWR

11

74

BWR >= 600 MW(e)

LWGR >= 600 MW(e)

10

BWR < 600 MW(e)

LWGR < 600 MW(e)

84

223

PWR >= 600 MW(e)

BWR

47

270

in the world

Number of units

PWR < 600 MW(e)

PWR

Reactor Type

TABLE 19. fULL OUTAGE STATISTICS DURING 2011

1773

809

2000

1647

3216

2065

1323

1590

1471

2502

4028

2684

1488

1669

1520

Planned outages (%)

78.3

100.0

47.7

92.1

43.8

72.0

90.0

65.9

75.6

78.0

69.3

76.5

80.2

93.3

82.7

Unplanned outages (%)

15.6

0.0

51.3

5.4

2.3

4.1

9.6

31.3

22.6

7.9

19.7

10.0

17.8

5.1

15.4

External outages (%)

6.1

0.0

1.0

2.5

53.9

23.9

0.4

2.8

1.8

14.1

11.0

13.5

2.0

1.6

1.9

60

Note: Only reactors which have achieved full commercial operation in or before 2011 are counted.

TOTAL

Other

Fuel management limitation (including high flux tilt, stretch out or coast-down operation)

Fire

561355

788

73 100.00

0.14

0.01 666262

8760

162 100.00

1.31

0.02

578

51296

57439

41

231

1042

20.80

1.95

0.44

8.11

62.29

5.07

4251

138568

12964

2935

54034

415043

33796

Human factor related

22.47

1.65

0.35

6.05

64.34

5.00

100.00

0.07

0.40

1.81

7.40

1.01

89.30

74906

208

451

2021

5496

983

65747

100.00

0.28

0.60

2.70

7.34

1.31

87.77

Unplanned full outages Energy lost Time lost GW(e)∙h % Hours %

Nuclear regulatory requirements

126119

9274

Major back-fitting, refurbishment or upgrading activities with refuelling

Major back-fitting, refurbishment or upgrading activities without refuelling

1946

33945

361161

28049

Planned full outages Energy lost Time lost GW(e)∙h % Hours %

Testing of plant systems or components

Inspection, maintenance or repair without refuelling

Inspection, maintenance or repair combined with refuelling

Refuelling without maintenance

Plant equipment problem/failure

Direct outage cause

TABLE 20. DIRECT CAUSES Of fULL OUTAGES DURING 2011

61

44926

1284

Note: Only reactors which have achieved full commercial operation in or before 2011 are counted.

2481827

1579

Other

TOTAL

2725

Fuel management limitation (including high flux tilt, stretch out or coast-down operation)

External restrictions on supply and services

100.00

0.06

0.11 3050189

17522

3354 100.00

0.57

0.11

426091

793

1204

3835 0.06

12.25

5.03

0.58

9.47

68.06

Fire 1909

373676

153387

17806

288958

2076012

6780 0.02

13.05

4.10

0.29

6.94

71.31

367271

100.00

0.19

0.28

0.90

1.59

10.54

0.30

86.20

513579

1613

1133

5277

8817

53351

3045

440342

100.00

0.31

0.22

1.03

1.72

10.39

0.59

85.74

Unplanned full outages Energy lost Time lost GW(e)∙h % Hours %

Human factor related 382

323778

Major back-fitting, refurbishment or upgrading activities without refuelling

Nuclear regulatory requirements

101683

7199

172346

1769760

Major back-fitting, refurbishment or upgrading activities with refuelling

Testing of plant systems or components

Inspection, maintenance or repair without refuelling

Inspection, maintenance or repair combined with refuelling

117563

0.00 4.13

3.85

102376

Refuelling without maintenance

Planned full outages Energy lost Time lost GW(e)∙h % Hours %

Plant equipment problem/failure

Direct Outage Cause

TABLE 21. DIRECT CAUSES Of fULL OUTAGES, 2007 TO 2011

62

AM AR BE BG BR CA CH CN CZ DE ES FI FR GB HU IN IR IT JP KR KZ LT MX NL PK RO RU SE SI SK

ARMENIA ARGENTINA BELGIUM BULGARIA BRAZIL CANADA SWITZERLAND CHINA CZECH REPUBLIC GERMANY SPAIN FINLAND FRANCE UNITED KINGDOM HUNGARY INDIA IRAN, ISLAMIC REPUBLIC OF ITALY JAPAN KOREA, REPUBLIC OF KAZAKHSTAN LITHUANIA MEXICO NETHERLANDS PAKISTAN ROMANIA RUSSIAN FEDERATION SWEDEN SLOVENIA SLOVAKIA

Full name

TABLE 22. COUNTRIES: ABBREVIATIONS AND SUMMARY

Country Code

2 1 3 2 33 10 1 4

50 21

1 2 7 2 2 18 5 16 6 9 8 4 58 18 4 20 1

Operational

3

2

1

1 2

4 9

12 27

27 2

3 1

5 3

1

4

1 4

1

10

2

2 5

7

1 1

26

2 1

1

Number of reactors, as of 31 Dec. 2011 Construction LT shut down Shut down

35

10 2

3

42

Planned

63

— 6 units in operation; 2 units under construction.

