TWIN SCREW PUMPS - Hindustan Petroleum Corporation Limited

34 downloads 178 Views 124KB Size Report
PUMP: Manufacturing Standard. API 676 (With approved deviation). Type of Pump. Twin Screw Pump. Product. Furnace Oil (FO). NPSHA at Maximum Viscosity.
HINDUSTAN PETROLEUM CORPORATION LIMITED (A Government of India Enterprise) MARKETING DIVISION Gresham Assurance, 2nd Floor, Sir, P.M.Road, P. B. No 198, Mumbai 400 001 India, Phone: 022 22608521 / 22642342, Fax: 022 22642352

TENDER DOCUMENT FOR

SUPPLY, TESTING & COMMISSIONING OF

TWIN SCREW PUMPS AT DESUR IRD, BELGAUM, KARNATAKA

SPECIFICATION OF TWIN SCREW PUMP WITH ELECTRIC MOTOR

DATA SHEET (Tank Wagon Unloading) PUMP: Manufacturing Standard Type of Pump Product NPSHA at Maximum Viscosity Specific Gravity Viscosity at 50 deg. C Total head (in meter) Discharge Horse power Operating temperature range Viscosity range for operating Condition Mechanical Seal Make of Seal Coupling Coupling Guard Flanges Base Plate/ Bolts & nuts Safety Relief Valve (SRV)

API 676 (With approved deviation) Twin Screw Pump Furnace Oil (FO) 5.5 Meter 0.94 180 Cst 40 Meter 272 KL/ hr Vendor to specify 35 to 70 deg Celsius 60 Cst to 380 Cst Single Coil Unbalanced type Flowserve sanmar / Eagle Burgmann/ John Crane Flexible Metallic spacer type Non Sparking type (Aluminium) Suitable companion flanges to be supplied. MS fabricated/ MS - SA 193 Grade B7/ A194 Grade 2H Line Mounted of Make Sebim / Tyco / Fainger Leser with 1” inlet & 3/4”outlet suitable to operate at differential pressure of 3.5Kg/cm2 with back pressure of 1.0 Kg/cm2

DATA SHEET (Tank Truck Loading) PUMP: Manufacturing Standard Type of Pump Product NPSHA at Maximum Viscosity Specific Gravity Viscosity at 50 deg. C Total head (in meter) Discharge Horse power Operating temperature range Viscosity range for operating Condition Mechanical Seal Make of Seal Coupling Coupling Guard Flanges Base Plate/ Bolts & nuts

API 676 (With approved deviation) Twin Screw Pump Furnace Oil (FO) 6.0 Meter 0.94 180 Cst 50 Meter 144 KL/ hr Vendor to specify 35 to 70 deg Celsius 60 Cst to 380 Cst Single Coil Unbalanced type Flowserve sanmar / Eagle Burgmann/ John Crane Flexible Metallic spacer type Non Sparking type (Aluminium) Suitable companion flanges to be supplied. MS fabricated/ MS - SA 193 Grade B7/ A194 Grade 2H

Safety Relief Valve (SRV)

Line Mounted of Make Sebim / Tyco / Fainger Leser with 1” inlet & 3/4”outlet suitable to operate at differential pressure of 3.0 Kg/cm2 with back pressure of 1.0 Kg/cm2

MATERIALS OF CONSTRUCTION 1. Pump Casing 2. Screw 3. Liner 4. Timing Gears 5. Safety Relief Valve a) Relief Valve Mounting b) RV body Material c) RV Internal Material 6. Shaft

Carbon Steel ASTM A 216 Gr. WCB AISI 410/ AISI 431 CI IS 210 FG 260 EN 353 / BS 970/ EN 36 Line mounted connecting Delivery & Suction CS ASTM A 216 GR WCB SS Carbon Steel AISI 410 (The construction of shaft and screw, either with screw manufactured separately and mounted on shaft or both shaft and screw made of single piece as integral part is acceptable)

Note: The given discharge of 144 KL/Hr and 272 KL/Hr shall be applicable for a viscosity of 180 cst and variations in discharge shall be not be more than + 5% for the viscosity range already provided in the pump data sheet. (i.e. through 60 Cst to 380 Cst) Deviation approved against API 676: 1. 2. 3. 4. 5. 6.

