facilities management: Using the balanced scorecard approach.” Proceedings of
.... Turner, R. Gower Handbook of Project Management. 4th Edition. Aldershot ...
References Abdel-Wahab M S, Dainty A R J, Ison S G, Bowen P and Hazlehurst G (2008) Trends of Skills and Productivity in the UK Construction Industry. Engineering, Construction and Architectural Management, 15(4), 372-382. Adams, K. (1991) Externalization vs. Specialization: what is happening to personnel? Human Resource Management Journal 14, 40-54. Agapiou, A., Price, A.D.F., McCaffer, R. (1995) Planning Future Construction Skill Requirements: Alinaitwe H M, Mwakali J A, and Hansson B (2007) Factors affecting the productivity of building craftsmen - Studies of Uganda. Journal of Civil Engineering and Management, 13(3), 169-176. Amaratunga, D., Baldry, D. and Sarshar, M. (2000). “Performance evaluation in facilities management: Using the balanced scorecard approach.” Proceedings of COBRA 2000, Greenwich, U.K., 1-15. Anvuur, A., Kumaraswamy, M., and Male, S. (2006) Taking Forward Public Procurement Reforms in Ghana. Construction in Developing Economies – New Issues and Challenges. CIB W107 Construction in Developing Economies International Symposium [18 - 20 January]. Santiago, Chile. Armstrong, M. (2001) A Handbook of Human Resource Management Practice. 8th Edition. London: The Bath Press Ltd. CPI Group. Baiden, B. K. (2006) Framework for the integration of the project delivery team. Submitted to the Department of Civil and Building Engineering, Loughborough University, in partial fulfilment of a PhD degree. Not Published Bass, B. M., and J. A. Vaughan. Training in Industry: The Management of Learning (Belmont, California: Brooks/Cole, 1966). Bassioni, H. A., Price, A. D. F. and Hassan, T. M. (2004). “Performance measurement in construction firms.” Journal of Management in Engineering, ASCE, 20 (2), 42–50. Bititci, U. S. and Turner, T. (2000). “Dynamics of performance measurement systems.” International Journal of Operational Product Management, 20(6), 692– 704.
145 | P a g e
Bititci, U. S. and Turner, T. (2000). “Dynamics of performance measurement systems.” International Journal of Operational Product Management, 20(6), 692– 704. Bititci, U. S., Carrie, A. S. and McDevitt, L. (1997). “Integrated performance measurement systems.” International Journal of Operational Product Management, 17(5), 522–534. Bititci, U. S., Carrie, A. S. and McDevitt, L. (1997). “Integrated performance measurement systems.” International Journal of Operational Product Management, 17(5), 522–534. Bogner, W.C., Thomas, H. 1996. From skills to competences: The “playout” of resource bundles across firms. In: Sanchez, R., Heene, A., Thomas, H. (eds.). Dynamics of competence-based competition: Theory and practice in the new strategic management. Elsevier Science, Oxford. Pp. 101–117. Boyatzis, R.E. (1982) The competent manager: a model for effective performance. London, Wiley. Brookfield, S.S. (1983) Adult Learning, Adult Education and the Community. Milton Keynes, Open University Press Bryman, A. (1989) Research Methods and Organisational Studies. London, Unwin Hayman. Chartered Institute of Personnel and Development. (2005) Competency and competency
frameworks
[Internet],
Chartered
Institute
of
Personnel
and
Development. Chartered Institute of Personnel and Development. (2007a) Selection interviewing [Internet], Chartered Institute of Personnel and Development. Chartered Institute of Personnel and Development. (2007b) Training: an overview [Internet], Chartered Institute of Personnel and Development. Available from:
[Accessed
26
January 2008]. Christensen, J.F. 1996. Analysing the technology base of the firm. A multidimensional resource and competence perspective. In: Foss, N.J., Knudsen, C. (eds.). Towards a competence theory of the firm. Routledge, London. Pp. 111–132. Churchman, C. (1959) “Measurement: Definitions and Theories”, Wiley & Sons, London. 146 | P a g e
