Information received from University can be seen at Annexure

103 downloads 2022 Views 566KB Size Report
Nov 3, 2009 ... University (Information may be provided in the following format). (Copy of the registered MOA/Trust Deed to be enclosed). Manav Bharti ...
University Grants Commission Bahadurshah Zafar Marg New Delhi – 110 002 Proforma for submission of Information by State Private Universities for ascertaining their norms and standards A. Legal Status 1.1 Name and address of the University MANAV BHARTI UNIVERSITY Village – Laddo, PO – Sultanpur, Tehsil & Distt. – Solan (HP)- 173229 1.2 Headquarters of the University Village – Laddo, PO – Sultanpur, Tehsil & Distt. – Solan (HP)- 173229 1.3 Information about University a. Website www.manavbhartiuniversity.edu.in b. E-mail [email protected] c. Phone Nos. 01792-268385, 268386 01792-268279, 268280 d. Fax Nos. Information about Authorities of the University a. Ph. (including Mobile), Fax Nos. & 080911-00003, 01792-268280 email of Chancellor [email protected] b. Ph. (including Mobile), Fax Nos. & 082650-10054, 01792-268280 email of Vice - Chancellor [email protected] c. Ph. (including Mobile), Fax Nos. & 089880-81555, 01792-268280 email of Registrar [email protected] d. Ph. (including Mobile), Fax Nos. & 082650-10056, 01792-268280 email of Finance Officer [email protected] 1.4 Date of establishment 3rd November, 2009 1.5 Name of the Society / Trust promoting the Manav Bharti Charitable Trust (Regd.), Solan University (Information may be provided in the (Trust Deed – Annexure 1) following format)

1.6

1.7

1.8

(Copy of the registered MOA/Trust Deed to be enclosed) Appendix – 1 Composition of the Society /Trust Name Address Occupation Designation in the Society / Trust (Details to be provided in Appendix – I) Whether the members of the Society / Trust No are members in other societies/Trusts or in the Board of Governors in companies? If yes, please provide details in the following format: Name of Address Name Designation the of the in the member Society/ Society / Trust Trust (Details to be provided in Appendix – II) Whether the promoting Society/Trust is No involved in promoting/running any other University / Educational Institution? If yes,

please give details in the following format: Name of the Activities University/ Educational Institution

1.9

(Details to be provided in Appendix – III) Whether the promoting society/trust is No involved in promoting/running activities other than educational? If yes, please give details in the following format: Name of the Activities Organisation

(Details to be provided in Appendix – IV) 1.10 Act and Notification under which established Enclosed (Copy of the Act & Notification to be enclosed) Enclosed

Not Enclosed

Act – Annexure 2 HP Govt. Notification – Annexure 3 UGC Notification – Annexure 4

1.11 Whether the University has been established Yes by a Separate State Act? B. Organisation Description 2.1 Whether Unitary in nature (as per the UGC Regulation) 2.2 Territorial Jurisdiction of the University as per the Act 2.3 Details of the constituent units of the University, if any, as mentioned in the Act 2.4 Whether any off-campus centre(s) established? If yes, please give details of the approval granted by the State Government and UGC in the following format: a. Place of the off-campus b. Letter No. & date of the approval of State Government c. Letter No. & date of the approval of UGC (Details to be provided in Appendix – V) (Please attached attested copy of the approval) 2.5 Whether any off-shore campus established? If yes, please give details of the approval granted by the Government of India and the host country in the following format: a. Place of the off-shore campus b. Letter No. & date of the approval of Host Country c. Letter No. & date of the approval of Government of India (Details to be provided in Appendix – VI) (Please attached attested copy of the approval) 2.6

Does the University offer a distance education programme? If yes, whether the courses run under distance mode are approved by the

Himachal Pradesh No No

No

No

2.7

competent authority? (Please enclose attested copy of the course-wise approval of competent authority) Whether the University has established study centre(s)? If yes, please provide details and whether these study centres are approved by the Competent authority of the University and UGC? (Details to be provided in Appendix – VII) Please enclose attested copy of the approval from the competent authority)

C. Academic Activities Description 3. Academic Programmes 3.1 Details of the programmes permitted to be offered by Gazette Notification of the State Government and its reference Programme Sanctioned Actual Intake Enrolment UG PG Diploma PG Diploma Certificate Course M.Phil. Ph.D. Any other (Pl. specify) (Details to be provided in Appendix – VIII) 3.2 Current number of academic programmes/ Courses offered by the University Programme Sanctioned Actual Intake Enrolment UG PG Diploma PG Diploma Certificate Course M.Phil. Ph.D. Any other (Pl. specify) (Details to be provided in Appendix – IX) 3.3 Whether approvals of relevant statutory council(s) such as AICTE, BCI, DEC, DCI, INC, MCI, NCTE, PCI etc. have been taken to: a. Start new courses b. To increase intake If yes, please enclose copy of approval and give course wise details in the following format: Name of the Statutory Whether course Council approval

No



Details of the programmes permitted to be offered by Gazette Notification of the State Government and its reference attached as Appendix – VIII



Current number of academic programmes/ Courses offered by the University attached as Appendix – IX

Appendix – X

taken

3.4

(Details to be provided in Appendix – X) If the University is running courses under distance mode, please provide details about the students enrolled in the following format: Name of the Courses No. of study centre offered students enrolled

NA

(Details to be provided in Appendix – VII)

3.5

3.6

(Please enclose copy of the course-wise approval of the competent authority) Temporal plan of academic work in the University Semester System / Annual System Whether the University is running any course which is not specified under Section 22 of the UGC Act, 1956? If yes please give details in the following format: a. Name of the Course(s) b. Since when started c. Whether the University has applied for permission from UGC? (Details to be provided in Appendix – XI)

Semester System

No

4. Student Enrolment and Student Support 4.1 Number of students enrolled in the University for the current academic year according to regions and countries (Please give separate information for main campus and off-campus/offshore campus) Particulars

UG

PG

M.Phil.

Ph.D.

Diploma

M F T M F T M F T M F T M F

No. of students from the same State where the University is located 29 4 33 6 2 8 0 0 0 0 0 0 18 9

No. of students from other States 72 3 75 2 4 6 0 0 0 0 0 0 44 3

No. of NRI students

No. of overseas students excluding NRIs Foreign Person of Indian Students Origin students

Grand Total

0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0

101 7 108 8 6 14 0 0 0 0 0 0 62 12

0 0 0 0 0 0 0 0 0 0 0 0 0 0

T 27 M 0 F 0 T 0 Certificate M 0 F 0 T 0 Any Other (Pl. M 0 Specify) F 0 T 0 M-Male, F-Female, T-Total

47 0 0 0 0 0 0 0 0 0

PG Diploma

0 0 0 0 0 0 0 0 0 0

4.2

Category-wise No. of students

4.3

Details of the two batches of students admitted

Particulars

No. of admitted to the Programme No. of Drop-outs (a) Within four months of Joining (b) Afterwards No. of appeared for the final examination No. passed in the final exam No. passed in first class 4.4

4.5

4.6

4.7

4.8

4.9

0 0 0 0 0 0 0 0 0 0

Category SC ST OBC PH General Total

Batch 1 Year of Entry – 2010 UG PG 361 113

232 99 66

0 0 0 0 0 0 0 0 0 0

Female 5 3 0 0 17 25

74 0 0 0 0 0 0 0 0 0

Male 11 8 16 1 135 171

Total 16 11 16 1 152 196

Total 474

Batch 2 Year of Entry - 2011 UG PG 317 75

Total 392

101

333

240

81

321

92 75

191 141

151 139

69 66

220 205

Does the University provide bridge/remedial courses to the educationally disadvantaged students? If yes, please give details Does the University provide any financial help to the students from socially disadvantages group? If yes, please give details In case the University is running M.Phil/Ph.D. programme, whether it is full time or part time and whether these programmes are run as per UGC Regulations, 2009 on M.Phil./Ph.D. Whether the University have a website? If Yes give website address and whether the website is regularly updated? How are the prospective students informed about the criteria for admission, rules & regulations, facilities available etc.? Whether any grievance redressal mechanism is available in the University? If yes, please provide details about the complaints received against

No

No

NA

Yes (www.manavbhartiuniversity.edu.in) Yes, it is regularly updated. Prospectus, Advertisement and University Website Yes

malpractices etc in the University in the following format: (Details to be provided in Appendix – XII) 5. Curriculum, Teaching Learning Process/Method, Examination/Evaluation System 5.1 Which University body finalized the curriculum? Academic Council & Board of Management The composition of the body may be given. (Board of Studies, Academic Council, Board of Compositions attached as Annexure - 5 Management) 5.2 What are the Rules/regulations/procedure for Board of studies of the concerned course revision of the curriculum and when was the shall consider the revision of syllabi and curriculum last updated? curriculum and process for revision will be adopted during the next academic session 2013-2014. 5.3 Whether approval of statutory bodies such as Yes Board of Studies, Academic Council and Board of Extracts of the minutes attached as per Management of the University has been taken Annexure - 6 to start various courses? if yes, please enclose extracts of the minutes. 5.4 Furnish details of the following aspects of Practical aspect is considered along with the curriculum design: curriculum.

5.5

5.6

5.7 5.8

5.9

5.10 5.11

5.12

5.13

Innovation such as modular curricula Inter/multidisciplinary approach Has the University conducted an academic audit? If Yes, please give details regarding frequency and its usage. Apart from classroom instruction, what are the other avenues of learning provided for the students? (Example: Projects, Internships, Field Trainings, Seminars etc.) Please provide details of the examination system (Whether examination based or practical based) What methods of evaluation of answer scripts does the University follow? Whether external experts are invited for evaluation?

Not so far

To ensure overall development of the candidate, MBU offers Projects, Industrial Training, Workshop, Seminars, Presentations, Surveys along with the curriculum. Scheme of Examinations of curriculum is attached as Annexure - 7 At present the practice of spot evaluation of answer scripts is in practice. However, the practice of scripts evaluation by external evaluators for the subsequent semesters will also be adopted. Annexure – 7 A

Mention the number of malpractice cases reported during the last 3 years and how they are dealt with. Does the University have a continuous internal Yes evaluation system? How are the question papers set to ensure the Through the Panel recommended by the achievement of the course objectives? HODs which includes the External and Internal Examiners State the policy of the University for the Copy of the Examination Rules attached as constitution of board of question paper setters, Annexure - 8 board of examiners and invigilators. How regular and time-bound are conduct of Year Date of Date of examinations and announcement of result? exams announcement Substantiate with details of dates of of results examinations and announcement of results for

the last 3 years. Details to be provided in the following format: Year Date of Date of exams announcement of results

D. Admission Process 6.1 How are students selected for admission to various courses? Please provide faculty-wise information a. Through special entrance tests b. Through interviews c. Through their academic record d. Through combination of the above

6.2

6.3

6.4

Please also provide details about the weightage give to the above Whether the University is admitting students from national level entrance test or state level entrance test? If yes please provide following details: Name of No. of % of Remarks the students students National/ admitted from the State total Level admitted Entrance Exam

MBU evaluate candidates comprehensively on the basis of following criterion of weightage in all courses a. Through special entrance tests: 50% b. Through interviews : 20% c. Through their academic record: 30% d. Through combination of the above * Reservation as per State Govt. Policy

Presently the University is admitting students on Merit basis or University entrance test. The University will accept the National level entrance test or state level entrance test score for admitting the students in UG/PG courses.

Whether admission procedure is available on the Detailed Admission procedure is mentioned University website and in the prospectus on the University website as well as prospectus. Sr. Name of the Eligibility Please provide details of the eligibility criteria for No. Course admission in all the courses 1

2

B. Tech. CSE/ECE/ Electrical/ ME/Civil MCA

3

BCA

4

MBA

5

BBA

6

M.Sc. Chemistry

7

Dip. in Fire Safety Mgt. M.Sc. Biotech.

8

10+2 with PCM (45% GEN. & 40% SC/ST)

10+2 (Math)+ Graduation (50% GEN. & 45% SC/ST) 10+2 (45% GEN. & 40% SC/ST) Graduation (50% GEN. & 45% SC/ST) 10+2 (45% GEN. & 40% SC/ST) B.Sc. with Chemistry as a subject (50% GEN. & 45% SC/ST) 10+2 (Pass) B.Sc. with Biotechnology as a subject (50% GEN. & 45% SC/ST)

9

M.Tech. (Biotech)

10

B.Tech. (Biotech) M. Pharmacy

11 12

16

B. Pharm. (Ayurveda) D. Pharm. (Ayurveda) B. Pharm. (Allopathy) D.Pharm. (Allopathy) LLB

17

BA LLB

18

BA

19

MA English/ Education

Graduation with second division or with 45% or Hons in the subject of his/her study of M.A.

20

B.Com.

21

M.Com.

