KRG - Duhok Governorate - Domiz Camp

2 downloads 184 Views 6MB Size Report
Dec 1, 2013 - Shower Cabin (596). Culvert (3). Identified Problems. Broken Pipe (15). Missing Pipe (1). Standing Water (
KRG - Duhok Governorate - Domiz Camp

For humanitarian relief purposes only Production date: 18/12/2013 Draft / work in progress

Greywater Infrastructure and Network - 01/12/2013

TURKEY

IRAN

Duhok

SYRIA

Erbil

The canal opens into a large pond of standing water. IRAQ

Transits 1 & 2 have no structured drainage network and tent greywater drains into small hand-dug pits.

Legend

Greywater Network

Open Drain Covered Channel Pipe, 2.5in

Pipe, other

Greywater Points

Shower Cabin (596) Culvert (3)

Identified Problems Broken Pipe (15) Missing Pipe (1)

Standing Water (297)

Most of showers in Phase 1 drain into the same tanks as toilets, causing them to fill up very quickly.

Phases 1 through 5 have concrete structures with kitchen, showers and toilets inside. It is assumed that each shelter has its own set of facilities and individual showers and kitchens are not marked on this map.

Transits 3, 4& 7 have standalone shower cabins that are often misused or damaged. They all drain with pipes connected to roadside greywater canals.

Thematic data: 04-10/2013, REACH, Camp Agencies Background imagery: 13/08/2013, DigitalGlobe Administrative boundaries: GADM Projection: WGS 1984 UTM Zone 38N Contact : [email protected] File: IRQ_DOMIZ_WASH-Greywater_A1_2DEC2013 Note: Data, designations and boundaries contained on this map are not warranted to be error-free and do not imply acceptance by the REACH partners, associates or donors mentioned on this map.

The canal opens into a large pond of standing water.

0

50

100

Meters

200

300