Residential Accessory Building. Permit Process. 10 to 21 business days. * Permit Package includes but is not limited to:
Residential Accessory Building Permit Process 10 to 21 business days
Permit package* turned in to the Building Department
Permit package logged in and sent for review and approval to :
Denied
Denied
Approved
Planning & Zoning
Denied
Approved
Building Plan Review
Permit package given back to applicant to make revisions
Approved
Public Works
Applicant called to pick up and pay for approved permit, set of plans and inspection card
* Permit Package includes but is not limited to: 1. 1 permit application with all required signatures 2. Initial $ 40.00 submittal fee 3. 3 sets of complete building plan package (site plans, architectural, structural, mechanical and electrical) 4. 2 pre-engineered truss drawings with hangar hardware called out if used 5. 1 soils report (Pad certification) which must be wet-stamped by Nevada Engineer (Only required for structures over 600 sq. ft). 6. 1 grading and drainage certification