10+2 (45% GEN., 40% SC/ST & other) B.Com. (50% GEN., 40% SC/ST & other)

13 14 15

6.5

6.6

Whether University is providing any reservation/relaxation in admission? If yes, please provide details in the following format: Category No. of % of Remarks students quota admitted provided for reservati on and preparati on in respect of actual enrolmen t

Whether any management quota is available for admission in the University? If yes, please provide details in the following format: Total No. No. of No. of % of of Seats total students students (Course- students admitted admitted wise) admitted under under Manage manage

B.Tech. in concerned discipline (50% GEN. & 45% SC/ST) 10+2 with PCM (50% GEN. & 45% SC/ST) B.Pharm. (50% GEN. & 45% SC/ST) 10+2 (Pass) 10+2 (Pass) 10+2 with science (Pass) 10+2 with science (Pass) Graduation (50% GEN. & 45% SC/ST) 10+2 (50% GEN. & 45% SC/ST) 10+2 (Pass) with English

Yes Category

Himacha li Bonafide SC ST OBC No

No. of student s admitte d in 2012-13

% of quota provided for reservation and preparatio n in respect of actual enrolment 25%

13 11 13

15% 7.5% 27%

Remar ks

ment quota 6.7

ment quota

What is the admission policy of the University with regard to NRI and overseas students?

No

E. Fee Structure 7.1

7.2

7.3 7.4

7.5 7.6 7.7 7.8 7.9

7.10

7.11

Present Course-wise fee structure of the University (Please provide head-wise details of total fee charged) Any other fee charged by the University other than the fee displayed in the UGC website (e.g. Building Fee, Development Fee, Fee by any name etc.) Whether fee structure is available on the University website and in the prospectus? Whether fee is charged by the University as per fee structure displayed in the University website and in the prospects or some hidden charges are there? Mode of Fee collection Whether University is providing any concession in fee to students? If yes, please provide details. Details of the Hostel Fee including mess charges Any other fee Basis of Fee Structure

Whether the University has received any complaint with regard to fee charged or fee structure? If yes please give details about the action taken. Whether University is providing any scholarship to students? If yes, pleas provide details.

Annexure – 9

Annexure – 10

Yes Yes, we charged fee as per the displayed fee in the University website and prospectus. There are no hidden charges. Demand Draft / Cash / Online Mode University helps the Meritorious / Poor & deserving Students Annexure – 10 No Fee Structure is designed on the basis of No Profit – No Loss duly approved by the State Govt. Income of the University is spent on the development of the student facility in the University. No

Not so far, proposal under consideration.

F. Faculty 8.1

8.2

Dep t.

Total no. of sanctioned and filled up posts (Institutionwise and Department wise)

Associate Assistant Professor Professor Sanctioned Filled Sanctioned Filled Sanctioned Filled 27 9 48 7 127 105 Details of teaching staff in the following format (Please provide details – Institution-wise and Department -wise) (Details to be provided in Appendix – XIII)

Name of the Teach er

Designa tion

Ag e

Dept. Professor

Educationa l Qualificati ons

Teaching Experien ce in Years

Date of appoint ment

Wheth Regula er full r or time or adhoc part

Scal e of Pay

No. of publica tions

(Whether qualified as per UGC Regulation s)

8.3

Category-wise No. of Teaching Staff

time

Category SC ST OBC PH General Total

Female 4 0 1 0 43 48

Male 3 0 0 0 90 93

Total 7 0 1 0 133 141

8.4 Details of the permanent and temporary faculty members in the following format Particulars Female Male Total no. of permanent teachers No. of teachers with Ph.D. as the highest qualification 11 34 No. of teachers with M.Phil. as the highest qualification 3 5 No. of teachers with PG as the highest qualification 29 29 Total no. of temporary teachers No. of teachers with Ph.D. as the highest qualification 0 0 No. of teachers with M.Phil. as the highest qualification 0 0 No. of teachers with PG as the highest qualification 0 0 Total no. of part-time teachers No. of teachers with Ph.D. as the highest qualification 0 0 No. of teachers with M.Phil. as the highest qualification 0 0 No. of teachers with PG as the highest qualification 0 0 Total No. of visiting teachers 0 0

8.5 8.6

8.7

8.8

Ratio of full-time teachers to part-time/ contract teachers Process of recruitment of faculty -Whether advertised? (Pl. attach copy of the ad) -Whether selection committee was constituted as per the UGC Regulation? Does the University follow self-appraisal method to evaluate teachers on teaching, research and work satisfaction? If yes, how is the self-appraisal of teachers analysed and used? Whether: Self Appraisal Evaluation Peer Review Students evaluation Others (Specify) Institution-wise and Department-wise teacher student ratio (Only full time faculty)

Total 45 8 58 0 0 0 0 0 0 0

All faculties are full-time faculty.

Yes, Annexure - 11 Yes, Annexure - 12 Yes, University adopts Self Appraisal method to evaluate teachers with respect to teaching, research and work satisfaction.

Institution-wise and Department-wise teacher student ratio (Only full time faculty) Civil ECE CSE Mechanical

Ratio

1:15 1:15 1:15 1:15

8.9

Whether the University is providing UGC Pay Scales to the Permanent Faculty? If yes, please provide the following details: Scale of Pay with all the allowances Professor : Associate Professor : Assistant Professor :

Mode of Payment – (Cash/Cheque) 8.10 Pay / Remuneration provided to: Part-Time Faculty – Temporary Faculty – Guest Faculty 8.11 Facilities for teaching staff (Please provide details about Residence, Rooms, Cubicals, Computers / Any other)

Engineering Comp. Science & App. Management Law Arts Commerce Science Pharmacy Fire Safety Management Yes

1:15 1:15 1:15 1:25 1:25 1:25 1:25 1:15 1:15

Scale of Pay with all the allowances Professor : 37400-67000+10000(AGP) Associate Prof. : 37400-67000+9000(AGP) Assistant Prof. : 15600-39100+6000(AGP) Mode of Payment – Bank Account /Cash

Part-Time Faculty – Temporary Faculty – 15600/- per month Guest Faculty – 500/- per Lecture Seating Rooms, Computers, Internet, Research Labs, Half Tuition Fee concession to the wards of employees

G. Infrastructure 9.1

a) b) c) d) e) 9.4 a) b)

Does the University have sufficient space for Land & Building? Does the University have sufficient class rooms? Laboratories & Equipment (Details to be provided in Appendix – XIV and Appendix – XV) Item Description (make and model) Location (Department) Value (Rs.) Present Condition Date of Purchase Library Total Space (all Kinds) Computer/ Communication facilities

c)

Total no. of Ref. Books (Each Department)

9.2 9.3

Yes Yes Appendix – XIV & XV (Common)

3,000 sq. mtr. E-Library with 50 terminals including Internet facility Sr. Department Name No. of No. Books 1 Pharmacy 5225 2 ECE 730 3 Mechanical 512 4 Civil 615 5 Electrical 940 6 CSE 670 7 Applied Sciences 755

8 9 10 11 12

d) 9.5 a) b) c) d) e) f) g) 9.6

H.

All Research Journals subscribed on a regular basis Sports Facilities (Details to be provided in Appendix – XVI) Open Play Ground(s) for outdoor sports (Athletics, Football, Hockey, Cricket etc.) Track for Athletics Basketball courts Squash / Tennis Courts Swimming Pool (Size) Indoor Sports Facilities including Gymnasium Any other Does the University has provision for Residential Accommodation including hostels (boys & girls separately) Financial Viability

10.1

Details of the Corpus Fund created by the University Amount – FDR No. Date – Period – (Documentary evidence to be given) Amount 87,01,520.00 87,12,657.00 87,12,654.00 65,73,126.00 19,59,832.00

FDR No. 05160310009734 05160310009710 05160310009727 05160310009741 05160310009772

13 Yes

Comp. Sci. & App. Law Fire Safety Mgt. Biotechnology Commerce & Management General Books

2076 2014 27 1063 2060 1800

Detail is given below: Yes – Volleyball Yes Yes Yes – Lawn Tennis Court No Yes – Chess, Carom, Table Tennis, Gym Yes

Detail is given below.

Date 31/12/09 31/12/09 31/12/09 31/12/09 5/2/11

Period 3 Yrs. 3 Yrs. 3 Yrs. 3 Yrs. 3 Yrs. Annexure - 13

10.2

Financial position of the University (please provide audited income and expenditure statement for the last 3 years)

Source of finance and quantum of funds available for running the University (for last audited year) Fees – Donations – Loan – Interest – Any other (Pl. Specify) 10. 4 What is the University’s ‘unit cost’ of education?

S.No. Year 1 2009-10 2 2010-11 3 2011-12 Annexure - 14

Income 139.66 773.61 1356.72

(In Lacs) Expenditure 138.70 398.38 603.11

10.3

Fees – 1324.23 Lacs Donations – NA Loan – 277.47 Lacs Interest – 31.46 Lacs Any other (Pl. Specify) – 1.02 Lacs 0.47 Lacs

I.

(Unit Cost = total annual expenditure (budget accruals) divided by the number of students enrolled) Unit Cost calculated excluding the salary component may also be given Governance System

11. Organization, Governance and Management 11.1

11.2

Composition of the statutory bodies of the University (please give names, profession & full postal address of the members and date of constitution): Governing Board, Executive Council Board of Management Academic Council Finance Committee Board of Studies Others (Details to be provide in Appendix – XVII) Dates of the meetings of the above bodies held during the last 2 years

Appendix - XVII

Sr. Name of Statutory No. Body 1 Governing Board

(Enclose attested copy of the minutes of the meeting)

11.3

11.4

What percentage of the members of the Board of Studies, or such other academic committees, are external? Enclose the guidelines for BOS or such other committees. Are there other strategies to review academic programmes besides the academic council? If yes, give details about what, when and how often are such reviews made?

2

Board of Management

3

Academic Council

4

Finance Committee

Dates of Meetings 30-12-2011 14-5-2012 20-11-2012 21-8-2011 28-11-2011 20-1-2012 16-3-2012 5-11-2012 18-2-2013 29.3.2013 31-5-2011 4-10-2011 19-10-2011 20-1-2012 31-5-2012 21-9-2012 25-10-2012 9-11-2012 4-2-2013 9-3-2012 3-10-2012 28.3.2013

Annexure – 15 10% Annexure - 16

Yes, the academic programmes are reviewed in the Departmental Staff Council, Board of Studies, a committee of teachers is also deputed to other Universities for interaction on reciprocal basis. Members from the Industry Association are invited to check the relevance of curriculum with the employability skill.

J.

Research Profile

12.1

Faculty-wise and Department-wise information to Presently University is running M.Pharm. & be provided in respect of the following: M.Tech. courses.  Student Teacher Ratio Particulars M.Tech. M.Pharm.  Class Rooms Student Teacher 1:1 3:2  Teaching Labs Ratio  Research Labs (Major Equipments) Class Rooms 2 2  Research Scholars (M.Tech., Ph.D. Post Teaching Labs 2 2 Doctoral Scholars) Research Labs 2 2  Publications in last 3 years (Year-wise list) (Major  No. of Books published Equipments)  Patents Research 17 15  Transfer of Technology Scholars  Inter-departmental Research (Inter(M.Tech., Ph.D. disciplinary) Post Doctoral  Consultancy Scholars)  Externally funded Research Projects Publications in Annexure - 17  Educational Programmes Arranged last 3 years (Yearwise list) No. of Books 0 0 published Patents 0 0 Transfer of Technology Interdepartmental Research (Interdisciplinary) Consultancy 0 0 Externally funded 0 0 Research Projects Educational 0 0 Programmes Arranged K. Misc. 13. Details of Non-Teaching Staff 13.1

Name

Details of Non-Teaching Staff

Designation

Age

Qualification

Scale of Pay

Date of Trained Appointment Yes/No If yes, Details

(Details to be provided in Appendix – XIX) 13.2

Summary of the Non-Teaching Staff

Particulars Female Administrative Staff Group A Group B

Male

Total

13.3

No. of Non-teaching Staff category wise

13.4 13.5

Ratio of Non-teaching staff to students Ratio of Non-teaching staff to faculty

Group C Group D Sub Total Teaching Staff Group A 2 Group B 1 Group C 14 Group D 10 Sub Total 27 Grand Total Category Female SC 4 ST 0 OBC 2 PH 0 General 21 Total 27 1:17 1:2

5 7 34 13 59 Male 7 0 4 0 48 59

7 8 48 23 86 Total 11 0 6 0 69 86

14. Academic Results 14.1

Faculty-wise and course-wise academic results of the past 3 years S.No. Course No. of Result Candidates appeared

Annexure - 18

15. Accreditation 15.1

15.2

15.3 15.4

Whether Accredited by NAAC? If yes please provide the following details: Date of Accreditation Period Grade CGPA Grading System Followed Whether courses are accredited by NBA? If yes please provide course-wise details as under: S.No. Course Whether Period of Accredited Accreditation

No

Other Accreditations, if any Any other information (including special achievements by the University which may be relevant for the University)

No ISO 9001:2008 ISO 14001:2004 Applied for membership for Association of Commonwealth Universities, London Applied for membership for Association of Indian Universities, New Delhi

No

16. Strength and Weaknesses of the University 16.1

Strengths of the University

1. Infrastructure: Well thought out architectural plan and buildings with good facilities. 2. Hostel and cafeteria, both well equipped. 3. Wi Fi connectivity on the entire campus. 4. Good sports facilities. 5. Good campus discipline 6. Teachers paid salaries as per the UGC approval scales. 7. Educational loans for needy students arranged. 8. Gender distribution among students highly satisfactory. 9. Faculty and non teaching staff given incentives to upgrade qualifications and skills. well mentored and 10. Students enthusiastic about their courses 11. Children of faculty and staff given half tuition fee concession. 12. Class rooms well designed and some well equipped. 13. Laboratories also well maintained and equipped. 14. Student’s Result declared within a month after examinations. 15. Good transport facility to the staff and students. 16. Good research facilities available for PG courses. 17. Separate faculties such as Engineering, Pharmacy, Law etc. are established.

