We propose to carry out a broad-based programme of R&D on level-1 trigger systems. Abstract ..... might be characterized by its ET and T] - ¢ position, plus a few binary words indicating are made to specify the ..... Bl Issz I EszI1zs4. EM IMI mlm .
will accept data in the 15 ns between bunch crossings, introducing no ... Although the possibility of a level-1 inner tracking trigger is not excluded, it is less.
Jan 3, 2000 - experiment TTC distribution networks having several trigger ...... To subscribe from another account: subscribe lhc-exp-ttc [your email address].
Honeywell, Aldermaston. Ashton M. Humphries J. Birmingham Univ. Villalobos Baillie O. CERN. Christiansen J. Cittolin S. Farthouat P. Gällnö P. Jacobsson R.
Aug 11, 2008 - This is also an opportunity to introduce a cooling system, as the total heat load in the. TAS body will be about 400 W. The TAN is located 140 m ...
That the dissertation The CMS Trigger Supervisor: Control and Hardware Monitoring ...... At the LHC center-of-mass energy of 14 TeV, Ïinel is expected to be ...... to buffer all calls from clients, coordinate the operation of all sub-system control
Jan 23, 2014 - In this report the target field quality for the inner triplets is given. ... the various sources of uncertainties in the magnetic field errors, sixty ...
Jun 4, 2004 - also been accumulated in the SPS on the electron cloud instability, which will limit the luminosity in ...
betatron energy is lost and only a very small fraction remains for further processing. This ... pick-up in order to increase the betatron frequency content in the baseband. ..... In reality this is not the case, with the average .... Tab. 2-1. Some g
Jun 20, 2005 - the storage and analysis of data from the four LHC experiments. ..... exported to external Tier-1 facilities; each Tier-1 site assumes principal ... disk.1 ESD distribution from CERN occurs at completion of the first-pass reconstructio
Jun 20, 2005 - 9 CCLRC, Rutherford Appleton Laboratory, Chilton, Didcot, United Kingdom ... 4.5 (Fabric Technology); Alberto Aimar, Ilka Antcheva, John ...
Mar 6, 2002 - Schematic layout of the LHC low-β triplet. Alongside the LHC main .... magnet (MBX) allowing more space for the injection sys- tems. In all cases, the .... quench at 240 T/m, additionally confirming the soundness of the design.
Jun 4, 2004 - The Large Hadron Collider Project was approved by CERN Council in ...... LHC, data from the HERA proton ri
The dream of the authors was .... (4-13) where k is the Boltzmann constant and Î is the temperature. Inserting (4-11), (4-12) and (4-13) into (4-10) gives. 2. 2. 2. 2.
CERN undertakes no obligation for the maintenance of this program, nor ..... The physics motivation is to improve the charged particle tracking close to the ..... enhancement of the radiation tolerance of hybrid pixel readout chips is also.
Mar 28, 2003 - a PVSS SCADA system via an OPC server. The PLC front-end is .... performed through a dedicated OPC6 server / gateway. The general layout ...
Rotating machinery for LHC Cryogenics: first analysis of reliability and origins of downtime. S. Claudet*, K. Brodzinski, E. Duret-Bourgoz, G. Ferlin, S. Knoops, ...
Nov 10, 2009 - DS90CR483-484 Serializer-Deserializer chip-set [13], that can transmit up to .... to the conclusion that time needed to cast header and footer in the ROD Muon ..... [Online] Available: https://edms.cern.ch/file/340643/1/mictp.pdf.
Nov 10, 2009 - DS90CR483-484 Serializer-Deserializer chip-set [13], that can transmit up to .... to the conclusion that time needed to cast header and footer in the ROD Muon ..... [Online] Available: https://edms.cern.ch/file/340643/1/mictp.pdf.
Oct 10, 2005 - The cold test part is one of the key elements amongst many other .... Lastly, the vacuum sleeve is pulled out and tightly ... pumped down (by means of a vane pump) to ~1 Pa and rinsed 3 times with dry nitrogen to extract as ...
Collision rate monitors are essential in bringing particle beams into collision and optimizing the ..... Measuring the collision rates at the four IPs will be.
Sep 25, 1995 - EUROPEAN LABORATORY FOR PARTICLE PHYSICS. CN/95/14 ... The problems encountered in porting both the CERN library and the specific. Atlas codes are .... 6Configuration with 16 MB of memory, 500 MB disk, and no monitor. .... CERN Unit me
In a different domain, superconductivity and cryogenics have rendered possible ... The recent development of cryogenics for accelerators follows closely from the.
Oct 19, 1998 - Although 20 years have elapsed since fused biconic taper (FBT) ... the third largest connector manufacturer world-wide, with 32 facilities.
First-level trigger systems for LHC experiments - CERN Document
systems for LHC experiments will have to be much faster and more powerful ... The time between bunch crossings at the LHC will be only 15 ns, compared .... coordinated with activities for level-2 triggers so that the combined rejection power of .... is possible, it would require a large number of crates of electronics with many.
Three possible altemative architectures are being studied: An improved single processor with synchronous bit-parallel data transmission and processing. This would have to use more advanced interconnection technology to overcome the problems described above and in Appendix 1. A single processor with asynchronous transmission of compressed zero suppressed data, followed by synchronous bit-parallel data processing. More details of this option are given in Appendix 2.
A farm of processors with bit-serial data transmission and processing, allowing a more compact design. A more detailed description of this option is included in Appendix 3.
The system aspects of all three possibilities are being actively pursued, each having
some advantages. We will use detailed system design studies to select an architecture within the first year of the project. In addition to overcoming the interconnection problem and making a more compact processor design, several significant improvements are required. We consider the addition of logic to uniquely identify the bunch·crossing responsible for the trigger to
be essential. This might be achieved by digital (or analogue) signal processing at the level of individual trigger channels. We also plan to improve the effectiveness of the isolation requirement by including hadron calorimeter information in the cluster-fmding algorithm.
- 13 OCR Output
We intend to construct a second small prototype processor. This will be used to assess the feasibility of key parts of the system. We plan to make beam tests of this second prototype trigger processor together with prototype calorimeters for LHC. This will
require the design, development and construction of additional electronics. Analogue summation will be used to combine the highly granular calorimeter cells into “trigger cells" corresponding to a granularity of An>