28 Mar 2012 ... PAMSIMAS. HC. PT ... 120/2008. 80 PDAMs not yet propose .... PDAMs submit
their proposal to Satker (physical and nonphysical support). 2.
INDONESIA’S BREAKTHROUGH IN ACHIEVING MDGs FOR WATER SUPPLY
A Presentation for ASIA WATER 2012 Kuala Lumpur, March 28, 2012 By Executive Director of PERPAMSI – Agus Sunara (PERSATUAN PERUSAHAAN AR MINUM SELURUH INDONESIA)
Summary program from :
1
OUTLINE • Existing condition of Water Services and MDGs Achievement Program • PDAMs Bussiness Development Program • Water Grant Program • NRW Reduction • Synchronized water development program with PDAMs 2
Existing condition of Water Services and MDGs Achievement Program
3
EXISTING CONDITION and TARGET OF SERVICES EXISTING CONDITION OF SERVICES Proportion of people with access to the safe drinking water
National
: 47,71 %
National : 68,87 % Proportion of people with access to the safe drinking water
Urban : 49,82 %
Rural : 45,72 %
National Total service coverage of piped water
WATER SERVICES TARGET 2015
: 25,56 %
Urban : 43,96 % Rural : 11,54 %
Direction of RI’s Pres ident: To overcome water crisis in dry and arid area to avoid water crisis in 2025
Urban : 78,19 % Rural : 61,60 %
Remarks : 1) Target of drinking water services Y 2015 refer to MDGs 2) Target of Dwater services (safe access) Y 2020: 85 % and Y 2025 : 100 %
National : 41,03 % Total service coverage of piped water
Urban : 68,32 % Rural : 19,76 %
MDGs Target of Water Services per Province Year 2015 2009
NO.
PROVINCE
(1) REGION I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Aceh Sumatera Utara Sumatera Barat Riau Jambi Sumatera Selatan Bengkulu Lampung Kep. Bangka Belitung Kep. Riau DKI Jakarta Jawa Barat Jawa Tengah DI Yogyakarta Jawa Timur Banten
Population Source: BPS August 2009
(people) (3) 4.374.901 13.282.201 4.838.658 5.325.773 2.841.734 7.239.190 1.671.012 7.508.573 1.140.678 1.525.830 9.234.978 41.597.759 32.902.860 3.507.306 37.316.833 9.812.829
2015
Acces to safe drinking water (total), Source: Susenas 2009
(%) (2)
30,60% 51,04% 46,62% 40,96% 51,19% 48,53% 33,02% 40,29% 36,84% 37,74% 34,81% 40,51% 58,30% 60,38% 55,70% 27,47%
Acces to safe drinking water (total) MDGs 2015
(%) (6)
50% 71% 70% 70% 71% 70% 50% 70% 52% 50% 50% 70% 75% 80% 73% 45%
5
MDGs Target of Water Services per Province Year 2015 (continued) 2009
NO.
PROVINCE
Population Source: BPS August 2009
(people) (1) REGION II 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Bali Nusa Tenggara Barat Nusa Tenggara Timur Kalimantan Barat Kalimantan Tengah Kalimantan Selatan Kalimantan Timur Sulawesi Utara Sulawesi Tengah Sulawesi Selatan Sulawesi Tenggara Gorontalo Sulawesi Barat Maluku Maluku Utara Papua Barat Papua
INDONESIA
(3) 3.556.628 4.445.475 4.633.754 4.330.635 2.090.462 3.504.254 3.176.417 2.232.257 2.487.149 7.925.474 2.125.432 985.873 1.050.292 1.342.613 977.555 746.147 2.104.262
231.835.791
2015
Acces to safe drinking water (total), Source: Susenas 2009
(%) (2)
59,99% 44,96% 45,45% 54,02% 36,89% 51,97% 55,71% 44,49% 44,36% 50,13% 59,12% 44,85% 42,92% 55,50% 43,75% 48,08% 35,44%
47,71%
Acces to safe drinking water (total) MDGs 2015
(%) (6)
75% 70% 70% 72% 52% 70% 73% 70% 70% 70% 74% 70% 70% 71% 70% 70% 50%
68,87%
6
FUNDING NEEDS TO ACHIEVE MDGs
Source
Peoples
Budget (Rp Trillion)
1) APBN (national budget) + DAK (Special Alocation Fund) for Urban + Rural
16.942.200
37,62 T
2) APBD (regional budget)/PDAMs/PPP/Bank loan + DAK
25.397.390
27,64 T
Total Budget
65,26 T