16.2

Weaknesses of the University

1. Due to hilly area, construction of building is very hard job. 2. University is established in rural hilly area of H.P., so the recruitment of experienced teachers is tough.

Certificate This is to certify that all the information provided above is true to the best of my knowledge and belief. The University will adhere to the rules, regulations and guidelines of the UGC, Central Government and relevant Statutory Council(s) and abide by all the provisions under the UGC Regulation. The above information is also posted on the website of the University www.manavbhartiuniversity.edu.in.

Signed and Sealed by the Head of the Institution

Appendix – I Constitution of Manav Bharti Charitable Trust, Solan Name

Address

Dr. Raj Kumar Rana

Vill. – Laddo, PO – Sultanpur, Distt. – Business Solan Vill. – Laddo, PO – Sultanpur, Distt. – Business Solan Vill. – Laddo, PO – Sultanpur, Distt. – Business Solan

Dr. Ashwini Kanwar Ms. Aaina

Occupation

Designation in the Society / Trust Chairman Member Member

Appendix – VIII Details of the programmes offered in 2009-2010 to be offered by Gazette Notification no. EDN-A-Ka(1)5/2008-Loose dated 3/11/2009 of the State Government. Programme UG PG Diploma PG Diploma Certificate Course M.Phil. Ph.D. Any other (Pl. Specify)

Sanctioned Intake 420 383 270 20 0 0 0 0

Actual Enrolment 51 85 78 2 0 0 0 0

Appendix – IX Current number of academic programmes/ Courses offered by the University Programme UG PG Diploma PG Diploma Certificate Course M.Phil. Ph.D. Any other (Pl. Specify)

Sanctioned Intake 660 330 180 0 0 0 0 0

Actual Enrolment 108 14 74 0 0 0 0 0

Appendix – X Approvals of Relevant Statutory Council(s) Name of the course

Statutory Council

Whether

Remarks

approval taken LLB / BA-LLB

Bar Council of India

Yes

(BCI) D.Pharm. & B.Pharm.

Pharmacy Council of

(Allopathy)

India (PCI)

B.Tech., MCA, MBA

AICTE

Copy of Approval /Notification attached as Annexure - 19

Yes

Not Required

Appendix – XIII Details of teaching staff in the following format (Please provide details – Institution-wise and Department -wise)

Name of the Department

Applied Sciences

Name of the Teacher

Designation

Age

Dr. Indira Pathania Prof. K P Singh Dr. Nisha Sharma Dr. Vikram Sharma Ms. Anita Sharma Ms. Madhu Chauhan

Assist. Prof. Asso. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof.

41 40 30

Dr. Anuj Kumar

Assist. Prof.

41

Dr. P K Vashistha Mrs. Vijeta Verma Mr. Vinod Kumar Bais Mr. Ashish Kumar Sharma Dr. Narender Kumar Ms. Nirmala Kumari

Assist. Prof. Assist. Prof. Assist. Prof.

35 25 38

Educational Qualifications (Whether qualified as per UGC regulations PhD Zoology, B.Ed. M.Sc. Chem., Ph.D. M.Sc. Chem., Ph.D. M.Sc. Chem., Ph.D. M.Sc. Chemistry, B.Ed. M.Sc. Chemistry M.Sc. (Maths), Ph.D, M.Tech. (Comp. Sci.) MA (Maths), Ph.D M.Sc. (Maths), B.Ed. M.Sc. (Maths), M.Phil.

Assist. Prof.

28

Assist. Prof. Assist. Prof.

37 28

Prof. P S Thakur

Professor

62

Dr. Gaurav Aggarwal Ms. Sumita Thakur Dr. Imtiyaz Wani Ms. Amandeep

Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof.

29 28 32 28

Prof. J.L. Vij

Arts

31 26

Professor

Dr. Shiv Pal Singh Dr. Ashoni Kanwar Dr. Ashwani Kumar Mr. Uday Veer Singh Dr. Kamal Kishore

Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof.

Dr. Bhupinder Jit Kaur

Assist. Prof.

39 33 26 42

Teaching experience in years 6

1 1.8

1/6/2010 10/1/2012 1/6/2010 23/11/2010 2/8/2010 26/10/2009

Whether full time/ part time Full Time Full Time Full Time Full Time Full Time Full Time

13

9/11/2011

Full Time

-

15600-39100

11

11 0.6 7

9/11/2011 26/8/2011 26/11/2011

Full Time Full Time Full Time

-

15600-39100 15600-39100 15600-39100

5

M.Sc. (Maths), M.Phil.

2.6

6/2/2012

Full Time

-

15600-39100

14

M.Sc., Ph.D. M.Sc. Physics , B.Ed. M.Sc. (Biotech.), M.Phil., Ph.D. M.Sc. (Biotech.), Ph.D M.Phil., M.Sc. (Biotech.) M.Sc. Microbio., PhD B.Sc. MLT MA, (Eco.), Ph.D, MA (Eng.), MA (Pol. Sci.) M.Ed., Ph.D. M.Ed., Ph.D. PhD Hindi & Sanskrit MA (History), M.Phil. MA, PhD (English) MA (English), M.Phil, Ph.D, B.Ed.

5.6 1.6

8/2/2012 25/11/2010

Full Time Full Time

-

15600-39100 15600-39100

2

30

25/11/2011

Full Time

-

37400-67000

124

1 2 6 2

1/9/2011 10/11/2009 1/7/2010 21/8/2009

Full Time Full Time Full Time Full Time

-

15600-39100 15600-39100 15600-39100 15600-39100

7

35

1/11/2011

Full Time

-

37400-67000

9

4

Full Time Full Time Full Time Full Time Full Time

-

15600-39100 15600-39100 15600-39100 15600-39100 15600-39100

12

0.2

29/12/2011 7/5/2012 2/5/2011 1/11/2011 1/9/2011

2

8/4/2011

Full Time

-

15600-39100

2

1.5

Date of appointment

Regular/ ad-hoc

Scale of pay

No. of Publications

-

15600-39100 37400-67000 15600-39100 15600-39100 15600-39100 15600-39100

3 3

10

9

Computer Science & Applications

Mrs. Meenu Sharma

Assist. Prof.

29

Dr. Virender

Assist. Prof.

31

Dr. Ranjan Misra

Assist. Prof.

45

Mrs. Bimla Devi Ms. Aradhana Santoshi Dr. M K Sharma Dr. Parveen Sharma Dr. Munish Goyal Dr. Neeru Gupta Mrs. Gunjan Bansal Mr. Pawan Kumar Ms. Ramandeep Ms. Anjali Dr. Dharmbir Singh Dr. Ramesh Aggarwal Dr. Anjana Attri

Assist. Prof.

53

MA (Eng.), B.Ed. MA (Social Work), MA (Phy. Edu.), M.Phil., Ph.D MA (Sociology), MSW, Ph.D , MBA (HR) MA (Pol. Sci.), B.Ed.

Assist. Prof.

28

MA (Pol. Sci.), B.Ed.

Asso. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Professor Professor Assist. Prof.

40 42 28 26

MCA, Ph.D. MCA, M.Phil., Ph.D. MCA, M.Phil., Ph.D. M.Sc. (CS), MCA, Ph.D MCA, M.Phil. MCA, M.Phil. MCA, M.Sc. (IT) MCA, M.Phil. MBA, Ph.D. MBA, Ph.D. Ph.D. (Finance), M.Com. M.Com., MBA, MA (Edu), MA (Eng), M.Phil. (Mgt.), M.Phil. (Eng.), Ph.D (Mgt.)

Dr. Imanjeet Singh Bawa Management

Electronics & Comm. Engg.

Dr. Chandershekhar Sharma Dr. Jyoti Sharma Dr. Sarika Mr. Manish Chandra Ms. Rama Sharma Ms. Richa Jaswal Mrs. Rashmi Sharma Ms. Khushani Dr. Anjana Sen Dr. Vikas Sen Mr. Mandhir K Verma Mr. Nitin Kathuria Ms. Shivani Sharma Ms. Anita Chaudhary Mr. Amit Thakur Mr. Ashish Gupta

31 30 24 65 44

3

1/8/2011

Full Time

-

15600-39100

8

24/8/2011

Full Time

-

15600-39100

35

8

26/3/2012

Full Time

-

15600-39100

10

11/6/2012

Full Time

-

15600-39100

21/4/2011

Full Time

-

15600-39100

9/2/2012 5/10/2009 5/5/10 7/10/2010

6

18/6/2012 30/6/2011 24/5/2011 1/12/2011 1/12/2011 1/9/2009

Full Time Full Time Full Time Full Time Full Time Full Time Full Time Full Time Full Time Full Time Full Time

-

37400-67000 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 37400-67000 37400-67000 15600-39100

6

8/11/2011

Full Time

-

15600-39100

8.9 2.5 1 1 1 1 19

13 2 5 2

42 3

Assist. Prof.

32

Assist. Prof.

47

M.Com., M.Phil., Ph.D.

11

29/7/2011

Full Time

-

15600-39100

6

Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof.

27 26 39 29 24 24 26 30 28 35

PGDCA, PGDPMS, MBA, Ph.D. MBA, Ph.D. MBA MBA MBA MBA MBA PhD Electronics PhD Electronics M.Tech. ECE M.E. ECE M.Tech. ECE M.Tech. ECE M.Tech. ECE M.Tech. ECE

2.5 2 10 2.9 1 2 1 3 3.6

3/10/2009 1/3/2010 12/1/2011 3/10/2009 2/4/2012 1/8/2011 15/10/2010 2/8/2010 2/8/2010

6/2/2012 1/8/2012 21/8/2012

-

15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100

5 2

1 1.4 1

Full Time Full Time Full Time Full Time Full Time Full Time Full Time Full Time Full Time Full Time Full Time Full Time Full Time Full Time Full Time

23 24 23 38

3 2 5 1

Comp. Science & Engg.

Mechanical Engg.

Civil Engg.

Mr. Rishubh Garg Mr. Mandeep Singh Ms. Suman Mehta Prof. K S Mehta Prof. K P Yadav Ms. Pooja Jaglan Mr. Naveen Jaglan Ms. Amandeep Kataria Mr. Amit Kumar Mr. Sompal Mr. Ravinder Singh Madhan Mr. Vikas Yadav Mr. Neeraj Kumar Mr. Mohit Sharma Ms. Pooja Soni Ms. Nisha Dua Ms. Nisha Thakur Prof. H.M. Khurana Prof. S Prasad Mr. Ankur Kulshreshtha Mr. Bhanu P Singh Mr. Vipul Sharma Mr. Praveen Pachauri Mr. Ashok Chauhan Mr. Saurabh Gautam Mr. Ashish Tanwar Mr. Kamal Kashyap Mr. Rajesh Kumar Mr. Syed Suheb Hussain Prof. A M Chandra Dr. R K R Bansal Mr. Aakash Singh Mr. Dinesh Kumar Chauhan Mr. Vivek Chandel

Assist. Prof. Assist. Prof. Lecturer Professor Asso. Prof. Assist. Prof. Assist. Prof. Assist. Prof.

24 26 25 58 40 25 27

M.Tech. ECE M.Tech. ECE B.Tech. ECE Ph.D. (CSE) M.Tech. (CSE), Ph.D. M.Tech. (Comp. Sci.) M.Tech. (Comp. Sci.) M.Tech. (Comp. Sci.)

0.8 3 1.9 12 5.3 4.5

Full Time Full Time Full Time Full Time Full Time Full Time Full Time

-

15600-39100 15600-39100 9300-34800 37400-67000 37400-67000 15600-39100 15600-39100

2

Full Time

-

15600-39100

Assist. Prof. Assist. Prof. Assist. Prof.

26 29

M.Tech. (Comp. Sci.) M.Tech. (Comp. Sci.) M.Tech. (Comp. Sci.)

2.1 2

17/1/2012 1/6/2012

Full Time Full Time

-

15600-39100 15600-39100

4

1/6/2012

Full Time

-

15600-39100

Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Lecturer Lecturer Professor Professor

28 24 24 25 27 23 66 79

M.Tech. (Comp. Sci.) M.Tech. (Comp. Sci.) M.Tech. (Comp. Sci.) M.Tech. (Comp. Sci.) B.Tech. (Comp. Sci.) B.Tech. (Comp. Sci.) M.Tech. (Mechanical), Ph.D M.Tech. (Mechanical), Ph.D

3 2 0.2 2 2 1 42

4/3/2013 21/8/2012 4/3/2013 1/3/2011 9/8/2011 1/6/2012 9/11/2011

Full Time Full Time Full Time Full Time Full Time Full Time Full Time Full Time

-

15600-39100 15600-39100 15600-39100 15600-39100 9300-34800 9300-34800 37400-67000 37400-67000

31 100

Assist. Prof.

