BLEKINGE INSTITUTE OF TECHNOLOGY
ISMA 5 – 5° IFPUG International Software Measurement & Analysis Conference Sao Paulo (Brazil), Sept. 13-15 2010
The Significance of IFPUG Base Functionality Types in Effort Estimation
An Empirical Study
Luigi Buglione, Buglione Ph.D. Proc. Improv. & Measur. Specialist Industry Business Unit Engineering.IT Cigdem Gencel, Gencel Ph.D. Assistant Professor Systems & Software Department Blekinge Institute of Technology (BTH) www.eng.it
Engineering
At a glance
_ The first Italian ICT player _ more than 730 M/€ revenues _ 1000 clients _ 6,300 IT specialists
Research and Development
PA & HC
Finance
Industry
TELCO
System Int. & Consultancy
%
46
70
54
80
Outsourcing
%
35
10
27
10
Software
%
19
20
19
10
Utilities
80
20
ERP
IT Security
ECM
Managed Operations
Plant Management System
Broadband & Media
www.eng.it
www.eng.it
BFC Types
Goals of the presentation
G1. Help project managers and estimators to obtain better estimates using the same historical data G2. Propose a list of filtering criteria helping in obtaining better homogeneous clusters for data analysis and process improvements G3. Identify and manage 'not visible' outliers in your own historical data G4. Go into a deeper detail when gathering more granular data in your historical database, that help in consolidating CMMI ML2 goals and achieving faster ML3 ones with better PALs (Process Asset Libraries) G5. Stimulate improvements in your organization supporting more and more experience by quantitative data
3
ISMA5 – Sao Paulo, Sept. 14, 2010 – © 2010 L.Buglione, C.Gencel
www.eng.it
BFC Types
•
Agenda
Introduction – A FSM History – Estimation Techniques – Top 10 Measurement problems – Estimation and SPI
•
Related works
•
Empirical Study – Data Collection – Data Preparation – Statistical Analysis & Results
•
Conclusions & Prospects
•
Q&A
4
ISMA5 – Sao Paulo, Sept. 14, 2010 – © 2010 L.Buglione, C.Gencel
www.eng.it
Introduction
A FSM History
Source: FSM webpage: http://www.semq.eu/leng/sizestfsm.htm 5
ISMA5 – Sao Paulo, Sept. 14, 2010 – © 2010 L.Buglione, C.Gencel
www.eng.it
Introduction
Estimation Techniques
Source: Briand L., Wieczorek I., Resource Estimation in Software Engineering, ISERN Technical Report 00-05, International Software Engineering Research Network, 2000, URL: http://isern.iese.de/moodle/ 6
ISMA5 – Sao Paulo, Sept. 14, 2010 – © 2010 L.Buglione, C.Gencel
www.eng.it
Introduction
Top-10 Problems in Measurement
1. Betting the Measurement Program on a Single Metric; 2. Trying to Find a Single Metric that Solves All Problems and Has No Evils 3. The Quest for an Industry Standard Set of Measures 4. Not Linking Measures to Behaviour; Failing to Realize that the Measures Are the System 5. Assuming that One Set of Measures Will Be Good for "All Time" 6. Measuring the Wrong IT Output 7. Measuring in Business Terms, but the Wrong Business Terms 8. Failure to Quantify in Business Terms; Failure to Plan for Benefits 9. Neglecting the Full Range of IT-Related Outcomes 10. Lack of Commitment; Treating Measurement As a Non-Value-Added Add-On Source: Rubin H.A., The Top 10 Mistakes in IT Measurement, IT Metrics Strategies, Vol.II, No.11, November 1996, URL: http://web.archive.org/web/20030119070257/www.cutter.com/benchmark/1996toc.htm 7
ISMA5 – Sao Paulo, Sept. 14, 2010 – © 2010 L.Buglione, C.Gencel
www.eng.it
Introduction
Estimation and SPI (CMMI-DEV, ML2)
MA – Measurement & Analysis
PP – Project Planning SG1
Establish Estimates Measurement Data
Planning Data
SG2
Develop a Project Plan An agreed-to set of requirements
REQM – Requirement Mgmt 8
Project Plans
SG3 Obtain
Committment to the Plan
PMC – Project Monitoring & Control
ISMA5 – Sao Paulo, Sept. 14, 2010 – © 2010 L.Buglione, C.Gencel
www.eng.it
Introduction
Estimation and SPI (CMMI-DEV, ML3) ion’s nizat s and a g r O eed ess n tives c o r p c obje
Senior Management Organization’s business objectives
OT Org.