Note: The total includes the following data from Taiwan, China:

TOTAL

UA US VN ZA

UKRAINE UNITED STATES OF AMERICA VIETNAM SOUTH AFRICA

Full name

TABLE 22. COUNTRIES: ABBREVIATIONS AND SUMMARY — continued

Country Code

435

2

15 104

Operational

65

2 1

5

138

4 28

Number of reactors, as of 31 Dec. 2011 Construction LT shut down Shut down

114

20 2

Planned

64

TOTAL

BWR FBR GCR HTGR HWGCR HWLWR LWGR PHWR PWR SGHWR X

Boiling light water cooled and moderated reactor Fast breeder reactor Gas cooled, graphite moderated reactor High temperature gas cooled, graphite moderated reactor Heavy water moderated, gas cooled reactor Heavy water moderated, boiling light water cooled reactor Light water cooled, graphite moderated reactor Pressurized heavy water moderated and cooled reactor Pressurized light water moderated and cooled reactor Steam generating heavy water reactor Other

Full name

TABLE 23. REACTOR TYPES: ABBREVIATIONS AND SUMMARY

Type code

65

1 5 53

15 47 270

435

4 2

5

4

1

138

31 7 35 4 4 2 9 5 38 1 2

Number of reactors, as of 31 Dec. 2011 Construction LT shut down Shut down

84 2 17

Operational

114

101

1

10 2

Planned

65

AEC/NPPD AEP AmerenUE ANAV ANPPJSC APS AVR Axpo AG BE BHAVINI BKAB BKW BRUCEPOW BV GKN CEA/EDF CEN/SCK CEZ CFE CHUBU CHUGOKU CIAE CNAT CofPiqua COGEMA CONSTELL CPC CVPA CYAPC DOE DUQU DOE/PRWR

ATOMIC ENERGY COMMISSION AND NEBRASKA PUBLIC POWER DISTRICT AMERICAN ELECTRIC POWER COMPANY, INC. AMEREN UE, UNION ELECTRIC COMPANY ASOCIACION NUCLEAR ASCO-VANDELLOS A.I.E. (ENDESA/ID) JOINT STOCK COMPANY ARMENIAN NPP ARIZONA PUBLIC SERVICE CO. ARBEITSGEMEINSCHAFT VERSUCHSREAKTOR GMBH KERNKRAFTWERK BEZNAUCH-5312 DÖTTINGEN BRITISH ENERGY BHARATIYA NABHIKIYA VIDYUT NIGAM LIMITED BARSEBÄCK KRAFT AB BKW ENERGIE AG BRUCE POWER BV GEMEENSCHAPPELIJKE KERNENERGIECENTRALE NEDERLAND (BV GKN) COMMISSARIAT À L'ENERGIE ATOMIQUE (80%)ELECTRICITÉ DE FRANCE (20%) CENTRE D'ETUDE DE L'ENERGIE NUCLEAIRE / STUDIECENTRUM VOOR KERNENERGIE CZECH POWER COMPANY, CEZ A.S. COMISION FEDERAL DE ELECTRICIDAD CHUBU ELECTRIC POWER CO., INC. THE CHUGOKU ELECTRIC POWER CO., INC. CHINA INSTITUTE OF ATOMIC ENERGY CENTRALES NUCLEARES ALMARAZ-TRILLO (ID/UFG/ENDESA/HC/NUCLENOR ) CITY OF PIQUA GOVERNMENT COMPAGNIE GENERALE DES MATIERES NUCLEAIRES CONSTELLATION ENERGY NUCLEAR GROUP, LLC CONSUMERS POWER CO. CAROLINAS-VIRGINIA NUCLEAR POWER ASSOC. CONNECTICUT YANKEE ATOMIC POWER CO. DEPARTMENT OF ENERGY AND DUQUESNE LIGHT CO. DOE & PUERTO RICO WATER RESOURCES

Full name

TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY

Operator code

5

6 2 3 2 1 3

1 6

2 15

2 1 3 1 3

Operational

1

1 2

1 1 1 1 1

1 2

2

1 1 1

3

1

1

1

Number of reactors, as of 31 Dec. 2011 Construction LT shut down Shut down Planned

1 2

66

DOMINION DPC DTEDISON DUKEENER E.ON EDF ELECTRAB ELETRONU EMO EnBW ENERGYNW EnKK ENTERGY EOS EPDC EPZ ESKOM EVN EWN EXELON FENOC FKA FORTUMPH FPL FQNP FSNPC GE GFNPC GNPJVC GPU HDR