26

M.Tech. Mechanical

5

14/2/2012

Full Time

-

15600-39100

6

Assist. Prof. Assist. Prof. Assist. Prof. Lecturer Lecturer Lecturer Lecturer Lecturer

24 26

2 3 13 0.2 2 1 1 0.2

3/12/2012 4/3/2013

22 27 26 23 24

M.E. Mechanical M.Tech. Mechanical B.Tech. Mechanical B.Tech. Mechanical B.Tech. Mechanical, MBA B.Tech. Mechanical B.Tech. Mechanical B.Tech. Mechanical

4/3/2013 26/8/2011 5/9/2011 9/9/2011 16/8/2012

Full Time Full Time Full Time Full Time Full Time Full Time Full Time Full Time

-

Lecturer

23

B.Tech. Mechanical

0.2

16/8/2012

Full Time

-

15600-39100 15600-39100 15600-39100 9300-34800 9300-34800 9300-34800 9300-34800 9300-34800 9300-34800

Professor Assist. Prof. Lecturer

66 29 21

Ph.D. (Civil) M.Tech. (Civil), Ph.D. B.Tech. (Civil)

1/3/2012 0.2

9/8/2012

Full Time Full Time Full Time

-

37400-67000 15600-39100 9300-34800

Lecturer

24

B.Tech. (Civil)

0.3

24/2/2012

Full Time

-

9300-34800

Lecturer

23

B.Tech. (Civil)

0.2

22/8/2012

Full Time

-

9300-34800

25

31

4/3/2013 4/3/2013 6/2/2012 1/12/2011 14/1/2012

22 3 4

1 2

20

Electrical Engg.

Fire Safety Management

Law

Pharmacy

Mr. Yoginder Singh Mr. Vikas Sheoran Mr. Nitish Kumar Ms. Rajbala Banwala

Lecturer Lecturer Lecturer Assist. Prof.

22 21 21 24

0.2 0.2 0.2 2

4/9/2012 21/8/2012 4/3/2013 30/4/2012

Full Time Full Time Full Time Full Time

-

9300-34800 9300-34800 9300-34800 15600-39100

9

12/9/2011

Full Time

-

37400-67000

1 2.3 0.2 0.2 0.2

1/8/2011 11/1/2012 21/8/2012 21/8/2012 4/3/2013

Full Time Full Time Full Time Full Time Full Time Full Time Full Time

-

15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 9300-34800

15

1/8/2011

Full Time

-

15600-39100

1

1/9/2011

Full Time

-

15600-39100

0.8

18/10/10

Full Time

-

15600-39100

1

5/9/2011

Full Time

-

15600-39100

46 73 35 27 27 26 30

B.Tech. (Civil) B.Tech. (Civil) B.Tech. (Civil) M.Sc. (Geology) M.Sc. (Physics), B.Ed., M.Phil., M.Tech. (Engg. Edu.) M.Tech. (Electrical), Ph.D. M.Tech. (Electrical) M.Tech. (Electrical) M.Tech. (Electrical) M.Tech. (Electrical) M.E. (Power System) B.Tech. (Electrical) Station Officer Course, Ex Station Fire Officer Diploma in Fire Engg. & Safety Mgt. Diploma in Fire Service Engg. BA, Advance Diploma in Fire & Security Mgt. LLM, Ph.D. LLM, Ph.D. LLM, Ph.D. LLM LLM LLM LLM

Mr. S. S. Chandel

Asso. Prof.

36

Dr. M S Naruka Mr. Ankit Tayal Mr. Vinay Kumar Mr. Abdul Azeem Mr. Yogesh Kumar Mr. Varun Kumar Mr. Deepak Negi

Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Lecturer

34 26 25 25 26 22

Mr. Beni Singh Sagar

Assist. Prof.

67

Mr. Satish Kumar

Assist. Prof.

30

Mr. Ashish Gupta

Assist. Prof.

23

Mr. Surender Kumar

Assist. Prof.

26

Dr. Shoeb Khan Dr. R K Garg Dr. Akhilesh Kumar Ms. Sukhraj Kaur Ms. Bimla Devi Ms. Reetu Sharma Ms. Reetu Ms. Meenakshi Parmar Dr. K. K Parashar

Principal Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof.

13 3 3 1 1 1 3

12/5/11 26/4/11 16/12/2011 21/5/2012 21/5/2012 10/10/2012 11/6/2012

Full Time Full Time Full Time Full Time Full Time Full Time Full Time

-

37400-67000 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100

Assist. Prof.

27

LLM

0.2

4/3/2013

Full Time

-

15600-39100

Professor

71

B.A.M.S, MD (Ayurveda) Ph.D. (Pharmacy), M.Pharmacy Ph.D. (Pharmacy), M.Pharmacy M. Pharmacy, Ph.D. B.A.M.S BHMS, M.Sc. Anatomy M. Pharmacy, PDCR, MBA M. Pharmacy

33

13/12/2010

Full Time

-

37400-67000

Dr. V Jain

Asso. Prof.

Full Time

-

37400-67000

15

Dr. Bharat Parashar

Asso. Prof.

29

Dr. Shalini Sharma Dr. Sarika Sharma Dr. K K Singh Mr. Hitesh Kumar Ms. Sonia Arora

Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof.

26 35 25 26

11

2

4

13

5

2/5/2011

Full Time

-

37400-67000

45

2.9 7.3

5/10/2009 1/9/2009 10/12/2012 23/8/2010 12/7/2011

Full Time Full Time Full Time Full Time Full Time

-

15600-39100 15600-39100 15600-39100 15600-39100 15600-39100

10

2 1

20

Physiotherapy Yoga Hotel Management

Mr. Pankaj Sharma Mrs. Isha Sharma Ms. Ritu Sharma Ms. Nisha Gupta Ms. Amrita Kainth Mr. Atul Kabra Ms. Ruchika Garg Mr. Subhash Chander Mr. Virender Yadav Mr. Somdutt Sharma Mr. Rajeev Kumar Mr. Surender Bhardwaj Mr. Ankur Verma Dr. Ghanshyam Soni Ms. Roshna Rani Mr. Ravi Prakash Mr. Pankaj Sharma

Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof. Lecturer Lecturer Lecturer Lecturer

29 28 26 26 24 24 24

M. Pharmacy M. Pharmacy M. Pharmacy M. Pharmacy M. Pharmacy M. Pharmacy M. Pharmacy B. Pharmacy B. Pharmacy B. Pharmacy B. Pharmacy

Assist. Prof.

26

Assist. Prof. Assist. Prof. Assist. Prof. Assist. Prof.

28 39 29 29

Assist. Prof.

27

28/1/2013

Full Time Full Time Full Time Full Time Full Time Full Time Full Time Full Time Full Time Full Time Full Time

-

15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100 15600-39100

0.7 0.7 1 0.2 0.2

10/1/2012 10/1/2012 28/3/2012 3/9/2012 14/9/2012

BPT

0.4

18/4/2012

Full Time

-

15600-39100

BPT PhD Yoga B.A, B.Ed. In Yoga M.Sc. (HM), MBA (HRM) M.Sc. Hotel Mgt. & Catering Technology

1.4 1 1.8 5

10/10/2010 2/8/2010 13/10/2009 28/9/2012

Full Time Full Time Full Time Full Time

-

15600-39100 15600-39100 15600-39100 15600-39100

1.7

15/6/2010

Full Time

-

15600-39100

3 4 1

1

Appendix XIV Detail of Laboratory Equipments S. No Name of the Lab 1

2

Basic Electronics

Digital

Name of the Item

Description (Make & Model)

Location (Deptt.)

Value (Rs)

CRO characteristics of a p-n junction diode characteristics of zener diode and use it as a voltage regulator.

Metro Q Creative Lab Creative Lab

ECE ECE ECE

15200/2450/2200/-

Present Condition working working working

Date of Purchase

characteristics of zener diode zener diode as a voltage regulator characteristics of common base configuration of an p-n-p transistor. characteristics of common emitter configuration of an NPN transistor. PNP/NPN transistor characteristics of common drain configuration of a MOSFET.

Creative Lab Creative Lab Creative Lab

ECE ECE ECE

2800/3200/2400/-

working working working

15-02-12 15-02-12 07-04-11

Creative Lab

ECE

2200/-

working

27-04-11

Creative Lab Creative Lab

ECE ECE

3200/2750/-

working working

15-02-12 27-04-11 & 15-02-12

characteristics curve UJT. voltage gain of single stage voltage series feedback amplifier.

Creative Lab Creative Lab

ECE ECE

3650/2750/-

working working

07-04-11 & 15-02-12 27-04-11

operational amplifier as Inverting amplifier Non-inverting amplifier comparator operational amplifier as a. Integrator b. differentiator operational amplifier as a. Adder b. Precision amplifier operational amplifier as inverter/ non inverter adder/ subtractor Digital Lab trainer UJT Logic gate Module Logic gate Universal Gate DMux/Mux Module Flip flop Module Shift register Mod N Counter Add/ Sub module D/A Converter Multivibrator monostable Clipper and clamper Power Supply

Creative Lab

ECE

3000/-

working

27-04-11

Creative Lab

ECE

3200/-

working

7/4/2011 & 15-02-12

Creative Lab

ECE

2750/-

working

27-04-11

Creative Lab

ECE

4200/-

working

15-02-12

Scientech Scientech Scientech Creative Lab Scientech Scientech Scientech Scientech Scientech Scientech Scientech Scientech Scientech Scientech

ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE

10780/3600/805/2800/920/1150/1035/865/1725/1725/1610/1670/3160/1380/-

working working working working working working working working working working working working working working

26-10-10 & 18-1-2012 26-10-10 26-10-10 & 18-1-2012 15-02-12 26-10-10 & 18-1-2012 26-10-10 26-10-10 & 18-1-2012 26-10-10 & 18-1-2012 26-10-10 & 18-1-2012 26-10-10 & 18-1-2012 26-10-10 & 18-1-2012 26-10-10 & 18-1-2012 26-10-10 26-10-10 & 18-1-2012

7/4/2011 27-04-11 & 15-02-12 27-04-11

S. No

Name of the Lab

3

Analog

4

Measurement & Instrumentation

5

Communication Systems

Name of the Item

Description (Make & Model)

Function Generator CRO 20 MHz Analog lab Trainer RC Coupled Amp CE trans Amp Class c Amp module Feedback Amp Module RC Phase Shift Amp Hartley Oscillator Colpitt oscillator Power Supply Function Generator Digital Multimeter Phase Shift Oscillator diode clipper class B amplifier CRO 30 MHz RC Coupler Amp with feedback diode clamper RC-coupled double stage amplifier RC-coupled single stage amplifier LVDT Kit. LDR kit. R.T.D Kit. Strain Gauge Kit. * Piezo-Electric Pick up.

Caddo Scientech Scientech Scientech Scientech Scientech Scientech Scientech Scientech Scientech Caddo Caddo Scientech Scientech Scientech Scientech Scientech Scientech Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab

ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE

5200/17435/11550/1380/980/1210/1725/1150/1150/1150/1380/7140/1150/1100/1320/1200/14079/1700/1320/3200/2800/12150/2750/6200/12450/8200/-

Present Condition working working working working working working working working working working working working working working working working working working working working working working working working working working

Capacitive Pick up.

Creative Lab

ECE

10500/-

working

Inductive Pick up. speed of DC Motor using Magnetic Pick up. speed of DC Motor using Photo Electric Pick up. Thermocouple Power Supply CRO amplitude modulation using a transistor frequency modulation using voltage controlled oscillator,

Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Metro Q galaxy Creative Lab

ECE ECE ECE ECE ECE ECE ECE ECE

14000/12500/12500/6200/2000/15200/4200/4000/-

working working working working working working working working

15-02-12 26-10-10 26-10-10 & 18-1-2012 26-10-10 & 18-1-2012 26-10-10 & 18-1-2012 26-10-10 & 18-1-2012 26-10-10 26-10-10 26-10-10 & 18-1-2012 26-10-10 & 18-1-2012 26-10-10 26-10-10 & 18-1-2012 26-10-10 18-1-2012 18-1-2012 18-1-2012 18-1-2012 18-1-2012 18-1-2012 15-02-12 15-02-12 4/5/2011 & 13-12-11 4/5/2011 & 13-12-11 4/5/2011 & 13-12-11 4/5/2011 & 13-12-11 4/5/2011, 13-12-11 & 1502-12 4/5/2011, 13-12-11 & 1502-12 4/5/2011 & 13-12-11 4/5/2011 & 13-12-11 4/5/2011 & 13-12-11 4/5/2011 & 15-12-11 04-05-11 7/4/2011 7/4/2011 & 13-12-11 7/4/2011 & 13-12-11

DSB-SC signal using balanced modulator, single side band signal. Creative Lab

ECE

7950/-

working

7/4/2011 & 13-12-11

Study of super heterodyne AM receiver PCM and sampling theorem. radio reciever

ECE ECE ECE

15200/6000/6120/-

working working working

7/4/2011 & 13-12-11 7/4/2011 & 13-12-11 13-12-11

galaxy galaxy Creative Lab

Location (Deptt.)

