Dec 1, 2013 - Shower Cabin (596). Culvert (3). Identified Problems. Broken Pipe (15). Missing Pipe (1). Standing Water (
KRG - Duhok Governorate - Domiz Camp
For humanitarian relief purposes only Production date: 18/12/2013 Draft / work in progress
Greywater Infrastructure and Network - 01/12/2013
TURKEY
IRAN
Duhok
SYRIA
Erbil
The canal opens into a large pond of standing water. IRAQ
Transits 1 & 2 have no structured drainage network and tent greywater drains into small hand-dug pits.
Legend
Greywater Network
Open Drain Covered Channel Pipe, 2.5in
Pipe, other
Greywater Points
Shower Cabin (596) Culvert (3)
Identified Problems Broken Pipe (15) Missing Pipe (1)
Standing Water (297)
Most of showers in Phase 1 drain into the same tanks as toilets, causing them to fill up very quickly.
Phases 1 through 5 have concrete structures with kitchen, showers and toilets inside. It is assumed that each shelter has its own set of facilities and individual showers and kitchens are not marked on this map.
Transits 3, 4& 7 have standalone shower cabins that are often misused or damaged. They all drain with pipes connected to roadside greywater canals.
Thematic data: 04-10/2013, REACH, Camp Agencies Background imagery: 13/08/2013, DigitalGlobe Administrative boundaries: GADM Projection: WGS 1984 UTM Zone 38N Contact :
[email protected] File: IRQ_DOMIZ_WASH-Greywater_A1_2DEC2013 Note: Data, designations and boundaries contained on this map are not warranted to be error-free and do not imply acceptance by the REACH partners, associates or donors mentioned on this map.
The canal opens into a large pond of standing water.
0