For material of construction relevant ISO standard will be allowed. Bearing as per ISO standards are acceptable. For bolting BS is acceptable. For studs the relevant IS standards are acceptable. For all pipe threads, tapering, fasteners etc relevant ISO standard is acceptable. Information on the name plate and maintaining of test record for the pump shall be as per agreement between manufacturer and purchaser.

MOTOR DRIVER (FLP TYPE) Specification Requirement conforming to IS: 325 for electric design. Make

Kirloskar/ ABB/ Marathon / Siemens/ Crompton & Greaves

RPM

Vendor to offer subject to 1500 RPM (Max)

Volts/phase/Hertz

415V/ 3 PHASE/50 Hz

Motor Rating

Pump compatible, Vendor to quote. (At least 110% of rated capacity as per API)

Type

Flame Proof conforming to IS 2148 suitable for Class II, Div I for Group IIA & IIB gases

Degree of Protection

TEFC IP-55 (AS PER IS: 4691)

Rotor

Squirrel Cage Induction Motor

Insulation

"F" Class

Starting Method

Star-Delta

Mounting

Horizontal Foot Mounted

Terminal Box

IP-55, Weather and dust proof (with FLP Glands), with double gland entry towards rear for cables for star delta starting.

Earthing

Two independent earthing points of bolted type on opposite sides of motor. This will be in addition to any earthing stud provided in the terminal box.

The bidder shall provide pump data sheet along with performance curves in the technical bid for both RV set pressure and differential pressure. The motor shall be compatible to VFD and bidder to submit the performance curves for range of frequency to enable VFD manufacturer to set their operations.

SUBMISSION OF DRAWINGS / DATA SHEETS FOR APPROVAL: Upon receipt of LOI, the successful Vendor has to submit the following data sheets drawings for approval within Two Weeks: i) Pump data sheet, ii) General arrangement Drawing, iii) iii) Cross Sectional Drawing, iv) Mechanical seal drawing, v) Type of Foundation required with details of base plate & location of foundation bolts etc. Drawings shall be approved by HPCL within 2 weeks from the date of submission.

3RD PARTY INSPECTION Inspection by one of the following agencies is acceptable to us: 1. LLYODS 2. DET NORSKE VERITAS 3. IRS 4. CEIL 5. BV

INSPECTION & TESTING PUMPS: The pumps shall be inspected by any one of the above third Party as per provisions of API 676 with the following mandatory tests: Procedures Hydrostatic test Performance NPSH Screw Dynamic Balancing:

As per API 676 Witnessing Witnessing Witnessing The dynamic balancing of screw is required to be performed if applicable.

MOTOR: The Motor shall be inspected by any one of the above third Party as per the following details: Type test certificate Routine Test witnessing

IS 325 (3-phase induction motors) As per IS 325 / 4029 to comprise of following:

a. Insulation resistance test b. High voltage test. c. No load running (current/voltage reading). d. Locked rotor test at a suitable voltage. e. Reduced voltage running up test.

IMPORTANT NOTES 1.

In addition to above tests vendor shall submit material test certificates wherever applicable and other type test certificates from manufacturers. Third party inspection agency shall Endorse these certificates are in order. Vendor to submit suitable supporting calculation for selection of motor rating.

2.

Vendors must submit all inspection test reports duly certified by authorised agency and obtain consent of HPCL before despatch of equipment.

3.

Acceptance of shop tests does shall not relieve the vendor of his responsibilities whatsoever.

4.

The mechanical running test on all pumps to ensure satisfactory operation at the specified operating condition need not be carried out with specified liquid nor the specified conditions. Such test data obtained shall be reviewed by Third Party Inspection Agency. The test results thus obtained shall be extrapolated/ interpolated for the specified operating condition mentioned in the tender. TPI should certify the derived test data thus arrived shall be as per relevant API standard/ specification.