Clark, J.T. (1982), “Selling Top Management – Understanding the Financial Impact of Manufacturing Systems”, American Production and Inventory Control Society Conference Proceedings, Fall Church, VA. Control of Major Accident Hazards (Amendment) Regulations 2005 London, HMSO Control of Major Accident Hazards (Amendment) Regulations 2008 London, HMSO Dainty, A.R.J., Bagilhole, B.M. and Neal, R.H. (2000) A grounded theory of women’s
career under-achievement in large UK construction companies,
Construction Management and Economics, Vol 18, pp 239-250 Derek L. Bosworth, Patricia A. Dutton, (1990) "Skill Shortages: An Overview", International Journal of Manpower, Vol. 11 Iss: 2, pp.54 - 57 Druker, J and White, G (1996) Managing people in construction. London: Institute of Personnel and Development Druker, J., White, G., Hegewish, A., and Mayne, L. (1996) Between hard and soft HRM: human resource management in the construction industry. Construction Management and Economics [14], 405-416. Easton, G. 1992. Industrial networks: a review. In: Axelsson, B., Easton, G. (eds.). Industrial networks – A new view of reality. Routledge, London, 1992. Pp. 1–27. Easton, G. 1995. Methodology and industrial networks. In: Möller, K., Wilson, D.T. (eds.). Business marketing: An interaction and network perspective. Kluwer Academic Publisher, Boston, MA. Pp. 411–492. Easton, G., Araujo, L. 1996. Characterizing organizational competences: An industrial networks application. In: Sanchez, R., Heene, A., Thomas, H. (eds.). Dynamics of competence-based competition: Theory and practice in the new strategic management. Elsevier Science, Oxford. Pp. 184–207. Egan, J. (1998) Rethinking Construction: The Report of the Construction Task Force. London: Department of the Environment, Transport and the Regions. ENR: Engineering News-Record; 11/28/2005, Vol. 255 Issue 21, p56-59 Evangelidizs, K. (1983). “Performance measured performance gained.” The Treasurer, February, 45–47. Fellows, R., Langford, D., Newcomb, R., and Urry, S. (1983) Construction Management in Practice. Construction Press, Addison Wesley Longman Ltd. Fellows, R., Langford, D., Newcomb, R., and Urry, S. (1983) Construction Management in Practice. Construction Press, Addison Wesley Longman Ltd. 147 | P a g e
Fitzgerald, B. and Howcroft, D. (1998) Towards dissolution of the IS research debate: from polarisation to polarity. Journal of Information Technology 13[4], 313-326. Fletcher, S. (1991) NVQ’s, Standards and Competence: A practical guide for employers, managers and trainers. London, Kogan Page. Fletcher, S. (2000) Competence-based assessment techniques. London, Kogan Page. Foss, N. (ed.) 1997. Resources, firms and strategies. Oxford University Press, Oxford. Foss, N., Knudsen, C. 1996. Towards a competence theory of the firm. Routledge, London. Gareis, R. (2007) Management of the Project-Oriented Company. Morris, Peter W. Goldstein, Irwin L. Training: Program Development and Evaluation (Monterey, California: Brooks/Cole, 1974). Green, S. D. (2002) The Human Resource Management Implications of Lean Construction: Critical Perspectives and Conceptual Chasms. Internet Material. Håkansson, H. 1987. Industrial technological development. A network approach. Croom Helm, London. Håkansson, H., Snehota, I. 1995. Developing relationships in business networks. Routledge, London. 418 p. Hall, L. (2004) HRM Practices and Employee and Organizational Performance: a
critique of the research and Guest's model. Cheshire: Manchester Metropolitan University. Hamel, G. (1994), “The Concept of Core Competence, in Competence- based Competition”, Gary Hamel and Aime Heene, eds., John Wiley & Sons, West Sussex, England. Hammersley, M. (1992) What's Wrong with Ethnography. London: Routledge. Haskel, J. and Martin, C. (1993a), ‘Do Skill Shortages Reduce Productivity: Theory and Evidence from the United Kingdom’, Economic Journal, 103, pp. 386-394 Health and Safety at Work etc Act 1974 London, HMSO. Health and Safety Executive. (2002) Developing and maintaining staff competence. Railway Safety Principles and Guidance Part 3 Section A. Suffolk, HSE Books. Health and Safety Executive. (2003a) Major accidents notified to the European Commission for: England, Wales & Scotland 2001 – 2002 – report of the competent authority
[Internet],
Health
and
Safety
Executive.