DOMINION GENERATION DAIRYLAND POWER COOPERATIVE DETROIT EDISON CO. DUKE ENERGY CORP. E.ON KERNKRAFT GMBH ELECTRICITE DE FRANCE ELECTRABEL M. V. NUCLEAIRE PRODUKTIE ELETROBRAS ELETRONUCLEAR S.A. ELECTROSTATION MOCHOVCE ENBW KRAFTWERKE AG ENERGY NORTHWEST ENBW KERNKRAFT GMBH (SITZ IN OBRIGHEIM) ENTERGY NUCLEAR OPERATIONS, INC. ENERGIE DE L'OUEST SUISSE ELECTRIC POWER DEVELOPMENT CO.,LTD. N.V. ELEKTRICITEITS-PRODUKTIEMAATSCHAPPIJ ZUID-NEDERLAND ESKOM VIETNAM ELECTRICITY ENERGIEWERKE NORD GMBH EXELON GENERATION CO., LLC FIRST ENERGY NUCLEAR OPERATING CO. FORSMARK KRAFTGRUPP AB FORTUM POWER AND HEAT OY (FORMER IVO) FLORIDA POWER & LIGHT CO. CNNC FUJIAN FUQING NUCLEAR POWER CO.,LTD FUJIAN SANMING NUCLEAR POWER CO.,LTD. GENERAL ELECTRIC GUANGXI FANGCHENGGANG NUCLEAR POWER COMPANY LTD GUANDONG NUCLEAR POWER JOINT VENTURE COMPANY LIMITED (GNPJVC) GENERAL PUBLIC UTILITIES (OWNED BY FIRSTENERGY CORP.) HEISSDAMPFREAKTOR-BETRIEBSGESELLSCHAFT MBH.

Full Name

TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY— continued

Operator code

2

17 4 3 2 4

1 2

1 2 12

1 7 3 58 7 2

7

Operational

2

3

1

1 2

1

1 1

1

6 4

2 1 1

1

3 8

1 1 1

Number of reactors, as of 31 Dec. 2011 Construction LT shut down Shut down Planned

3 2

2

67

HEPCO HIFRENSA HKG HNPC HOKURIKU HONGYANH HQ HSNPC ID INPP JAEA JAPCO JAVYS JNPC KBG KEPCO KGB KGG KHNP KKB KKG KKK KKL KKN KLE KOZNPP KWG KWL KYUSHU LANPC LDNPC

HOKKAIDO ELECTRIC POWER CO.,INC. HISPANO-FRANCESA DE ENERGIA NUCLEAR, S.A. HOCHTEMPERATUR-KERNKRAFTWERK GMBH HAINAN NUCLEAR POWER COMPANY HOKURIKU ELECTRIC POWER CO. HONGYANHE NUCLEAR POWER COMPANY HYDRO QUEBEC HUANENG SHANDONG SHIDAOBAY NUCLEAR POWER CO.,LTD. IBERDROLA, S.A. IGNALINA NUCLEAR POWER PLANT JAPAN ATOMIC ENERGY AGENCY JAPAN ATOMIC POWER CO. JADROVA A VYRADOVACIA SPOLOCNOST/NUCLEAR AND DECOMMISSIONING COMPANY, PLC./ JIANGSU NUCLEAR POWER CORPORATION KERNKRAFTWERK-BETRIEBSGESELLSCHAFT MBH KANSAI ELECTRIC POWER CO. KERNKRAFTWERKE GUNDREMMINGEN BETRIEBSGESELLSCHAFT MBH KERNKRAFTWERK GUNDREMMINGEN GMBH KOREA HYDRO AND NUCLEAR POWER CO. KERNKRAFTWERK BRUNSBÜTTEL GMBH KERNKRAFTWERK GOESGEN-DAENIKEN AG KERNKRAFTWERK KRÜMMEL GMBH & CO. OHG KERNKRAFTWERK LEIBSTADT KERNKRAFTWERK NIEDERAICHBACH GMBH KERNKRAFTWERKE LIPPE-EMS GMBH KOZLODUY NPP-PLC GEMEINSCHAFTSKERNKRAFTWERK GROHNDE GMBH & CO. OHG KERNKRAFTWERK LINGEN GMBH KYUSHU ELECTRIC POWER CO., INC. LINGAO NUCLEAR POWER COMPANY LTD. LINGDONG NUCLEAR POWER COMPANY LTD.

Full name

TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY— continued

Operator code

6 2 2

1 2 1

1

1

2 21

11

2

3

1

1

2

3

Operational

2

5

2

1

1

4

1

1

1

1 1

2

2 2 1 3

1

1 1

Number of reactors, as of 31 Dec. 2011 Construction LT shut down Shut down Planned

1

2

4

2

1

1

68

LHNPC LIPA LNPC LUMINANT MAEC-KAZ MEL MTE MYAPC NASA NBEPC NDNPC NEK NEXTERA NMC NNEGC NPCIL NPPDCO NPQJVC NSP NUCLENOR OH OKG OPG OPPD PAEC PAKS Zrt PE PG&E PORTGE PPL SUSQ PROGRESS