Training for projects and support groups in std process and assets
Training
Tra i
Std processes and other assets
OPD Org.
OPF Org. Process Focus
Resources and Coordination
Process Definition
nin g
ne ed s
Std process, work environment std, and other assets
Improvement Information (e.g. lessons learned, data, artifacts)
Process Improvement proposals; participation in definining, assessing, and deploying processes
9
ISMA5 – Sao Paulo, Sept. 14, 2010 – © 2010 L.Buglione, C.Gencel
www.eng.it
Project Mgmt, Support & Engineering PAs
Introduction Create Org. Process Assets SP1.2
Establish lifecycle model description s
SP1.1
Establish Standard Processes
SP1.3
Establish Tailoring Criteria & GL
Estimation and SPI (CMMI-DEV, ML3 - OPD) Make Supporting Process Assets Available
SP1.4
Org. Standard Processes
Establish Org. Meas. Repository
Org. Measur. Repository SP1.5
Establish Org. PAL
SP1.6
Org. Library of Process Doc
Tailoring Guidelines
Establish Work Env. Std
10
Lifecycle models
ISMA5 – Sao Paulo, Sept. 14, 2010 – © 2010 L.Buglione, C.Gencel
www.eng.it
Related Works
Analysis on the use of single BFC types
Use more independent variables • when using FSM methods, e.g. use combinations of 2+ BFC types IFPUG BFC (EI, EO, EQ, ILF, EIF) COSMIC BFC (E, X, R, W)
• Results: increased R2 using the same dataset
NW _ Effort = B0 + B1 ( EI ) + B2 ( EO) + B3 ( EQ) + B4 ( ILF ) + B5 ( EIF ) Preconditions • Historicize project data at the proper level of granularity. E.g. FSU at the BFC type level (by frequencies and – eventually – weigthed values) Effort at the SLC phase and/or by ReqType and/or… Defects by severity/priority class and/or resolution time by phase, and/or…
• Skill people – not only estimators – a bit more on Statistics • Use something more than averages! Source: Gencel C. & Buglione L., Do Different Functionality Types Affect the Relationship between Software Functional Size and Effort?, Proceedings of IWSM/MENSURA 2007, Palma de Mallorca (Spain), November 5-8 2007, pp. 235-246 11
ISMA5 – Sao Paulo, Sept. 14, 2010 – © 2010 L.Buglione, C.Gencel
www.eng.it
Related Works
Analysis on the use of single BFC types
Study/Year
Obs
Source
FSMM
Filters
BuglioneGencel (2008)
34
ISBSG r10
COSMIC v2+
30
ISBSG r10
24
ISBSG r10
COSMIC v2+ COSMIC v2+
24
ISBSG r10
15
BajwaGencel (2009)
FerrucciGravinoBuglione (2010)
12
DQR/NewDev
R2 w/CFP 0.7639
R2 w/BFC 0.8919
Diff. % +16.7
DQR/Enh
0.7086
0.8755
+23.6
DQR/ApplType (2)
0.29
0.78
+64.1
DQR/ApplType (3) Web-based portals (all)
0.29
0.86
+66.3
Company’s data
COSMIC v2+ COSMIC v2.2
0.824
0.875
+5.82
8
Company’s data
COSMIC v2.2
0.910
0.966
+5.79
7
Company’s data
COSMIC v2.2
Web-based portals (subset 1) Web-based Inf. Utilities (subset 2)
0.792
0.831
+4.69
ISMA5 – Sao Paulo, Sept. 14, 2010 – © 2010 L.Buglione, C.Gencel
www.eng.it
Empirical Study
Data Collection (ISBSG r11, 2009)
FSMM
No. Projects
IFPUG
3.799
75%
FISMA
496
10%
COSMIC
345
7%
Others (LOC, Dreger, etc.)