To achieve MDGs target, 8.5 million new connection has to be installed
7
POLICY SCHEME FOR WATER DEVELOPMENT FUNDING Raw Water Rural
Water-prone villages
Distribusion APBD PDAM PPP APBN (MBR)
APBN
APBN
APBN (up to public hydrant)
APBN
APBN
APBN
APBN APBD CBD
HC PT
APBN (up to public hydrant)
APBN APBD CBD
PAMSIMAS
Village with easy raw water (Pamsimas)
Transmission
APBD PDAM PPP (APBN)
APBN
IKK (Kecamatan capital)
Production /WTP
: 70 % : 10 % : 20 %
Note : All existing systems operated by LG/PDAM/CBD (community base dev) APBN : Budget from Central Gov APBD : Budget from Local Gov MBR : Low income communities
8
WATER SERVICES COVERAGE DEVELOPMENT PROGRAM MDGs Urban Water Services
Low Income Communities Services
Service Expansion
Water Grant
PDAMs’ business development program
Loan NRW Reduction
PPP
Well performed PDAM NRW Grant Debt Restructuring
Under performed PDAM
Proj Aid
Management Assistance
Technical assistance for PDAM improvement 9
PDAMs Business Development Program
10
PDAMs PROGRAM Business PENCAPAIAN Development MDG’s Program Well performed PDAM
BUSINESS DEV
PPP (B TO B) MoPW Reg No. 12/2010 Subsidized Loan - Pres. Reg No. 29/2009 - MoF Reg No. 229/2009
199 Under performed PDAM
175 PDAMs with bad loan have to be restructured in line with MoF Reg !(( 120/2008 80 PDAMs not yet propose
ACHIEVING MDGs
11
PUBLIC PRIVATE PARTNERSHIP Definition
An Agreement of Cooperation (MCC) or contract, between government agencies with a business entity/ private parties, in which: • private parties carrying out some functions of government for a period of time • private parties to receive compensation for the implementation of these functions, either directly or indirectly • private parties are responsible for most of the risks arising from the implementation of these functions, • government facilities, land or other assets can be transferred or used by private parties during the contract period.
12
PPP MODALITY
5. CONCESSION Nature: to improve services consistently l Limited investment l Management and development l Profit for all parties l High efficiency l Moderate risks
4. BOT / BOOT Nature : Out Sourcing l Limited investment l Infrastructure development l High quality l Profit for all parties l High efficiency l Relatively high risks l Suitable for stable economy 3. LEASE CONTRACT Nature: to improve operational efficiency
1. SERVICE CONTRACT Nature: Out Sourcing l Limited investment l Limited to O & M l Limited risks
l Limited investment l Limited to tools cost l Moderate profit l Moderate efficiency 2. MANAJEMEN CONTRACT l Limited risks Nature : to improve management efficiency l Limited investment l Limited risks
13
LOAN (Domestic Bank) Investment Program be guaranteed and subsidized by Central Govt. in accordance to President Regulation No. 29/2009 & MoF Regulation No. 229/2009. Criteria :
1. Well performed PDAM (HEALTHY) (BPPSPAM evaluation) 2. Approved of Debt Restruct (if any) 3. Full cost recovery Water Tariff GUARANTEED & SUBSIDIZED by Central + Local Govt
GUARANTEED
SUBSIDIZED
1) 70% of Principle guaranteed by Govt (40 % CG, 30 % LG if any default); 2) 30% Creditor Risk’s
1.BI Rate + max 5%; 2.(Commercial Interest Rate – BI Rate) ≤ 5 % Case : If CIR 14 % and BI Rate 6 % 9 % for PDAM If CIR 11 % and BI Rate 6 % 6 % for PDAM If CIR 10 % and BI Rate 6 % ? 6 % (= BIR)
14