LIAONING HONGYANHE NUCLEAR POWER CO. LTD. (LHNPC) LONG ISLAND POWER AUTHORITY LIAONIN NUCLEAR POWER COMPANY,LMT. LUMINANT GENERATION COMPANY LLC MANGISHLAK ATOMIC ENERGY COMPLEX-KAZATOMPROM, LIMITED LIABILITY COMPANY MAGNOX ELECTRIC LIMITED MINTOPENERGO OF UKRAINE - MINISTRY OF FUEL AND ENERGY OF UKRAINE MAINE YANKEE ATOMIC POWER CO. NUCLEOELECTRICA ARGENTINA S.A. NEW BRUNSWICK ELECTRIC POWER COMMISSION NINGDE NUCLEAR POWER COMPANY LTD. NUKLERANA ELEKTRARNA KRŠKO NEXTERA ENERGY RESOURCES, LLC NUCLEAR MANAGEMENT CO. NATIONAL NUCLEAR ENERGY GENERATING COMPANY NUCLEAR POWER CORPORATION OF INDIA LTD. NUCLEAR POWER PRODUCTION & DEVELOPEMENT CO. OF IRAN NUCLEAR POWER PLANT QINSHAN JOINT VENTURE COMPANY LTD. NORTHERN STATES POWER CO. (SUBSIDIARY OF XCEL ENERGY) NUCLENOR, S.A. ONTARIO HYDRO OKG AKTIEBOLAG ONTARIO POWER GENERATION OMAHA PUBLIC POWER DISTRICT PAKISTAN ATOMIC ENERGY COMMISSION PAKS NUCLEAR POWER PLANT LTD PREUSSENELEKTRA KERNKRAFT GMBH&CO KG PACIFIC GAS AND ELECTRIC COMPANY PORTLAND GENERAL ELECTRIC CO. PPL SUSQUEHANNA, LLC PROGRESS ENERGY

Full Name

TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY— continued

Operator code

2 5

2

3 10 1 3 4

15 20 1 4 3 1

1 4

2 1

3

2

Operational

2

2 6

4

1

4

2

1 1 1

2

1

1 23 4 1

1

Number of reactors, as of 31 Dec. 2011 Construction LT shut down Shut down Planned

1

3

2

2

69

TOHOKU TPC TQNPC TVA TVO UFG UKAEA VAK

PSCC PSEG QNPC RAB RCPA REA RWE SCE SCE&G SE,plc SENA SHIKOKU SMNPC SMUD SNEC SNN SNPC SOGIN SOUTHERN STP TEPCO TNPC

PUBLIC SERVICE CO. OF COLORADO PSEG NUCLEAR LLC PUBLIC SERVICE ELECTRIC & GAS CO. QINSHAN NUCLEAR POWER COMPANY RINGHALS AB RURAL COOPERATIVE POWER ASSOC. JOINT STOCK COMPANY CONCERN ROSENERGOATOM RWE POWER AG SOUTHERN CALIFORNIA EDISON CO. SOUTH CAROLINA ELECTRIC & GAS CO. SLOVENSKÉ ELEKTRÁRNE, A.S. SOCIETE D'ENERGIE NUCLEAIRE FRANCO-BELGE DES ARDENNES SHIKOKU ELECTRIC POWER CO., INC SANMEN NUCLEAR POWER CO., LTD. SACRAMENTO MUNICIPAL UTILITY DISTRICT SAXTON NUCLEAR EXPIRAMENTAL REACTOR CORPORATION SOCIETATEA NATIONALA NUCLEARELECTRICA S.A. SHANDONG NUCLEAR POWER COMPANY LTD SOCIETA GESTIONE IMPANTI NUCLEARI S.P.A. SOUTHERN NUCLEAR OPERATING COMPANY, INC. STP NUCLEAR OPERATING CO. TOKYO ELECTRIC POWER CO.,INC. GUANGDONG TAISHAN NUCLEAR POWER JOINT VENTURE COMPANY LIMITED (TNPC) JOINT VENTURE BETWEEN EDF (30%) AND GUANGDONG NUCLEAR POWER GROUP (CGNPC). TOHOKU ELECTRIC POWER CO.,INC TAI POWER CO. THE THIRD QINSHAN JOINTED VENTURE COMPANY LTDA. TENNESSEE VALLEY AUTHORITY TEOLLISUUDEN VOIMA OY UNION FENOSA GENERATION S.A. UNITED KINGDOM ATOMIC ENERGY AUTHORITY VERSUCHSATOMKRAFTWERK KAHL GMBH

Full Name

TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY— continued

Operator code

4 6 2 6 2

6 2 13

2

3

1 1

2

2

2

2

10

33 2 1 4

2

1 4 1

4

4

1 1

1

1 5 2 1

1

Number of reactors, as of 31 Dec. 2011 Construction LT Shut Down Shut down

3 1 4

Operational

2

2

2

2

35

Planned

70

TOTAL

WCNOC YAEC YJNPC not specified

WOLF CREEK NUCLEAR OPERATION CORP. YANKEE ATOMIC ELECTRIC CO. YANGJIANG NUCLEAR POWER COMPANY

Full name

TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY— continued

Operator code

435

1

Operational 3 65

5

138

1

Number of reactors, as of 31 Dec. 2011 Construction LT shut down shut down

114

3 39

Planned

71

A/F/W ABBATOM AC ACECOWEN ACLF AECL AECL/DAE AECL/DHI AEE AEG AEG,GE AEG,KWU AMN/GETS APC AREVA ASE ASEASTAL ASPALDO AtEE B&W BBK BBR CE CEA CGE CNCLNEY CNNC CZEC DFEC DHICKAEC