Value (Rs)

Date of Purchase

S. No

6

7

8

9

Name of the Lab

Industrial Electronics

Name of the Item Function generator LCR Q meter Design of an AM modulator using diode/ BJT/ FET. Design of an FM modulator using diode/ BJT/ FET. AM Modulator/Demodulator FM Modulator/Demodulator Phase modulation/Pulse modulation characteristic of an SCR. Characteristics of DIAC. Characteristics of TRIAC speed of DC motor with the help of SCR. full wave rectifier using SCR for various firing angles.

thyristor SCR firing angle relation using a phase shift circuit and a picking transformer relaxation oscillator for values of C. Electronic Logic Circuit electronic circuit simulation tool kit full wave rectifier. Design full wave bridge rectifier. voltage regulator using zener diode. common emitter single stage amplifier. ring counter and twisted ring counter. mod -8 up and down counter. square wave generator using IC555 timer. biased diode clipper. operation verification of OR, AND, NAND, NOT, NOR & X-OR gates 8085 microprocessor kit Microprocessor & Interfacing on 8255 like LED display control Interfacing Device Interfacing of LCD with microprocessor Interfacing of microprocessor with stepper motor temp. control using 8085 & 8255 PPI water level control using 8085 DAC card Linear Integrated inverting and noninverting configuration of the Op-Amp 741. Circuit To verify the function of op-amp as a summer and as a difference amplifier. To perform the mathematical operation of integration using basic and practical Circuits of op-amp s.

Description (Make & Model)

Location (Deptt.)

Value (Rs)

Creative Lab Creative Lab Scientech Scientech Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab

ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE

2000/7250/4500/5200/4200/4000/7200/3600/2400/3800/10200/5600/-

Present Condition working working working working working working working working working working working working

Date of Purchase

Creative Lab Creative Lab

ECE ECE

3250/3450/-

working working

13-12-11 & 15-02-12 13-12-11

Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab

ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE

3420/6000/2750/2800/2500/2450/3600/3400/3200/1650/2450/-

working working working working working working working working working working working

27-04-11 & 13-12-11 27-04-11 07-04-11 & 13-12-11 27-04-11 & 13-12-11 27-04-11 & 13-12-11 07-04-11 & 13-12-11 27-04-11 & 13-12-11 27-04-11 & 13-12-11 07-04-11 & 13-12-11 07-04-11 & 13-12-11 13-12-11

Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab

ECE ECE ECE ECE ECE ECE ECE

4800/1300/1800/2400/2500/2500/2900/-

working working working working working working working

27-04-11 & 13-12-11 27-04-11 27-04-11 27-04-11 13-12-11 13-12-11 21-09-11 & 13-12-11

Creative Lab

ECE

3100/-

working

21-09-11 & 13-12-11

Creative Lab

ECE

2600/-

working

21-09-11 & 13-12-11

04-05-11 04-05-11 21-09-11 21-09-11 24-02-12 24-02-12 24-02-12 27-04-11 & 13-12-11 07-04-11 & 13-12-11 07-04-11 & 13-12-11 27-04-11 & 13-12-11 27-04-11 & 13-12-11

S. No

10

11 12

13 14

15

Name of the Lab

Name of the Item

To perform the mathematical operation of differentiation using Creative Lab basic and practical Circuits of op-amp s.

ECE

2700/-

Present Condition working

half/full wave rectifier using op-amp s. Creative Lab To design a second order butter worth low pass filter for cut of Creative Lab frequency of 2 KHz And determining its frequency response.

ECE ECE

2900/3250/-

working working

21-09-11 21-09-11 & 13-12-11

To study the frequency response of a high pass filter (second order). To study fourth order low pass filter and high pass filter.

Creative Lab

ECE

2900/-

working

21-09-11 & 13-12-11

Creative Lab

ECE

2800/-

working

21-09-11

Creative Lab

ECE

3200/-

working

21-09-11 & 13-12-11

Creative Lab

ECE

3400/-

working

21-09-11 & 13-12-11

Creative Lab

ECE

3250/-

working

21-09-11 & 13-12-11

Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab

ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE

5200/15200/8200/2500/2500/2500/2500/2200/1900/3000/2500/5200/150 200 7200/6500/32000/15000/18000/12000/18000/-

working working working working working working working working working working working working working working working working working working working working working

15-02-12 15-02-12 24-02-12 24-02-12 24-02-12 24-02-12 24-02-12 24-02-12 24-02-12 24-02-12 24-02-12 24-02-12 24-02-12 24-02-12 17-09-12 17-09-12 17-09-12 17-09-12 17-09-12 17-09-12 17-09-12

Creative Lab Creative Lab Creative Lab Metro Q

ECE ECE ECE ECE

2200/2400/3200/26000/-

working working working working

17-09-12 17-09-12 17-09-12 7/4/2011

To plot the frequency response of the band pass filter for a specified frequency range. To design a square wave and triangular wave generator using Op-amp s. To design wein bridge oscillator using Op-Amp for oscillating frequency 1 KHz Function Generator CRO Advanced Microprocessor 8086 8259- Interrupt controller Microprocessor 8279- Keyboard/Display 8251- USART Stepper Motor Traffic Light Control Numeric Printer interface A/D & D/A DMA Interface Microcontroller 8051 26 Pin FRC cable 50 pin fre cable Digital Communication FSK Modulation & Demodulation Delta Modulation & Demodulation TV Engineering Lab Black & White TV receiver (controls & effects) Control of different stage on PAL color TV receiver Black & White TV receiver (to study faults) To study faultson PAL color TV receiver Optical Fiber Comm. Optical Fiber Trainer kit Lab Embedded System Lab A/D Converter D/A Converter 7-Segment Display DSO Measurement &

Description (Make & Model)

Location (Deptt.)

Value (Rs)

Date of Purchase 21-09-11 & 13-12-11

S. No

Name of the Lab

Name of the Item

Frequency generator RLC bridge distortion factor meter logic pulser and logic probe universal counter/ frequency counter ELECTRONIC DEVICES RC coupled C-E amplifier and measure its voltage gain. & DIGITAL DESIGN LAB Design of a Wein bridge oscillator using BJT/FET/IC. Design an astable multivibrator using UJT. Design of a phase shift oscillator using BJT/ FET/ IC. Design of a first and second order filters as low pass blocks using IC741 Design of a first and second order filters as high pass blocks using IC741. Design of first and second order filters as band pass blocks using IC741. Design of first and second order filters as band elimination blocks using IC741. D/A converter Design a half adder and Full Adder using IC a 4-bit counter Design a 8:1 multiplexer using common gates. Function Generator CRO 30 MHz Electronic Devices and two stage RC coupled amplifier single stage RC coupled amplifier circuit design push pull amplifier hartley and colpitts oscillator wein bridge oscillator IC-555 as monostable multivibrator series and shunt clipping circuits IC741(op amp) as adder/subtractor integrator/ differentiator

Metro Q Metro Q Metro Q Creative Lab Metro Q Creative Lab

ECE ECE ECE ECE ECE ECE

5200/5200/6200/750/7000/3200/-

Present Condition working working working working working working

Creative Lab Creative Lab Creative Lab Creative Lab

ECE ECE ECE ECE

2950/3200/2950/3200/-

working working working working

21-09-11 21-09-11 21-09-11 21-09-11

Creative Lab

ECE

2900/-

working

21-09-11

Creative Lab

ECE

3200/-

working

21-09-11

Creative Lab

ECE

3500/-

working

21-09-11

Creative Lab Creative Lab Creative Lab Creative Lab Scientech Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab

ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE ECE

3200/4200/4200/3850/5200/14079/3200/2800/3800/2800/2900/3500/4000/4500/-

working working working working working working working working working working working working working working

21-09-11 21-09-11 21-09-11 21-09-11 15-02-11 18-1-2012 15-02-12 15-02-12 15-02-12 15-02-12 15-02-12 15-02-12 15-02-12 15-02-12

18

Structural Analysis lab Clarks Maxwell Theoram Apparatus Flexural Rigidity 3 hinged Arch 2 hinged Arch

Creative Labs Creative Labs Creative Labs Creative Labs

Civil Civil Civil Civil

24500 22000 23500 21500

Working Working Working Working

10/11/2011 10/11/2011 10/11/2011 10/11/2011

19

Transportation Engineering Lab

Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs

Civil Civil Civil Civil Civil

82000 95000 9500 2100 9500

Working Working Working Working Working

24/02/12 24/02/2012 24/02/2012 24/02/12 24/02/12

Measuring Instrumentation

16

17

Abrasion test on Ayuregates CBR lab rest on Soil Determination of bitumen content Flankiness and elongation index of aggregates Instrument for viscosity test of bitumen

Description (Make & Model)

Location (Deptt.)

Value (Rs)

Date of Purchase 7/4/2011 27-04-11 27-04-11 27-04-11 27-04-11 21-09-11

S. No

20

21

Name of the Lab

Concrete Technology lab

Soil and Foundation Engg. Lab

Name of the Item

Description (Make & Model)

Location (Deptt.)

Value (Rs)

Marshell's stability test Specific gravity and water absorption Trays Specific gravity of bitumen Proportioning of aggregates

Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs

Civil Civil Civil Civil Civil

74000 1500 500 1800 8800

Present Condition Working Working Working Working Working

Date of Purchase

Blerne's air permeability method Compressive strength of Cement Compressive strength of Cement by: i) Cube test ii) Cyclinder Test Compaction factor test Concrete cube Mould Cement testing cube with base plate Container tray Indirect tensile strength of concrete modulus of ruputure of concrete by flexure test Measuremet of specific gravity of cement(Piyrometer)

Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs

Civil Civil

9500 62000

Working Working

19/10/2011 19/10/2011

Civil Civil Civil Civil Civil Civil Civil Civil Civil

1550 5200 18500 2200 2200 2200 105000 6000 600

Working Working Working Working Working Working Working Working Working

19/10/2011 19/10/2011 19/10/2011 24/02/2012 24/02/2012 24/02/2012 12/5/2011 12/5/2011 19/10/2011

sand Replacement

Creative Labs

Civil

2800

Working

Setting time of cement(Intial and final)

Creative Labs

Civil

8700

Working

19/10/2011 & 24/02/2012 19/10/2011&24/02/2012

Sieve set(fineness of cemet by sieve analysis) Sieve Shaker Stop Watch Digital Type Sieve set(fineness of cemet by sieve analysis)

Creative Labs Creative Labs Creative Labs Creative Labs

Civil Civil Civil Civil

6200 6500 900 5100

Working Working Working Working

Sieve Shaker Specific Gravity test apparatus Trays Consistency of cement Vicat's apparatus Vicat's apparatus Workability of cement by slump test

Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs

Civil Civil Civil Civil Civil Civil

2500 590 700 3250 5200 2800

Working Working Working Working Working Working

Weighing Machine(Digital) Fineness modulus of coarse and fine aggregate

Creative Labs Creative Labs

Civil Civil

6200 8500

Working Working

19/10/2011 & 24/02/2012 24/02/2012 24/022012 24/02/2012 19/10/2011 24/02/2012 19/10/2011 & 24/02/2012 24/02/2012 19/10/2011

Core Cutter Method Determation of specific gravity of soil solids Direct shear test Desicator

Creative Labs Creative Labs Creative Labs Creative Labs

Civil Civil Civil Civil

6200 1500 95000 5500

Working Working Working Working

19-10-11 19-10-11 24-02-12 24-02-12

24/02/2012 24/02/12 24/02/12 24/02/12 24/02/12

24/02/2012 19/10/2011

S. No

22

Name of the Lab

Name of the Item

Description (Make & Model)

Location (Deptt.)

Value (Rs)

Present Condition Working Working Working Working Working Working Working Working Working Working Working Working Working Working Working Working Working Working Working Working Working Working Working

Date of Purchase

Coefficient of permeability Grain size analysis glass rod Liquid limit Mixing tray Measuring cylinder Metal Container to collect soil Plastic limit Proctor compaction Pychometer Pallet knife Proctor Compaction Rapid moisture meter Sand Replacement Shrinkage Limit sand Pouring Cyclinder Steel Hammer Steel Dolly Stright Edge Steel rule Unconfined Compressive Strength Test Sieves Tongs Visual soil classification & water content determation

Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs

Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil

28000 6500 500 5200 900 1950 58 7400 4500 800 500 9200 4500 4200 5200 14300 3250 3200 8200 80000 26800 105 6500

24-02-12 19-10-11 24-02-12 19-10-11 24-02-12 24-02-12 24-02-12 19-10-11 &24-02-12 24-02-12 24-02-12 24-02-12 19-10-11 24-02-12 19-10-11 24-02-12 24-02-12 24-02-12 24-02-12 24-012 19-10-11 24-02-12 24-02-12 19-10-11

wash Bottles

Creative Labs

Civil

550

Working

21-02-12

Cross Staff cylon tracer Optical square Theodalite complete set Transit vernier theodalite * 2 Tacheometer Tilting level Tangent clinometer Drawing Board Plane table set Dumpy level Digital theodalite Dumpy level with stand * 2 Abhev level Arrows Auto level Measuring chain

Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs

Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil

12250 21500 5250 39000 36000 8400 15600 7200 1700 7500 22000 234000 44000 700 1900 45000 360

Working Working Working Working Working Working Working Working Working Working Working Working Working Working Working Working Working

12-05-11 & 24-02-12 24-07-12 & 24-02-12 12-05-11 & 24-02-12 12/5/2011 24-02-12 & 24-07-12 24-07-12 24-07-12 & 24-02-12 24-07-12 & 24-02-12 12/5/2011 24-02-12 & 24-07-12 24-07-12 24-07-12 12-05-11 & 24-02-12 12/5/2011 24-07-12 & 12-05-11 24-07-12 12/5/2011

Survey LAB

S. No

23

24

Name of the Lab

Basic Electrical Engineering Lab

Electric Work Shop

Name of the Item

Description (Make & Model)

Location (Deptt.)

