Precast Concrete Handling Solutions Details in this document are ranked in order of recommendation by section colour
Primary Solution
These are recommended options that are safer and more practical as they eliminate the need for personnel to be standing on the back of a trailer or the requirement for edge protection or fall arrest systems
Secondary Solution
Requires staff on trailer
Last Solution
Requires staff on trailer but could become Secondary Solution when used with platforms and edge protection
Advise Against Use
Under no circumstances should this be used
CONTENTS
(Click on the product name to take you to that page)
PRODUCTS
DETAILS
Pipes
Offloading and installation equipment for 300 to 2400 diameter precast concrete pipes
Pipe Lifters
Stanton Bonna range of Pipe Lifters for pipes and fittings
Manholes
Offloading Standard Manhole Rings
4-5
Perfect etc
Offloading Perfect Manhole Rings and Base, Catchpits, Flow Control Units
6-7
Slabs & Fittings
Offloading of Slabs, Gullies, Fittings, Seating Rings
8
Multi Systems
Pallets, Slings, Air Bags
9
PAGE NO
1-2 3
Handling and Off Loading - PIPES
PIPES DN
Pipe Lifter T2-i-A
Pipe Lifter T4-80-A
Stanton Bonna 2-3 Days 500kg Short lengths, some fittings and bends
Stanton Bonna 2-3 Days 650kg Short lengths, some fittings and bends. Can be used with 300's but grater care must be taken
Pipe Lifter T8-90-A
Pipe Lifter T12-100-A
Pipe Lifter AP 1
Pipe Lifter RVD-4-ECO
Lorry Mounted Fork Lift (Moffat)
Stanton Bonna 2-3 Days 1100kg Short lengths, some fittings and bends. Can be used on smaller pipes with some difficulty
MGF, Maybey 2-3 Days 600KG Can also be used for installation
Probst, A PLANT 2-3 Days 914kg Can also be used for installation
Some hauliers 3 days Various Short lengths, some fittings and bends
Pipe Pusher
300 375 450 525 600 675 750 800 900 1050 1200 1400 1500 1600 1800 2000 2200 2400 Supplier Lead Time Self Weight Kg Notes
Primary Solution
Back to Cover Page
Oct 2016
These are recommended options that are safer and more practical as they eliminate the need for personnel to be standing on the back of a trailer or the requirement for edge protection or fall arrest systems Customers are reminded to check prior to delivery they have the ability to safely unload the products.
Stanton Bonna 3-5 days 360kg
Handling and Off Loading - PIPES
PIPES DN
C Beam HLH3A
Platforms
Trailer Edge Protection
Crane offload (Hiab)
Slings
Chains and Lifting Clutches
2-3 days
Stanton Bonna 2-3 days Variable
Stanton Bonna 2-3 days Variable
Supplier Lead Time Self Weight Kg Notes
Secondary Solution Last Solution
Back to Cover Page
Oct 2016
UNDER NO CIRCUMSTANCE SHOULD THEY BE USED
300 375 450 525 600 675 750 800 900 1050 1200 1400 1500 1600 1800 2000 2200 2400
Pipe Hooks
Speedy Hire, Marwood Grantham Fabrications 2-3 days 2-4 weeks 310kg Requires rope guide
Stanton Bonna 2-3 days Limited availability
Limited service. Would be used combined with slings or C beam.
Requires staff on trailer Requires staff on trailer but could become Secondary Solution when used with platforms and edge protection
Unsafe lift & damage
Stanton Bonna Pipe Lifters PIPES
DN
Full Lengths
SHORT LENGTHS
Rockers
Stubs
BENDS
Uni's
11.25Ø
22.5Ø
BACK DROPS
45Ø
90Ø
45Ø
90Ø
JUNCTIONS
45Ø
90Ø
300 375 450 525 600 675 750 800 900 1050 1200 1400 1500 1600 1800 2000 2200 2400 T2-i-A T2-i-A or T4-80-A T2-i-A, T4-80-A or T8-90-A T2-i-A, T4-80-A, T8-90-A or T12-90-A T4-80-A, T8-90-A or T12-100-A T8-90-A or T12-100-A T12-100-A Can be lifted with a T2-i-A Pipe Lifter but with some difficulty. Due to the value of the product, pre-slinging is probably the best option Can be lifted with either a T2-i-A or T4-80-A Pipe Lifter but with some difficulty. Due to the value of the product, pre-slinging is probably the best option
NOTES Back to Cover Page
Oct 2016
When picking up bends always enter through socket
Handling and Off Loading - MANHOLES
STANDARD Small Diameter MANHOLE RING Manhole Lifters RK1 Manhole Lifters RK2 Manhole Lifter SVZ DN 900 1050 1200 1350 1500 1800 2100 2400 2700 3000 Supplier Lead Time Self Weight Kg
Notes
Primary Solution Back to Cover Page
Oct 2016
Small Diameter Scanlift 685
RK1 RK1 RK1 RK1
Stanton Bonna, Probst Stanton Bonna, Probst 2-3 days 120kg RK2 - 320kg There is a RKIII that will pick up to DN3000, but at the moment we don’t think there is one available In the UK.
MGF, GAP, Marwood 2 -3 days 209kg
Scanlift
Adaptor available for 1800 ring subject to additional cost
Sale Only
185kg
These are recommended options that are safer and more practical as they eliminate the need for personnel to be standing on the back of a trailer or the requirement for edge protection or fall arrest systems Customers are reminded to check prior to delivery they have the ability to safely unload the products.