221
4%
NESMA
155
3%
Mark-II
36
1%
Total
13
% of the projects
5.052
ISMA5 – Sao Paulo, Sept. 14, 2010 – © 2010 L.Buglione, C.Gencel
100%
www.eng.it
Empirical Study Entity Product Product Product Project
14
Data Collection (ISBSG r11, 2009)
Attribute Count Approach
Definition The description of the technique that was used to size the project (e.g. IFPUG, COSMIC, etc.) Functional Size The count of unadjusted FP. The unit is based on the measurement method that is used to measure the functional size. Application Type The type of the application (e.g. MIS). Normalized Work Effort The effort used during the full life cycle. For those projects that have covered less than a complete life cycle effort, this value is an estimate. For those projects covering the full life cycle and those projects whose development life cycle coverage is not known, this value and value of summary work effort is same.
Project
Development Type
Project
Business Area Type
This field tells that whether the development is new, enhanced or re-developed This identifies the subset within the organisation being addressed by the project. It may be different to the organisation type or the same. (e.g.: Manufacturing, Personnel, Finance).
Project
Programming Language Type
The primary language used for the development: JAVA, C++, PL/1, Natural, Cobol etc.
ISMA5 – Sao Paulo, Sept. 14, 2010 – © 2010 L.Buglione, C.Gencel
www.eng.it
Empirical Study Step
Data Preparation
Attribute
Filter
0
---
---
1
Count Approach
2
Projects Excluded
Remaining Projects
---
5052
= IFPUG
1,253
3,799
Data Quality Rating (DQR)
= {A | B}
3,799
3,614
3
Quality Rating for Unadjusted Function Points (UFP)
= {A | B}
3,614
2,879
4
BFC Types
= {Not Empty}
1,482
1,397
Four subsets derived: ID
# Dev projects Type
Application Type
Bus. Type
Prog.Lang.
1
37
NewDev
Fin trans. Process/accounting
Insurance
All
2
14
NewDev
Fin trans. Process/accounting
Insurance
COBOL
3
15
NewDev
Fin trans. Process/accounting
Insurance
Visual Basic
4
16
NewDev
Fin trans. Process/accounting
Banking
COBOL
15
ISMA5 – Sao Paulo, Sept. 14, 2010 – © 2010 L.Buglione, C.Gencel
www.eng.it
Empirical Study
Statistical Analysis & Results - UFP
A typical elaboration (subset #3) #3 only with UFP…
ANOVA Regression Residual
d.f. 1. 13.
Total
14. 331,156,354.40 Coeff. Std Err
Intercept Total (IFPUG FP)
T (2%) 16
SS 220,988,529.59 110,167,824.81
Linear Regression Statistics R 0.817 R Square 0.667 Stand. Error 2911.091 Total Number Of Cases 15 MS F p-level 220988529.59 26.08 0.00 8474448.06
LCL
UCL
t Stat
plevel
H0 (2%) rejected?
2149.62
849.57
-102.01 4401.26
2.53
0.03
No
3.97
0.78
1.91
6.03
5.11
0.00
Yes
2.65
ISMA5 – Sao Paulo, Sept. 14, 2010 – © 2010 L.Buglione, C.Gencel
www.eng.it
Empirical Study
Statistical Analysis & Results – BFC+
..and applying more BFCs
Linear Regression Statistics
R
0.932
R Square
0.868
Stand. Error
2205.569
Total Number Of Cases
15
ANOVA Regression Residual
d.f. 5. 9.
SS 287375530.43 43780823.97
MS 57475106.09 4864536.00
F 11.82
p-level 0.00
Total
14.
