P17 C Changes to performance based specification for bituminous ...
Recommend Documents
Oct 5, 2012 - KEYWORDS: steel slag, dolomite sand waste, asphalt mixture, permanent deformation, fatigue. Introduction ... Bitumen BND 60/90 and polymer modified bitumen (PMB). 50/70-53, which was ..... The main disadvantages.
Oct 5, 2012 - KEYWORDS: steel slag, dolomite sand waste, asphalt mixture, permanent deformation, fatigue. Introduction ... Bitumen BND 60/90 and polymer modified bitumen (PMB). 50/70-53, which was ..... The main disadvantages.
The pavement design cross section will comply if using the procedures in the AUSTRAODS ... this means of assessment is still early in its development. Data still ...
DESIGN AND CONSTRUCTION OF FLEXIBLE UNBOUND PAVEMENTS ... site ( www.transit.govt.nz/technical_information/specifications.html ) to obtain the ... email: [email protected] .... Therefore, it is the Contractors best interest to.
Mixtures With Dolomite Sand Waste and BOF Steel Slag,â Journal of Testing and Evaluation, Vol. ... ABSTRACT: The rapid
Results 188 - 984 - 3.6 Test methods for performance specifications .............................................. 3-23 .... 1.1.1 Definitionsâ¯As documented on its website, NRMCA discusses [In 1.1] a performance ...... would be $50CDN/m3. 2.8.2.5 N
ECMA-334. 4th Edition / June 2006. C# Language Specification. Ecma
International Rue du Rhône 114 CH-1204 Geneva T/F: +41 22 849 6000/01 ...
SECTION 1: COLLABORATIVE PRODUCT DEVELOPMENT APPLICATIONS ... In this domain, multiple researches are conducted using web-based architecture.
In this paper, we present a theory for the evaluation of test cases with respect to formal specifications. In particu- lar, we use the specification language ...
Ezio Santagata*, Orazio Baglieri, Lucia Tsantilis, Giuseppe Chiappinelli, Davide ..... Planellas M, Sacristán M, Rey L, Olmo C, Aymamà J, Casas MT, del Valle LJ, ...
1Museum of Pharmacy a Branch of the Museum of Warsaw. 2. Polish Academy of Sciences Museum of the Earth in Warsaw. Profe
Here, 1,2,3,4,5,6,7 and 8 are the numbers of the electrons of the oxygen atom, while P1 ... 5 â continue of experiment
Under the Americans with Disabilities Act (ADA) each of these 541 agencies is required to facilitate the movement of wheelchair riders and blind people.
Aug 22, 2001 - Among others, class members can be of type FLOAT (e.g., for timing ...... In: D. Pritchard, Jeff Reeve (Eds.): Euro-Par'98 Parallel Processing ...
Dec 17, 1999 - Michael Gerndt, Hans-Georg EÃer ..... [7] A. Lucas: Basiswerkzeuge zur automatischen Auswertung von Apprentice-Leistungsdaten,. Diploma Thesis, RWTH Aachen, Internal Report Forschungszentrums Jülich Jül-3652, 1999.
Thanks to my committee members: John Knight, Jim French, and Jim Aylor, for their insights ...... HEY90. Heydon, A. Miro: Visual Specification of Security et al.
This document is a reference manual for ACSL, an acronym for “ANSI C ... we
assume that the reader has a good knowledge of the ANSI C programming.
Stencil generation. P17 7 ... Only allow authorised staff access to the stencil
generation area. ... Skin problems in the printing industry Leaflet IACL101(rev1).
18 Apr 2013 ... Sosiologi SMAfMA lPS. ' štšfiai' riiiliiislltm'. Nama 3 Ati; Ardian* livi-. NoPeserta:
32 » 0"- “4 -7 l. Sebagai orang Jawa, Budi dididik oleh ibu dan ...
of advanced wireless networks far surpasses today's mobile extensions of PC and Internet ... referred to as the 3rdGeneration Wireless Technologies. (3G).
Obras de Carreteras y Puentes (General and Technical. Specifications for Road and Bridge Construction) [16]. Because of this new situation, certain mixes that ...
position of the Department of Defense or the U. S. Government. ...... Software engineering as a whole has made very few
programming were supposed to bring software development to a level capable of ... is to develop a knowledge representati
steering by software will put patient's life in peril if they try in vain to satisfy ... an overdose, or unnecessary dose, monitoring the diabetic in vain is ended to.
P17 C Changes to performance based specification for bituminous ...
with the principles of the text book Chipsealing in New Zealand. Rephrased ...
Section 4.4 Traffic Stress 3rd Bullet point – Changed to match last bullet point of.
NZTA P17 Changes: October 2012
CHANGES TO PERFORMANCE BASED SPECIFICATION FOR RESEALS Changes to P17 Specification: October 2012 1. 2. 3. 4. 5. 6. 7.
Changed “Consultant” to “Engineer” in clauses 4.7 and 4.8 Changed “maintenance period” to “defects liability period” in clauses 4.8, 7.1, 7.4, 10.1 and 10.2. Added “cycleways” to clause 7.3 Added words “during the defects liability period” to clause 10.1, 3rd paragraph. Corrected equation (6) on page 14. Changed 0.1 to 0.2 Italicised “Td” in clause 11.1, equation 8 to differentiate it from other instances of “Td”. Corrected a reference in clause 11.1 to clause 9.2.1.