Value (Rs)

Meter gunter chain Metric chain 20 m * 2 Metric chain 30 m Metallic tape Level machine Levelling staff Prismatic compass Surveyor's compass Sprit level Ranging rod Metallic tape Invor tape Plinko meter Line ranger Five ranger KVL & KCL Kit Types of meter Panel Types of Transformers Thevenin theorem Kit Norton Theorem Kit Thevenin theorem Kit Norton Theorem Kit G to A and G to V Converter Multimeters (3) Single phase Transformer load test panel DC shunt generator load test Panel Single phase Transformer open circuit and short circuit panel

Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Labs Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Anand Electronics Anand Electronics Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab

Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Civil Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg.

2750 2900 3700 500 20000 12500 9750 9000 2250 5000 500 2500 2500 2200 6400 2400 24000 7200 2400 2400 5500 6380 2000 1350 22000 20000 27000

Present Condition Working Working Working Working Working Working Working Working Working Working Working Working Working Working Working Running Running Running Running Running Running Running Running Running Running Running Running

a) Measurement of power by 3 voltmeter/3ammeter methods

Creative Lab

Electrical Engg.

38000

Running

4-May-2011

b) 3 phase/2watt meter Single phase R-L & R-C series Panel Single phase R.L.C. circuit Panel R.L.C.Parallel Panel To test a Lead Acid battery Hand cramping tool 10mm Analog Multimeter (2) Digital Multimeter (2) Meggar 500V Digital/Analog (2) Energy meter single phase,220 V,10 Amp , 50Hz. Energy meter Three phase,440 V,10 Amp , 50Hz. Phase Sequence Indicator Techometer Contact type.0---10000 rpm

Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab

Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg.

25500 25500 32500 7200

Running Running Running Running Running Running Running Running Running Running Running Running

4-May-2011 4-May-2011 12-May-2011 27-Apr-2011 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012

900 2700 1900 19000 25500 700 1900

Date of Purchase 12/5/2011 24-02-12 & 24-07-12 24-02-12 & 24-07-12 24-07-12 12/5/2011 24-07-12 & 24-02-12 29-02-12 & 24-07-12 24-02-12 & 24-07-12 24-07-12 & 24-02-12 24-02-12 & 24-07-12 24-02-12 24-02-12 24-02-12 29-02-12 24-07-12 27-Apr-2011 27-Apr-2011 27-Apr-2011 27-Apr-2011 27-Apr-2011 19-Oct-2010 19-Oct-2010 27-Apr-2011 27-Apr-2011 4-May-2011 4-May-2011 4-May-2011

S. No

Name of the Lab

Name of the Item D.O.L. Starter Mannual Operated Star-Delta Starter (For 3-5 HP) Automatic Star-Delta Starter (For 3-5 HP) Earth Tester Kit. (Digital) Contractor 10A,230V (3N/O,2N/C) Contractor 10A,415V (4N/O,3N/C) MCB-6A (6) MCB-16A (3) ELCB-40A Bench Drilling Machine 3/4", Adjustable Plateform Portable Drilling Machine with Stand 1/2" Auto Transformer 0-270V,12A Pully Puller Bearing Puller Elan-Key Set Small Hacksaw Frame 6" (2) Hacksaw Frame 14" (2) Soldering Iron 35W (2) Soldering Iron 65W (3) Soldering Iron 125W (2) Centre Punch (2) Blow Lamp (2) Twizer (4) Wire Striper (2) Screw Driver Set- 10" (2) Screw Driver Set- 12" (2) Combination Plier 8" (6) Nose Plier 6" (4) Nut Driver Set 6" and 8" (3) Line Tester 500V (4) Cable Cutter Wooden Saw 12" ------- (3) Deep Hole Saw (2) Key Hole Saw (2) Hammer 200 gm. (3) Ball Pin Hammer (3) Wooden Chisel ( Mortail) 4,6Soot (3) Wooden Chisel (Firmer) 3/4",1" (2) Raship File Half Round 10" (4) Flate File ,(Smooth) 10" (2) Flate File ,(Rough) 10" (2) Round File,(Rough) 10" (2) Half Round File,(Smooth) 10" (2)

Description (Make & Model) Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab

Location (Deptt.) Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg.

Value (Rs) 950 2500 3400 4200 10500 21500 630 555 700 7500 17000 3500 335 260 290 80 240 160 360 300 64 1100 72 120 210 300 1620 1480 1260 260 450 315 180 90 315 330 720 380 600 560 560 500 500

Present Condition Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running

Date of Purchase 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012

S. No

25

26

Name of the Lab

Electric machine Lab

Electrical Instrument Lab

Name of the Item

Description (Make & Model)

Location (Deptt.)

Value (Rs)

Half Round File,(Rough) 10" (2) Square file,(Smooth) 10" (2) Square file,(Rough) 10" (2) Triangular File(Smooth) 8" (2) Triangular File(Rough) 8" (2) Standerd Wire gauge(British) Spanner Set Try Square 6" Bench Vice 3" (3) Bench Vice 5" (3) Screw Driver Set Single Phase Induction Panel Single Phase Induction motor Three phase slip ring induction panel Three phase slip ring induction Motor Squirrel cage induction Panel Squirrel cage induction motor Alternator characteristics V Curve Synchronous panel Synchronous motor Xd and Xq Synchronous machine slip test Three phase induction panel Three phase induction motor Induction motor panel induction motor Single-phase transformer polarity test Single-phase transformer open and short circuit test

Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab

Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg.

580 500 640 300 300 105 320 70 2940 5250 250 18500 4500 25500 5200 29000 6200 55000 35500 8200 55500 29000 5200 55000 19500 40000

Present Condition Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running Running

Date of Purchase

Transformer. Sumpner Test Single phase- transformer parallel operation Three phase transformer Scott connection Load test DC shunt generator (panel) DC shunt generator Hopkinsons Test on DC machine DC shunt panel DC shunt motor DC shunt motor panel DC shunt motor DC series motor Characteristics DC series motor load test To convert D' arsonval galvanometer in to voltmeter (2)

Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab

Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg.

33000 23000 28000 25000 22000 22500 22000 8500 23500 5500 23500 11500 5600

Running Running Running Running Running Running Running Running Running Running Running Running Running

16-Jan-2012 16-Jan-2012 16-Jan-2012 16-Jan-2012 16-Jan-2012 16-Jan-2012 22-Jan-2012 22-Jan-2012 22-Jan-2012 22-Jan-2012 22-Jan-2012 22-Jan-2012 17-Sep-2012

To convert D' arsonval galvanometer in to Ammeter (2)

Creative Lab

Electrical Engg.

5600

Running

17-Sep-2012

15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 15-Feb-2012 17-Jan-2012 17-Jan-2012 17-Jan-2012 17-Jan-2012 17-Jan-2012 17-Jan-2012 17-Jan-2012 17-Jan-2012 17-Jan-2012 17-Jan-2012 22-Jan-2012 22-Jan-2012 22-Jan-2012 16-Jan-2012 16-Jan-2012

S. No

27

Name of the Lab

Applied Physics lab

Name of the Item De saute's bridge (2) Wien's bridge (2) C.T and P.T. Panel Kelvin's Double Bridge (2) B.H. Curve Apparatus

Creative Lab Creative Lab Creative Lab Creative Lab NVIS & NV6108

Electrical Engg. Electrical Engg. Electrical Engg. Electrical Engg. Applied Sciences

16400 19000 35000 18400 31900

Present Condition Running Running Running Running Working

BJT Amplifier

NVIS & NV6542

Applied Sciences

5980

Working

2/8/2011

Balance

Applied Sciences

1150

Working

7/4/2011

Charging and Discharging of Capacitor

Applied Sciences

9500

Working

12/5/2011

Conversion of Galvanometer into ammeter

Applied Sciences

2400

Working

7/4/2011

Applied Sciences

3480

Working

11/7/2011

Applied Sciences

850

Working

7/4/2011

Foster Bridge with four gap

Description (Make & Model)

ME876

Cantilever

Location (Deptt.)

Value (Rs)

Date of Purchase 17-Sep-2012 17-Sep-2012 17-Sep-2012 17-Sep-2012 19/10/2010

Newton's Ring apparatus

NVIS & NV6104

Applied Sciences

14300

Working

19/10/2010

Sonometer

ME867

Applied Sciences

2088

Working

11/7/2011

Determine dispersive power of the material

ME868

Applied Sciences

7656

Working

11/7/2011

Polarimeter

ME854

Applied Sciences

7308

Working

11/7/2011

Diode Characteristics

NVIS & NV6501

Applied Sciences

5520

Working

2/8/2011

Energy Band gap

NVIS & NV6106

Applied Sciences

6820

Working

19/10/2010

e/m by Thomson method

NVIS & NV6103

Applied Sciences

13200

Working

19/10/2010

e/m by Helical method

ME581

Applied Sciences

10390

Working

11/7/2011

FET Characteristics

NVIS & NV6512

Applied Sciences

6820

Working

19/10/2010

Applied Sciences

450

Working

7/4/2011

Applied Sciences

15525

Working

2/8/2011

Applied Sciences

1100

Working

7/4/2011

Stop watch Fresnel Biprism set up Gravesands apparatus

NVIS & NV6028

S. No

Name of the Lab

Name of the Item

Description (Make & Model)

Hall Effect

NVIS & NV6101

Applied Sciences

66000

Present Condition Working

Hartley and Colpitt oscillator

NVIS & NV6505

Applied Sciences

4600

Working

2/8/2011

Lissajous Figure

NVIS &NV6543

Applied Sciences

7150

Working

19/10/2010

Logic Gates

NVIS & NV6551

Applied Sciences

5175

Working

2/8/2011

Lissajous Pattern

NVIS & NV6543

Applied Sciences

7475

Working

2/8/2011

Magnetic Lab

NVIS & NV6004

Applied Sciences

6900

Working

2/8/2011

Electrical lab

NVIs & NV6000

Applied Sciences

8625

Working

2/8/2011

Malus Law

NVIS & NV6023

Applied Sciences

9775

Working

2/8/2011

Moment of Inertia

NVIS 7 NV6026

Applied Sciences

9775

Working

2/8/2011

Susceptibility of Paramagnetic solution

NVIS & NV6102

Applied Sciences

54000

Working

2/8/2011

Applied Sciences

850

Working

7/4/2011

Ohm's Law

Location (Deptt.)

Value (Rs)

Date of Purchase 2/8/2011

Planck Constant

NVIS & NV6025

Applied Sciences

8800

Working

19/10/2010

Photocell Characteristics

NVIS & Nv6006D

Applied Sciences

7700

Working

19/10/2011

Applied Sciences

9500

Working

12/5/2011

Applied Sciences

5280

Working

19/10/2010

Applied Sciences

1800

Working

7/4/2011

Photovoltaic cell &Inverse square Law Diode Characteristics

NVIS & NV6501

Resistance in Series and parallel combination Resolving Power of Telescope

NVIS & NV6028

Applied Sciences

16675

Working

2/8/2011

Ray Optics

NVIS &NV6045

Applied Sciences

6440

Working

2/8/2011

Resolving Power of telescope

NV & NV6042

Applied Sciences

16675

Working

2/8/2011

Rectifier Trainer

NVIS & NV6503

Applied Sciences

2530

Working

2/8/2011

SCR Characteristics

NVIS & NV6530

Applied Sciences

6380

Working

19/10/2010

S. No

Name of the Lab

Name of the Item Stable and monostable multivibrator Trainer

Description (Make & Model) Nvis & NV6507

Moment of Inertia of flywheel Spectrometer Setup

NVIS & NV656

Searle's apparatus

Value (Rs)

Applied Sciences

5175

Present Condition Working

Date of Purchase

Applied Sciences

1392

Working

11/7/2011

Applied Sciences

15812

Working

2/8/2011

Applied Sciences

950

Working

7/4/2011

2/8/2011

Young's Modulus

NVIS & NV6040

Applied Sciences

5720

Working

19/10/2010

Transistor Characteristics

NVIS & NV6502

Applied Sciences

5980

Working

2/8/2011

Travelling microscope

Applied Sciences

5100

Working

7/4/2011

Refractive index of the Prism By Spectrometer

Applied Sciences

7656

Working

11/7/2011

Applied Sciences

23316

Working

11/7/2011

Turning Fork

Applied Sciences

1810

Working

11/7/2011

Thermocouple by mean of Potentometer

Applied Sciences

4872

Working

11/7/2011

He-Ne Laser

28

Location (Deptt.)

