Feb 4, 2010 ... IEC60529 Edition 2.1 2001-02 ... additional letter (A(1),B(2),C(3),D(4,5,6)) ... 14.2.
1. Test for protection against water indicated by the second ...
Aug 16, 2016 - email you provided on your form. You can also mail your application and required documentation to the add
Chapter 14: Pressure Systems. Pressure Test Record Form. Product ID: 615 |
Revision ID: 1408 | Date Published: 24 July 2012 | Date Effective: 24 July 2012.
Dec 9, 2008 ... Preparation of Test Reports (guidance only);. UNI –10653 – November 1997.
Quality product technical documentation (guidance only) ;.
ECPE Sample Test Form A 1. 1. ... The examiner will have already provided you
a writing answer document on which to write ... This page intentionally left blank.
WORK No.: ITEM No.: LOCATION: SIGNATURE. Inspection Type :
PERFORMANCE TEST FOR HVAC. (TEST RUNNING RECORD FOR AIR
HANDLING. UNIT).
**If email address is provided, results are to be sent via email unless otherwise ... until payment has been received. 2
**If email address is provided, results are to be sent via email unless otherwise ... Code. **Sample submitter signs "Re
Apr 12, 2011 ... ISO 105 E04: 2008, ICP-MS. 0.5. 0.1. Antimony (Sb) mg/kg. ISO 105 E04: 2008,
ICP-MS. 1.1. 1.0. Cadmium (Cd) mg/kg. ISO 105 E04: 2008, ...
Mar 2, 2011 ... Yes. # 6 VOLVO. V70. M6. 1590. 764. Yes. 5. Control of test vehicles and
maintenance prior to ... No fault codes where recorded on any vehicle.
Feb 10, 2012 ... 138 Compliance Testing of. 2011 Volkswagen Jetta Four-Door Passenger Car,
NHTSA .... Scenario P – Malfunction Detection Test – TPMS Fuse Removal . .....
Identify Telltale Symbol Used (check box above figure). Note any ...
Dec 11, 2009 ... TEST REPORT. IEC/EN 62040-1. Uninterruptible power systems (UPS) –. Part 1:
General and safety requirements for UPS. Report Reference ...
Nov 21, 2011 - Test Method: With reference to EN 717-1:2004, analysis was performed by UV-Vis. Test Item(s) ... Notes: (
was tested and assessed against the requirements of BS EN 60529 : 1992 sub
clauses 13.1,. 13.2, 13.3, 13.4. 13.6, 14.1, 14.2, 14.2.8 and 14.3 from 14 August ...
Dec 3, 2004 ... ISO 9227, 1990. Corrosion tests in artificial atmospheres - Salt spray tests.
Neutral salt spray. ISO 10289, 2001. Method for corrosion testing of ...
Feb 4, 2015 - Page 1 of 14. (SVHC). LIAONING SHENMEI-LUNG MENG NEW ENVIRONMENTAL MATERIAL CO.,LTD . NANJIANG INDUSTRIAL
Nov 21, 2011 - Conclusion: When tested as specified, the specified material of the submitted sample comply with the stat
Test method: DD CEN/TS 15534-1:2007 Section 7.3 and ISO 178:2001Amd. 1:
2004 ... Section 8.1.1, EN ISO 4892-2:2006, EN ISO 4628-6:2007, ISO 7724-1,.
Feb 4, 2015 - RL=0.005% is evaluated for element (i.e. cobalt, arsenic, lead, chromium (VI), aluminum, zirconium, boron,
PLAB test place cancellation form. Please complete this form in clear writing,
using black ink. If you do not fully complete the form this may delay the
cancellation ...
Comments. (Feet). Equipment Used. Well. Special Test. Reason. Required Test.
Address. City. State. Zip Code. RESERVOIR PRESSURE TEST - FORM 9A.
Credit Report Dispute Form. Found inaccuracies in your report? If so, use this
form to contact the credit bureau (Experian, Equifax, or TransUnion) that supplied
...
of the holes in the drip irrigation tubes and the quality of the post- treated water. ..... ties of the various agencies are delineated in the Research Protocol (App. A).
Annex 4. Test Report. To be filled up by licensed Electrical Contractor. Book No.
... Name of the Wireman/ Trainee. Designation. From. To. (ii). The work was ...
Annex 4 Test Report To be filled up by licensed Electrical Contractor
Book No. _______________
Form No. __________________
To be filled up by the licensee This is being issued for providing electrical connection at the premises of Mr./ Mrs./ Ms. _________________________________ ______________. The address of the premises is __________________________ ______________________________________________. The name and address of the licensed electrical contractor is __________________________ __________________________________________________________________________. The date of issue of this report is __________________________.
To be filled up by the licensed electrical contractor 5
I hereby declare that – (a)
I have ________________________ class license valid till ______________ . The license number is _________________________________________.
(b)
I have completed this work for Mr./ Mrs./ Ms. _________________________ _____________________for his ____________________________________ ______________________________________________________________. Details of Job
Sl No
Item
220/ 230 Volts Red Phase No
1 2
Total Watts
440/ 400 Volts
Green Phase
Blue Phase
No
No
Total Watts
Total Watts
No
Total Watts
3 4 5 6 7
(c) (i) Sl No.
The particulars of the employees who executed the job are tabulated below.
Name of the Wireman/ Trainee
Designation
Period From
(ii)
(d)
To
The work was carried out under the supervision of _______________________________ (Supervisor Wireman) whose certificate number is __________________________________. He is responsible for work carried out during the period ____________________________________.
This installation specifications adhere to all the provisions of Indian Electricity Rules 1956.
6
I also declare/ certify the following: (a)
The installed switches are of correct ratings:
Yes/ No
(b)
All the switches and wiring are permanent and of correct specifications Yes/ No
(c)
All plugs are of three pin type and controlled by separate switches Yes/ No
(d)
All the Single Pole switches connected to the phase
Yes/ No
(e)
Required permanent mark is provided on the main switch board for Neutral point Yes/ No
7
(f)
Arrangement for earthing is according to Rule 61 of Indian Electricity Rules, 1956 Yes/ No
(g)
In case of three phase installation (i)
Danger board, fire extinguisher with buckets, shock chart and first aid kit have been provided for Yes/ No
(ii)
The installation specifications of the switch board is as per Rule 15 of Indian Electricity Rules, 1956 Yes/ No
Test results Date of testing_______________________ Insulation to Earth
Insulation between conductors
Phase 1 Phase 2 Phase 3
Earth Resistance
Date of testing
Electrode No 1
Electrode No 2
8 The date of registration according to form ‘L’ of Madhya Pradesh Licensing Board (Electricity) is as follows: Sl No. ____________________________ Date _____________________________ Signature of the Licensed Electrical Contractor
Certificate from Supervisor wireman
It is hereby certified that the aforesaid work has been undertaken by ____________________ ________________________________ who has a wireman permit number of ____________ __________________________ that is valid till ___________________________. It is also certified that testing of the installation has been undertaken by _________________ _________________________________ who has a permit number of __________________ __________________________ that is valid till ___________________________.
Signature of Supervisor, wireman
Signature of the wireman
Receipt The test report form number ____________________for the installation at the premises of ________________________________ prepared by ______________________________ has been received on _________________________________. Signature of Officer in Charge Name Designation Date