Second prfmance axis (VM) - Google Compute Engine

11 downloads 59 Views 2MB Size Report
Aug 30, 2012 ... 35. 1. Screen control part. Migration part. It. Proposal part. P01. 8. Second prfmance axis (VM). 0%. Area 2. First performance axis (Vol). V 100%.
US 20120221699Al

(19) United States (12) Patent Application Publication (10) Pub. No.: US 2012/0221699 A1 (43) Pub. Date:

Moriyasu et al. (54)

(75)

MANAGEMENT COMPUTER AND COMPUTER SYSTEM MANAGEMENT METHOD Inventors:

(73) Assignee:

(51)

Int. Cl. G06F 15/173

(52)

US. Cl. ...................................................... .. 709/223

(2006.01)

Toshihiro Kura, Yokohama (JP);

(57)

Nobuyoshi Sakai, Zushi (JP)

A management computer 3 con?gures a coordinate plane

Hitachi, Ltd.

from a ?rst axis, Which denotes a performance value of a virtual machine 1, and a second axis, Which denotes a perfor mance value of a volume 2, and partitions this coordinate plane into multiple areas in accordance With a prescribed

Appl. No .:

13/133,307

(22)

PCT Filed:

Feb. 28, 2011

PCT No.:

Publication Classi?cation

Kengo Moriyasu, Yokohama (JP);

(21)

(86)

Aug. 30, 2012

ABSTRACT

criterion. The management server computes to Which area of the areas a pair con?guration of a virtual machine and a

logical volume belongs, and stores the result. At a prescribed time, the management server 3 re-evaluates a coordinate of the pair con?guration, and determines Whether or not an

PCT/JP2011/054543

initial area and a latest area match. The management server

§ 371 (0X1), (2), (4) Date:

creates a migration plan so that the latest area matches the

Jun. 7, 2011

initial area.

Performance area setting part

Resource information management part

Change Re evaluation

C)

r35

1

System configuration coordinates evaluation part

"

/- 35

1 Migration part

Screen control part It

Proposal part

Area 2 P01

8

pSercfonmade (axViMs) -

0%

50%

2(2)

V 100%

First performance axis (Vol)

Patent Application Publication

Aug. 30, 2012 Sheet 1 0f 34

US 2012/0221699 A1

3A —\_

Performance area setting part

/- 30

Change

Resource information management part V

/

V

evaluation Re(

System configuration coordinates evaluation part

VScreen control V / part

6

V

Migration part I



,- 3F

>

Proposal part

J,

r‘

a__ I