ASSOCIATION ACEC, FRAMATOME ET WESTINGHOUSE ABBATOM (FORMERLY ASEA-ATOM) ALLIS CHALMERS ACECOWEN (ACEC-COCKERILL-WESTINGHOUSE ) (ACECOWEN - CREUSOT LOIRE - FRAMATOME) ATOMIC ENERGY OF CANADA LTD. ATOMIC ENERGY OF CANADA LTDA AND DEPARTMENT OF ATOMIC ENERGY (INDIA) ATOMIC ENERGY OF CANADA LTD./DOOSAN HEAVY INDUSTRY & CONSTRUCTION ATOMENERGOEXPORT ALLGEMEINE ELEKTRICITAETS-GESELLSCHAFT ALLGEMEINE ELECTRICITAETS-GESELLSCHAFT, GENERAL ELECTRIC COMPANY (US) ALLGEMEINE ELEKTRICITAETS GESELLSCHAFT, KRAFTWERK UNION AG ANSALDO MECCANICO NUCLEARE SPA/GENERAL ELECTRIC TECHNICAL SERVICES CO ATOMIC POWER CONSTRUCTION LTD. AREVA, 27-29, RUE LE PELETIER, 75433 PARIS CEDEX 09URL: WWW.AREVA.COM ATOMSTROYEXPORT ASEA-ATOM/STAL-LAVAL ASPALDO ATOMENERGOEXPORT BABCOCK & WILCOX CO. BROWN BOVERI-KRUPP REAKTORBAU GMBH BROWN BOVERI REAKTOR GMBH COMBUSTION ENGINEERING CO. COMMISSARIAT A L'ENERGIE ATOMIQUE CANADIAN GENERAL ELECTRIC CNIM-CONSTRUCTIONS NAVALES ET INDUSTRIELLES DE MEDITERRANEE CL - CREUSOT LOI CHINA NATIONAL NUCLEAR CORPORATION CHINA ZHONGYUAN ENGINEERING CORPORATION DONGFANG ELECTRIC CORPORATION DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD./KOREA ATOMIC ENERGY RESEARCH INSTITUTE

Full name

TABLE 25. NSSS SUPPLIERS: ABBREVIATIONS AND SUMMARY

NSSS supplier code

2 2

7

1

14

7

1 2

2

4 1 9 1 3 8

7

Operational

2 20

4 4

1 1 6 3 1 1 1 1 1 1

6 1 1 2 1 2

2

1 2 3

Number of reactors, as of 31 Dec. 2011 Construction LT shut down Shut down

13

1 1

Planned

72

DHICKOPC EE/B&W/T EL/WEST FAEA FRAM FRAMACEC GA GAAA GE GE,AEG GE/GETSC GE/T GEC GETSCO GNEPRWRA GTM H/G HITACHI HRB IA ICL/FE IZ KWU LEVIVIER MAEC-KAZ MAEP MHI MSM NGA NNC NPC

DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD./KOREA POWER ENGINEERING COMPA THE ENGLISH ELECTRIC CO. LTD / BABCOCK & WILCOX CO. / TAYLOR WOODROW CONSTRU ELETTRONUCLEARE ITALIANA / WESTINGHOUSE ELECTRIC CORP. FEDERAL ATOMIC ENERGY AGENCY FRAMATOME FRAMACECO ( FRAMATOME-ACEC-COCKERILL ) GENERAL ATOMIC CORP. GROUPEMENT ATOMIQUE ALSACIENNE ATLANTIQUE GENERAL ELECTRIC CO. GENERAL ELECTRIC COMPANY (US), ALLGEMEINE ELEKTRICITAETS- GESELLSCHAFT GENERAL ELECTRIC CO./GENERAL ELECTRIC TECHNICAL SERVICES CO. GENERAL ELECTRIC CO./TOSHIBA CORPORATION GENERAL ELECTRIC COMPANY (UK) GENERAL ELECTRIC TECHNICAL SERVICES CO. GENERAL NUCLEAR ENGINEERING & PUERTO RICO WATER RESOURCES AUTHORITY (US) GRANDS TRAVAUX DE MARSEILLE HITACHI GE NUCLEAR ENERGY, LTD. HITACHI LTD. HOCHTEMPERATUR-REAKTORBAU GMBH INTERATOM INTERNATIONALE ATOMREAKTORBAU GMBH INTERNATIONAL COMBUSTION LTD. / FAIREY ENGINEERING LTD. IZHORSKIYE ZAVODY SIEMENS KRAFTWERK UNION AG LEVIVIER MAEC-KAZATOMPROMMANGISHLAK ATOMIC ENERGY COMPLEX-KAZATOMPROM, LIMITED LIABILITY MINATOMENERGOPROM, MINISTRY OF NUCLEAR POWER AND INDUSTRY MITSUBISHI HEAVY INDUSTRIES LTD. MINISTRY OF MEDIUM MACHINE BUILDING OF THE USSR (MINSREDMASH) NATIONAL GESELLSCHAFT ZUR FÖRDERUNG DER INDUSTRIELLEN ATOMTECHNIK NATIONAL NUCLEAR CORPORATION NUCLEAR POWER CO. LTD.