331156354.40
17
ISMA5 – Sao Paulo, Sept. 14, 2010 – © 2010 L.Buglione, C.Gencel
www.eng.it
Empirical Study
Statistical Analysis & Results – BFC+
..and applying more BFCs (…next)
Coeff.
Std Error
LCL
UCL
t Stat
p-level
H0 (2%) rejected?
Intercept
2076.14
878.79
-403.31
4555.59
2.36
0.04
No
EI
-14.74
39.13
-125.16
95.67
-0.38
0.72
No
EO
4.67
36.98
-99.67
109.01
0.13
0.90
No
EQ
26.25
9.81
-1.44
53.93
2.67
0.03
Yes
ILF
-24.26
12.58
-59.76
11.23
-1.93
0.09
No
EIF
34.85
14.23
-5.29
74.99
2.45
0.04
Yes
T (2%)
2.90
18
ISMA5 – Sao Paulo, Sept. 14, 2010 – © 2010 L.Buglione, C.Gencel
www.eng.it
Empirical Study
Statistical Analysis & Results
Summary Data Subset
# prj
R2 w/Total FP
Is Total FP significant?
R2 w/FP for each BFC Type
Diff% (R2)
Which BFC Types are significant?
#1
37
0.290
Yes
0.369
+21%
No
#2
14
0.057
No
0.838
+93%
Yes (ILF)
#3
15
0.667
Yes
0.868
+23%
Yes (EQ, EIF)
#4
16
0.720
Yes
0.893
+19%
Yes (EO)
% distribution of BFC types by value
19
Data set
# points
EI
EO
EQ
ILF
EIF
Subset1
37
16.9%
24.6%
19.3%
21.7%
17.6%
Subset2
14
19.8%
39.0%
6.3%
14.4%
20.6%
Subset3
15
17.0%
21.6%
22.8%
23.4%
15.3%
Subset4
16
18.7%
31.0%
11.4%
27.7%
11.2%
ISMA5 – Sao Paulo, Sept. 14, 2010 – © 2010 L.Buglione, C.Gencel
www.eng.it
BFC Types
Conclusions & Perspectives
•
FSM Methods Born with the goal to provide more objectivity in sizing FUR for a software system The IFPUG method has the heritage of the Albrecht’s FPA and evolves it from 1986 Current version is v4.3.1 (Jan 2010) and is also an ISO standard (20926:2009) Several methods have arisen and share common principles and background (ISO 14143-x) • BFC Types Each FSM method has a series of basic countable elements contributing to the final fsu value, generically called by ISO “BFC” IFPUG FPA has 5 BFC: EI, EO, EQ, ILF, EIF Regression analysis with ANOVA Sizing & Estimation issues R2 values increased in 3 out of 4 cases (from +19% till +93%) Programming language (no set in subset #1) can impact in absolute terms on predictability Some lessons learned Positive Effects: using that approach yet at lower maturity levels (e.g. ML2) can improve significantly estimates, helping in saving resources to be reinvested in other project activities, anticipating also the achievement of ML3 concepts (e.g. PAL) Precondition: Precondition gather historical FSM data at that level of granularity …let’s remember when estimating anyway that any fsu is a product size for software FURs (and not a project size) deal with NFR and their impact on the overall project effort within the defined project scope 20
ISMA5 – Sao Paulo, Sept. 14, 2010 – © 2010 L.Buglione, C.Gencel
www.eng.it
BFC Types
Q&A
Obrigado pela sua atenção! Thanks for your attention! 21
ISMA5 – Sao Paulo, Sept. 14, 2010 – © 2010 L.Buglione, C.Gencel
www.eng.it
Thanks for your Attention !
We care of your problems and we have in mind a solution Luigi Buglione
Industry, Services & Infrastructures
22
Via R.Morandi 32 00148 Roma
Tel. +39-06.8307.4472 Fax +39-06.8307.4200 Cell. +39 -335.1214813
www.eng.it
[email protected]
ISMA5 – Sao Paulo, Sept. 14, 2010 – © 2010 L.Buglione, C.Gencel