This chapter represents the activities to be performed by the MDOT Metro Region
in ... investigations within the cities of Warren, Sterling Heights and Livonia.
6. METRO REGION This chapter represents the activities to be performed by the MDOT Metro Region in fulfillment of the Permit requirements. Each region has its own chapter within this Storm Water Management Plan (SWMP) containing the required activities it will perform as described in the SWMP Activities (Section 3.7). Included in this chapter is an outline of the proposed procedures described in the activities that will be incorporated into MDOT roadway projects, a map of the Metro Region facilities (Figure 6-1), contact and address information (Table 6-1), a table containing the activities the Metro Region will implement (Table 6-2), and the Phase II IDEP Investigation Maps for the Metro Region (Figures 6-2 though 6-3). Each activity fact sheet is represented in Table 6-2 with a checkmark next to the applicable activities. Each activity is also indicated as a statewide or an urbanized area requirement per the Permit. The facility map is included to indicate locations where pollution prevention measures are taken. Contact information is provided on the MDOT employees in managerial positions for each Region/Transportation Service Center (TSC). The Phase II IDEP Investigation Maps were developed as part of the Illicit Discharge Elimination Program (IDEP). The maps indicate MDOT roadways that cross impaired waterbodies within urbanized areas. Impaired waterbodies refer to those waterbodies listed on the MDEQ 2004 305(b) and 303(d) Impaired Waterbodies List. Additionally, a CD-ROM containing outfall maps representing the location of each outfall investigated during the Phase I program is available upon request from MDOT. During the NPDES Phase I storm water program, approximately 366 outfalls were investigated throughout the six permitted cities as part of the IDEP. The six permitted cities included Ann Arbor, Grand Rapids, Flint, Sterling Heights, Warren, and Livonia, with Sterling Heights, Warren and Livonia being the only permitted cities within the Metro Region. MDOT conducted 118 outfall investigations within the cities of Warren, Sterling Heights and Livonia. The following outline of proposed SWMP procedures shows the order in which individual activities, as described in Chapter 3, are followed within the scope of a typical MDOT roadway project. Once these procedures are developed, they will be incorporated into MDOT projects on a case-by-case basis depending on the scope and needs of the project. 1. Early coordination with MDEQ or other regulatory agencies will be sought during the initial design of selected projects (MDEQ Early Coordination Workgroup and Activity C4). 2. Consideration will be given to transportation-related areas of concern as identified by Metropolitan Planning Organizations (MPO)s with storm water quality control programs. Best management practices (BMPs) to address areas of concern will be incorporated into MDOT roadway projects to the maximum extent practicable (MEP) (Activity C-2). 3. Permanent BMPs (post-construction) will be selected based on MDOT BMP selection criteria (Activities C-3 and C-6) with consideration given to MDEQ or other regulatory MDOT Phase II SWMP
Page 6-1 April 2005
agency input (Activity C-4) to the MEP. BMP selection will also be based on approved BMPs in the MDOT Drainage Manual and any Total Maximum Daily Load (TMDL) requirements (BMP Design and Maintenance Workgroup) (Activity C-5). 4. Maintenance requirements will be developed for new permanent BMPs (BMP Design and Maintenance Workgroup and Activity C-1). 5. Permanent BMPs will be properly installed and maintained following BMP selection (Activities C-6 and C-1). 6. Construction activities will be conducted under MDOT’s approved Soil Erosion and Sedimentation Control (SESC) Plan and the State of Michigan’s Permit by Rule. 7. The outfall labeling procedure will be implemented if new outfalls are planned. The consultant conducting outfall mapping will be notified that new outfalls are in place (Outfall Labeling Workgroup and Activity C-10). 8. Newly discovered outfalls will be identified and mapped (Outfall Mapping Workgroup and Activity I-5). 9. New flow control structures in urbanized areas will be reviewed and assessed for water quality benefits gained based on calculated pollutant removal rates (Activity C-11). 10. SWMP activities will be tracked and documented (Activity A-1). Examples include tracking the number of outfalls labeled and tracking maintenance activities through the Maintenance Activity Reporting System (MARS) (Program Assessment and Reporting Workgroup). For specific roadway projects scheduled to be completed in the Metro Region, refer to MDOT’s 2005-2009 Five Year Transportation Program. The 2005-2009 Five Year Transportation Program is a report highlighting Michigan’s plan for preserving and improving its transportation network. The report describes the planned projects for each MDOT region. A link to the report is available on the MDOT Storm Water Management Web site. The 2005-2009 Five Year Transportation Program is currently underway and will limit the ability to implement new procedures not yet adopted by MDOT. Therefore, new procedures will be incorporated as they are adopted.