Full name

TABLE 25. NSSS SUPPLIERS: ABBREVIATIONS AND SUMMARY— continued

NSSS supplier code

2 6

2

3 12

20

1

9

2

5

5 1

9 2 1 2

2 1 1 1

1 1

2 1 11 1 1 1 3

4 1 5 3

Number of reactors, as of 31 Dec. 2011 Construction LT shut down Shut down

1 1

2

1

47

1 66 2

7 2

Operational

2

2

2

Planned

73

TOTAL

NPCIL OH/AECL PAA PAIP PPC RDM ROSATOM S/KWU SACM SIEM,KWU SIEMENS SKODA T/H/F/M TBD TNPG TOSHIBA UEC UKAEA WH WH/MHI not specified

NUCLEAR POWER CORPORATION OF INDIA LTD.VIKRAM SARABHAI BHAVAN, ANUSHAKTI NAG ONTARIO HYDRO/ATOMIC ENERGY OF CANADA LTD. PRODUCTION AMALGAMATION 'ATOMMASH', VOLGODONSK PRODUCTION AMALGAMATION IZHORSKY PLANT ATOMMASH,VOLGODONSK,RUSSIA PWR POWER PROJECTS LTD ROTTERDAMSE DROOGDOK MAATSCHAPPIJ (RDM) IN ROTTERDAM (NL) STATE ATOMIC ENERGY CORPORATION ROSATOM SIEMENS/KRAFTWERK UNION AG SOCIETE ALSACIENNE DE CONSTRUCTIONS MECANIQUES SIEMENS AG, KRAFTWERK UNION AG SIEMENS AG, POWER GENERATION -FRG SKODA CONCERN NUCLEAR POWER PLANT WORKS TOSHIBA/HITACHI/FUJI ELECTRIC HOLDINGS/MITSUBISHI HEAVY INDUSTRIES TBD THE NUCLEAR POWER GROUP LTD. TOSHIBA CORPORATION UNITED ENGINEERS AND CONTRACTORS UNITED KINGDOM ATOMIC ENERGY AUTHORITY WESTINGHOUSE ELECTRIC CORPORATION WESTINGHOUSE ELECTRIC CORPORATION/MITSUBISHI HEAVY INDUSTRIES LTD.

Full name

TABLE 25. NSSS SUPPLIERS: ABBREVIATIONS AND SUMMARY— continued

NSSS supplier code

435

71 1

65

3 2 1

1 2

1 10 5 14

10

4

5

1

4

138

9 3 1 10 10

2 2 1 1

1

Number of reactors, as of 31 Dec. 2011 Construction LT shut down Shut down

33 1

16 16 4 11 1

Operational

114

4 2 49

1

37

Planned

300

Number of reactors

Number of reactors/net electrical power (GW(e))

250

248.4

270

Net electrical power (GW(e))

200

150

47

77.7

84

100

2

0

PWR

BWR

GCR

PHWR

LWGR

Reactor type figure 1. Number of operational reactors by type and net electrical power (as of 31 Dec. 2011).

74

0.6

15 8.8

10.2

17

23.1

50

FBR

60

Number of reactors

51.3

53

Net electrical power (GW(e))

40

30

20

5

2 PWR

BWR

PHWR

0.9

1 0

LWGR

1.3

3.2

5.3

10

4

Number of reactors/net electrical power (GW(e))

50

FBR

Reactor type figure 2. Reactors under construction by type and net electrical power (as of 31 Dec. 2011).

75

76

0%

5.2% 5.0% 3.8% 3.7% 3.6% 3.5% 3.2% 1.9% 0.0%

20%

19.5% 19.3% 19.0% 18.1% 17.8% 17.8% 17.6% 15.3%

40%

Nuclear share

34.6% 33.2% 33.0% 32.6% 31.6%

43.3% 41.7% 40.9% 39.6%

47.2%

Note: The nuclear share of electricity supplied in Taiwan, China, was 19.0% of the total.

figure 3. Nuclear share of electricity generation (as of 31 Dec. 2011).