ME861H

Universal Gates

NVIS & NV6552

Applied Sciences

5175

Working

2/8/2011

Van de Graff gaterator

NVIS &NV6020

Applied Sciences

5850

Working

2/8/2011

Zener diode

NVIS & NV6508

Applied Sciences

4025

Working

2/8/2011

Wein Bridge Oscillator

NVIS& NV6506

Applied Sciences

4830

Working

2/8/2011

India Made

Applied Sciences

7500

Working

28.05.11 & 12.01.12

Digital Balance (1)

India Made

Applied Sciences

5500

Working

10.05.11

Muffle Furnace (1)

India Made

Applied Sciences

5000

Working

28.05.11

Hot Air Oven (1)

Vijay Scientific Works

Applied Sciences

4500

Working

11.11.11

Redwood Viscometer (3)

India Made

Applied Sciences

6000

Working

28.05.11 & 12.01.12

pH-Meter (1)

India Made

Applied Sciences

2500

Working

11.11.11

Applied Chemistry Lab Able's Flash Point Apparatus (3)

S. No 29

Name of the Lab Workshop

Name of the Item

Description (Make & Model)

File flat

Creative Lab

File half round

Creative Lab

File smooth

Creative Lab

File full round

Creative Lab

Plyer pye

Creative Lab

Nose plyer

Creative Lab

Hexa frame

Creative Lab

Screw driver

Creative Lab

Wire cutter

Creative Lab

Wire stripper

Creative Lab

Bench vice 4"

Creative Lab

Inch tape

Creative Lab

Try square 8"

Creative Lab

Key set(8pc set)

Creative Lab

Spanner set

Creative Lab

Lathe m/c belt set

Creative Lab

Radial drill m/c

Creative Lab

Pedestal grinder

Creative Lab

Wood working lathe

Creative Lab

Universal milling m/c

Creative Lab

Lever hexa

Creative Lab

Location (Deptt.) Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop

Value (Rs)

Present Condition OK

24/04/2011

1248

OK

24/04/2011

962

OK

24/04/2011

2132

OK

24/04/2011

845

OK

24/04/2011

520

OK

24/04/2011

520

OK

24/04/2011

481

OK

24/04/2011

260

OK

24/04/2011

500

OK

24/04/2011

11115

OK

24/04/2011

377

OK

24/04/2011

624

OK

24/04/2011

213.2

OK

24/04/2011

1064.7

OK

24/04/2011

105000

OK

24/04/2011

65000

OK

24/04/2011

15000

OK

24/04/2011

74000

OK

24/04/2011

155000

OK

24/04/2011

48000

OK

24/04/2011

1060.8

Date of Purchase

S. No

30

Name of the Lab

SOM lab

Name of the Item

Description (Make & Model)

Type drill m/c

Creative Lab

Power hexa blade

Creative Lab

Pillar type drill m/c

Creative Lab

Drill chuck

Creative Lab

Wheel green

Creative Lab

Wheel black

Creative Lab

L-Key set

Creative Lab

Toll kit

Creative Lab

Vernier calliper

Creative Lab

Scale

Creative Lab

Brinell Hardness Machine

Creative Lab

Brinell Hardness Machine

Creative Lab

Rockwell Hardness Testing Machine

Creative Lab

Rockwell Tester

Creative Lab

Vickers Hardness Testing Machine

Creative Lab

Erichsen Sheet Metal Testing Machine

Creative Lab

Impact Testing Machine

Creative Lab

Impact Testing Machine

Creative Lab

Universal Testing Machine

Creative Lab

Universal Testing Machine(Digital)

Creative Lab

Torsion Testing Machine

Creative Lab

Location (Deptt.) Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Workshop Mechanical Engg. Deptt. Mechanical Engg. Deptt. Mechanical Engg. Deptt. Mechanical Engg. Deptt. Mechanical Engg. Deptt. Mechanical Engg. Deptt. Mechanical Engg. Deptt. Mechanical Engg. Deptt. Mechanical Engg. Deptt. Mechanical Engg. Deptt. Mechanical Engg. Deptt.

Value (Rs) 22000

Present Condition OK

Date of Purchase

48000

OK

3/5/2011

32000

OK

3/5/2011

1937

OK

3/5/2011

377

OK

3/5/2011

273

OK

3/5/2011

182

OK

3/5/2011

715

OK

3/5/2011

351

OK

3/5/2011

32.5

OK

3/5/2011

36875

Working

9/27/2010

40000

Working

6/7/2011

36875

Working

9/27/2010

40000

Working

9/27/2010

243750

Working

6/7/2011

68000

Working

9/27/2010

56250

Working

6/7/2011

55000

Working

9/27/2010

275000

Working

6/7/2011

360000

Working

6/7/2011

60000

Working

6/7/2011

24/04/2011

S. No

31

Name of the Lab

DOM lab

Name of the Item Torsion Testing Machine

Creative Lab

Static and Dynamics Balancing Apparatus

Creative Lab

Motorized Gyroscope

Creative Lab

Universal Governor Apparatus

Creative Lab

CAM Analysis Apparatus

Creative Lab

Whirling of shaft Demostrator

Creative Lab

Journal Bearing Apparatus

Creative Lab

Epicyclic gear Train Apparatus 32

33

Heat Power Engg. Lab

KOM Lab

Description (Make & Model)

Creative Lab

Water Cooling Tower Apparatus

Creative Lab

Thermal Condcutivity of Powder

Creative Lab

Heat Transfer IN-Natural Convection

do

Emissivity Measuring Apparatus

do

Pin-fin Forced Convection

do

Thermal Condcutivity of Hot Plate method

do

Thermal Conductivity of Metal rod

do

Parallel and Counter flow Heat Exchanger

do

Separating and Thrtolling Calorimeter

do

Stefan's and Boltzmasn Apparatus

do

Helical Gear Compound Gear Train Sample Gear Receiver Gear Compound Gear Bevel Gear(MS) Bevel Gear(Bronze)

Creative Lab do do do do do do

Location (Deptt.) Mechanical Engg. Deptt. Mechanical Engg. Deptt. Mechanical Engg. Deptt. Mechanical Engg. Deptt. Mechanical Engg. Deptt. Mechanical Engg. Deptt. Mechanical Engg. Deptt. Mechanical Engg. Deptt. Mechanical Engg. Deptt. Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mech Deptt. Mech Deptt. Mech Deptt. Mech Deptt. Mech Deptt. Mech Deptt. Mech Deptt.

Value (Rs) 90000

Present Condition Working

6/7/2011

36,000

Working

12/6/2012

40,000

Working

do

42,000

Working

do

52,000

Working

24/07/12

42,000

Working

12/6/2012

72,000

Working

24/07/12

62,000

Working

82,000

Working

31,500

Working

27/09/11

34,500

Working

do

42,000

Working

do

34,500

Working

do

35,500

Working

do

33,500

Working

do

38,000

Working

do

Working

do

Working

do

Working Working Working Working Working Working Working

27/09/11 do do do do do do

32,000

5,000

13,500

Date of Purchase

24/07/12

S. No

34

35

Name of the Lab

Name of the Item

Single Slide Mechanism Pair Chain Combination of Kinematic pair Screw Jack Various types of Gear Train, Simple, reverted, compound and epicyclic Ref. and Air Cond. Lab Ice Plant Test Rig

Description (Make & Model) do do do do do

Mech Deptt. Mech Deptt. Mech Deptt. Mech Deptt. Mech Deptt.

95,00 2,500 13,500 5500 17,500

Present Condition Working Working Working Working Working

Creative Lab

Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering

95,000

Working

17/09/12

95,000

Working

do

82,000

Working

do

82,000

Working

do

42,000

Working

do

15,000

Working

do

4800

Working

7/6/2011

4800

Working

7/6/2011

1500

Working

27/04/11

4800

Working

27/04/11

4800

Working

7/6/2011

4800

Working

7/6/2011

4800

Working

27/04/11

9500

Working

27/04/11

2200

Working

27/04/11

2200

Working

27/04/11

2200

Working

27/04/11

2200

Working

27/04/11

AC Test Rig

do

Water Cooler Test Rig

do

Refigeration Test Rig

do

Pressure Gauge Tester

do

Compnent of Refrigeration Cycle

do

Basic Mechanical engg. Babcock-Wilcox Boiler Model Lab Lancashire Boiler Model

Creative Lab do

Pressure Gauge

do

Locomotive Boiler

do

Vertical Water Tube Boiler

do

Benson Boiler Model

do

Cochran Boiler

do

Single Stage air Compressor

do

2-S petrol Engine

do

2-S Diesel Engine

do

4-S petrol Engine

do

4-S Diesel Engine

do

Location (Deptt.)

Value (Rs)

Date of Purchase do do do do do

S. No

Name of the Lab

36

Fluid Machines Lab

37

I.C. Engines Lab

38

Fluid Machanics Lab

39

Automobile Engg. Lab

Name of the Item

Description (Make & Model)

Screw Jack

do

Winch Crab Apparatus

do

Double Slide Winch Crab

do

Worm & Worm wheel (Single)

do

Worm & Worm wheel (Double)

do

Worm & Worm wheel (Triple)

do

Pelton Turbine Frances Turbine Kaplan Turbine Certifugal Pump Preciprocating Pump Air Compression Hydraulic Ram 2 Stroke Petrol Engine 4 Stroke Diesel Engine Indicated Power Frictional Power of Multicylinder 4 Stroke Petrol Engine 4 Stoke Diesel Engine Venturimeter Bernolis Theorm Loss due to friction in pipe Notch tank apparatus Reynolds apparatus Jet apparatus Metacentric Hieght Losses in pipe line Force vertex Pivot Tube Battery Ignition System

Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab Creative Lab

Carburetor

do

Ac Pump

do

Su Pump

do

Location (Deptt.) Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Mechanical Mechanical Mechanical Mechanical Mechanical Mechanical Mechanical Mechanical Mechanical Mechanical Mechanical Mechanical Mechanical Mechanical Mechanical Mechanical Mechanical Mechanical Mechanical Mechanical Mechanical Mechanical Mechanical Engineering Mechanical Engineering Mechanical Engineering Mechanical Engineering

Value (Rs) 3500

Present Condition Working

Date of Purchase 27/04/11

3500

Working

27/04/11

7200

Working

4/5/2011

3500

Working

4/5/2011

5500

Working

4/5/2011

7200

Working

4/5/2011

135000 225,000 325,000 58,000 69,000 52,000 75,000 65000 170,000 170,000 230,000 130,000 72,000 32000 32000 32000 32000 27000 27000 18500 29500 31000 33000 7200

Ok Ok Ok Ok Ok Ok Ok Not Ok Not Ok Not Ok Not Ok Not Ok Not Ok ok ok ok ok ok ok ok ok ok ok Working

11/10/2011 Do Do Do Do Do Do 9/27/2011 Do Do Do 11/10/2011 Do 5/4/2011 Do Do Do Do Do Do Do Do 5/12/2011 2/24/2012

3200

Working

do

4200

Working

do

4500

Working

do

S. No

Name of the Lab

Name of the Item Fuel Injection Pump Master Cylinder

40

Material Science Lab.

Study Crystal Structure Study Crystal Imperfections Microstructures of Metals/Alloys Microstructures ofHeat Treated Steel Microstructures of Metal/Alloys Microstructures of Heat Treated Furnace Solidification Curve Heat Treatment Process Thermosetting Of Plastic Heat Treatment Furnace Polishing Machine Single Disk Different Types Of Metal/Alloys

41

42

C & C++ Lab

Internet Lab

Computer System (25)

Description (Make & Model) do

Location (Deptt.)

Mechanical Engineering do Mechanical Engineering Creative Lab Mechanical Engineering do Mechanical Engineering do Mechanical Engineering do Mechanical Engineering do Mechanical Engineering do Mechanical Engineering do Mechanical Engineering do Mechanical Engineering do Mechanical Engineering do Mechanical Engineering do Mechanical Engineering do Mechanical Engineering Wipro Ltd. (0413), 160 GB Hard Computer Science Disk,1GB RAM, Pentium ® Dual- & Engineering Core Processor, 2.70GHz speed.

Value (Rs) 4500

Present Condition Working

do

3200

Working

do

12250

Working

9/27/2010

29375

Working

9/27/2010

26875

Working

9/27/2010

15625

Working

9/27/2010

5500

Working

10/1/2011

25500

Working

10/1/2011

19375

Working

9/27/2010

27500

Working

9/27/2010

36875

Working

9/27/2010

18500

Working

6/7/2011

22500

Working

6/7/2011

550

Working

6/7/2011

407,500

Working

8/2/2010

Working

24/08/2009

Working

3/3/2012

Printer (1)

H.P. Printer 1007

Computer Science 6200 & Engineering

Computer System (24)

Amp Solutions (Beetel), 160 GB Computer Science 159,600 Hard Disk, 2.00 GB RAM, AMD & Engineering Athlon ™ II×2, 260 Processor, 3.20GHz speed.

Date of Purchase

S. No

43

Name of the Lab

Advanced Application Lab

Name of the Item

Language Lab

Location (Deptt.)

Value (Rs)

Present Condition Working

Date of Purchase

Computer System (1)

Wipro Ltd. (0413), 160 GB Hard Computer Science 16,300 Disk,1GB RAM, Pentium ® Dual- & Engineering Core Processor, 2.70GHz speed.

Emersion UPS (3)

6 KVA Online UPS with DSP technologies.

Computer System (2)

Wipro Ltd. (0413), 160 GB Hard Computer Science 32,600 Disk,1GB RAM, Pentium ® Dual- & Engineering Core Processor, 2.70GHz speed.