Available
from:
148 | P a g e
[Accessed
26
November
2007]. Health and Safety Executive. (2003b) Reducing error and influencing behaviour. Suffolk, HSE Books. Health and Safety Executive. (2005) Summary Of Changes To COMAH Introduced By The Control Of Major Accident (Amendment) Regulations 2005 [Internet], Health and Safety Executive. Available from: [Accessed 1 February 2007]. Health and Safety Executive. (2006) Five steps to risk assessment. Suffolk, HSE Books. Health and Safety Executive. (2007) Managing competence for safety-related systems: Part 1: Key guidance [Internet], Health and Safety Executive. Available from: http://www.hse.gov.uk/humanfactors/comah/mancomppt1.pdf [Accessed 26 November 2007]. Hendry, C. and Pettigrew, A. M. (1990) Human Resource Management: an agenda for the 1990s'. International Journal of Human Resource Management 1[1], 17-43. 322 Herbsman Z and Ellis R (1990) Research of Factors influencing construction productivity. Construction Management and Economics, 8(1), 49-61. Hinrichs, John R. "Personnel Training", in Marvin Dun-nette (Ed.), Handbook of Industrial and Organizational Psychology (Chicago: Rand McNally, 1976), pp. 829860. Horner M (1982) The Control to Productivity, CIOB, Technical Information Service, No. 6. Houle, C. (1980) Continual Learning in the Professions. San Francisco, Josey-Bass. Hronec, S. M. (1993). Vital Signs: Using Quality, Time and Cost Performance Measurements to Chart Your Company’s Future, Amacom, New York, NY Hronec, S. M. (1993). Vital Signs: Using Quality, Time and Cost Performance Measurements to Chart Your Company’s Future, Amacom, New York, NY http://www.cipd.co.uk/subjects/recruitmen/selectn/selnintvg.htm
[Accessed
26
January 2008]. Hughes, J. and Sharrock, W. (1997) The Philosophy of Social Research. London: Longman. 149 | P a g e
International Construction; Oct2005, Vol. 44 Issue 8, p15-16, 2p Katz, J., Aldrich, H., Welbourne, T. M., and William, P. M. (2000) Guest Editors Comments Special Issues on HRM and the SME: Toward a New Synthesis Entrepreneurship Theory and Practice. Kazaz A and Ulubeyli S (2006) Organisational factors influencing construction manpower productivity in Turkey. In: Boyd D (Ed.), 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK, 1, 39-48. Keegan, A., Turner, R., and Huemann, M. (2007) Managing Human Resource in Project Based Organizations. Turner, R. Gower Handbook of Project Management. 4th Edition. Aldershot, England: Gowe Publishing Ltd. Knudsen, C. 1996. The competence perspective. A historical review. In: Foss, N.J., Knudsen, C. (eds.). Towards a competence theory of the firm. Routledge, London. Pp. 13–37. Kolb, A. and Kolb, D.A. (2001) Experiential Learning Theory. Boston, Ma.: McBer and Co. Kolb, D.A. & Fry, R. (1975) Toward an applied theory of experiential learning. In Cooper, C. ed. Theories of Group Process. London, John Wiley, pp. 33-58. Krishnan, S. and Singh, M. (2007) Strategic Human Resource: Three-Stage Process and Influence Organizational Factors. Langford, D., Hancock, M. R., Fellows, R., and Gale, A. W. (1995) Human Resource Management in Construction. Longman Science and Technical. Leonard-Barton, D. (1992), “Core Capabilities and Core Rigidities: A Paradox in Managing new Product Development”, Strategic Management Journal, Vol.13, Iss. Special issue (summer), p.111-125. Lewin, K. (1933) A Quick Guide to Action Research [Internet], University of Southampton.
Available
http://www.rdsu.soton.ac.uk/documents/Action_research_newsletter.doc
from: [Accessed
31 December 2008]. Lewin. K. (1951) Field Theory in Social Science. New York, Harper and Row. Lewis, M.A., Gregory, M.J. 1996. Developing and applying a process approach to competence analysis. In: Sanchez, R., Heene, A., Thomas, H. (eds.). Dynamics of competence-based competition: Theory and practice in the new strategic management. Elsevier Science, Oxford. Pp. 141–163. 150 | P a g e
Loosemore, M., Dainty, A. R. J., and Lingard, H. (2003) Human Resource Management in Construction Projects. London: Spon Press. Maskell,
B.
(1989).
“Performance
measurement
of
world
class
manufacturing.”Management Accounting, 67(5), 32–33. McGehee, W., and P. W. Thayer. Training in Business and Industry (New York: John Wiley & Sons, 1961). McNair, C. J., Lynch R. L. and Cross K. F. (1990). “Do financial and nonfinancial performance measures have to agree?” Management Accounting, 72(5), 28-36. Miles, D. and Ward, J. (1991) Small-Scale Construction Enterprises in Ghana: Practices, Problems and Needs. Loughborough University, UK: WEDC Library. Mlinga, R. S. and Wells, J. (2002) Collaboration between Formal and Informal Enterprises in the Construction Sector in Tanzania. Habitat International 26, 269-280. Morano, Richard. "Determining Organizational Training Needs," Personnel Psychology, Vol. 26 (1973), 479-487. Norman, P. (1999) Control of Major Accident Hazards: Process Safety Notes [Internet],
University
of
Newcastle
Upon
Tyne.
