Assembly Instructions

31 downloads 7620 Views 649KB Size Report
the table to expose the power beam ... up to the power beam as illustrated ... 2013 Krueger International, Inc. All Rights Reserved • Code KI-61967/KI/PDF/ 1213.
Assembly Instructions Activ8™ Electrical System

Assembly Instructions

DataLink, InTandem & WorkZone

Activ8 Electrical System

DataLink, InTandem & WorkZone

#10-24 x ½” screws

December 2013

Activ8 to RPT Module to Datalink Activ8 RPT Module Datalink Training Table Training Table

bracket mounting holes

DataLink power beam

RPT module bracket

Note: Refer to the DataLink Training Table System Assembly Note: Refer to the DataLinktoTraining Instructions assemble the legs, Table System Assembly beam and Instructions the beam door.to

assemble the legs, beam and the beam door. 1. Open the beam door at the rear of

the table to expose the power beam

DataLink Training Table

#10-24 nuts

anddoor locateatthe RPTofmodule 1. Open the beam thetwo rear bracket hole locations, the table to expose the mounting power beam and locate the two RPT bracket one module pair at each end of the beam as mounting hole locations, one pair illustrated (Figure 1). at each end of the beam as illustrated (Figure 1). Note: Each table may have one or two RPT module brackets attached

it, one at each have oneend. or two Note: Each tabletomay RPT module brackets attached to it, 2. Position the RPT module bracket one at each end.

up to the power beam as illustrated and use the #10-24 screws and 2. Position the RPT nutsmodule provided bracket to secure up the bracket to the power beam as illustrated and to the beam (Figure 1).

beam door

use the #10-24 screws and nuts provided to secure the bracket to the 3. Feed the connector end of the RPT beam (Figure 1).

module through the rectangular opening in the bracket and snap the 3. Feed the connector the(Figure RPT 2). moduleend into of place

Figure 1 - DataLink Training Table RPT module bracket

RPT module

module through the rectangular opening in the bracket and snap the module into place (Figure 2).

DataLink Training Table

Figure 2 - DataLink Training Table

Actv8-Elect-AI

Assemble units as described herein only. To do otherwise may result in instability. All screws, nuts and bolts must be tightened securely and must be checked periodically after assembly. Failure to assemble properly, or to secure parts may result in assembly failure and personal injury.

Activ8™ Electrical System - DataLink, InTandem & WorkZone Assembly Instructions

Assemble units as described herein only. To do otherwise may result in instability. All screws, nuts and bolts must be tightened securely and must be checked periodically after assembly. Failure to assemble properly, or to secure parts may result in assembly failure and personal injury.

Activ8 RPT Module to Activ8 RPT Module to InTandem Table InTandem Table System System Note: Refer to the InTandem Table System Assembly Note: Refer to the InTandem Instructions to assemble the legs,Table System Assembly to beam and the beam Instructions door.

bracket mounting holes at upper power beam back-to-back receptacle covers

InTandem Table

assemble the legs, beam and the beam door. 1. Open the inner plastic beam door at the inside, rear of the table to

the upper beam. 1. expose Open the innerpower plastic beam door at the rear two RPT module theLocate inside, of the table to expose hole locations thebracket uppermounting power beam. Locate the two nearmodule the back-to-back RPT bracket receptacle mounting hole covers. One pairthe of mounting locations near back-to-back holes is at covers. each end One of thepair beamof mounting receptacle as illustrated (Figure holes is at each end3). of the beam as illustrated (Figure 3).

#10 Torx screws

Note: Each table may have one or twoEach RPT table modulemay brackets Note: have one or two attached to it,brackets one at eachattached end. RPT module to it,

RPT module bracket

one at each end.

2. Position the RPT module bracket up to the power beam as 2. illustrated Position and the use RPTthemodule bracket up #10 to the power beam as illustrated and self-tapping Torx screws to use the #10 self-tapping Torx screws secure the bracket to the beam to (Figure secure3).the bracket to the beam

inner plastic beam door

(Figure 3).

3. Feed the connector end of the RPT 3. module Feed the connector end of the RPT through the rectangular module the rectangular opening openingthrough in the bracket as in illustrated the bracket illustrated and as snap the moduleand snap theinto module into place place (Figure 4). (Figure 4).

Figure 3 - InTandem Table System

RPT module bracket

InTandem Table

RPT module

Figure 4 - InTandem Table System 2

Activ8™ Electrical System - DataLink, InTandem & WorkZone Assembly Instructions

Assemble units as described herein only. To do otherwise may result in instability. All screws, nuts and bolts must be tightened securely and must be checked periodically after assembly. Failure to assemble properly, or to secure parts may result in assembly failure and personal injury.

