roof retrofit for stormwater attenuation and also when assessing green roofs ... surface or near-surface drainage options (Charlesworth and Warwick, 2011).
ter monitoring infrastructure, understanding fundamen- tal stormwater ... uses, the relative importance of different sources, and the best measures for reducing.
replacement of the old turbocharger model (retrofit) with a new unit of more modern technology with many economical, tec
Both the grate residue and fly ash were used as fill ... to steam demand or furnace temperature. ... gas pass boiler, a tubular air heater, a coarse particulate.
110, year 2014 station wagon 1461cm3, 81 kW, 72,000 km, 1383 kg. (empty, without ...... tank, urea pump and injector, urea-exhaust mixer, temperature sensor,.
Surge protector. AC347-480V High Voltage. · White painted parts are treated with a five-stage phosphate bonding. Occupa
DVD 6 Disc Changer â Region Specific so many part numbers! AVIO Panel ... SPDIF (Toslink) Fibre Optic Cable for DVD au
We retrofitted conventional gasoline engine car, Nissan Elgrand. (3,500cc), into
the hydrogen-fueled car in July, 2006 and it was authorized to run on public ...
Lutron occupancy sensors use a patented, revolutionary sensing technology, XCTTM, which enhances the ... Wireless techno
The first Public Review Draft (Draft Manual) of the Rhode Island Stormwater ...
applications under the current manual and will not be required to comply with the
...
type corresponds to Musgrave's [18] classification scheme. The SCS Hand book [19] has a ...... GWR the volume of water stored in the ground water reservoir ...... 261,000. 16.7. 6. 105,000. 14.3. 7. 70,400. 12.5. 8. 20,900. 11.1. 9. 5600. 10. 10.
This paper will focus on stormwater management and infrastructure affecting the City of Gold Coast, a highly urbanised coastal city, and the indexing model ...
include stormwater drainage, water quality improvements, aquatic habitat ... rapid development and population growth pace, urban water systems are not unable ...
compliance with the Stormwater Management Standards. The following checklist
is ... Volume 3 of the Massachusetts Stormwater Handbook. The Stormwater ...
Jul 8, 2016 - Identify potential hydrologic adjustments to the existing system utilizing the historic flowways located w
Page 1 of 2. A Guide to Healthy Habits for. Cleaner Water. ollution on streets, parking lots and lawns is. washed by rai
1.8 m. 2.2 m2. 2.7 m. 2 hours. 24,1 mm. 1.24. 29.9 mm. 0.1 ms. 0,1 ms. 0.2 m3 .... Storage. · required. 1.0 m. 1.3 m. 1.6 m2. 2.0 m. 2.4 m. 2.6 m3. 2,5 m. 2.2 m3.
Jun 1, 2011 ... and Water Pollution Control Program (WPCP) Preparation Manual ...... require
municipal and industrial stormwater discharges to comply with ...
The figure can be accessed on the Internet. at http://www.epa.gov/region1/npdes/stormwater/assets/pdfs/ma/North Andover.
Aug 26, 2007 - Pratt, et al. ..... 1996, sponsored by the Engineering Foundation and the ASCE. ..... 4.6. 0.41. 0.43. Shopping Centers. 33. 64. 3.6. 0.43. 0.47. Schools. 79 ...... Burton, G.A., Jr. âEvaluation of seven sediment toxicity tests and t
Aug 31, 2016 - and sustainable stormwater management concepts in mitigating excessive ... drainage systemsâare at the local level, the role of local land use ...
design, construction and use with proper training, quality assurance and feedback. .... Controllable passive stack using
European Regional. Development Fund ... System re-sizing may be desirable as a ... central Europe requires that the buil
PROJECT: Two bioretention basins (raingardens) were installed to treat parking lot runoff at the Hayes Community Center.
PROJECT FACTSHEET 17-CCP-01
City of Apple Valley
Stormwater Retrofit PRACTICE:
Bioretention basins (2)
BENEFITS:
BEFORE
2.6 acre-feet per year of reduced runoff
3.4 lbs of phosphorus per year prevented from traveling downstream
Improved water quality
Opportunity for public outreach and education
PARTNERS:
AFTER
City of Apple Valley
Vermillion River Watershed Joint Powers Organization
Minnesota Board of Water and Soil Resources
P R O J E C T: Two bioretention basins (raingardens) were installed to treat parking lot runoff at the Hayes Community Center. The project reduces stormwater discharge from the site and prevents sediment and phosphorus from traveling to downstream waterbodies. Total Project Cost: $114,795 FUNDING: Cost Share Amount: $50,000 Landowner Amount: $64,795
WATERSHED:
Vermillion River
RECEIVING WATERS:
North Creek
Clean Water Fund: Protecting and restoring Minnesota’s waters for generations to come. 4100 220th Street W, Suite 102, Farmington, MN 55024
LOCATION: Apple Valley
INSTALLATION:
Tel: (651) 480-7777
Fax: (651) 480-7775
Spring 2018
www.dakotacountyswcd.org
Revised: 8/3/2018
City of Apple Valley
Stormwater Retrofit
Location of one bioretention basin prior to the start of construction
Excavation of existing soils
Installation of limestone retaining wall on the perimeter of the bioretention basin
Installation of underdrain system and valve at the bottom of the bioretention basin
Backfilled soils using an engineered sand and compost soil mixture
Plant layout prior to planting
4100 220th Street W, Suite 102, Farmington, MN 55024