Working

8/2/2010

H.P. Multiseat Server (1)

Computer Science 40,000 & Engineering

Working

4/4/2011

Computer Science 40,000 & Engineering

Working

5/4/2011

Thin Clients (21)

500 GB Hard Disk, 6 GB RAM, Core 2 Quad Processor, 2.83 GHz speed 500 GB Hard Disk, 6 GB RAM, Core 2 Quad Processor, 2.83 GHz speed H.P. Thin Client T100

Computer Science 70,350 & Engineering

Working

4/4/2011

T.F.T's (23)

H.P. 15.6 inch

Computer Science 121,900 & Engineering

Working

4/4/2011

Computer System (4)

Wipro Ltd. (0413), 160 GB Hard Computer Science 65,200 Disk,1GB RAM, Pentium ® Dual- & Engineering Core Processor, 2.70GHz speed.

Working

8/2/2010

H.P. Multiseat Server (1)

Computer Science 40,000 & Engineering

Working

4/4/2011

Computer Science 40,000 & Engineering

Working

5/4/2011

Thin Clients (19)

500 GB Hard Disk, 6 GB RAM, Core 2 Quad Processor, 2.83 GHz speed 500 GB Hard Disk, 6 GB RAM, Core 2 Quad Processor, 2.83 GHz speed H.P. Thin Client T100

Computer Science 63,650 & Engineering

Working

4/4/2011

T.F.T's (21)

H.P. 15.6 inches

Computer Science 111,300 & Engineering

Working

4/4/2011

H.P. Multiseat Server (1)

44

Description (Make & Model)

H.P. Multiseat Server (1)

Computer Science 158653.86 & Engineering

Not Working

8/2/2010

13/07/2010

S. No

Name of the Lab

Name of the Item

Description (Make & Model)

Location (Deptt.)

Value (Rs)

Present Condition Working

Date of Purchase 3/3/2012

45

Database Lab

Computer System (25)

Amp Solutions (Beetel), 160 GB Computer Science 166,250 Hard Disk, 2.00 GB RAM, AMD & Engineering Athlon ™ II×2, 260 Processor, 3.20GHz speed.

46

Hardware Lab

Printer (1)

H.P. Printer 1007

Computer Science 6200 & Engineering

Working

24/8/2009

Printer (1)

H.P. DJK-2099

Computer Science 7300 & Engineering

Working

2/12/2011

Hard Disk (2)

160 GB

Computer Science …. & Engineering

Working

….

Desktop (7)

14 Inches, 15 Inches

Computer Science …. & Engineering

Working

….

C.P.U. (3)

Dual-Core Processor

Computer Science …. & Engineering

Working

….

CD-ROM (4)

….

Computer Science …. & Engineering

Working

….

Beetal K-Roy & Company, Varanasi

Law Chemistry Deptt.

153615/950

Working Working

3/3/2012 10.05.11

Abbe,s Refractrometer (1)

India Made

Chemistry Deptt.

6000

Working

11.11.11

Colorimeter (2)

India Made

Chemistry Deptt.

300

Working

11.11.11

Digital Balance (1)

India Made

Chemistry Deptt.

5500

Working

11.11.11

Hot Air Oven (1)

India Made

Chemistry Deptt.

4500

Working

12.01.12

pH-Meter (1)

India Made

Chemistry Deptt.

2500

Working

11.11.11

Potentiometer (1)

India Made

Chemistry Deptt.

3500

Working

11.11.11

Centrifugal Machine (1)

India Made

Chemistry Deptt.

2100

Working

12.01.12

Digital Balance (1)

India Made

Chemistry Deptt.

5500

Working

29.02.12

47 48

49

Law Computer Lab Computers Physical Chemistry Lab Analytical Balance (2)

Inorganic Chemistry Lab

S. No

50

51

52

Name of the Lab

Name of the Item Disttilation Unit (5 lt.) (1)

India Made

Chemistry Deptt.

11000

Present Condition Working

Kipps Apparatus (2)

India Made

Chemistry Deptt.

600

Working

12.01.12

Magnetic Stirrer (1)

India Made

Chemistry Deptt.

1100

Working

10.05.11

Melting Point Apparatus (1)

India Made

Chemistry Deptt.

1700

Working

23.12.10

Heating Mental (1)

India Made

Chemistry Deptt.

650

Working

10.05.11

Hot Air Oven (1)

India Made

Chemistry Deptt.

4500

Working

29.02.12

India Made

Chemistry Deptt.

5500

Working

29.02.12

Magnetic Stirrer (1)

India Made

Chemistry Deptt.

1100

Working

10.05.11

Melting Point Apparatus (1)

India Made

Chemistry Deptt.

1700

Working

12.01.12

Heating Mental (1)

India Made

Chemistry Deptt.

650

Working

10.05.11

Vacuum Pump (1)

Value (VE115N)

Chemistry Deptt.

5500

Working

28.05.11

Hot Air Oven (1)

India Made

Chemistry Deptt.

4500

Working

29.02.12

United Manufacturing

Fire & Safety Management Fire & Safety Management Microbiology

21,98,589.

Running

15-12-2011

28890

Running

24-2-2012

1800

In function

22.12.2009

Microbiology Microbiology Microbiology Microbiology Microbiology Microbiology Microbiology Microbiology Microbiology Microbiology Microbiology Microbiology Microbiology

3200 8900 13400 7890 24,00.00 13250 19700 800 3200 8840 6800 4800 5000

-

20.03.2010 20.03.2010 17.05.2010 17.05.2010 23.05.2010 23.05.2010 23.05.2010 07.07.2010 7.07.2010 15.10.2010 15.10.2010 21.03.2011 21.03.2011

Organic Chemistry Lab Digital Balance (1)

Fire Water Tender Fire Fighting Equipments & Fittings Fire Extinguishers Microbiology Lab

Description (Make & Model)

Him Fire& Safety Engineers

Analytical balance Microscope(Simple) Microscope(Binoculars) Water bath Incubator Centrifuge(simple) Microtome Digital Flame photo meter Hot plate Ph meter Colorimeter Colony counter Electrical weighing machine Inoculation wood

Praga-100 S Praga-100BC

Sampsons-C125 Spectronics-203 SI-139 Simtronics Sampson-CC130 Digtons-D56

Location (Deptt.)

Value (Rs)

Date of Purchase 29.02.12

S. No

53

Name of the Lab

Pharmacology

Name of the Item Laminar air flow Autoclave Auto-analyzer Tissue homogenizer Hot air oven Dessicator jar VDRL shaker Digital centrfiguge Electrophoresis unit Magnetic stirrer Bottle washer Plethysmograph

Description (Make & Model) LF156 EEC-S Plus

Sheros-234

Suri Scientific work

Location (Deptt.) Microbiology Microbiology Microbiology Microbiology Microbiology Microbiology Microbiology Microbiology Microbiology Microbiology Microbiology Pharmacy

Value (Rs)

Present Condition

Date of Purchase

35000 24,00.00 80900 6000 9700 550 6000 13050 9500 1725 11000 650

1 Not Working

26.08.2011 26.08.2011 20.09.2011 20.09.2011 20.09.2011 13.10.2011 13.10.2011 13.02.2012 14.02.2012 14.02.2012 14.02.2012 7/5/2011

6000

1 Working 6 Working 4 Not Working

26/04/2011 5/12/2011

Digital Tele Thermometer Sherrington Recording Drum

INCO

Student organ Bath (Single Unit)

Kaplas Scientific Work

Student organ Bath (Double Unit) Hot Plate Electro-Convulsiometer Actophotometer Spirometer Digital pH Meter Analgesiometer (Eddy’s Hot Plate & Tail Flick) Rectangular Water Bath Digital Rota rod Apparatus Hot Air Ovan Student Stimulator Cook’s Climbing pole Apparatus Tissue Homogenizer Weighing Balance(for Animals) Weighing balance(Physical Balance) Sphygmomanometer Stethoscope Haemometer Histamine Chamber Micro Centrifuge Aerator

Kaplas Scientific Work Kaplas Scientific Work INCO

16000 1700 15900

Kaplas Scientific Work Puri Kaplas Scientific Work

4500 2800 4200

Kaplas Scientific Work

5000

Kaplas Scientific Work Kaplas Scientific Work

6150 3800

Kaplas Scientific Work Kaplas Scientific Work Kaplas Scientific Work Kaplas Scientific Work Kaplas Scientific Work Suri Scientific Work Kaplas Scientific Work

600 1200 450 3500 4800 1500

Incenerator

Kaplas Scientific Work

107467

10Working 1 Not Working 5 Working 2 Working 1 Working 1 Working 1 Working 1 Working 1 Working 1 Working 1 Working 1 Working 1 Working 1 Working 1 Working 2 Working 1 Working 5 Working 5 Working 41Working 1 Working 1 Working 9 Working 1 Not Working 1 Working

14/05/2010 5/12/2011 22/04/2011 14/05/2010 7/5/2011 7/5/2010

5/12/2011 30/12/2011 14/05/2012 10/3/2010 14/05/2010 14/05/2010 14/05/2010 5/12/2011 7/5/2011 28/05/2011

4/10/2011

S. No 54

Name of the Lab HAP

Name of the Item Model

Description (Make & Model) Kaplas Scientific Work

Location (Deptt.) PHARMACY

Value (Rs) 2500

Present Condition Working

Date of Purchase 10/3/2010

Appendix – XVII

Composition of the Statutory Bodies of the University

Appendix - XIX Details of Non-Teaching Staff Sr. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49

Name of the Member Dr. Rakesh Kumar Dr. Ashok Babu Verma Mr. J B Sharma Dr. S K Singh Mr. Rajender K Dhiman Dr. Sarika Mrs. Saroj Bala Dr. Sandeep Kumar Mr. Ashish Kumar Mr. Ankur Verma Ms. Babita Dr. Amit Singla Mr. Vijay Kumar Mr. Rajender Rana Mr. Arvind Mr. Hemant Kumar Ms. Rajni Ms. Reena Ms. Alka Arora Ms. Shaifali Ms. Mamta Thakur Ms. Monika Mr. Hem Raj Mr. Ankit Kharb Mrs. Varuni Joshi Mr. Roop Chand Mr. Karamveer Mr. Duni Chand Mr. Sheesh Pal Mr. Naresh Kumar Mr. Sanjeev Kumar Mr. Ram Lal Mr. Chaman Kumar Mr. Prakash Chand Mr. Manu Kumar Ms. Sangeeta Kumari Mr. Shamsher Singh Mr. Ankush Thakur Mr. Naveen Singh Mr. Arun Kumar Mr. Sanjeev Kumar Mr. Ajay Kumar Mr. Pankaj Kumar Mrs. Nidhi Sharma Mr. Kuldeep Dhiman Mr. Chanchal Kapoor Mr. Heem Chand Mr. Chaman Lal Mr. Hem Raj

Designation Registrar Controller of Exam. OSD Deputy Registrar Account Officer Superintendent Librarian Assistant Superintendent Assistant Accounts Assistant Accounts Assistant Accounts Programmer cum Network Engineer Supervisiors Supervisiors Supervisiors Clerk cum Typist Clerk cum Typist Clerk Clerk Clerk cum Typist Clerk Clerk cum Typist Clerk Clerk Clerk Storekeeper Electrician Electrician Driver Driver Driver Driver Carpenter Carpenter Carpenter Lab Attendant (CSE) Lab Attendant (Electrical) Lab Attendant (Electrical) Lab Attendant (Mechanical) Lab Attendant (Mechanical) Lab Attendant (Civil) Lab Attendant (Civil) Lab Attendant (ECE) Lab Attendant (ECE) Lab Attendant (ECE) Lab Attendant (ECE) Instructor (Workshop) Instructor (Workshop) Instructor (Workshop)

Group A A A

A A A A B B B B B B B B C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C

Sr. No. 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86

Name of the Member Mr. Virender Kumar Mr. Anil Kumar Mr. Rohit Kumar Mr. Manoj Kumar Mr. Vinay Kumar Mr. Vikram Rana Mr. Dinesh Thakur Mr. B R Sharma Mrs. Deva Sharma Mrs. Madhu Sakhlani Mrs. Suman Dogra Ms. Sunil Kumari Ms. Ashu Machh Mr. Ganesh Dutt Mr. Rajat Mr. Satpal Singh Mr. Het Ram Mr. Dinesh Kumar Mr. Kanshi Ram Mr. Anil Kumar Mr. Balbir Singh Mr. Ashwani Kumar Mr. Kundan Lal Mr. Ramesh Kumar Mr. Gopal Ms. Lazza Devi Mrs. Krishna Mrs. Jayawanti Ms. Sunita Ms. Manju Ms. Dayawanti Ms. Anju Bala Mrs. Aruna Ms. Suman Mrs. Kamlesh Mr. Sita Ram Mr. Dhanvir

Designation Instructor (Workshop) Lab Attendant (Chemistry) Lab Attendant (Pharmacy) Lab Attendant (Pharmacy) Lab Attendant (Pharmacy) Lab Attendant (Pharmacy) Lab Attendant (CSA) Library - Clerk Library - Clerk Library - Clerk Library - Clerk Library - Clerk Receptionist Xerox Operator Peon Peon Peon Peon Peon Peon Peon Security Security Security Security Sweeper Sweeper Sweeper Sweeper Sweeper Sweeper Sweeper Sweeper Sweeper Cook Gardener Gardener

Group C C C C C C C C C C C C C C D D D D D D D D D D D D D D D D D D D D D D D