Available
from:
[Accessed 20 November 2007]. Ofori, G. and Debrah, Y. A. (1998) Flexible Management of Workers, Review of\ Employment Practices in the Construction Industry in Singapore. Construction Management and Economics 16, 397-408. Olomolaiye P (1990) An evaluation of the relationships between bricklayers motivation and productivity. Construction Management and Economics, 8(2), 301313. Olomolaiye P, Jayawardene A, Harris F (1998) Construction Productivity Management. Chartered Institute of Building, UK. Patten, Thomas H. Jr. Manpower Planning and the De-velopment of Human Resources (New York: John Wiley, 1971). Pfeffer, J. (1998) The Human Equation. Boston: Harvard Business School Press. Prahalad, C.K and Hamel, G. (1990), “The Core Competence of the Corporation”, Harvard Business Review, vol. 68, No. 3, p. 79-91. Ritchie, J. and Lewis, J. (2003) Qualitative Research Practice: a guide for social science students and researchers. London: SAGE Publications Ltd.
151 | P a g e
Robinson, H. S., Carrillo, P. M., Anumba, C. J. and Al-Ghassani, A. M. (2005).“Business performance measurement practices in construction engineering organizations.” Measuring Business Excellence, 9(1), 13-22. Samson, M. and Lema, N.M. (2002). “Development of construction contractors performance measurement framework.” The 1st Int. Conference of CIB, South Africa. Sanchez, R. 1997. Managing articulated knowledge in competence-based competition. In: Sanchez, R., Heene, A. (eds.). Strategic learning and knowledge management. John Wiley & Sons, Chichester, UK. Pp. 163–187. Sanchez, R., Heene, A., Thomas, H. (eds.) 1996a. Dynamics of competence based competition: Theory and practice in the new strategic management. Elsevier Science, Oxford. 403 p. Sanchez, R., Thomas, H. 1996. Strategic goals. In: Sanchez, R., Heene, A., Thomas, H. (eds.). Dynamics of competence-based competition. Theory and practice in the new strategic management. Elsevier Science, Oxford, 1996.Pp. 63–83. Schon, D. (1990) Educating the reflective practitioner. San Francisco, Jossey-Bass. SCOTT, P and COCKRILL, A (May 1997) ‘On secure foundations? Comparative observations on training for the construction industry’, ESRC Learning Society Conference ‘Skills Formation’, University of Bristol Seale, C. (1999) The Quality of Qualitative Research. Oxford: Blackwell. Sinclair, M. (2007) A guide to understanding theoretical and conceptual frameworks. Evidence Based Midwifery, 5 (2) September pp.39 Sinclair, M. (2007) A guide to understanding theoretical and conceptual frameworks. Evidence Based Midwifery, 5 (2) September pp.39 Slevin, O. & Basford L. (1999) Theory and practice of nursing: an integrated approach to caring practice. Cheltenham, Stanley Thornes. Sparrow, P and Marchington, M. Human Resource Management: The New Agenda. London: Pitman. Stevens, Philip Andrew, (2007), ‘Skill shortages and firms' employment behaviour’, Labour Economics, vol. 14(2), pages 231-249. Szilagyi, A.D. (1988). Management and Performance, 3rdEdition, Foresman and Co. Tan, Hong, Yevgeniya Savchenko, Vladimir Gimpelson, Rostislav Kapelyushnikov and Anna Lukyanova, (2007), ‘Skills Shortages and Training in Russian Enterprises’, IZA Discussion Paper No. 275. 152 | P a g e
Teece, D.J.; Rumelt, R.; Dosi, G. and Winter, S. (1994), “Understanding Corporate Coherence: Theory and Evidence”, Journal of Economic Behavoir and Organization, Vol.23, Iss.1, p.1-30. Torrington, D. P. and Chapman, J. B. (1979) Personnel Management. Hemel Hempstead: Prentice Hall. Turner, R. (2007) Gower Handbook of Project Management. 4th Edition. Aldershot, England: Gowe Publishing Ltd. Understanding Labour Resource Issues. Construction Management and Economics 13, 149 – 161 Wells, J. (2001) Construction and Capital Formation in Less Developed Economies: Unravelling the Informal Sector in an African city. Construction Management and Economics 19, 267-274. Wells, J. (2007) Labour Contracting in the Construction Industry: An Assessment from Two Perspectives. Journal of Construction in Developing Countries. Wright, M., Turner, D. & Horbury, C. (2003) Competence assessment for the hazardous industries: Research Report 086. Suffolk, HSE Books. Zairi, M., Letza, S. R. and Oakland, J. S. (1994). “Does TQM impact on bottom-line results?” The TQM Magazine, 6(1), 38–43.
153 | P a g e