Leg the Bridge: 4 @ 2x4 legs at 83 ¼” in each corner / / screw at first ... (3” screws // screwgun/// c clamps/// then drill and bolt.) ... (cut pieces/// use tek screws to.
LOAD IN /// SET UP

TO DO MONDAY

A BRIDGE FIRST Leg the Bridge: 4 @ 2x4 legs at 83 ¼” in each corner / / screw at first Place the bridge// clamp to the SL platform Once placement is set work off of the bridge to place platform 3C Then 3B///then 3A. (3” screws// screwgun/// c clamps/// then drill and bolt.) ( also jigsaw off notches on the bridge framing at ends) TD A ALSO :CURVED STAIRS START STAGE RIGHT: LAMINATE TRIM THE EXCESS FACING ON STAIRS SO BEST FIT OF PLATFORMS CAN OCCUR (TOOLS: laminate trimmer/ flush trim bit/ jigsaw/ blades.) B STAGE RIGHT STUDWALLS NEXT: Place studwalls 3A1 braces in 3A2 braces USR 3B3 braces USR Wall D studwall face USR (hammers/ double head nails/ 1x4 bracing// Level// framing squares) C PLATFORMS ON STAGE RIGHT STUDWALLS: Place the platforms on top of SR studwalls First place 3C Then place 3B Then place 3A Clamp first///then drill & use 3/8” carriage bolts D STAGE RIGHT STAIRS: Add top tread to curved stair unit Brace as necessary E STAGE RIGHT WALLS Assemble walls: SR C FRIAR’S D FRIAR’S DOOR FLAT // CHECK FIT FOR THE RUSTIC DOOR HINGE THE DOOR & HINGE RUSTIC DOOR TO 1X4 (ATTACH THE DOOR UNIT TO WALL D SEE TD)

F

WALLS ABOVE ON STAGE RIGHT:

Then mark floor above SR and set walls: F1 F G H Mr (screw to floor// use “L” hardwares and strap walls together) (check for square and level) F

WALLS BELOW ON STAGE LEFT: J K L M (screw to studwall faces// pull in with strapping tape) Strapping tape/// screws/// screwguns/// (check for square and level) N HINGE THE SWINGING DOOR OPENING AND CATCH. TRIM ALL BRACES BELOW PER INSTRUCTIONS.

G

WALLS ABOVE ON STAGE LEFT: Mark floor and then place J1 ARCH (use right angles to attach to wall O & floor) 0 ARCH (use right angles to attach to wall P & floor) P RETURN WALL (use strapping tape to attach to wall Q & use right angles To attach to floor) Q WINDOW WALL ( use strapping tape to attach to wall R & use right Right angles to attach to floor) R same S screw into face of wall R and into the floor of platform.

H

ARCH CURTAINS: CUT WINE COLORED VELOURS FROM ROLL & CUT LENGTHS THEN STAPLE WITH BOX PLEATS IN OPENINGS. (SHEARS// TAPE MEASURE// WIDE CROWN T-50 STAPLERS)

I

BRIDGE RAILINGS: DRESS WITH LAUAN AND 1X1’s (cut pieces/// use tek screws to attach//predrill 1x1s) Use right angles to attach to platforms and walls above. J ANCHOR ESCAPE STAIR USR: PLACE TO PLATFORMS 2X4 BLOCKS FOR THE FLOOR (DUPLEX NAIL BLOCKS TO FLOOR) SCREW LEGS INTO BLOCKS K

RAISE BORDER & SET TRIMS PER DESIGNER INSTRUCTIONS:

L

ANCHOR ESCAPE STAIR SL SAME

M

MASK UNDER PLATFORMS: CUT VELOURS TO MASK UNDER LOWER PLATFORMS PER INSTRUCTION

N

HANG THE BLACK SCRIM:

O.

GET FLOOR ELEMENTS FROM THE ANNEX TO CREATE A GROUND ROW USL

P. PUT THE STAIR PLUGS INTO PLACE AND PUT BLACK STAIRS INTO THE HOUSE. Q.

GET THE LIGHTING PRODUCTION TABLE SET UP IN THE HOUSE.

R.

DO TOUCH UPS PER INSTRUCTIONS.

S. CUT AND ATTACH CROWN MOLDINGS ONCE THEY ARE PAINTED/TEXTURED T.

ATTACH COLUMN/ BASE AND CEILING PIECE SL ONCE PAINTED.

OTHER AS INSTRUCTED………………………………………………………….. ATTACH WINDOW ATTACH BLACK SCRIM TO WINDOW ATTACH PLY PIECES TO WALL “F” IN SMALL WINDOW AND ARCH PAINT THEM/// ATTACH THEM////

FINISH WALL “U” : MUD/// SKETCH IN FACE/// PAINT//// PLACE //// ATTACH// PAINT TO DO LIST MONDAY LOAD IN WALL “S” PAINT BACK OF WALL WITH “GROSS” PAINT. MASKING WALLS mr & ml USE THE “INTO THE WOOD” WALLS AND: BASE PAINT WITH “SANDS OF TIME” BRICKS: BASECOAT WITH GOLDEN YELLOW WHILE WET SCUMBLE WITH RAW SIENNA WASH CROWN MOLDING: BASECOAT WITH “SANDS OF TIME” BARS: BASE PAINT NEAR FLAT BLACK TEXTURE WINDOW: SHADOW LINE & HIGHLIGHTS AFTER THE BASIC UNIT IS COMPLETED ON STAGE RIGHT. CURVED STAIR: MUD ON THE STAIRS & PLATFORM ONSTAGE. BASE PAINT WITH “SANDS OF TIME” CURVED BENCHES: BASE PAINT WITH SANDS OF TIME ROSE AND PLUM SCUMBLE AND SPONGE COLUMN: BASE PAINT WITH ….SANDS GROUND ROW ELEMENT: ROLL MUD ONTO THE FACE

PAINT PER INSTRUCTIONS

PROPS: CANDLESTICK: FINISH IN GOLD PAINT PROPERTIES

BED: FACE WITH LAUAN ADD BASE MOLDING ADD SECTIONS VERTICAL ADD HORIZONTAL PIECES

TOOLS NEEDED: VACUUM TAPE MEASURES LEVELS SQUARES SCREWGUNS CHALK LINES COMBINATION SQUARE FLASHLIGHTS CHOP SAW JIGSAWS BLADES ADHESIVE /// /CAULK GUN LAMINATE TRIMMER EXTENSION CORDS SAWZALL WIDE CROWN STAPLER NARROW CROWN STAPLER SHEARS END NIPPERS ANGLE GRINDER T-50 STAPLERS T-50 STAPLES

SCULPT OR COAT FABRICS 1X4’S ////2X4’S ///// SHELF BRACKETS “L” RIGHT ANGLES TEK SCREWS///BITS