PDAMS LOAN PROGRESS to THE BANK A. 5 State Bank committed for Rp 4,22 T : 1) BRI Rp 1,8 T 2) BNI: Rp 1,8 T 3) Bank Jabar Banten: Rp 0,1 T 4) Bank Kalsel Rp 0,12 T 5) Bank Mandiri: Rp 0,4 T B. 6 PDAM propose the Loan. And 3 PDAM signed Loan Agreement , 3 PDAM on going (appraisal) process. Signed Loan Agreement : 1. PDAM Kab. Ciamis Rp. 14,7 M 2. PDAM Kab. Lombok Timur Rp. 11,18 M 3. PDAM Kab. BogorRp. 24,312 M On Going (Project Appraisal Document) : 1. PDAM Kota Banjarmasin Rp. 110 M 2. PDAM Kota Malang Rp. 44,974 M 3. PDAM Kab. Tasikmalaya Rp. 51,18 M 15
RECOVERY PROCESS OF NON-PERFOMED PDAM (Unhealthy & Less Healthy) 199 NON-PERFORMED PDAM
BPPSPAM • Diagnose
DIT. PAM • Treatment
DIT. PAM & BPPSPAM • Performance evaluation
UNHEALTY 70
LESS HEALTHY 129
16
Why PDAM Non performed 1. Inefficiency of O & M 2. Inefficiency of Bill Collection 3. Average Tariff < Cost 4. Bad loan 5. Incompetent human resources.
17
Diagnosis of PDAM Technical Assistance (Bantek) 1. Project Aid (Banpro) to optimize the system 2. Management Assistance (Capacity Building) : • Tech Trainning (NRW reduction, operational efficiency) • Finance + Manag Trainning (Billing System, Financial Report, Water Tariff, etc)
18
Project Aid (BanPro) in principle (BanPro) to optimize drinking water system, not for expansion, e.g :
Rehabilitation of WTP Back up power (Genset) Install Main Water Meter Rehab Raw Water Trans and Distrib
19
Water Hibah (Grant) Program
20
1. Aim : To provide access to safe drinking water for low income communities (MBR).
2. Criteria a.
Local govt. Without debt arrears or in the process of debt restructuring
b.
Having idle capacity
21
3. HOW MUCH MONEY for WATER HIBAH
HIBAH (GRANT)
Up to 1.000 HC
Rp 2 million / HC
> 1.000 HC
Rp 3 million / HC
Number of Grants given to local government for a maximum annual savings that have been issued for this activity
22
4. Terms and Condition for Water Hibah
Having waiting List Approval Document of APBD as bridging finance
Readiness of DED (Distribution)
Comply to be verified and audited Provide budget for overhead of Project Implementaion Unit (PIU)
23
NRW Reduction
24
TWINNING PROGRAM
PILOT PROJECT (DMA)
SUBJECT: NRW REDUCTION
8 PDAM TWINNING INT’L + 2 LOCAL TWINNING
IMPLEMENTATION
PIP2B BEING MENTOR (CENTER OF EXCELLENT)
NRW HIBAH TARGET: 10 PDAMs
10
30 90 25
Synchronized water development program with PDAMs
26
A. PROGRAM CONSOLIDATION DIT. PAM
PERPAMSI
1. Regular meeting with PDAM 1. Consolidation of PDAMs and Perpamsi Regional Board proposed activity min. twice a year 2. Project aid for water system
2. Agreement on the sort of assistances B. PDAM RECOVERY
DIT. PAM
PERPAMSI
1. Management support through assistances and training
1. Provide mentor from well performed PDAM to share best practices to nonperformed PDAM
2. Program Assistances
2. Monitor benefit values of Management and Assistances Program in improving PDAMs performances. 27
C. TWINNING PROGRAM DIT. PAM PERPAMSI 1. Concept establisment 1. Program promotion 2. Program controling management
2. Replication through domestic program
3. Generate source of funding
3. Proposing PDAM to be mentor and recipient in internasional twinning program and center of excellent
28
Synchronized Provincial Satker PK-PAM with PDAMs/Perpamsi Regional
1. PDAMs submit their proposal to Satker (physical and nonphysical support) 2. PDAMs preparing their Business Plan containing their needs. The Business Plan will be examined by Satker to determine any support to be provided 3. Perpamsi Regionals invite Provincial Satker in every proper technical or non-technical meeting.
29
30