Activ8 RPT Module to WorkZ

Activ8 RPT Module to to the WorkZone Note: Refer WorkZoneSystem Table Assembly Instruction Note: Refer to the WorkZone assemble the worksurface, le Desking modesty System Assembly panels and the pow Instructions to assemble the door. worksurface, legs, modesty panels and the power/data door.

power/data door #12 x 1” screw

1. Open the power/data door table and locate mounting po 1. Open thethe power/data door under brackets two RPT module the tableillustrated. and locate mounting The module brack positionsbeforlocated the two RPT modulefrom any 1” away bracketspower/data as illustrated. grommet The hole an module brackets must be located such that when the power/da 1” away closes, from any there power/data is no interferenc grommet5hole and mounted & Detail A). such

RPT module bracket

that when the power/data door closes, there is no interference 2. Using the two mounting ho (Figure 5 & Detail A).

RPT module

RPT module brackets as a te mark drilling locations to the

2. Using theoftwo holes a drill driv themounting table. Using of the RPT module brackets as agauge set drill bit, with depth template,pre-drill mark drilling two locations mounting holes to the underside the table. Take care to markedoflocation. 1 Using a drill /8” drill to the w too driver deep and as damage bit, with may depth occur. gauge set to 3/4”, pre-drill two mounting holes at each marked location. Take care 3. too Position RPTtomodule b to not drill deep asthe damage over the holes and secure us the worksurface may occur.

WorkZone Table

power/data grommet hole

#12 x 1” screws (Figure 5).

3. Position the RPT module bracket Feed connector over the 4. holes andthe secure using end of through two #12 module x 1” screws (Figure the 5). rectangu

Figure 5 - WorkZone Table

Detail A

in the bracket and snap the m

(Figure 4. Feed the place connector end of5). the RPT module through the rectangular opening in the bracket and snap the module into place (Figure 5).

3

Activ8™ Electrical System - DataLink, InTandem & WorkZone Assembly Instructions

Assemble units as described herein only. To do otherwise may result in instability. All screws, nuts and bolts must be tightened securely and must be checked periodically after assembly. Failure to assemble properly, or to secure parts may result in assembly failure and personal injury.

Activ8 Connections & Source Power 1. After the RPT module/bracket components are installed and tables are mechanically connected together, the remaining electrical devices may be installed per your space-planning layout. 2. PowerUp module (shown) or Villa power modules may be installed if specified. PowerUp module snaps into the worksurface at the top and Villa installs with screws from underneath. For Villa module installation, refer to instructions provided with the unit (Figure 6). & Source Power Activ8 Connections

WARNING: Assembly of all mechanical frame components must be completed before any electrical connections. All electrically connected furnishings must also be mechanically connected.

5. Once connected to a power source, verify that a green LED is lit on the power infeed enclosure. A green LED indicates that power is being supplied to the devices. If the LED is flashing red, verify that no other infeeds are attached to the system. If the LED is solid red, verify that there is no more than 8 devices plugged together, and that the total length of the system and all interconnecting cords (exclusive of the power infeed unit) does not exceed 40 feet, or 12 meters. Activ8 PowerUp module

3. Jumper cables come in various

Warning: Assembly of Activ8 all mechanical sizes and connect frame components must be completed components between RPT before any electrical connections. All modules, PowerUp & Villa electrically connected furnishings must modules and between tables. also be mechanically connected.

jumper cable (table-to-table) RPT module & bracket

Jumper cables are keyed and can only be plugged in one way 1.After the RPT6).module/bracket (Figure

components are installed and tables are mechanically connected together, Warning: Never attach more the remaining be thanelectrical one powerdevices infeed to may a chain installedofper your space-planning devices. Always check to be layout. certain that the system is not

jumper cable

jumper cable

already powered from another

infeed(shown) before attaching infeed. 2. PowerUp or Villaanreceptacle modules may be installed by snapping into the worksurface topclose if specified. 4. Choose a location to a For Villapower module installation, refer to source outlet for the power instructions with infeedprovided component. Plugthetheunit (Figure 6). power infeed into an appropriate

power infeed

location in the Activ8 system

onlycables after allcome other components 3. Jumper in various sizes are installed. NEMA 5-15P and connect Activ8The components of the power infeed may betweenplug RPTendmodules, PowerUp & Villa to a standard 100/120V modulesconnect and between tables. Jumper wallkeyed outlet power source. cables are and can only be plugged in one way (Figure 6).

Warning: Never attach more than one power infeed to a chain of devices. Always check to be certain that the system is not already powered from another infeed before attaching an infeed.

Figure 6 - Activ8 Power Components

1330 Bellevue Street • P.O. Box 8100 • Green Bay, WI 54308-8100 • Tel 1-800-424-2432 • www.ki.com

4. Choose a location close to a power source outlet for the power infeed component. Plug the power infeed into an appropriate location in the Activ8 system only after all other components are installed. The NEMA 5-15P plug end

© 2013 Krueger International, Inc. All Rights Reserved • Code KI-61967/KI/PDF/1213