Sep 27, 2006 - Network resource management techniques ... management system-based (management system interface has not b
We4.1.1
G-lambda: Coordination of a Grid Scheduler and Lambda Path Service over GMPLS Michiaki Hayashi1, Tomohiro Kudoh2 and Yasunori Sameshima3
1
KDDI R&D Laboratories Inc. 2 National Institute of Advance Industrial Science and Technology (AIST) 3 NTT Network Innovation Laboratories Sep. 27, 2006
Agenda
Background Network service invocation G-lambda project Architecture overview GNS-WSI: Network service interface Nation-wide Grid networking demonstration
Sep. 27, 06
ECOC 2006, Cannes
2
Background Growth of the endTime="2006-09-07T06:15:00Z“ bandwidth="1000000" latency="10"/>
Sep. 27, 06
ECOC 2006, Cannes
17
GNS-WSI: Information services Discovery of available resources SOAP method : netAvailableResourceQuery NRM
GRS
Give me a list of following network resource available. -1 Gb/s -17:15:00 to 21:00:00
netAvailableResourceQuery [(Site IDs), (Bandwidth), (Availability), Reservation Time]
GRS
NRM
Available resources are listed as follows; -1Gb/s (Site A-B) -10Gb/s (Site A-E) -1Gb/s (Site C-D)
Response [Response code, ([Site IDs, Bandwidth, (Availability)])]
Site C
Site A 10 Gb/s
Site E
1 Gb/s
Network 1 Gb/s Site B Site D
Sep. 27, 06
ECOC 2006, Cannes
Italic : Method name [ ] : Parameters [ ] : Parameter array ( ) : Optional 18
GNS-WSI: Advance reservation service Reservation of network resources in advance of the job execution SOAP method : netResourceReservation GRS Give me following resources. 1. LSP ID : 1 -Site A-B -100 Mb/s -Latency < 5 msec -17:15:00 to 18:00:00 2. LSP ID : 2 -Site A-E -1 Gb/s -Latency < 5 msec -17:30:00 to 18:00:00 Let me know the reservation status. -Reception ID : 1765
netResourceReservation [LSP ID, Site IDs, BW, Avail., Reservation Time, Latency] Response [Response code, (Reception ID)] Request has been processed. -Reception ID : 1765
GRS
NRM
Site A Latency=3 msec
Sep. 27, 06
Site B
Reservation status is as follows -ID 1 : Queued -ID 2 : Queuing error
netResourceReservationStatusQuery [Reception ID] Response [Response code, ([LSP ID, Status code])]
Latency=13 msec
10 Gb/s 1 Gb/s
NRM
Site E
Network ECOC 2006, Cannes
Italic : Method name [ ] : Parameters [ ] : Parameter array ( ) : Optional 19
GNS-WSI: Reservation modification service Modification of queued reservation or on-going reservation SOAP method : netResourceModification GRS
Please modify a reservation as follows; -Reception ID : 1765 -LSP ID : 1 -End time : 18:00:00 -> 18:20:00
NRM
netResourceModification [Reception ID, [LSP ID, (BW,) (Reservation Time)]]
GRS
Let me know the reservation status. -Reception ID : 1765
NRM
Site A
Request has been processed. These are the result. -Reception ID : 1765 -ID 1 : Reserve Modified
Response [Response code] netResourceReservationStatusQuery [Reception ID] Response [Response code, ([LSP ID, Status code])]
1 Gb/s Network Site B Scheduling table 16:00
17:00
Extended time 18:00
19:00
Site A-B
Sep. 27, 06
Time
ECOC 2006, Cannes
Italic : Method name [ ] : Parameters [ ] : Parameter array ( ) : Optional 20
Demonstration network Nation-wide GMPLS network (JGN II test bed)
Application GUI
Number of processor sites : 6 sites GMPLS network dimension : 1,260 km
OXC4, OXC5, Router5 and Router6 are located in the same site (Station’s space limitation)
Gigabit Ethernet-based TE-links
NTP synchronization : NRM, GRS and processors Site 1
GRS
Site 2
Site 3
NRM Japan Router 2 Router 1 OXC 1
Site 3 Site 2 Site 1
660 km 242 km Site 6
Router 6 Sep. 27, 06
64 km OXC 3
Site 4 Site 5
Site 6
OXC 2
Router 3
OXC 5
ECOC 2006, Cannes
290 km 4 km
Router 4 TE-link (1Gbit/s)
OXC 4
Site 4
Processors
Site 5
Router 5 21
Advance reservation parameters LSP ID #
End points
Bandwidth
Network restoration
Delay
Start time
End time
1
Site 1-4
500 Mbit/s
Unprotected
10 msec
02:40:00
02:50:10
100
Site 3-6
700 Mbit/s
Unprotected
10 msec
02:45:00
02:55:00
50
Site 2-5
1 Gbit/s
Unprotected
10 msec
02:40:00
03:00:00
256
Site 1-5
800 Mbit/s
Unprotected
15 msec
02:47:00
02:57:00
LSP route management of NRM Site 2
Site 1
Site 3
#1 R1
#100
R2
R3
Overlap Site 4
#50 OXC 1
OXC 2
OXC 3
R4
OXC 5OXC 4
R5
#256 02:40
02:45
02:50
02:55
03:00
Site 6
R6
Site 5
Time Sep. 27, 06
ECOC 2006, Cannes
22
Grid portal: Requirement editor input
Sep. 27, 06
ECOC 2006, Cannes
23
Sep. 27, 06
ECOC 2006, Cannes
24
Conclusion GRS and NRM allows co-allocation of both computing and network resources Network service for Grid application is demonstrated by using preliminary interface definition of “GNS-WSI” Nation-wide Grid computing is successfully demonstrated Next steps Inter-domain advance reservation and co-allocation Collaboration with Enlightened project: “Inter-domain advance reservation of coordinated network and computing resources over the Pacific”
Enhancement of GNS-WSI Promote standardization of interface to reserve bandwidth in advance
Sep. 27, 06
ECOC 2006, Cannes
25
Thank you.
G-lambda project http://www.g-lambda.net