WILLIAM O. EDDY HALL REVITALIZATION - CSU Facilities ...

1 downloads 162 Views 4MB Size Report
Apr 10, 2012 - Upgrade offices, restrooms and student support space. • Repair damaged parapets and exterior concrete s
WILLIAM O. EDDY HALL REVITALIZATION  April 10, 2012    EXECUTIVE SUMMARY:  The Eddy Building is a 69,457gsf building located on the academic spine of Main  Campus.  It houses classrooms, lecture halls and faculty offices for the English, Philosophy, Foreign  Languages and Literature, and Communication Studies departments in the College of Liberal Arts.  This  revitalization project would prioritize life safety, ADA and energy efficiency upgrades, while improving  the overall building aesthetics.   Integral components of the revitalization would include:            

Upgrade main building entrance and entry plaza  Upgrade offices, restrooms and student support space  Repair damaged parapets and exterior concrete stairs  New floor finishes throughout the building  Paint/patch exterior walls and replace lecture hall roof  Installation of a fire sprinkler system and upgrades to fire alarm system  Tie‐in to campus chilled water system to replace aging chiller, now that District Cooling Plant #2  is online  Asbestos abatement including floor tiles as well as mechanical and plumbing insulation  Installation of new mechanical and plumbing fixtures  Refurbish elevator  Replace windows 

  JUSTIFICATION:  William O. Eddy Hall was built in 1963 and has had only limited upgrades over the  years.  The building is home to approximately 157 faculty, staff and graduate students and over 10,500  students (average of last 3 semesters) have classes in the building each week.  A capital renewal project  was submitted to the State in 2008 to address the deferred maintenance needs.   It received cash fund  spending authority, but was not funded.  A portion of the 2010 classroom upgrade bonds were  earmarked for new furniture and cosmetic upgrades to the heavily used general assignment classrooms  in the building.  These funds helped improve appearances, but building systems, offices and deferred  maintenance items were not addressed.  The Eddy building is a heavily used building that provides vital classroom and office space, with deferred  maintenance needs that we should not continue to ignore.     

William O. Eddy Hall Revitalization 4/10/2012 Project Budget

Estimated Costs

Remarks

Professional Services Site Survey, Geotechnical Consultants - Architects, Engineers, Vibration, Acoustics

$

-

$

700,000

$

1,000

CSU Facilities Project Management

$

140,000

Independent Code Review/Commissioning

$

50,000

Total Professional Services

$

891,000

Revitalization - 69,457sqft @$72/sqft

$

5,000,904

Site Work Service/Utilities

$

58,096

Site Improvements/Landscaping

$

200,000

$

5,259,000

CSU Communications/AV

$

50,000

Total Equipment and Furnishings Costs

$

50,000

Relocation and temporary space

$

-

Total Miscellaneous Costs

$

-

Advertisements

Construction

High Performance Certification Program Subtotal Construction Costs Equipment & Furnishings Fixed Equipment Moveable Equipment

Miscellaneous

Subtotal Project Cost

$

6,200,000

Project Contingency10% for building revitalization

$

700,000

Total Contingency

$

700,000

$

6,900,000

$

99

Project Contingency

Total Budget

Total Project Cost / sqft

COLORADO STATE UNIVERSITY Facilities Planning Design and Construction

10% of construction cost

121

111 110

113

112

119

120

108

101

103 124

109 102

115 118

107

106

104

123

116 122

117

114 105

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115

116

117

118

119

120

121

122

123

124

Suggest Documents