Changes to P17 Specification: December 2011 8. 9.
10.
11. 12. 13.
14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24.
Updated references to TNZ specifications to NZTA specifications. Section 1 Scope – Added requirement that the chipseal is designed in accordance with the principles of the text book Chipsealing in New Zealand. Rephrased the first sentence under the bullet points. Section 3 Quality Plan – Added requirement that the Contractor shall have available for inspection by the Engineer all documents detailed in the Quality Plan (this text has been moved from the last line of old Section 7). Section 4 Site Acceptance – Rephrased introductory paragraph. Section 4.1 Confirmation of Treatment – Rephrased and added words “and contract timing”. Section 4.2 Surface Hardness – Changed 5th bullet point to “agree to an alternative risk profile and associated performance criteria as detailed in clause 4.8 of this specification”, deleting reference to TNZ P/4 Specification. Made same change in section 4.3. Section 4.3 Surface Texture – Changed reference to Bituminous Sealing Manual to Chipsealing in New Zealand. Made same change in section 7.1. Section 4.4 Traffic Stress – Changed “may” to “must”. Section 4.4 Traffic Stress 3rd Bullet point – Changed to match last bullet point of sections 4.2 and 4.3 and to remove reference to TNZ P/4 Specification. New Section 4.5 Contract Timing Section 4.6 Payment Reduction – re-written to assist with implementation of changes in sections 4.2, 4.3 and 4.4. New Section 4.8 Alternative Risk Profile Section 6 Traffic Control – Changed “included in” to “covered by”. Added “continuous centreline length”. Section 7 – New Section Headings 7.1, 7.2, 7.4 and 7.5. Section 7.1 Chip Coverage – re-written so the words “the whole sealed area shall have” appear on each bullet. Section 7.2 Defects – re-written to emphasise visual inspection. New Section 7.3 – Loose and Surplus Chip Previously this performance requirement was “After the speed restriction signs are removed the surface shall be regularly
SP/CP17: 2012 121002
CHANGES TO PERFORMANCE BASED SPECIFICATION FOR RESEALS
Page 1 of 2
NZTA P17 Changes: October 2012
25.
26. 27. 28. 29. 30.
31.
32. 33. 34. 35. 36.
37. 38.
39.
40. 41.
maintained during the maintenance period so that:” Now re-arranged so it is clear that this requirement must be met both before the speed restriction signs are removed (section 7.3) and throughout the maintenance period (section 7.4). Added new sentence at start of 7.3 regarding protection of drainage structures to prevent loose chip entering them. Section 7.3 – Loose and Surplus Chip – Added new paragraph emphasising removal of all surplus chips not only from the works, but also from any roadside structures and any other areas within the road reserve where chips have been tracked. New Section 7.4 – Maintenance of Surfacing New Section 7.5 – Same Day Sealing New Section 7.6 – Positive Traffic Control Section 8.2 Aggregate Properties – changed reference to Pavement and Bitumen Contractors’ Assocation to Roading New Zealand. Section 8.3 Bituminous Binder Properties – Added introductory sentence and reformatted Section 8.3 with bullets. Changed TNZ M/1 Specification to NZTA M1 Specification. Section 8.3 Bituminous Binder Properties, 2nd bullet point – Changed as AGO is no longer covered by NZTA M1 Specification for Roading Bitumens. Added sentence to allow for use of alternative fluxing materials, providing Contractor can demonstrate similar performance. Table 1 – Added reference to PSV test to BS EN 1097-8:2009. Changed all TNZ to NZTA. Section 9 and subsections – Changed TNZ to NZTA. Section 9.4 – changed “TD” to “Td” for consistency. Section 10 Maintenance – Added requirement for a monthly report throughout the maintenance period. Section 10.1 Repairs – Changed grade 4 to grade 6. Also changed wording so any repairs shall be performed using a chip with an ALD not exceeding 0.5 mm smaller than that of the original chip (previously “within 0.5 mm of the original chip”). Section 10.1 Repairs - Added words “The contractor shall design all repairs to ensure that the risk of a reduced seal design life is minimised”. Section 10.2 Contractors Response Time for Intervening – Added words to introductory paragraph explaining assessment of loose or lost chip (as defined in clause 7.3), loss of skid resistance (assessed visually, e.g. flushing) and added new first bullet point. “The Contractor shall: * Respond, within two hours of becoming aware of the need for intervention, with the installation of temporary warning signs”. Section 11.1 Single Coat Seals – Equation 6 updated in order to remove a reference to Tf which was the traffic factor from the Bituminous Sealing Manual. Changed TNZ to NZTA. Section 11.1 Single Coat Seals – Equation 8, Changed “TD” to “Td” for consistency. Schedule A – Added Columns for Expected Life and Reason for Sealing in both schedules. Corrected reference in Note 1.
SP/CP17: 2012 121002
CHANGES TO PERFORMANCE BASED SPECIFICATION FOR RESEALS