Washington University in St. Louis Effort Certification Report 07/01/2014 to 12/31/2014 Frequency: Semi-Annual Due Date: 2/10/2015 Certifier Name: Title: Department/Division: Email: Status:
Yi Fang - 067850 Sr Research Technician 003178 - 003178 - PEDIATRICS-NEPHROLOGY/INULIN LAB
[email protected] Not Certified, Not Processed
Accounts
Payroll % or $
Effort Coordinator: Certification Period:
Project Breakdown
Mrs Angela Michelle Mayer - 306302 07/01/2014 to 12/31/2014
% Of Effort
Effort by Category
Account Number
DEPARTMENT RESEARCH Dr Keith A Hruska - DR. HRUSKA BRIDGE
DEPARTMENT RESEARCH Total:
10.84
11
10.84
12 003178 12 14 93177H
11.00
ORGANIZED RESEARCH Dr Dennis J. Dietzen - **MD-II-2013-301** - INTEGRATION OF THE KETOGENIC-KETOLYTIC A
5.00
5
22 003169 12 20 81144
Dr Keith A Hruska - **011410-0001** - EFFECTS OF RAP-011 ON CKD STIMULATED VAS
17.00
17
22 003178 12 20 49594
Dr Keith A Hruska - **5R01DK08913703** - CARDIOVASCULAR RISK MECHANISMS IN CKD
47.66
48
22 003178 12 20 52611
Dr Keith A Hruska - **2R01DK07079009A1** - RENAL OSTEODYSTROPHY AND VASCULAR CALCIF
19.50
20
22 003178 12 20 89156
ORGANIZED RESEARCH Total:
89.16
Grand Total:
100.00
90.00
101
101.00
This page displays the actual (i.e., Payroll %) and rounded (i.e., % of Effort) salary percentages for each activity/fund/project that you worked on during the current period. Please review these figures to determine if they represent a reasonable approximation of the actual effort you provided. If a change to a percentage figure in the % of Effort column is necessary, please adjust the figure in the box provided. When the effort percentage for each activity/fund/project has been finalized, press the "Certify" button at the bottom of the screen. Note: All salary percentages must be entered as an integer value, e.g., 10. To account for rounding, the ePAR will accept a grand total figure 99%, 100% or 101% for the certification period. Effort category definitions can be found at:
Effort Categories
I certify that the percentages noted on this page for the period shown indicate a reasonable approximation of the effort actually spent on the projects/activities listed.
PRINT NAME: __________________________________________SIGNATURE: __________________________________________DATE: ___________________