Modular GTL : Converting a liability into economic ... - CompactGTL

10 downloads 720 Views 8MB Size Report
Converting a liability into economic ... GTL needs excellent site logistics ? ... 100 man-years commercial GTL plant design & operations experience in SA & Qatar.
www.compactgtl.com

Iain Baxter Director of Business Development

Slide 1 © 2012

Modular GTL : Converting a liability into economic value

While the information contained herein is believed to be accurate, no representation or warranty, express or implied is or will be given by the Company or its directors, employees or advisers or any other person as to the accuracy, completeness or fairness of this presentation and, so far as permitted by law and except in the case of fraud by the party concerned, no responsibility or liability whatsoever is accepted for the accuracy or sufficiency thereof or for any errors, omissions or misstatements, negligent or otherwise, relating thereto. Except where otherwise indicated, this presentation speaks as of the date hereof. The delivery of this presentation shall under no circumstances create any implication that there has been no change in the affairs of the Company since the date hereof. In furnishing this presentation, the Company does not undertake any obligation to update any of the information contained herein or to correct any inaccuracies which may become apparent.

www.compactgtl.com

Disclaimer

Slide 2 © 2012

This presentation shall remain the property of the Company.

GTL plants are huge ? GTL needs cheap gas ? GTL needs a large gas reserve ? GTL needs excellent site logistics ? GTL is complicated & unreliable ? GTL is expensive ?

Facts or Myths ?

Slide 3 © 2012

• • • • • •

www.compactgtl.com

Industry perceptions of GTL ?

An ISO 9001 company – established 2006 Wilton, UK Operations

Aracaju, Brazil Operations

> 100 man-years commercial GTL plant design & operations experience in SA & Qatar Strong functional organization for project delivery & continuous improvement Strategic Analysis

CEO Nicholas Gay

SHE & QA

Director of Business Development Iain Baxter

CTO Lary Kocher

COO Simon Clark

Finance and Admin Manager Jane Bardell

Business Development

Technology & Process Engineering

Project & Contract Management

Finance

Proposals

Reactor & Catalyst Management

Brazil Office

IT

Plant Operations

HR & Administration

Contracts

IP / Commercial

www.compactgtl.com

Rio De Janeiro Office

Slide 4 © 2012

Abingdon, UK Head Office

Compact GTL Oilfield access 2 years operations • > 4 years operations

• > 90% availability

• Full GTL process from NG to syncrude

• Project fully funded by Petrobras

• Reactors from candidate suppliers

• Associated gas feed from offshore

• Catalysts from candidate suppliers

• Fully integrated GTL process

• Operator training centre & R&D facility

• Commercial scale reactors - Sumitomo • Catalysts - Johnson Matthey

www.compactgtl.com

Commercial demonstration plant Aracaju, Brazil - 2010

Slide 14 © 2012

Pilot plant Wilton, UK - 2008

Technology demonstration & qualification 13 years in development since year 2000 IP 100% owned by CompactGTL 222 granted patents worldwide

Independent verification by Oil companies

Slide 15 © 2012

Independent verification by Bayer, SBM Offshore, Nexant, Fluor, TWI

www.compactgtl.com

275 pending patents worldwide

CompactGTL plant features •

Wide range of feed gas compositions



Configurable for railcar transportation



High availability – multiple modules



High turn-down & flexibility



Exchangeable 100 bopd CGTL reactor modules

• Configurable for utility self-sufficiency

www.compactgtl.com

Flexible deployment

Slide 16 © 2012

• Fully modularised yard construction options

Slide 17 © 2012

Brazil plant movie www.compactgtl.com

Slide 18 © 2012

Commercial CompactGTL FT Reactors: Constructed by Sumitomo Comprise proven reactor cores modularised into 40’ containerised packages by Kawasaki Heavy Industries

www.compactgtl.com

Technology scale up completed

Mini-channel CompactGTL reactor cores

www.compactgtl.com

Brazed plate-fin reactor construction minimises metal content and weight

Automated catalyst insertion and removal

Slide 19 © 2012

Corrugated metallic catalyst inserts maximise active surface area per channel

SMR reactor core construction

0 0

0

0

0

0

0

0

0

0

0

0

0

Slide 20 © 2012

61,000 hours SMR reactor & SMR catalyst in operation

www.compactgtl.com

Modular SMR Reactor

FT reactor core construction

0

52,000 hours FT reactor & FT catalyst in operation

0

0

0 0 0

0 0

0

0 0

0 0 0 0 0 0

0

0

Slide 21 © 2012

0

0

www.compactgtl.com

Modular FT Reactor

CompactGTL - process overview

FT synthesis

FT cooling System steam

pre-wash

gas feed

mercury removal heating sulphur removal

High CO2 Possible !

prereformer

SMR 1 reactor modules

SMR 2 reactor modules

No Oxygen Required !

steam generation (WHB)

syngas compressor

FT 1 reactor modules

FT 2 reactor modules

water treatment product flash HC rich tail-gas

GT drivers

H2 rich tailgas

syncrude

www.compactgtl.com

Syngas production

Slide 22 © 2012

gas treatment

20’ SMR modules

FT 40’ FT modules

Slide 23 © 2012

SMR

www.compactgtl.com

Typical 1,000bpd CompactGTL plant

Slide 24 © 2012

Supply chain partners & projects www.compactgtl.com

Catalyst

Modularisation

Suppliers

Reactor Suppliers

Consultants

Engineering & Project Delivery Partner

FPSO Project Delivery & Expertise

• Each partnership represents a well established, long term relationship • Certain exclusivity rights have enabled pre-investment & joint development funding by the supply chain, ensuring early capacity to deliver • Reactor manufacturing by Sumitomo in Japan, and catalyst manufacture by Johnson Matthey in Europe, utilise established mass production techniques • CGTL & Sumitomo jointly developed automated catalyst insertion & removal systems for the reactors

Slide 25 © 2012

Reactor

www.compactgtl.com

World-class partners

Slide 26 © 2012

Exclusive in field

Pre-invested 4 Pre-investment years work for Equity investor in manufacturing conceptual FPSO capacity design

www.compactgtl.com

Supply chain commitment

Project examples – global footprint Feed gas rate

Project driver

IOC

MENA

50 MMscf/d

NOC

Americas

25 MMscf/d

NOC

Russia-CIS

10 MMscf/d

NOC

MENA

20 MMscf/d

NOC

Russia-CIS

100 MMscf/d

Liberate crude production Extended Well Test Vessel Remote location Liberate crude production Remote location

IOC

Asia-Pacific

30 MMscf/d

Eliminate flaring

Project Status Completed Ongoing Ongoing Ongoing Completed Completed

www.compactgtl.com

Region

Slide 27 © 2012

Client

Slide 28 © 2012

The market www.compactgtl.com

Onshore

800 oilfields with reserves of 73 bn barrels of oil Analysis carried out by Wood Mackenzie and Fugro Robertson

Slide 29 © 2012

Offshore

www.compactgtl.com

≈ 800 Oilfields with problematic Associated Gas @