Mar 19, 2018 - Scope: Pole Number 45. âRemove 100m of 4 core 40mm electrical cable from mini sub to pole 45. âInstal
SCOPE OF WORK : Scope of work. REQ NO: 11096156 PLEASE QUOTE ON YOUR COMPANY LETTER HEAD PLEASE SUPPLY COMPANY DETAILS REF REQ NO: 11096156 DESCRIPTION: Remove and Installation of Underground Cable. Scope: Pole Number 45 “Remove 100m of 4 core 40mm electrical cable from mini sub to pole 45 “Install 100m of 4 core 35mm electrical cable from mini sub to pole 45 “Terminate installed cable on min sub and on pole 45 Pole Number 47 " Remove 130m of 4 core 40mm electrical cable from Pole 45 to pole 47 " Install 130m of 4 core 40mm electrical cable from Pole 45 to pole 47 “Terminate installed cable on Pole 45 and on pole 47 Pole Number “Remove 10m of 4 core 20mm electrical cable from Pole 45 “Install 10m of 4 core 20mm electrical cable “Terminate installed cable on Pole 45 The Supplier should supply cable and termination glands and insulation material. After completion the supplier must test and commission High masts Site Meeting Date: 19/03/18 Venue: 1st floor 45 Bay Terrace Time: 11H00 FOR FURTHER DETAILS PLEASE CONTACT SONTO Cell number: 083 561 8088
1) Quotations must be in a sealed envelope with the seal signed by the sender. 2) Please remember to quote the reference number on the Request For Quotation AND on the envelope with description. 3) Envelopes must be deposited into the Quotation Box at the Regional Procurement Office, 111 Mahatma Gandhi Road (Point Road) Durban. - Incomplete Quotations will not be accepted. - All quotations must have the a) Validity period of the Quotation, b) Guarantees / Warranties, d) Delivery date / Lead Time/ Stock Availability. 4) No late quotations will be accepted. 5) Please attach your BBBEE Certificate/Affidavit.
6) Terms and conditions of RFQ will be available on request 7) TPT have the right to split the award of the order/s between more than one Supplier/Service Provider should it at Transnet’s discretion be more advantageous in terms of, amongst others, cost or developmental considerations: This Request will close on: Date: 27th March 2018 Time: 10:00am