MDOT Phase II SWMP
Page 6-2 April 2005
Figure 6-1 Metro Region Facilities Map
MDOT Facilities Metro Region N
25
136
Port Huron
Capac 69 19
B.R. 94
ST CLAIR
29
Richm ond
75 15
Davisburg
Clarkston
Adair
24
19
MACOMB
75 24
150 B.R. 75
Sterling Heights
59
OAKLAND
696
696
696
5
75 10
24
12
Belleville
94
75
1
102
8
96 39
Westland
375
Detroit
M
Taylor 94 WAYNE
24
Legend 85
State Routes
275
75 B.R. 94
Created by MDOT December 2004
MDOT Phase II SWMP
St. Cl air
Southfield
14
154
97
24
275
29
3
Lak e
Waterford
153
94
53
M
Maintenance Garage
Counties
Rest Area
Interstate Routes
TSC
Interstate Routes
(Abbreviation B.R. Business Routes)
Region Offices
34
State Routes
Welcome Center
223
U.S. Routes
MITS Building
Page 6-3 April 2005
Table 6-1 Metro Region Contact Information MDOT Facility Metro Region Office Region Engineer: Greg Johnson Region Storm Water Coordinator: Randy McKinney Detroit TSC Manager: Rita Screws 1400 Howard St Detroit, MI 48216 Macomb TSC Manager: Drew Buckner 38257 Mound Road Sterling Heights, MI 48310 MITS Center Manager: Gregory Krueger 1050 6th Street Detroit, MI 48226 Oakland TSC Manager: Randy McKinney 2300 Dixie Highway Waterford, MI 48328 Port Huron TSC Manager: Larry Young 2127 11th Avenue Port Huron, MI 48060 Taylor TSC Manager: Kim Avery 25185 Goddard Taylor, MI 48180 M and T Field Laboratory Material Technician: Joe Muscat 35414 Mound Road Sterling Heights, MI 48310 Blue Water Bridge Manager: Michael Szuch 1410 Elmwood Street Port Huron, MI 48060 Blue Water Bridge Maintenance Garage Bridge Foreman: Reggie Washington 2900 Lewis Drive Port Huron, MI 48060
MDOT Phase II SWMP
18101 W. Nine Mile Rd., Southfield, MI 48075 Phone: 248-483-5100 FAX: 248-569-3103 Phone: 313-965-6350 FAX: 313-965-6339
Phone: 586-978-1935 FAX: 586-978-8075
Phone: 313-256-9800 FAX: 313-256-9036
Phone: 248-451-0001 FAX: 248-451-0108
Phone: 810-985-5011 FAX: 810-985-5042
Phone: 313-375-2400 FAX: 313-295-0822 Construction FAX: 2950844 Phone: 586-826-8992
Phone: 810-984-3131
Phone: 810-984-4482
Page 6-4 April 2005
MDOT Facility Allen Park Field Office Resident Engineer: Brian Scharboneau 5831 Courtland Street Allen Park, MI 48101 For storm water-related concerns at the rest areas, the following individual should be contacted: Region Storm Water Coordinator: Randy McKinney Port Huron Welcome Center 901 I-94 WB, Mile Marker 274 Clarkston Rest Area 904 I-75 SB, Mile Marker 94
Davisburg Rest Area 908 I-75 NB, Mile Marker 96 Adair Rest Area 909 I-94 EB, Mile Marker 255 Richmond Rest Area 910 I-94 WB, Mile Marker 250 Belleville Rest Area 911 I-94 WB, Mile Marker 188 Westland Rest Area 912 I-275 NB, Mile Marker 23 Capac Rest Area 913 I-69 WB, Mile Marker 174
MDOT Phase II SWMP
Phone: 313-563-8770
Phone: 248-483-5100 FAX: 248-569-3103
St Clair County Oakland County South bound on I-75, 1 mile north of Exit 93, last southbound Rest Area on I75 before Detroit and state line. Oakland County Saint Clair County Saint Clair County Wayne County Wayne County Saint Clair County
Page 6-5 April 2005
Table 6-2 Metro Region Activity Requirements
Activity # E-1: Maintain and Use Lansing Information Center E-2: Publish Articles in MDOT Publications E-3: Provide Information on Watershed Stewardship on the MDOT Public Web site E-4: Provide Education Materials Along with Tap-in/Discharge Permit Applications E-5: Notify and Invite Public to Review and Comment on the Storm Water Management Plan (SWMP) E-6: Determine Partnership Potential with MDEQ Statewide Public Education Program T-1: Present Applicable Training Modules to the Job-Related Public T-2: Certify MDOT's Staff for Pesticide/Fertilizer Application T-3: Train Staff Responsible for Administering Part 91 and those having Decision Making Authority for SESC Development or Review, Inspections, or Enforcement; and Storm Water Operators as Required under Part 31 T-4: Survey MDOT Staff on Storm Water Knowledge I-1: Submit