Handling and Off Loading - MANHOLES
STANDARD MANHOLE RING DN
Platforms
Trailer Edge Protection
Crane off load (Hiab)
Stanton Bonna
Stanton Bonna
Manhole Suspension Clamps
Manhole Quick Release Lifting Pins and Chains
900 1050 1200 1350 1500 1800 2100 2400 2700 3000 Supplier
Grantham Fabrications
Lead Time Weight Kg Comments
2-4 weeks
Secondary Solution Last Solution
Back to Cover Page
Oct 2016
Speedy Hire, Marwood
2-3 days A crane off load using a manhole grab would but the offload in to the green category
55kg access to trailer bed required to fit clamps
Stanton Bonna
2-3 days 2kg access to trailer bed required to fit pins. Only use pins that the right size, have a test cert and are CE marked
Requires staff on trailer Requires staff on trailer but could become Secondary Solution when used with platforms and edge protection
Handling and Off Loading - PERFECT, CATCHPIT and FLOW CONTROL
MANHOLE Small Diameter RINGS & BASES Manhole Lifter SVZ Manhole Lifters RK1 Manhole Lifters RK2 DN Watertight Rings Watertight Base GJ Watertight Base SJ Catchpit Flow Control Unit
1200 & 1500* UP TO 2500KG UP TO 2500KG UP TO 2500KG UP TO 2500KG
1200 UP TO 1250KG UP TO 1250KG UP TO 1250KG UP TO 1250KG
1500 UP TO 3000KG UP TO 3000KG UP TO 3000KG UP TO 3000KG
Supplier
MGF, GAP, Marwood
Lead Time Weight Kg Notes
2 -3 days 209kg *Adaptor available for 1800 ring subject to additional cost
Stanton Bonna, Probst 2 -3 days 120kg
Stanton Bonna, Probst 2 -3 days 320ks
Primary Solution Back to Cover Page
Oct 2016
Pallets
Stanton Bonna
Self levelling Crane Forks (2-5T)
Excavator Attach Forks (up to 3T)
UP TO 2500 KG UP TO 2500 KG UP TO 2500 KG UP TO 2500 KG UP TO 2500 KG
UP TO 3000 KG UP TO 3000 KG UP TO 3000 KG UP TO 3000 KG UP TO 3000 KG
Marwood
Strickland, Pipe UK, Geith In Stock
Use with pallets
Use with pallets. Check quick hitch size
2 -3 days Dependent on size, check with sales. Would need availability od forks or telehandler
These are recommended options that are safer and more practical as they eliminate the need for personnel to be standing on the back of a trailer or the requirement for edge protection or fall arrest systems Customers are reminded to check prior to delivery they have the ability to safely unload the products.
Handling and Off Loading - PERFECT, CATCHPIT and FLOW CONTROL
MANHOLE RINGS & BASES DN
Platforms
Trailer Edge Protection
Lifting Clutches
Supplier
Grantham Fabrications
Stanton Bonna
Stanton Bonna
Lead Time Weight Kg Costs
2-4 weeks
2 -3 days
POA
£165
2 -3 days 2kg Set of 3 clutches, slings & wear sleeves £180 (DN1200), £285 (DN1500). Sets required. Credit available for safe return
Watertight Rings Watertight Base GJ Watertight Base SJ Catchpit Flow Control Unit
Notes
Secondary Solution Last Solution
Back to Cover Page
Oct 2016
Requires staff on trailer Requires staff on trailer but could become Secondary Solution when used with platforms and edge protection
Handling and Off Loading - SLABS, GULLIES and FITTINGS
Slabs 900 - 3000 Gullies 375 - 450 Fittings 375 - 2400 Seating Rings
Up to 2700
Pallets Or load raised on timber bearers **
**
**
Supplier
Stanton Bonna
Stanton Bonna
Lead Time Weight Kg Notes
2 days
2-3 Days Dependent on type check with SBC for what can be lifted.
PRODUCT GROUP
Primary Solution
Back to Cover Page
Oct 2016
Single Use Slings
** Dependent on size, check with sales. Sling for 3000 slabs by special request only
Pipe lifter
Stanton Bonna
Self levelling Crane Forks (2-5T)
Excavator Attach (up to 3T)
Marwood
Strickland, Pipe UK, Geith In Stock
2 to 3 days VARIABLE ** Dependent on size, Use with pallets or raised Use with pallets or raised check with loads. loads sales.Dependent on size, Check quick hitch size check with sales. Would need availability of forks or telehandler
Gully Hook
Gully Lifter
Stanton Bonna/Probst
Scanlift
350kg
These are recommended options that are safer and more practical as they eliminate the need for personnel to be standing on the back of a trailer or the requirement for edge protection or fall arrest systems Customers are reminded to check prior to delivery they have the ability to safely unload the products.
7-10days 210 - 240kg For sale from Scanlift only
Handling and Off Loading - MULTI PRODUCTS
MULTI PRODUCTS
Pallets or Raised Loads
Supplier Lead Time Weight Kg
SBC 2 - 3 days VARIABLE
Notes
Primary Solution
Last Solution
Back to Cover Page
Oct 2016
Single Use Slings
Telehandler
Air Bags
Bean Bags
Trailer Mat System
Fall Arrest System
SBC
Plant Hire
Pro Active Inflatables 2 - 3 days
Forest Safety Product 2 - 3 days 20 - 40kg
Marwood 2 - 3 days
Brandon Hire
Requires Inflation
Requires Inflation
VARIABLE Can be use for handling palletised or raised loads
Costs based on example delivery within 20 miles. Requires inflation.
610kg ballast, 3000kg unit
These are recommended options that are safer and more practical as they eliminate the need for personnel to be standing on the back of a trailer or the requirement for edge protection or fall arrest systems Customers are reminded to check prior to delivery they have the ability to safely unload the products. Requires staff on trailer but could become Secondary Solution when used with platforms and edge protection