Following Drawings / Data Sheets to be provided along with Pumps, Motors, Starters while seeking despatch clearance: • • • • • • • • • • • • •

PERFORMANCE CURVES shall indicate differential head, efficiency, NPSH (R) and BHP as functions of flow rate. These curves shall be shown for minimum and maximum impeller diameters. PRELIMINARY Outline & Arrangement drawings, schematic diagrams. CROSS SECTIONAL DRAWING and literature (TWO sets of each pump) Drawings for Installation Drawings showing dimensions and position of mechanical seal. Foundation plan. Outline dimensional drawing with general arrangement. Manual for Installation/ operating/ maintenance and overhauling. Spare Parts book. Inspection Reports: “Cleared for despatch” note by the inspection agency Material test certificate: “Cleared for despatch” note by the inspection agency Type test certificate: “Cleared for despatch” note by the inspection agency Periodic maintenance schedule & maintenance manual – 4 copies each for individual pump

In addition vendor will submit 4 copies of all the test certificates as follows: • 2 copies to material despatch location • 1 copy to HPCL, E&P Dept., Gresham Assurance House, 2nd Floor, Fort, Mumbai–400 001 • 1 copy to HPCL,Commercial Dept., Gresham Assurance House, 2nd Floor, Fort, Mumbai– 400 001

BEFORE DESPATCH 1.

Inspection Reports

certified by the inspection agency.

2. 3.

certified by the inspection agency. certified by the inspection agency.

4.

Material test certificates Type test certificates . PAINTING:

5.

DESPATCH:

All pumps shall be painted with two coats of anti corrosive paint and three coats with glossy finish as per the approved colour code. Pump/ motor shall be coupled together and aligned before despatch.

Scope of Supervision of commissioning: Vendor shall depute competent persons for

supervision and commissioning of pumps within SEVEN DAYS days of HPCL intimation. Commissioning of the pumps is planned to be completed so as to limit the stay the competent personal to stay back till completion of commissioning to the fullest satisfaction of EIC at location. Vendor shall quote the rate against item in the price bid which shall include to & fro charges, lodging, boarding, food, local transport & all other incidental charges. Party to quote lump sum rate till commissioning of pumps.

PAYMENT TERMS: Payment Schedule shall be as under: SUPPLY OF PUMPS: - 90% on supply at site as per scope - 10% on successful commissioning COMMISSIONING SUPERVISION / ASSISTANCE - 100% on successful commissioning

PERFORMANCE GUARANTEE: Supplies shall be fully guaranteed against any manufacturing defect / poor workmanship/ inferior design or quality etc. for a period of 12 months from the date of delivery or 18 months from the date of supply , whichever is earlier. During this period seller will arrange to repair/replace any defective part at free of cost or replace complete set if required.

DOCUMENTS TO BE SUBMITTED ALONG WITH TECHNICAL BID: The specification provided are minimum required for the proposed operation at Desur IRD and vendors are free to quote for superior specification than provided in the technical specification. Vendors to clearly give the data sheet including performance curves for the pump for the required product (FO) properly filled for our evaluation.

The pumps are required at our Desur Depot. The address is as follows: Desur Depot, Hindustan Petroleum Corporation Limited, Zadshapur Village, Near Desur Railway Station, Desur, Belgaum-590014, Karnataka.

SCHEDULE OF QUANTITIES

!"

#$ %

&#

# '

#

# #

#

( ) #*

#

+ "

& ,

-

6

1

& !

3

'4

5

- - ."/0 %

0

)12

( $ ,

4

'#

( $

'"

,11 ."/0 /5

& !

3

'

( $ 6

4

'#

( $

%

6

7 %

0

&

) 82

8

8

7 %

&

8

TIME SCHEDULE

DESCRIPTION OF WORK:

SUPPLY OF TWIN SCREW PUMPS AT DESUR IRD, BELGAUM, KARNATAKA PART

LOCATION DESUR IRD, BELGAUM, KARNATAKA

COMPLETION PERIOD FROM DATE OF ISSUE OF FOI/LOI/PO 5 MONTHS

NOTE: 1) Time for completion shall be reckoned from the date of issue of Fax/ Letter of Intent/Purchase Order by HPCL. 2) Time for completion shall include the time required for mobilization, demobilization, carrying out the works as per requirements of Contract Document and instructions of HPCL Engineer-in-Charge.