and Implement Mapping Schedule for Outfalls I-2: Perform Inventory and Dry Weather Screening on Outfalls I-3: Receiving and Notifying MDEQ of Illicit Discharges and Actions Taken I-4: Report Updates and Changes to Legal Authority Status I-5: Map Known Outfalls (statewide) C-1: Maintenance Requirements for MDOT Permanent BMPs C-2: Identify and Coordinate with MPOs Having Storm Water Quality Control Programs C-3: Procedure to Select, Apply, and Maintain Permanent BMPs for Storm Water Management Activities (Post-Const.) C-4: Procedure to Work with MDEQ for Early Coordination on Initial Design Projects C-5: Review Projects with Storm Water Discharges to Water Bodies with a Promulgated Total Maximum Daily Load C-6: Implement Procedures to Select, Apply, and Maintain Permanent BMPs for Storm Water Management Activities (Post-Const.) C-7: Internal Quality Assurance/Quality Control (QA/QC) Protocol for Construction Storm Water Control C-8: Periodically Update Drainage Manual C-9: Documentation and Tracking of Road Maintenance Activities C-10: Procedure for Outfall Labeling C-11: Review Flow Control Structures C-12: Audit the Pollution Incident Prevention Plan (PIPP) Requirements A-1: Program Assessment and Reporting
Statewide (S) or Implemented Urbanized in this Area (UA) Region √ S* S* S* S
√
S*
√
S* S S*
√ √
S* S* UA* UA*
√ √ √ √
S S* S* S
√
S
√
S
√
S*
√
S*
√
S
√
S* S* S UA* UA S S
√
√ √
√ √ √ √ √
* Indicates initial activity implementation is performed by others but Region will be affected. MDOT Phase II SWMP
Page 6-6 April 2005
Figure 6-2 Detroit Urbanized Area IDEP Investigation Locations
^^ _ _ r Cre
£ ¤ 24
£ ¤
Q R
Q R
24
Q R
53
150
n to in Cl
Q R ^^ _ _ ^ ^^ _ ^ _ _^ __ ¦ ^_ QR QR ¨ _ § ^ R _^ _ Q ^ § ¦ ¨ § ¦ ¨ _^ ^ _ ^ _ _^ ^ Q R _^ _ ^ _^ _^ _ § ¦ ¨ R Q RQ Q R _ ^ _ ^ _ ^ ¦ QR ¨ Q R ^_^_^_ § § ¦ ¨ _ Q ^ R ^_^_^_^_^_^_ § ¦ ¨ _ ^ _ ^ _^ _^ _^ ^ _ ` ^_ _ ¤ ^_ § ¦ £ ¨ _ ^ § ¦ ^_^_^_^_ QR ¨ ` ^_^_^_ _ 59
r ve
La ke Ke nt
696
10
375
O:\032609T\03\Project\Phase II Maps 11-16-04
Wayne County
Legend
_ ^
Waters of the State
Counties
MDOT Phase II SWMP
85
275
Washtenaw County
MDOT Regions
24
Detroit River
94
Impaired Waterbodies
75
Ecorse River
12
23
94
8
39
153
£ ¤
Lake St. Clair
102
96
14
University Region
154
3
1
5
IDEP Field Investigation Locations
Q R
97
Metro Region
MDOT Roads
59
75
Detroit UA
96
£ ¤
_ ^
Ri
£ ¤ 23
12
94
iver
Oakland County Livingston County
§ ¦ ¨
Macomb County
St. Clair River
15
Sal tR
Q R
Bay Region
Dee
Shiawassee County
ek
Genesee County
Detroit UA Other UA
24
-MDOT road data are from the Michigan Center for Geographic Information Library and the MDOT graphics department database (Oct 2004). -Base map data were obtained from the Michigan Center for Geographic Information Library. -Urbanized Area status is based on 2000 census data. -Rivers with upper case labels are impaired waterbodies.
0
4
Designer: NKT Date: 3-28-05
8
Miles 12
. Page 6-7 April 2005
Figure 6-3 Port Huron Urbanized Area IDEP Investigation Locations
LL MI
CR
K EE
19
QR
Bay Region
rain
QR
136
Metro Region
Mill Creek Qu ake nbu sh D
Bra nc h 69
Pi n e Ri v er
§¨¦
Ri ve r
Sanilac County
Macomb County
^_ Be lle
CR
Ru n
S H’ IT SM
Ra ttle
St. Clair County
K EE
94
§¨¦ NE PI
25
69
§¨¦
^_
RQ
94
§¨¦ ^_
R VE RI
29
Port Huron UA
94
§¨¦ QR St. Clair River
Lake Huron
_ ^
County Lines
Waterbodies
MDOT Regions
MDOT Roads IDEP Field Investigation Locations
MDOT Phase II SWMP
Urbanized Area Other UA
-MDOT road data are from the Michigan Center for Geographic Information Library and the MDOT graphics department database (Oct 2004). -Base map data were obtained from the Michigan Center for Geographic Information Library. -Urbanized Area status is based on 2000 census data. -Rivers with upper case labels are impaired waterbodies.
0
1
2
Designer: NKT
3
4
5
Miles 6
.
O:\032609T\03\Project\Phase II Maps 11-16-04
Legend Impaired Waterbodies
Date:3-28-05
Page 6-8 April 2005