FRANCE SLOVAKIA BELGIUM UKRAINE HUNGARY SLOVENIA SWITZERLAND SWEDEN KOREA, REP. ARMENIA CZECH REP. BULGARIA FINLAND SPAIN USA ROMANIA JAPAN UK GERMANY RUSSIA CANADA SOUTH AFRICA ARGENTINA PAKISTAN INDIA NETHERLANDS MEXICO BRAZIL CHINA IRAN, ISL. REP. 54.0% 54.0%

60%

80%

77.7%

0

Number of reactors

2011

7

12

20

23

29

64 75

80

2006 – 2010

2001 – 2005

1996 – 2000

1991 – 1995

1986 – 1990

74

85

86

95

99

100

1981 – 1985

1976 – 1980

Number of reactors /construction time (in months)

105

103 123

131

140

120

60

40

20

Construction time

figure 4. Worldwide median construction time in months (as of 31 Dec. 2011).

77

78

Number of reactors

0

5

10

15

20

25

30

35

1

5

2

2

3

0

4

3

5

2

6

4

7

5

8

2

3

6

4

4

3

6

4

5

6 4

33

20 18

22 19

6

11

13 13 11

20

13 10

12

4

7

0

1

Reactor age (in years)

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44

6

9

figure 5. Number of reactors in operation by age (as of 31 Dec. 2011).

0

7

10

11

14

21

24

32

79 Number of reactors 0

10

20

30

40

50

figure 6. Annual construction starts and connections to the grid, 1954 to 2011.

1 1 8

0 1

5 13

3 6

1

7

5

11

4 7

1

8 5 8 8

9 9 9 9 15

8

25

11

37

7 10

13 37

6 16

18 29

16

29

20

38

26

38

15

42

19 24

18 20

23 28

8 20 21 16

23 19 19

16

23

10

33 20

33

8

27 13

7

22

14

6

12

5 2

10

4 3

6 4

2

Construction starts

9 5

0

5 1

6 3 3

5 4 4 4 6

1

7

3 6 6

1

2 2

Grid connections

1954 1955 1956 1957 1958 1959 1960 1961 1962 1963 1964 1965 1966 1967 1968 1969 1970 1971 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

5 3

2

4 4 8

3

10

0

12

2

16

5 4

7

@

No. 22

Where to order IAEA publications

In the following countries IAEA publications may be purchased from the sources listed below, or from major local booksellers. Payment may be made in local currency or with UNESCO coupons. AUSTRALIA

DA Information Services, 648 Whitehorse Road, MITCHAM 3132 Telephone: +61 3 9210 7777 • Fax: +61 3 9210 7788 Email: [email protected] • Web site: http://www.dadirect.com.au

BELGIUM

Jean de Lannoy, avenue du Roi 202, B-1190 Brussels Telephone: +32 2 538 43 08 • Fax: +32 2 538 08 41 Email: [email protected] • Web site: http://www.jean-de-lannoy.be

CANADA

Bernan Associates, 4501 Forbes Blvd, Suite 200, Lanham, MD 20706-4346, USA Telephone: 1-800-865-3457 • Fax: 1-800-865-3450 Email: [email protected] • Web site: http://www.bernan.com Renouf Publishing Company Ltd., 1-5369 Canotek Rd., Ottawa, Ontario, K1J 9J3 Telephone: +613 745 2665 • Fax: +613 745 7660 Email: [email protected] • Web site: http://www.renoufbooks.com

CHINA

IAEA Publications in Chinese: China Nuclear Energy Industry Corporation, Translation Section, P.O. Box 2103, Beijing

CZECH REPUBLIC

Suweco CZ, S.R.O., Klecakova 347, 180 21 Praha 9 Telephone: +420 26603 5364 • Fax: +420 28482 1646 Email: [email protected] • Web site: http://www.suweco.cz

FINLAND

Akateeminen Kirjakauppa, PO BOX 128 (Keskuskatu 1), FIN-00101 Helsinki Telephone: +358 9 121 41 • Fax: +358 9 121 4450 Email: [email protected] • Web site: http://www.akateeminen.com

FRANCE

Form-Edit, 5, rue Janssen, P.O. Box 25, F-75921 Paris Cedex 19 Telephone: +33 1 42 01 49 49 • Fax: +33 1 42 01 90 90 Email: [email protected] • Web site: http://www. formedit.fr Lavoisier SAS, 145 rue de Provigny, 94236 Cachan Cedex Telephone: + 33 1 47 40 67 02 • Fax +33 1 47 40 67 02 Email: [email protected] • Web site: http://www.lavoisier.fr

GERMANY

UNO-Verlag, Vertriebs- und Verlags GmbH, Am Hofgarten 10, D-53113 Bonn Telephone: + 49 228 94 90 20 • Fax: +49 228 94 90 20 or +49 228 94 90 222 Email: [email protected] • Web site: http://www.uno-verlag.de

HUNGARY

Librotrade Ltd., Book Import, P.O. Box 126, H-1656 Budapest Telephone: +36 1 257 7777 • Fax: +36 1 257 7472 • Email: [email protected]

INDIA

Allied Publishers Group, 1st Floor, Dubash House, 15, J. N. Heredia Marg, Ballard Estate, Mumbai 400 001, Telephone: +91 22 22617926/27 • Fax: +91 22 22617928 Email: [email protected] • Web site: http://www.alliedpublishers.com Bookwell, 2/72, Nirankari Colony, Delhi 110009 Telephone: +91 11 23268786, +91 11 23257264 • Fax: +91 11 23281315 Email: [email protected]

ITALY

Libreria Scientifica Dott. Lucio di Biasio “AEIOU”, Via Coronelli 6, I-20146 Milan Telephone: +39 02 48 95 45 52 or 48 95 45 62 • Fax: +39 02 48 95 45 48 Email: [email protected] • Website: www.libreriaaeiou.eu

JAPAN

Maruzen Company, Ltd., 13-6 Nihonbashi, 3 chome, Chuo-ku, Tokyo 103-0027 Telephone: +81 3 3275 8582 • Fax: +81 3 3275 9072 Email: [email protected] • Web site: http://www.maruzen.co.jp

REPUBLIC OF KOREA

KINS Inc., Information Business Dept. Samho Bldg. 2nd Floor, 275-1 Yang Jae-dong SeoCho-G, Seoul 137-130 Telephone: +02 589 1740 • Fax: +02 589 1746 • Web site: http://www.kins.re.kr

NETHERLANDS

De Lindeboom Internationale Publicaties B.V., M.A. de Ruyterstraat 20A, NL-7482 BZ Haaksbergen Telephone: +31 (0) 53 5740004 • Fax: +31 (0) 53 5729296 Email: [email protected] • Web site: http://www.delindeboom.com Martinus Nijhoff International, Koraalrood 50, P.O. Box 1853, 2700 CZ Zoetermeer Telephone: +31 793 684 400 • Fax: +31 793 615 698 Email: [email protected] • Web site: http://www.nijhoff.nl Swets and Zeitlinger b.v., P.O. Box 830, 2160 SZ Lisse Telephone: +31 252 435 111 • Fax: +31 252 415 888 Email: [email protected] • Web site: http://www.swets.nl

NEW ZEALAND

DA Information Services, 648 Whitehorse Road, MITCHAM 3132, Australia Telephone: +61 3 9210 7777 • Fax: +61 3 9210 7788 Email: [email protected] • Web site: http://www.dadirect.com.au

SLOVENIA

Cankarjeva Zalozba d.d., Kopitarjeva 2, SI-1512 Ljubljana Telephone: +386 1 432 31 44 • Fax: +386 1 230 14 35 Email: [email protected] • Web site: http://www.cankarjeva-z.si/uvoz

SPAIN

Díaz de Santos, S.A., c/ Juan Bravo, 3A, E-28006 Madrid Telephone: +34 91 781 94 80 • Fax: +34 91 575 55 63 Email: [email protected], [email protected], [email protected], [email protected] Web site: http://www.diazdesantos.es

UNITED KINGDOM

The Stationery Office Ltd, International Sales Agency, PO Box 29, Norwich, NR3 1 GN Telephone (orders): +44 870 600 5552 • (enquiries): +44 207 873 8372 • Fax: +44 207 873 8203 Email (orders): [email protected] • (enquiries): [email protected] • Web site: http:// www.tso.co.uk On-line orders DELTA Int. Book Wholesalers Ltd., 39 Alexandra Road, Addlestone, Surrey, KT15 2PQ Email: [email protected] • Web site: http://www.profbooks.com Books on the Environment Earthprint Ltd., P.O. Box 119, Stevenage SG1 4TP Telephone: +44 1438748111 • Fax: +44 1438748844 Email: [email protected] • Web site: http://www.earthprint.com

UNITED NATIONS

Dept. I004, Room DC2-0853, First Avenue at 46th Street, New York, N.Y. 10017, USA (UN) Telephone: +800 253-9646 or +212 963-8302 • Fax: +212 963-3489 Email: [email protected] • Web site: http://www.un.org

UNITED STATES OF AMERICA

Bernan Associates, 4501 Forbes Blvd., Suite 200, Lanham, MD 20706-4346 Telephone: 1-800-865-3457 • Fax: 1-800-865-3450 Email: [email protected] · Web site: http://www.bernan.com Renouf Publishing Company Ltd., 812 Proctor Ave., Ogdensburg, NY, 13669 Telephone: +888 551 7470 (toll-free) • Fax: +888 568 8546 (toll-free) Email: [email protected] • Web site: http://www.renoufbooks.com

Orders and requests for information may also be addressed directly to: Marketing and Sales Unit, International Atomic Energy Agency Vienna International Centre, PO Box 100, 1400 Vienna, Austria Telephone: +43 1 2600 22529 (or 22530) • Fax: +43 1 2600 29302 Email: [email protected] • Web site: http://www.iaea.org/books

12-24221

REFERENCE DATA SERIES No. 2 2012 Edition

Nuclear Power Reactors in the World

INTERNATIONAL ATOMIC ENERGY AGENCY VIENNA ISBN 978–92–0–132310–1 ISSN 1011–2642

@